This Addendum No. 1, issued October 9, 2026, modifies the Request for Proposal (RFP) 3826 for Splashpad Renovation and Improvement by the City of DeBary, Florida, in coordination with Volusia County. The project involves removing and replacing existing splash-pad fixtures with new water features, installing a new pump system with filters and controllers, resurfacing the splash pad with decorative non-slip painting incorporating a dinosaur-themed design, replacing an outdoor shower, and installing six new benches. The tentative construction start date is November 19, 2026, with an estimated project completion date of February 26, 2027. The addendum addresses 38 questions and answers from potential bidders and releases compiled specifications and installation manuals as attachments. Proposals were originally due October 26, 2026, at 2:00 PM EST, with a mandatory pre-proposal meeting held on September 30, 2026. Award is anticipated for November 18, 2026, to the lowest responsive and responsible bidder based on lump-sum base bid pricing.
All pricing must be submitted as a single lump-sum amount on the provided Bid Price Sheet and shall include labor, materials, equipment, mobilization, and bonding costs. Performance and Payment Bonds equal to one hundred percent of the total bid are required, with both the City and County listed as obligees; however, the City will waive this requirement only if the award does not exceed $200,000, though this project appears to exceed that threshold based on ECHO grant requirements. The project is partially funded with Volusia County ECHO funds, though Davis-Bacon wage rates and Federal Grants Terms and Conditions do not apply. Liquidated damages of $500.00 per calendar day apply for work remaining incomplete after the contractual completion date. A one-year correction period applies to maintain the performance bond through the guaranty period. Construction water and power will be provided on-site at no cost to the Contractor, with work hours restricted to 7:00 AM to 7:00 PM on weekdays only unless extended hours and weekend work are approved in advance by the City.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 1
October 9, 2026
38-26 - Splashpad Renovation and Improvement
The original Request for Proposal (RFP) documents shall remain in full force and effect, except as modified herein, which shall take precedence over any contrary provisions in the prior documents.
This addendum is being issued to address questions received, make revisions to the original solicitation document, and release attachments.
The following are questions and answers regarding the above-mentioned solicitation:
1. Question: Please provide a project duration ( Substantial and Final)
Answer: Tentative Construction Start Date: November 19 , 2026 Estimated Project Completion Date: February 26 , 2027
2. Question: Bond is required, do you have a budgetary amount?
Answer: A Bid Bond is not required for this project. However, Performance and Payment Bonds will be required from the awarded Contractor. Performance and Payment bond must have the City and the County included on the bond and must be provided for approval prior to construction. Compensation to the Contractor for providing the required Payment and Performance Bonds shall be included in Item # 1, Mobilization.
3. Question: Are the existing equipment and plans (As built) available?
Answer: Existing specifications not available.
4. Question: What is the existing pad paint finish and specification?
Answer: Current paint is Richards Paint # 3515 Pool Guard Chlorinated Rubber Swimming Pool Paint and SG-60 Skid Guard Non-Skid Paint Additive (lightweight polyethylene granules).The City will consider alternates or equivalents as long as they perform up to the current standard or better and are approved by the City.
5. Question: Do you have a detailed drawings for desired pad design ( dino foot print, etc)?
Answer: See ADDENDUM- COMPILED SPECIFICATIONS.
6. Question: Could you confirm whether the City is looking for a contractor to handle the complete project, or whether there is an opportunity for a specialty aquatic contractor to participate as part of the project team?
Answer: All documents and plans are available on the websites:
City's Webpage https://debary.org/bids.aspx; VendorLink https://www.myvendorlink.com/; DemandStar https://www.demandstar.com/ The document titled “Exhibit I – Bid Price Sheet” identifies the scope pay items that the awarded contractor will be expected to complete.
7. Question: Cut sheet for RainDrop's large tree feature states ideal feature flow is 81.7gpm, existing 1-1/2” piping max flow is 62gpm@10fps. Will this be acceptable performance?
Answer: We have replaced this fixture with the same tree feature but a low flow option to ensure adequate flow. See ADDENDUM- COMPILED SPECIFICATIONS & COMPILED INSTALLATION MANUALS.
8. Question: Is the bollard to be reused or will it call for a new bollard and if so, is it the owners intention to have it flange mounted or require a poured footer as shown in spec sheets?
Answer: Actuator bollard & button to be removed & replaced, purchased by contractor as part of the pump package. Bollard will be flush mounted to replace existing in same place. VakPak to provide updated spec sheet for flange-mounted bollard prior to construction.
https://debary.org/bids.aspx https://www.myvendorlink.com/ https://www.demandstar.com/
9. Question: What products are approved for use on splash pad surface?
Answer: See answer to #4 above.
10. Question: Is bidder to replace damaged ground spray inserts of snake feature?
Answer: No, the snake feature ground sprays are not part of this scope.
11. Question: Will city provide template or detailed rendering of snake and footprints that are feasible to paint on surface?
Answer: No, custom paint based on the conceptual included in the RFP attachments. Contractor responsible for any templates needed. Work with City on a final design and colors.
Question: Plan Sheet 5 notes "Pump System Design by Others." Will the City or Vak Pak, Inc. provide a signed and sealed circulation system design? If so, please confirm the specific pump, filter, and controller models and quantities. The Pump Specifications include both Speck BADU Pro and Model 95 pumps and three Waterco HRVR filter sizes (24/30/36).
Answer: Speck BADU Pro V IG385-V270T-TUS , 2.7HP, and Model 95X, 7.5HP pumps and Waterco HRVR- 30 filter size 30". The attached Vak Pak drawing sheet also verifies these component model numbers. See
ADDENDUM- COMPILED SPECIFICATIONS & COMPILED INSTALLATION MANUALS.
12. Question: At their intended flow rates, the new features total approximately 149 GPM, excluding the existing jets to remain (Sheet 5, items 5, 7 and 9). The largest specified filter (HRVR 36) is rated at 141 GPM maximum.
Please confirm the design flow, whether separate feature and filtration pumps are intended, and the flow rate of the existing jets.
Answer: The system has two separate pump loops, one for the recirculation pump, which runs 24/7 at 67 GPM. This loop utilizes the 30" Waterco sand filter which is rated for up to 98.2 GPM due to the 4.91 sq.ft.
of filter area. The feature loop, which consists of the 7.5hp pump draws water through six - 150sq.ft.
vacuum cartridge elementsin the collector tank. These are rated for over 330 GPM of filtered flow at a .375 GPM/sq.ft. filter rate.
13. Question: Is a Florida Department of Health construction/modification permit required for this interactive water feature? If so, who prepares and submits the DOH application and engineering drawings? Does Bid Item 2 (Permitting for Installations) include DOH, City building, and electrical permits and fees?
Answer: The City is responsible for DOH permit; permit has been filed and will be approved prior to construction. Contractor is responsible for any applicable Building Permits.
14. Question: Will the City accept the pump, filter, and circulation work being performed by a Florida-licensed commercial pool/spa subcontractor under the prime contractor's CGC license?
Answer: Yes
15. Question: Please clarify Vak Pak's scope: equipment supply only, or supply plus installation, startup, programming of the "All ON/All OFF" activation, and owner training?
Answer: Equipment Supply. VakPak will be on site one day at start up for commissioning, programming, chemical balancing, and training. Contractor to coordinate with VakPak.
16. Question: Please clarify the chemical treatment scope. Is a chemical controller, sanitizer system, or UV system required beyond the Stenner metering pump? Will the City supply chemicals for startup?
Answer: See the new document provided for the chemical controller. Nothing else is needed outside of what is included in the FRP documents. See ADDENDUM- COMPILED SPECIFICATIONS & COMPILED
INSTALLATION MANUALS.
17. Question: Collector tank: please confirm the tank's size, material, and condition, and the full extent of "internal components" to be removed and replaced. Is the No-Niche skimmer installed in the collector tank?
Answer: The attached updated drawing notes the components that will be provided for the contractor to install in the tank which includes the no niche skimmer, water level control float and hydraulic solenoid valve, feature filter elements and manifold with basic instructions on how to replace. This is a 1,000 gallon tank. See ADDENDUM- COMPILED SPECIFICATIONS & COMPILED INSTALLATION MANUALS.
18. Question: Are as-built drawings available for the existing supply piping (sizes, routing, depth)? The Rain Tree (RNTR-016) requires a 3" minimum supply line. If existing lines are undersized or unusable, how will replacement or upsizing be compensated (unit price, allowance, or change order)?
Answer: All pipes are usable and no additional piping is needed other than making the connection to the ficture on the pad. Rain Tree feature has been updated for low-flow; See ADDENDUM- COMPILED
SPECIFICATIONS & COMPILED INSTALLATION MANUALS.
19. Question: Please provide the existing splash pad slab thickness and any footing or anchorage requirements for the Rain Tree (17'-5" tall) and the Elevated Spinning Lasso (11'-5" tall). Is a structural footing detail available?
Answer: 6 inch concrete pad. See ADDENDUM- COMPILED SPECIFICATIONS & COMPILED
INSTALLATION MANUALS.
20. Question: Will the new fixtures be installed at existing fixture locations, or at new locations? If new, please provide a dimensioned layout.
Answer: New fixtures to be installed at existing locations. Layout included in the RFP documents.
21. Question: Please clarify the following Sheet 5 notes: (a) Item 2, "Volcano change jet to Peacock"; (b) Item 4, "Toby T-Rex – add valve to balance w/5"; (c) Item 5, "Existing jet."
Answer:
a. The standard volcano emits a radial spray. The volcano is close to the perimeter. Rain Drop is going to replace the radial jet in this feature with a flatter spray pattern to help eliminate over spray on the perimeter side. This could be a peacock or water tiara style pattern.
b/c. Decision was made to abandon the surface jet that would share existing supply line 1 leaving only the Toby T-rex. Balance valve should not be needed. Existing jet to be capped underground at the jet and void filled with concrete.
22. Question: Actuator bollard: RFP Scope Item 1 states the bollard is to be removed and reinstalled (protect & save), while Sheet 4 states "Remove & Replace." Please confirm which applies, and whether the new AM-BA-01 actuator is furnished by Vak Pak.
Answer: See answer to #8 above.
23. Question: Is an existing equipotential bonding grid present at the pad? The ELLS-003-SS requires a copper bonding connection.
Answer: Cannot verify the as-built plan as to the presence of an existing bond grid within the slab. The feature can be bonded to that grid if present when existing feature is removed. If existing feature is stainless or has metal fixture base the installer should be able to bond the new fixture to that base. Most above grade fixtures from the previous fixture supplier have this base. This needs to be verified once existing feature is removed.
24. Question: Please confirm the existing electrical service at the equipment yard (voltage, phase, panel capacity).
Several specified pumps require 3-phase power. Does the controller panel replacement include new electrical service or feeders?
Answer: Existing electrical is single phase and new pump system was designed for single phase to accommodate existing electrical. No electrical upgrades are needed.
25. Question: Please identify the required coating system (manufacturer/product), number of colors, and slip-resistance requirement.
Answer: See answer to #4 & #5 above.
26. Question: Will the City provide final artwork for the dino prints (Item 7) and snake finish (Item 9)? If the design is not finalized at bid, will an allowance be established?
Answer: See answer to #11 above.
27. Question: Please confirm the splash pad surface area to be prepared and coated. Our takeoff from Sheet 5 (R26'-6") indicates approximately 2,200 SF.
Answer: As-builts confirm 26.5’ radius; 2206sqft.
28. Question: For City-furnished fixtures, the shower, and benches: who is responsible for receiving, offloading, storage, and risk of loss prior to installation? What is the anticipated delivery date?
Answer: The City will receive and provide to contractor when ready for installation. The shower and bench is readily available and will be ready at the time needed for installation. The fixtures were ordered on 8/20/26 to arrive by the end of the year. No delivery date has been established yet.
29. Question: Are anchors and mounting hardware for the benches and fixtures furnished by the City or the Contractor?
Answer: Mounting hardware provided for benches and shower. See updated documents on mounting hardware for fixtures to be provided by the contractor. See ADDENDUM- COMPILED SPECIFICATIONS &
COMPILED INSTALLATION MANUALS.
30. Question: Outdoor shower: please confirm the existing supply size and location, and whether a drain connection is required.
Answer: ½ half inch supply line. No drain connection is required, the replacement shower is the updated version of the existing shower.
31. Question: Bid security: Section 11.1 references forfeiture of bid security, but no bid bond is listed in the required submittal documents. Is a bid bond required? If so, in what amount?
Answer: A bid bond is not required for this project.
32. Question: Retainage: Section 32.2 states "ninety percent (95%)." Please confirm whether retainage is 5% or 10%.
Answer: 10%
33. Question: The project is partially funded with Volusia County ECHO funds. Do the Federal Grants Terms and Conditions, including Davis-Bacon wage rates, apply to this project?
Answer: No
34. Question: Does the City intend to waive Performance and Payment Bonds under F.S. 255.05 if the award is
$200,000 or less?
Answer: No, it is required per the ECHO grant requirements. Performance and Payment bond must have the City and the County included on the bond and must be provided for approval prior to construction.
Compensation to the Contractor for providing the required Payment and Performance Bonds shall be included in Item # 1, Mobilization.
35. Question: If delivery of City-furnished fixtures is delayed, will the contract time be extended accordingly without assessment of liquidated damages?
Answer: Yes
36. Question: Will construction water and power be available on site at no cost to the Contractor? Are there restrictions on work hours?
Answer: Yes, water and power available on site. Work hours are 7am to 7pm, no weekends; extended hours and weekend work allowed with notice and prior approval. Contractor shall communicate construction schedule to City, along with any changes or updates.
38. Question: What is the Fixture anchoring process?
Answer: For anchoring of the features by Rain Drop, the concrete will need to be a minimum of 6" thick.
Existing concrete pad is 6” thick. The existing anchors that are holding the features to the concrete will likely need to be cut off and ground off if the flange patten does not match the Rain Drop feature that is going to replace the feature. New feature is then installed over existing.
- For the lasso an 8" flange gasket will go between the flange and the concrete.
- For the cannons a 6" flange gasket will go between the flange and the concrete.
- The rain tree, volcano, egg hatchers and dinosaur will require a stubbed up pipe for connecting the feature to the supply.
No additional footers are required to anchor and install fixtures. Documentation provided on the two achor types used for Rain Drop fixtures – Lag Anchor and Wedge Anchor. See ADDENDUM- COMPILED
SPECIFICATIONS & COMPILED INSTALLATION MANUALS.
The following are the attachments released regarding the above-mentioned solicitation:
ADDENDUM- COMPILED SPECIFICATIONS
COMPILED INSTALLATION MANUALS
If you should have any questions regarding this addendum, please do not hesitate to contact me by email sperry@debary.org
Sincerely, Susan Perry, CPPB, CFSBO, FCCM City of DeBary Purchasing Coordinator
Acknowledgment of Addendum No. 1 by Vendor/Contractor The Vendor/Contractor hereby acknowledges receipt of the following Addendum:
This addendum shall be completed and signed by an authorized representative and returned with the solicitation submittal. The Acknowledgement of the Addendum receipt will become an integral part of the solicitation document. In acknowledging receipt of this Addendum, the undersigned understands and accepts the foregoing solicitation changes and clarifications.
All other bid terms, conditions, and specifications as originally issued remain unchanged.