Addendum 3~2.pdf
PDF 2 MB Posted
- Attached to
- EWEB ITB 22-236-PW IP Switchgear Replacement
- Solicitation number
- S-P00140-00004924
- Issued by
- Lane County, Oregon
About this file
This document is an addendum to an Invitation to Bid (ITB) issued by the Eugene Water & Electric Board (EWEB) for the IP Turbine-Generator #4 Switchgear Replacement project. The addendum provides additional information on the commissioning requirements, including the commissioning organization, responsibilities of the owner and contractor, commissioning phases, and inspection and test plans. It also clarifies that the project closing date has been revised to December 13, 2022 at 2:00 PM PST, from the original closing date of December 8, 2022. The project involves the replacement of 13.8kV switchgear, bus duct, protective relays, and communication equipment at the International Paper facility in Springfield, Oregon.
The project is funded by EWEB, and the contract will be awarded to the successful bidder. The addendum indicates that the contractor will be responsible for performing various testing and inspection activities during the construction, pre-operational, and startup/operational test phases of the project, and that EWEB will witness and review the testing as necessary. The contractor will also be required to provide a system deficiency list and resolve any issues identified during the commissioning process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM # 3 December 6, 2022
Title: IP Switchgear Replacement
RFP # 22-236-PW
This addendum adds additional information to the original ITB document.
REMINDER:
Purchasing Contact is now Sandra Hahn. Please send all communication to sandra.hahn@eweb.org.
CHANGES TO BID DOCUMENT
Exhibit 1 of this addendum is attached and incorporated for this RFP. It contains the commissioning manual for the project and summarizes the contractor’s responsibilities. The commissioning manual is still in draft form and subject to additional revisions but should help you with your bid response. Commissioning scope and requirements are also defined in the technical specifications.
QUESTION & ANSWER
Q1. Will you be wanting a quote from our subcontractor regarding the alternate fiber route provided in our official proposal?
A1. No, we are not asking for an alternative fiber route as part of this bid. Please only bid on the fiber scope included in the bid package.
CLOSING DATE AND TIME
REVISED CLOSING DATE REMAINS: DECEMBER 13, 2022 2:00 PM PST
Original Closing Date: December 8, 2022
This addendum constitutes a MATERIAL CHANGE to the Request for Proposals.
Addendum prepared by:
Sandra Hahn Purchasing Analyst
REVISION 0
IP TURBINE-GENERATOR #4
SWITCHGEAR REPLACEMENT
Commissioning Manual
B&V PROJECT NO. 408517
B&V FILE NO. 53.2000
PREPARED FOR
Eugene Water and Electric Board
NOVEMBER 18, 2022
B la ck
V e a tc h
H o ld in g C o m p a n y
A ll r ig h ts r e se rv e d
EXHIBIT #1
Eugene Water and Electric Board | IP TURBINE-GENERATOR #4 SWITCHGEAR REPLACEMENT
BLACK & VEATCH | Table of Contents i
Table of Contents
1.0 Overview ................................................................................................................................................ 1-1
1.1 Scope ......................................................................................................................................................... 1-1
1.2 Introduction ........................................................................................................................................... 1-1
2.0 Commissioning Organization .......................................................................................................... 2-1
2.1 General ..................................................................................................................................................... 2-1
2.2 Organization Chart .............................................................................................................................. 2-1
2.3 Owner Information and Responsibilities ................................................................................... 2-3
2.4 Contractor Information and Responsibilities .......................................................................... 2-3
2.5 Roles and Responsibilities ............................................................................................................... 2-4
2.5.1 Commissioning Director ................................................................................................ 2-4
2.5.2 EWEB Engineering ........................................................................................................... 2-4
2.5.3 EWEB Communications Shop ...................................................................................... 2-4
2.5.4 EWEB Operations .............................................................................................................. 2-4
2.5.5 International Paper .......................................................................................................... 2-4
2.5.6 States Manufacturing ....................................................................................................... 2-4
2.5.7 Contractor ............................................................................................................................ 2-4
3.0 Commissioning Program .................................................................................................................. 3-1
3.1 Construction Test Phase ................................................................................................................... 3-1
3.2 Pre-operational Test Phase .............................................................................................................. 3-1
3.3 Startup and Operational Test Phase ............................................................................................ 3-1
4.0 Commissioning Implementation ................................................................................................... 4-1
4.1 Inspection and Test Plan ................................................................................................................... 4-1
4.2 Construction Test Phase ................................................................................................................... 4-1
4.3 Pre-operational Test Phase .............................................................................................................. 4-1
4.4 Startup and Operational Test Phase ............................................................................................ 4-1
Appendix A. Inspection and Test Plan .................................................................................................... A-1
Appendix B. Test Procedures and Forms .............................................................................................. B-1
LIST OF TABLES
Table 2-1 Testing and Turnover Periods per Construction Contract ................................................. 2-1
LIST OF FIGURES
Figure 2-1 Commissioning Team Organization Chart ................................................................................. 2-2
BLACK & VEATCH | Acknowledgements ii
Acknowledgements Prepared by: Lou Traxel, P.E., Black & Veatch
Reviewed by: Bruce Benson, P.E., Black & Veatch
Submitted by: Jim Brunot, Project Manager, Black & Veatch
BLACK & VEATCH | Overview 1-1
1.0 Overview
1.1 SCOPE
This commissioning manual is developed specifically for the Turbine-Generator #4 Switchgear
Replacement Project at the International Paper (IP) Mill in Springfield, Oregon.
This manual prescribes inspections and tests to be performed by the Contractor during installation of the equipment and after completion of construction. Equipment covered under this manual includes:
13.8kV Switchgear
13.8kV Bus Duct
Protective Relays
Communication Equipment
1.2 INTRODUCTION
This commissioning manual was developed to assist those involved with the IP Turbine-Generator
#4 Switchgear commissioning program in support of the construction work described in the conformed contract numbered #22-236-PW. This manual will describe the organization of the
Commissioning Team followed by a description of the commissioning phases. Appendices contain instructions specific to individual components and systems. This manual and the appendices identify specific requirements for testing the associated components and systems.
Thorough reviews will be coordinated between all parties involved with the commissioning program and all comments will be resolved or incorporated into this manual.
BLACK & VEATCH | Commissioning Organization 2-1
2.0 Commissioning Organization
2.1 GENERAL
The commissioning team was developed through discussions with the Owner. The construction contract provides a clear path for the turnover of the equipment being commissioned. The basic components of this turnover are listed in Table 2-1 with a reference to the page and paragraph within the conformed contract:
Table 2-1 Testing and Turnover Periods per Construction Contract
TESTING AND TURNOVER PERIODS CONFORMED CONTRACT REFERENCE
Milestone Dates Section 01 32 13, Paragraph 1.7.3.B & 1.7.3.C
Startup Schedule Requirements Section 01 91 00, Paragraph 3.3.A
Substantial Completion Requirements Section 0700, Paragraph K.4.2 and Section 01 77 00
Final Completion Requirements Section 0700, Paragraph K.4.1 and Section 01 77 00
2.2 ORGANIZATION CHART
See Figure 2-1 for the Commissioning Team Organization Chart.
BLACK & VEATCH | Commissioning Organization 2-2
Figure 2-1 Commissioning Team Organization Chart
BLACK & VEATCH | Commissioning Organization 2-3
2.3 OWNER INFORMATION AND RESPONSIBILITIES
The Owner is the Eugene Water and Electric Board (EWEB). The Owner’s responsibilities are summarized below:
Coordinate and direct the overall commissioning program for the IP Turbine-Generator #4
Switchgear equipment.
Review administrative, construction, pre-operational and operational test programs and schedules.
Witness testing activities, as necessary, in support of the commissioning program.
Program new alarm and status inputs to plant control systems and verify signals and programming.
Configure and test new communication link between power plant and substation.
Provide coordination with off-site operating, dispatching, or interfacing agencies, as required.
Conditionally accept equipment and systems for operation during the pre-operational testing phase.
Accept equipment, systems, and facilities, after successful testing of these items, and provide final acceptance of the project.
Operate all plant equipment in coordination with International Paper to support the start-up schedule.
Make final decisions in areas of dispute relating to test activities performed during the commissioning program.
The Owner also has the responsibility to commission any plant equipment outside the Contractor’s scope of work as specified in the construction contract. These responsibilities are clearly defined in this manual.
2.4 CONTRACTOR INFORMATION AND RESPONSIBILITIES
The Contractor for this commissioning program is (Later) and their subcontractors. The
Contractor’s responsibilities are summarized below:
Perform testing on Owner-furnished equipment and systems in accordance with approved test procedures.
Record test data results during construction and pre-operational testing, distribute to the
Owner, and incorporate into the system turnover package.
Implement tagging and work clearances on systems and equipment under the jurisdiction of the Contractor in accordance with International Paper’s lockout/tagout procedures prior to turnover to the Owner.
Complete construction work and test activities to support the commissioning schedule.
Advise the Owner when turnover will occur on Owner-furnished equipment.
Provide craft personnel during construction, pre-operational, and operational testing by the
Contractor, and in support of startup by the Owner.
Provide system deficiency list with equipment turnover and resolve all deficiencies.
BLACK & VEATCH | Commissioning Organization 2-4
Notify the Owner of any engineering or construction deficiencies or operational constraints that will not allow for proper testing and operation of any system.
2.5 ROLES AND RESPONSIBILITIES
2.5.1 Commissioning Director
The Commissioning Director is responsible for the safe execution of the entire commissioning program by close coordination with all parties involved to ensure a smooth and effective effort. The
Commissioning Director will give final approval to all pre-operational and operational test procedures prior to implementation.
Duties and responsibilities of the Commissioning Director include the following:
Coordinate all commissioning activities among the responsible parties.
Ensure all commissioning activities have been completed in accordance with accepted procedures.
2.5.2 EWEB Engineering
EWEB Engineering is responsible for reviewing completed testing documentation and resolving any technical issues that may arise related to the testing activities and procedures. Separate engineers are assigned to resolve questions related to activities in the generation and substation areas.
2.5.3 EWEB Inspectors
EWEB inspectors are responsible for witnessing the Contractor’s commissioning activities and signing off on the Inspection and Test Plan (ITP).
2.5.4 EWEB Communications Shop
The EWEB Communications Shop is responsible for configuring and testing the new JMUX communication devices at the power plant and substation, and for programming new signals to the
Remote Terminal Units (RTUs).
2.5.5 EWEB Operations
EWEB Operations has primary responsibility for all electrical switching and energizing activities related to the cogeneration facility. All commissioning activities involving switching and energizing must be coordinated with EWEB Operations.
2.5.6 International Paper
International Paper has primary responsibility for operation and maintenance of the cogeneration facility, including the Mark VI turbine control system. All commissioning activities involving unit operation or maintenance must be coordinated with International Paper.
2.5.7 States Manufacturing
States Manufacturing is the supplier for the Owner-furnished switchgear and bus duct. States is responsible for certifying the proper installation of the bus duct and switchgear.
2.5.8 Black & Veatch
Black & Veatch (BV) is the Owner’s Engineer for the project and is responsible for preparing the design documents. BV is also responsible for preparing the Commissioning Manual, including functional test procedures, and developing the protective relay settings files.
BLACK & VEATCH | Commissioning Organization 2-5
2.5.9 Contractor
The Contractor’s commissioning responsibilities include the following:
Perform pre-startup checks and testing including:
● Visual inspections
● Medium-voltage and low-voltage cable testing
● Cable termination checks
● Fiber optic cable OTDR and power loss testing
● Switchgear and circuit breaker testing
● Instrument transformer testing
Perform functional testing including:
● Installing Owner-furnished settings files in protective relays
● Routine relay maintenance including verifying all hard-wired I/O are functional
● Protective relay element and logic testing
● Protective relay control circuit testing
● Circuit breaker close and trip circuit testing
● End-to-end communications signal testing
Perform commissioning activities including:
● Preliminary load checks upon energization
● Final testing of control and tripping circuits after energization
● Final load checks during generation
Provide assistance to the Owner during startup activities to resolve any installation issues.
The Contractor shall maintain a Startup Team led by a Startup Manager. Responsibilities of the
Contractor’s Startup Manager are described in Specification Section 01 91 00, Paragraph 1.5.1 and include the following:
Compile and distribute all startup and field testing plans, documents, and forms.
Develop a comprehensive schedule for all commissioning activities and provide regular schedule updates.
Schedule and lead commissioning planning meetings.
Coordinate with manufacturer of Owner-furnished equipment for field services and certification of proper equipment installation.
Oversee and administer all startup, testing, and commissioning activities, including direct participation in the activities and/or oversight and monitoring of activities.
Ensure readiness for and coordinate maintenance, repair, and adjustment of equipment and systems during startup, testing, and commissioning.
Conduct or oversee pre-startup checks and activities to ensure readiness for testing.
Ensure all testing equipment is in proper working order and has been calibrated to appropriate standards.
BLACK & VEATCH | Commissioning Organization 2-6
Enforce safe work policies and procedures, including lockout/tagout procedures and personal protective equipment (PPE) policies, to be followed during all field startup and testing activities.
Organize teams of qualified representatives from suppliers, subcontractors, and others, as appropriate, to efficiently and expeditiously start up and test equipment and systems.
Ensure the development and maintenance of records documenting all startup, testing, and commissioning activity.
Ensure the Startup Team is equipped and ready to make emergency repairs and adjustments to equipment.
BLACK & VEATCH | Commissioning Program 3-1
3.0 Commissioning Program
There are three phases of testing included in this commissioning manual. The Contractor will perform the required inspections and tests to ensure that completed installations are in accordance with contract requirements and the latest engineering and design information. The results of testing in each phase will be documented and turned over to the Commissioning Director.
3.1 CONSTRUCTION TEST PHASE
Construction testing generally includes:
Insulation resistance testing of electrical equipment and cables.
Continuity tests to verify cable routing.
Inspection of electrical equipment, including anchorage and grounding connections.
Verification of cable terminations in accordance with design documents.
Verification of proper grounding of shielded cables.
3.2 PRE-OPERATIONAL TEST PHASE
The Pre-Operational Test Phase generally includes the following:
Electrical testing of equipment, including switchgear, bus duct, circuit breakers, and instrument transformers.
Verification of electrical control circuitry through functional testing.
Calibration of electrical relays and meters.
Loop calibration of all instrument loops.
Verification of polarity, integrity, and phasing of instrument transformer circuits.
Verification of control, monitoring, status, and alarm signals to plant control systems.
3.3 STARTUP AND OPERATIONAL TEST PHASE
Operational Testing will include (at a minimum) the following:
Operation of 115kV breaker while energized.
Verification of proper turbine startup operation.
Verification of proper excitation system operation, including field breaker.
Verification of proper generator-to-system synchronization.
Operation of generator breaker while energized.
Testing and verification of electrical protection systems with load.
Operation and monitoring via plant control systems (local and remote).
BLACK & VEATCH | Commissioning Implementation 4-1
4.0 Commissioning Implementation
4.1 INSPECTION AND TEST PLAN
The Inspection and Test Plan (ITP) identifies the main inspection and testing activities and serves as a sequencing guide for the Commissioning Team. The ITP covers all phases of commissioning described in this section. On occasion, it may be necessary to vary from the sequence slightly to resolve issues encountered during testing. The ITP and commissioning procedures found in
Appendix A of this manual provide the detailed instructions for commissioning the IP Turbine-
Generator #4 Switchgear and associated equipment.
4.2 CONSTRUCTION TEST PHASE
During the construction test phase, the Contractor will perform the necessary inspections and tests to ensure that completed installations are acceptable and in accordance with the latest engineering and design information. The results of construction testing will be documented by the Contractor.
4.3 PRE-OPERATIONAL TEST PHASE
The Contractor will perform all pre-operational testing. The Commissioning Director and staff will witness the checkout and testing during this phase to ensure that tests are conducted in accordance with approved procedures prior to commencing the operational testing phase.
4.4 STARTUP AND OPERATIONAL TEST PHASE
The startup and operational test phase will require coordination between the Contractor, the
Owner, International Paper, and others to start up and energize the unit and to verify proper operation of the equipment being commissioned. This phase includes all tests and checks that are necessary to ensure satisfactory plant commercial operation (see Section 3.3). This phase will include placing all systems in operation and ultimately operating the generating facility at full load.
BLACK & VEATCH | Appendix A
Appendix A. Inspection and Test Plan
Rev: 0
Title:
IP Turbine-Generator #4 Switchgear Replacement
Inspection and Test Plan
EWEB WO: 2100317
Client: Eugene Water and Electric Board
Initial issue Name Date B&V Project Number: 408517
Prepared L. Traxel 11/18/2022
Checked B. Benson 11/18/2022
Approved J. Brunot 11/18/2022
Rev. Description of Revision Rev. Approved Date
0 Initial Issue J. Brunot 11/18/2022
Step Predecessor Description Responsibility
Procedure Reference Dates and Signatures
Comments Execute Witness Date Witness 1 Witness 2
CONSTRUCTION TESTING
CABLE TESTING
1. MV Cable Insulation Testing CC EI 26 05 11-3.2.2
2. LV Cable Insulation Testing CC EI 26 05 11-3.2.3
3. LV Cable Continuity Testing CC EI 26 05 11-3.2.3
4. LV Cable Loop Impedance Testing CC EI 26 05 11-3.2.3
5. Power, Control, and Instrument
Cable Termination Checks
CC EI
6. Instrument Loop Calibration
Checks
CC EI
7. Fiber Optic Cable OTDR Testing CC EI 40 66 33-3.2
8. Fiber Optic Cable Power Loss
Testing
CC EI 40 66 33-3.2
Procedure Reference Dates and Signatures
Comments Execute Witness Date Witness 1 Witness 2
9. Communication Cable
Termination Checks
CC EI
PRE-OPERATIONAL TESTING
COMMUNICATION SYSTEM
10. Powerhouse Communication
Panel Visual Inspection
CC EI
11. Substation Panel 6 Visual
Inspection
CC EI
12. Substation Panel 7 Visual
Inspection
CC EI
13. 7-9 Configure JMUX Devices and Test
Communication Link
EC EC
14. 2-13 JMUX Devices Functional Testing CC EI CP-001
GENERATOR SWITCHGEAR
15. Visual Inspection CC EI
16. 15 Hi-Pot Test CC EI IEEE C37.20.2
17. 15 Micro-Ohm Test CC EI
18. 2-5, 15 Energize Heater Circuit CC EI
19. 16-18 Installation Check SM EI
GENERATOR BUS DUCT
20. Visual Inspection CC EI
21. 20 Hi-Pot Test CC EI IEEE C37.23
22. 20 Micro-Ohm Test CC EI
23. 2-5, 20 Energize Heater Circuit CC EI
24. 21-23 Installation Check SM EI
13.8KV BREAKER 2790 CTS (4 SETS)
25. 2-5 CT Circuit Phasing Checks CC EI
26. 2-5 CT Secondary Injection Test CC EI
27. 2-5 CT Grounding Test CC EI
Procedure Reference Dates and Signatures
Comments Execute Witness Date Witness 1 Witness 2
28. 2-5 CT High-Current Push Test CC EI
GENERATOR PHASE & GROUND CTS
29. 2-5 CT Circuit Phasing Checks CC EI
EXCITER PPT CTS
30. 2-5 CT Circuit Phasing Checks CC EI
GSU TRANSFORMER 4 PHASE & GROUND CTS (2 SETS + GROUND CT)
31. 2-5 CT Circuit Phasing Checks CC EI
115KV BREAKER 2750 CTS (2 SETS)
32. 2-5 CT Circuit Phasing Checks CC EI
13.8KV SWITCHGEAR PTS (GEN 4 PT)
33. 2-5 PT Circuit Phasing Checks CC EI
34. 2-5 TTR Test CC EI
35. 2-5 Megger Test CC EI
13.8KV SWITCHGEAR PTS (EXC PT)
36. 2-5 PT Circuit Phasing Checks CC EI
37. 2-5 TTR Test CC EI
38. 2-5 Megger Test CC EI
13.8KV SWITCHGEAR PTS (SWGR PT)
39. 2-5 PT Circuit Phasing Checks CC EI
40. 2-5 TTR Test CC EI
41. 2-5 Megger Test CC EI
13.8KV SUBSTATION PTS (PT4)
42. 2-5 PT Circuit Phasing Checks CC EI
SUBSTATION PANEL 5 AUX PTS
43. 2-5 PT Circuit Phasing Checks CC EI
44. 2-5 TTR Test CC EI
45. 2-5 Megger Test CC EI
115KV BREAKER 2750
46. 14 Functional Testing CC EI CP-002
Procedure Reference Dates and Signatures
Comments Execute Witness Date Witness 1 Witness 2
FIELD BREAKER
47. 46 Functional Testing CC EI CP-003
13.8KV BREAKER 2790
48. 15 Megger Test CC EI 15kV PCB Test Form
49. 15 Hi-Pot Test CC EI 15kV PCB Test Form
50. 15 Micro-Ohm Test CC EI 15kV PCB Test Form
51. 47 Functional Testing CC EI CP-004
GENERATOR PROTECTION
52. 51 Generator Protection Functional
Testing
CC EI CP-005
53. 2-5 Generator Protection Relay
Element and Logic Testing
CC EI
EXCITER PROTECTION
54. 52 Exciter Protection Functional
Testing
CC EI CP-006
55. 2-5 Exciter Protection Relay Element and Logic Testing
CC EI
13.8KV LINE PROTECTION
56. 52 13.8kV Powerhouse Line
Protection Functional Testing
CC EI CP-007
57. 2-5 13.8kV Powerhouse Line
Protection Relay Element and
Logic Testing
CC EI
58. 56 13.8kV Substation Line Protection
Functional Testing
CC EI CP-008
59. 2-5 13.8kV Substation Line Protection
Relay Element and Logic Testing
CC EI
60. 2-5 13.8kV Line Protection POTT/87L
Testing
CC EI
Procedure Reference Dates and Signatures
Comments Execute Witness Date Witness 1 Witness 2
GSU TRANSFORMER 4 PROTECTION
61. 58 GSU Transformer 4 Protection
Functional Testing
CC EI CP-009
62. 2-5 GSU Transformer 4 Protection
Relay Element and Logic Testing
CC EI
OPERATIONAL TESTING
UNIT STARTUP & SHUTDOWN
63. 1-62 Unit Synchronizing CC EI CP-010
64. 63 Unit Tripping Sequences CC EI CP-011
PROTECTION RELAY LOAD CHECKS
65. 64 Substation Relay 11L1 Load
Check
CC EI Relay Load Check Forms
66. 64 Substation Relay 87L Load Check CC EI Relay Load Check Forms
67. 64 Relay 87T4 Load Check CC EI Relay Load Check Forms
68. 64 Powerhouse Relay 11L1 Load
Check
CC EI Relay Load Check Forms
69. 64 Powerhouse Relay 87L Load
Check
CC EI Relay Load Check Forms
70. 64 Relay 11G4A Load Check CC EI Relay Load Check Forms
71. 64 Relay 11G4B Load Check CC EI Relay Load Check Forms
72. 64 Relay 51E Load Check CC EI Relay Load Check Forms
METERING LOAD CHECKS
73. 64 SEL-735 Meter Load Check CC EI
74. 64 ION Meter Load Check CC EI
75. 64 Exciter Ammeter Load Check CC EI
76. 64 Control Panel A Meters Load
Check
CC EI
77. 64 Mark VI Metering Load Check CC EI
78. 64 DECS-300 Load Check CC EI
Procedure Reference Dates and Signatures
Comments Execute Witness Date Witness 1 Witness 2
79. 64 Panel 7 Ammeter Load Check CC EI
LEGEND
Company/Department Acronym Role Responsibilities Comments
EWEB Communications
Shop
EC Owner Plant Communications & Control
System Configuration
EWEB Inspectors EI Owner Electrical Inspection
EWEB Operators EO Owner Electrical Switching & Energization
International Paper IP Plant Operator Plant Operations & Maintenance
Black & Veatch BV Owner’s Engineer Commissioning Plan
Construction Contractor CC Construction Contractor Cable Testing, Equipment Inspections, Equipment Testing, Breaker Testing, Instrument Transformer Testing, Functional Testing, Protective Relay
Element & Logic Testing, Load Checks
States Manufacturing SM Switchgear & Bus Duct
Manufacturer
13.8kV Switchgear & Bus Duct
Installation Check
