Soil & Groundwater Sampling Mount Washington State Park, Summit Environmental Assessment
Solicitation number
RFB DNCR 2026-18
Issued by
Cheshire County, New Hampshire

About this file

This Addendum 4 to the Request for Bids pertains to soil and groundwater sampling services at Mount Washington State Park issued by the New Hampshire Department of Natural and Cultural Resources, Division of Parks and Recreation. The procurement solicits qualified environmental contractors to develop a Sampling & Analysis Plan and Quality Assurance Project Plan compliant with EPA Region 1 standards, conduct soil borings with discrete and composite sample collection, install and develop temporary groundwater wells, perform groundwater sampling per NHDES regulations, and execute laboratory analyses for volatile organic compounds, semi-volatile organic compounds, polycyclic aromatic hydrocarbons, total petroleum hydrocarbons, metals, and PFAS per EPA method 1633. The contractor must also perform full data validation, prepare a Data Usability Summary Report, and deliver comprehensive draft and final reports with figures, tables, boring logs, well construction details, laboratory reports, and electronic data deliverables. Vendor questions were due by May 13, 2026, with sealed bids due by 2:00 P.M. on May 15, 2026. The State anticipated issuing a Notice of Intent to Award by May 20, 2026, with contract finalization and Notice to Proceed by June 1, 2026. The fieldwork window runs from June 1 through July 31, 2026, with final reports and electronic data deliverables required by October 15, 2026. All work must be performed between 7:00 A.M. and 4:30 P.M., Monday through Friday, unless pre-approved otherwise, and site visitation is the vendor's responsibility prior to bidding.

The contract will be awarded to the lowest responsible and responsive bidder meeting all minimum qualifications, with bid pricing remaining firm for the entire contract period and stated in US dollars, including all delivery and associated costs. The pricing structure requires vendors to submit lump sum amounts for planning and QAPP development, unit pricing for soil borings, soil samples, monitoring well installations, groundwater samples, and laboratory analyses by analyte type, and lump sum amounts for mobilization/demobilization, QA/QC and validation, draft report preparation, and final report with electronic data deliverables. Prior to contract award, vendors must be registered with the NH Bureau of Purchase and Property and the NH Secretary of State (if applicable), maintain comprehensive general liability insurance coverage of at least $1,000,000 per occurrence and $2,000,000 aggregate, and provide proof of workers' compensation insurance. The RFB documents do not indicate any specific set-aside designations for disadvantaged enterprises, and no incumbent vendors or current contractors are identified. All bids must remain valid for 180 days from submission, and the State reserves the right to reject any or all bids and terminate the contract with 30 days' written notice.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum 4 - Revised Scope of Services

Soil & Groundwater Sampling Mount Washington State Park – Summit Environmental Assessment 5/11/2026

Project# CAP2610

A. Scope of Services:

The Contractor shall perform comprehensive soil contamination sampling at Mount Washington State Park to support the Master Plan requirement for an independent third-party environmental assessment. Services include development of a detailed Sampling & Analysis Plan (SAP), a full EPA Region 1-compliant QAPP, and all required field and laboratory tasks. Field activities shall include soil borings and the collection of discrete and composite soil samples. Groundwater sampling shall be limited to the existing well located at the Yankee Building; no new temporary groundwater wells shall be installed or developed. There will be no new installation or development of temporary groundwater wells.

Groundwater samples from the existing well shall be collected in accordance with Env- Or 610.02. Analytical work shall encompass VOCs, SVOCs, PAHs, TPH, metals, and PFAS (EPA 1633). The Contractor shall also perform full data validation, prepare a Data Usability Summary Report (DUSR), and provide Draft and Final reports including figures, tables, boring logs, well construction details (for the existing well only), laboratory reports, and electronic data deliverables (EDD).

• Contractor shall comply with NHDES Env-Or 600, Env-Or 610, PFAS soil standards, EPA Region 1 QAPP requirements, EPA QA/R-5, and all other referenced environmental regulations.

• Prepare a Sampling & Analysis Plan (SAP) and full QAPP.

• Conduct soil sampling near building perimeters, tank areas, infrastructure, historic-use zones, and areas of suspected contamination.

• Use only the existing well at the Yankee Building for groundwater sampling, no installation of new temporary wells.

• Perform analysis for VOCs, SVOCs, PAHs, TPH, Metals, and PFAS.

• Perform data validation, prepare the DUSR, and submit Draft and Final Reports.