This Construction Bid Addendum No. 3 is issued by the Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration Design and Construction Division for the Barry State Game Area - New Pole Barn project (File Number 751/22020.JLM). The addendum, issued on February 5, 2024, revises the bid opening date to February 14, 2024 at 2:00 PM via the SIGMA system. The project is being managed by NFE Engineers with Project Director Josiah Meyers overseeing the design and construction. The addendum addresses clarifications regarding concrete reinforcement specifications, specifically responding to a pre-bid Request for Information regarding the use of epoxy-coated wire mesh in concrete throughout the project.
The key modification outlined in the addendum requires all 6x6 W1.4/W1.4 steel remesh to be provided as epoxy-coated per ASTM A884 specification for both exterior and interior concrete slabs as part of the base bid, clarifying that the original drawings contained inconsistent specifications. All bidders must acknowledge receipt of this addendum in their bid submission documentation; failure to do so may result in bid rejection. This addendum becomes part of the binding contract documents and supersedes any previous conflicting specifications in the original bidding documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 2.pdf | ||
| Specifications 22020.pdf | ||
| Drawings 22020_Part1.pdf | ||
| Drawings 22020_Part2.pdf | ||
| Addendum 1 Drawings.pdf | ||
| Addendum 4.pdf | ||
| 751-22020.JLM_Pre-Bid Sign-in Sheet.pdf | ||
| Addendum 2 Bid Summary.pdf | ||
| Addendum 1.pdf | ||
| 751-22020.JLM_Barry SGA_Geotech Report.pdf | ||
| Advertisement 22020.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 12/17)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
CONSTRUCTION BID ADDENDUM NO. 3
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
2/5/2024
PROJECT NAME
Barry State Game Area – New Pole Barn
FILE NUMBER
751/22020.JLM
PROFESSIONAL
NFE Engineers
PROJECT DIRECTOR
Josiah Meyers
BID OPENING DATE:
2/14/2024
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
1. Issue Final version of Bid Addendum #2:
• See attached
2. Revised Bid Opening Date:
• Bid Due Date, via SIGMA, is revised to be 2/14/2024 at 2:00pm.
3. Pre-Bid RFI question #6
• Q. In some details the prints call for epoxy coated wire mesh in the concrete and in other details it just states reinforced concrete with 6x6 mesh. Please clarify whether epoxy coated wire is required.
• A. In the site plan drawings, exterior concrete has epoxy coated steel re-mesh called out for reinforcement, while the interior concrete is not called out as epoxy coated steel re-mesh in the architectural plans.
Please provide ALL 6x6 W1.4/W1.4 STEEL REMESH AS EPOXY COATED PER ASTM A884 including the interior slab in the base bid.
2.
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: Karl Ruiter DATE: 2/5/2024
APPROVED BY:
PROJECT DIRECTOR: Josiah Myers DATE: 2/5/2024
File details come from the government source that posted it. Updated .