BLACK & VEATCH | Appendix B B-1
Appendix B. Test Procedures and Forms
The following test procedures and forms are included in this Appendix:
CP-001 JMUX Devices Functional Testing
CP-002 115kV PCB 2750 Functional Testing
CP-003 Field Breaker Functional Testing
CP-004 13.8kV PCB 2790 Functional Testing
CP-005 Generator Protection Functional Testing
CP-006 Exciter Protection Functional Testing
CP-007 Powerhouse Line Protection Functional Testing
CP-008 Substation Line Protection Functional Testing
CP-009 GSU Transformer 4 Protection Functional Testing
CP-010 Unit Synchronizing
CP-011 Unit Tripping Sequences
- 15kV PCB Test Form
- Protective Relay Load Check Forms
EWEB WO 2100317
Commissioning Procedure CP-001 JMUX Devices Functional Testing
CP-001 JMUX Devices Functional Testing Page 1 of 4 11/18/2022
Purpose of Procedure This procedure is to verify proper operation of the JMUX communication devices at the powerhouse and substation, including status and trip signals passed between the facilities, and to verify signals to the Powerhouse RTU and Substation RTU.
Reference Drawings:
D-10469 PANEL 6 – COMMUNICATION EQUIPMENT – SCHEMATIC DIAGRAM
D-10561-2 METER AND RELAY – ONE-LINE DIAGRAM
D-10561-15 PANEL 6 – COMMUNICATION EQUIPMENT – CONNECTION DIAGRAM –
SHEET 1
D-10561-15A PANEL 6 – COMMUNICATION EQUIPMENT – CONNECTION DIAGRAM –
SHEET 2
D-10561-25 ANNUNCIATOR 1, 2 & 3 – CONNECTION DIAGRAM
D-12248-4 RTU 7-19 – LEFT SIDE – CONNECTION DIAGRAM
D-12261-4 RTU 8-21 – LEFT SIDE – CONNECTION DIAGRAM
D-38389-E5 METER AND RELAY – ONE-LINE DIAGRAM
D-38389-E10 SCHEMATICS – 13.8KV SWITCHGEAR MISC CONTROL
D-38389-N1 COMMUNICATION EQUIPMENT – SCHEMATIC DIAGRAM
D-38389-N3 WIRING DIAGRAM – COMMUNICATION PANEL – SHEET 1
D-38389-N4 WIRING DIAGRAM – COMMUNICATION PANEL – SHEET 2
Initial Conditions:
Verify the following initial conditions before beginning the procedure:
115kV PCB 2750 OPEN
115kV Disconnect Switches BSD2750 & XSD2750 OPEN
13.8kV Disconnect Switch XSD2790 OPEN
Generator Off-Line
13.8kV PCB 2790 Racked Out
125VDC control power present at Substation Communication Panel 6
Substation Relay Panel 7 Test Switches SW1D, SW1E, SW2E, SW3E, SW4E, SW5E, SW6E OPEN (all poles)
125VDC control power present at Powerhouse Communication Panel
125VDC control power present at Powerhouse Control Panel A (for 115kV PCB 2750 indicating lights)
125VDC control power present at 13.8kV Switchgear
Switchgear Fuse Block FU_ CLOSED (2750X & T4X relays)
13.8kV Switchgear Test Switches SW1A, SW2A, SW3A, SW4A, SW5A, SW6A, SW1B, SW2B, SW3B, SW4B, SW5B, SW6B OPEN (all poles)
Caution This procedure requires test personnel to work on energized equipment. Working near energized parts requires properly trained and knowledgeable personnel. Test personnel shall be apprised of the hazards prior to testing. All necessary precautions shall be taken to protect test personnel from harm from all hazards. Proper safety clearance rules in accordance with EWEB’s policies and local, state, and federal laws shall be adhered to during all testing.
