ADDENDUM__COMPILED_SPECIFICATIONS.pdf
PDF 19 MB Posted
- Attached to
- Splashpad Renovation and Improvement
- Solicitation number
- 38-26
- Issued by
- Volusia County, Florida
About this file
This is an Addendum to Compiled Specifications for the City of DeBary, Florida's Splashpad Renovation and Improvement project, issued under RFP 3826. The project scope encompasses removal and replacement of existing splash-pad fixtures with new city-furnished fixtures, replacement of an outdoor shower fixture, removal and installation of a new pump system with associated filters, controllers, and activation modules, preparation and resurfacing of the splash pad with decorative non-slip painting incorporating a dino-theme design, and replacement of six existing benches with new city-furnished benches. A mandatory pre-proposal meeting is scheduled for September 30, 2026 at 2:00 PM EST at City Council Chambers. Sealed proposals are due October 26, 2026 at 2:00 PM EST, with evaluation occurring October 27, 2026 and anticipated City Council approval on November 18, 2026. Tentative construction is scheduled to begin November 19, 2026, with an estimated completion date of February 26, 2027. Written inquiries regarding the bid must be submitted by October 26, 2026 at 2:00 PM EST.
The contract will be awarded to the lowest responsive and responsible bidder based on lump-sum base bid pricing that includes all labor, materials, equipment, mobilization, and bonding. Performance and Payment Bonds equal to one hundred percent of the total accepted bid are required unless the contract value does not exceed $200,000, in which case the City may waive this requirement. Volusia County must be listed as an additional obligee on required bonds. Mandatory insurance includes Commercial General Liability of $1,000,000 per occurrence/$2,000,000 annual aggregate, Business Auto Liability of $1,000,000 per accident, and Workers' Compensation insurance in accordance with Florida statutory requirements. Liquidated damages of $500.00 per calendar day apply for work remaining incomplete after the contractual completion date, with no time extensions granted for inclement weather unless rainfall exceeds normal historical patterns. A one-year correction period applies to maintain the performance bond through the guaranty period. The project is partially funded with ECHO funds and must comply with applicable Florida building codes, ADA accessibility standards, and health department regulations. Equipment specifications include specific manufacturers such as Blue-White Industries pitot tube insertion flow meters, Waterco fiberglass side-mount media filters and multiport valves, Yaskawa GA500 AC variable frequency drives, and Stenner metering pumps.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .