This document is an Addendum (No. Five) for an Invitation to Bid (RFB-235-25) issued by the Commonwealth of Kentucky's Department for Facilities and Support Services, Division of Engineering and Contract Administration, for the Upper Guide Wall Repairs Project at Kentucky River Locks 2 & 3 in Henry County. The project involves repairing guide walls, with specific work including below and above water excavation, material disposal, metal sheet piling installation, percussion drilling, grout injection, anchor installations, concrete work, and various aggregate placements. The addendum specifically corrects a previously issued Description of Work for Item No. 3 in the List of Unit Prices, requiring bidders to use the revised unit price list when submitting bids.

The bid document includes a comprehensive List of Unit Prices covering 18 distinct work items, with each item specifying the materials, labor, and equipment required. Prices are to be quoted per unit of measure such as cubic yard, linear foot, ton, square yard, or each, with bidders required to fill in all price blanks. The unit prices will be used to determine contract price adjustments for changes or extra work, and failure to complete all pricing could result in bid rejection. The project appears to be focused on infrastructure repair and restoration of river lock facilities, with detailed specifications for various construction and materials management tasks.

View the file

Other files

File Type Posted
Addendum Nine.pdf PDF
Final_RFB_785_2500000645_8_SO_FORM.PDF PDF
Final_RFB_785_2500000645_7_SO_FORM.PDF PDF
Addendum No 7.pdf PDF
Addendum No. 2.pdf PDF
Addendum No. 4.pdf PDF
Addendum No. 1.pdf PDF
Addendum No 6.pdf PDF
Final_RFB_785_2500000645_1_SO_FORM.PDF PDF
Final_RFB_785_2500000645_10_SO_FORM.PDF PDF
Final_RFB_785_2500000645_5_SO_FORM.PDF PDF
Final_RFB_785_2500000645_6_SO_FORM.PDF PDF
Final_RFB_785_2500000645_3_SO_FORM.PDF PDF
Addendum No 10.pdf PDF
Addendum Eight.pdf PDF
Final_RFB_785_2500000645_9_SO_FORM.PDF PDF
Final_RFB_785_2500000645_4_SO_FORM.PDF PDF
Addendum No. 3.pdf PDF
Final_RFB_785_2500000645_2_SO_FORM.PDF PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-235-25

FOR: Upper Guide Wall Repairs Project Kentucky River Locks 2 & 3 Kentucky River Authority Henry County, Kentucky

DATE: June 6, 2025

RFB-785-2500000645

ADDENDUM NO. Five (5)

BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING

UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.

Item 1: Refer to Official Bid Document, List of Unit Prices, page 12; the Description of Work listed for

Item No. 3 was incorrect. Use the attached REVSIED List of Unit Prices when bidding in lieu of previously issued.

END OF ADDENDUM

Invitation to Bid No. RFB-235-25 For: Upper Guide Wall Repairs Project Kentucky River Locks 2 & 3 Kentucky River Authority Henry County, Kentucky

Kristi Sharp, Statewide Procurement Manager Division of Engineering and Contract Administration

REVISED RFB-235-25

OFFICIAL BID DOCUMENT

FOR

UPPER GUIDE WALL REPAIRS PROJECT

KENTUCKY RIVER LOCKS 2 & 3

KENTUCKY RIVER AUTHORITY

HENRY COUNTY, KENTUCKY

LIST OF UNIT PRICES: (ALL BLANKS MUST BE FILLED IN)

Unit prices shall include the furnishing of all labor, materials, suppliers, services and shall include all items of cost, overhead and profit for the Contractor and any Subcontractor involved, and shall be used uniformly without modification for either additions or deductions. The Unit Prices as established shall be used to determine the equitable adjustment of the Contract Price in connection with changes or extra work performed under the Contract. Failure to completely fill out all unit prices requested may result in bid rejection.

DESCRIPTION OF WORK

UNIT PRICE

UNIT OF

MEASURE

1.

Below Water Excavation (Includes all materials, labor, and equipment needed to excavate materials below water (elevation 440.4 ft. at Lock 2 and elevation

453.7 ft. at Lock 3).t $ Cubic Yard

2.

Above Water Excavation (Includes all materials, labor, and equipment needed to excavate materials above water (elevation 440.4 ft. at Lock 2 and elevation

453.7 ft. at Lock 3). $ Cubic Yard

3.

Dispose of excavated material in an accepted off-site disposal area or CONTRACTOR-permitted disposal area (Includes all materials, labor, and equipment needed to complete the work). $ Cubic Yard

4.

PZC-26 Metal Sheet Piling, including connections and accessories (Includes labor and equipment needed to install metal sheet piling, and all material, labor, and equipment needed to install walers, temporary bracing, templates, etc. ). $ Ton

5.

Percussion Drilling (Includes all materials, labor, and equipment needed to drill initial holes and/or re-drill after water-tightness grouting, as indicated in the drawings and specifications for the Tie-back Anchor installation into bedrock). $ Linear Foot

6.

High Mobility Grout Injection (Includes all materials, labor, and equipment needed to prepare a hole and place grout for water-tightness). $ Gallon

7.

Water Pressure Testing (Includes all materials, labor, and equipment needed to prepare a hole and pressure test per the Specifications for water-tightness). $ Each

REVISED RFB-235-25

CONTINUED LIST OF UNIT PRICES: (ALL BLANKS MUST BE FILLED IN)

DESCRIPTION OF WORK

UNIT PRICE

UNIT OF

MEASURE

8.

Two 270-KSI 7-wire strand Tie-back anchor Installation into bedrock (Includes all anchor materials, labor, and equipment needed to install a Tie-back Anchor per the Drawings and Specifications at Lock 2.

This includes hole setup, recess drilling, anchor bar system materials and installation (including anchor head assembly), grouting of bonded and unbonded lengths, cleanup, and any incidental items of the Work).. $ Linear Foot

9.

1 ¼” Dia. 150 KSI All Thread Bar Anchor (Includes all anchor materials, labor, and equipment needed to install a threaded anchor per the Drawings and Specifications at Lock 3. This includes the retaining wall and anchor wall connections) $ Linear Foot

10.

Unreinforced Concrete, Mix 1 (Includes all materials, labor, and equipment needed to prepare surfaces and place unreinforced Mix 1 concrete). $ Cubic Yard

11.

Reinforced Concrete, Mix 1 (Includes all materials, labor, and equipment needed to prepare surfaces and place reinforced Mix 1 concrete). $ Cubic Yard

12.

Geotextile Fabric (Includes all materials, labor, and equipment to place geotextile fabric). $ Square Yard

13.

Sand in place (Includes all materials, labor, and equipment to place and compact Sand). $ Cubic Yard

14.

No. 57 Coarse Aggregate in place (Includes all materials, labor, and equipment to place and compact No. 57 Coarse Aggregate). $ Cubic Yard

15.

No. 9 Coarse Aggregate in place (Includes all materials, labor, and equipment to place and compact No. 9 Coarse Aggregate). $ Cubic Yard

16.

Class III Channel Lining in place (Includes all material, labor, and equipment needed to place Class III Channel Lining). $ Cubic Yard

17.

Stainless Steel Mooring Pins (Includes all materials, labor, and equipment needed to install stainless steel mooring pins). $ Each

18.

Steel Mooring Pins painted with submersible paint (Includes all materials, labor, and equipment needed to install steel mooring pins) $ Each