This is Construction Bid Addendum No. 4 issued by the Michigan Department of Technology, Management and Budget, State Facilities Administration Design and Construction Division for the Barry State Game Area New Pole Barn project. The addendum was issued on February 7, 2024, with a bid opening date of February 14, 2024. The professional on record is NFE Engineers, with Josiah Meyers serving as project director. This addendum modifies the existing bidding documents through clarifications and specification revisions that must be acknowledged by all bidders to avoid bid rejection.
The primary modifications in this addendum address prevailing wage requirements and payroll record-keeping obligations. The addendum adds prevailing wage language requiring compliance with Michigan's 2023 PA 10 prevailing wage statute (MCL 408.1101 to 408.1126), mandating that all construction mechanics receive prevailing wages and fringe benefits consistent with local rates. Contractors and subcontractors must maintain detailed payroll records including employee names, addresses, wage classifications, hourly rates, hours worked, and benefits provided, with these records available for state inspection and audit for five years following final payment. The addendum also removes previous state-funded project prevailing wage requirements sections and implements nondiscrimination and nonretaliation protections for construction mechanics, including provisions for legal remedies and damages for wage violations. Contractors are required to post prevailing wage rates on the construction site in a conspicuous location.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 2.pdf | ||
| Specifications 22020.pdf | ||
| Drawings 22020_Part1.pdf | ||
| Drawings 22020_Part2.pdf | ||
| Addendum 1 Drawings.pdf | ||
| Addendum 3.pdf | ||
| 751-22020.JLM_Pre-Bid Sign-in Sheet.pdf | ||
| Addendum 2 Bid Summary.pdf | ||
| Addendum 1.pdf | ||
| 751-22020.JLM_Barry SGA_Geotech Report.pdf | ||
| Advertisement 22020.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 12/17)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
CONSTRUCTION BID ADDENDUM NO. 4
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
2/7/2024
PROJECT NAME
Barry State Game Area – New Pole Barn
FILE NUMBER
751/22020.JLM
PROFESSIONAL
NFE Engineers
PROJECT DIRECTOR
Josiah Meyers
BID OPENING DATE:
2/14/2024
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
1. Revise Project Specifications as indicated below:
Add 00100:
26. PREVAILING WAGE: The Bidding Documents include either the a$ached Appendix V of prevailing rates of wages and fringe benefits for all classes of Construc-on Mechanics called for in the Bid and resul-ng Contract, if any, or the a$ached current prevailing wage determina-on issued by the U.S. Department of Labor, as applicable depending on the funding source(s).
Replace 00700-2.5 with:
2.5 Prevailing Wages and Access to Payroll Records:
2.5.1 Prevailing Wages:
To the extent applicable, Contractor will comply with state (2023 PA 10, MCL 408.1101 to 408.1126) prevailing wage requirements.
State Prevailing Wages-The following provisions of this Ar-cle 7.15 apply when 2023 PA 10 applies.
Prevailing Wage and Fringe Benefits--The rates of wages and fringe benefits to be paid to each class of Construc-on
Mechanic by DB En-ty and Subcontractors, shall not be less than the wage rates and fringe benefit rates prevailing in the locality in which the work is performed.
Nondiscrimina-on, Nonretalia-on- Contractor or a Subcontractor shall not discharge, discipline, retaliate against, or otherwise discriminate against a Construc-on Mechanic, or threaten to do any of these things, because the
Construc-on Mechanic reported or was about to report a viola-on or suspected viola-on of the act.
Construc-on Mechanics under this Contract are intended beneficiaries of the contractual prevailing wage, fringe benefit, and nondiscrimina-on nonretalia-on requirements of the Contract. Any such Construc-on Mechanic aggrieved by failure of a contractor or subcontractor to pay prevailing wages or benefits as specified in the Contract, or by viola-on of sec-on 7 of 2023 PA 10, in addi-on to any other remedies provided by law, may bring an ac-on in a court of competent jurisdic-on against such contractor or subcontractor for damages or injunc-ve relief and may be awarded reinstatement or other appropriate relief, and all damages sustained, together with actual costs and a$orney fees at trial and on appeal.
Contractor and Subcontractors shall keep posted on the construc-on site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates prescribed in this Contract and shall keep an accurate record showing the name and occupa-on of and the actual wages and benefits paid to each Construc-on Mechanic employed by it in connec-on with the Contract. This record shall be available for reasonable inspec-on by the State.
2.5.2 Payroll: The Contractor and its Subcontractors must maintain and keep, in accordance with generally accepted accoun-ng principles, records pertaining to the bidding, award and performance of the Work, including, but not limited to cer-fied payroll, employment records and all data used in es-ma-ng the Contractor’s prices for the Bid, Change Order, proposal or claim. The Owner or its representa-ve must have access to those records, must have the right to interview the Contractor’s employees and must be provided with appropriate facili-es for the purpose of inspec-on, audit/review and copying for five years aBer final payment, termina-on, or date of final resolu-on of any dispute, li-ga-on, audit excep-on or appeal. The payroll and other employment records of workers assigned to the site must contain the name and address of each worker, correct wage classifica-on, rate of pay, daily and weekly number of hours worked, deduc-on made, and actual wages paid. The Contractor must maintain records that show:
(a) the an-cipated costs or actual costs incurred in providing such benefits, (b) that commitment to provide such benefits is enforceable, and (c) that the plan or program is financially responsible and has been communicated in wri-ng to the workers affected.
Delete 00800 STATE-FUNDED PROJECT PREVAILING WAGE REQUIREMENTS #1 & #2.
2.
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: Karl Ruiter DATE: 2/7/2024
APPROVED BY:
PROJECT DIRECTOR: Josiah Myers DATE: 2/7/2024