CP-001 JMUX Devices Functional Testing Page 2 of 4 11/18/2022
Powerhouse JMUX Alarms
JMUX DC Fail Alarm
VERIFY Powerhouse RTU Input 11A-27 OFF
OPEN Breaker CB-1 in Powerhouse Communication Panel
VERIFY Powerhouse RTU Input 11A-27 ON
CLOSE Breaker CB-1 in Powerhouse Communication Panel
OPEN Breaker CB-2 in Powerhouse Communication Panel
VERIFY Powerhouse RTU Input 11A-27 ON
CLOSE Breaker CB-2 in Powerhouse Communication Panel
OPEN Breaker CB-3 in Powerhouse Communication Panel
VERIFY Powerhouse RTU Input 11A-27 ON
CLOSE Breaker CB-3 in Powerhouse Communication Panel
OPEN Breaker CB-4 in Powerhouse Communication Panel
VERIFY Powerhouse RTU Input 11A-27 ON
CLOSE Breaker CB-4 in Powerhouse Communication Panel
VERIFY Powerhouse RTU Input 11A-27 OFF
JMUX Major Alarm
VERIFY Powerhouse RTU Input 11A-29 OFF
INSTALL temporary jumper on JMUX CDAX Module (Slots 12 & 13) Major Alarm contact (Terminals P1-1 & P1-2) in Powerhouse Communication Panel
VERIFY Powerhouse RTU Input 11A-29 ON
REMOVE temporary jumper on JMUX CDAX Module (Slots 12 & 13) Major Alarm contact (Terminals P1-1 & P1-2) in Powerhouse Communication Panel
JMUX Minor Alarm
VERIFY Powerhouse RTU Input 11A-28 OFF
INSTALL temporary jumper on JMUX CDAX Module (Slots 12 & 13) Minor Alarm contact (Terminals P2-1 & P2-2) in Powerhouse Communication Panel
VERIFY Powerhouse RTU Input 11A-28 ON
REMOVE temporary jumper on JMUX CDAX Module (Slots 12 & 13) Minor Alarm contact (Terminals P2-1 & P2-2) in Powerhouse Communication Panel
Substation JMUX Alarms
JMUX DC Fail Alarm
VERIFY Substation RTU Input 12B-89 OFF
OPEN Breaker CB-1 on Substation Communication Panel 6
VERIFY Substation RTU Input 12B-89 ON
CLOSE Breaker CB-1 on Substation Communication Panel 6
OPEN Breaker CB-2 on Substation Communication Panel 6
VERIFY Substation RTU Input 12B-89 ON
CLOSE Breaker CB-2 on Substation Communication Panel 6
OPEN Breaker CB-3 on Substation Communication Panel 6
VERIFY Substation RTU Input 12B-89 ON
CLOSE Breaker CB-3 on Substation Communication Panel 6
OPEN Breaker CB-4 on Substation Communication Panel 6
VERIFY Substation RTU Input 12B-89 ON
CLOSE Breaker CB-4 on Substation Communication Panel 6
VERIFY Substation RTU Input 12B-89 OFF
JMUX Major Alarm
VERIFY Substation RTU Input 12B-91 OFF
CP-001 JMUX Devices Functional Testing Page 3 of 4 11/18/2022
INSTALL temporary jumper on JMUX CDAX Module (Slots 12 & 13) Major Alarm contact (Terminals P1-1 & P1-2) on Substation Communication Panel 6
VERIFY Substation RTU Input 12B-91 ON
REMOVE temporary jumper on JMUX CDAX Module (Slots 12 & 13) Major Alarm contact (Terminals P1-1 & P1-2) on Substation Communication Panel 6
JMUX Minor Alarm
VERIFY Substation RTU Input 12B-90 OFF
INSTALL temporary jumper on JMUX CDAX Module (Slots 12 & 13) Minor Alarm contact (Terminals P2-1 & P2-2) on Substation Communication Panel 6
VERIFY Substation RTU Input 12B-90 ON
REMOVE temporary jumper on JMUX CDAX Module (Slots 12 & 13) Minor Alarm contact (Terminals P2-1 & P2-2) on Substation Communication Panel 6
Breaker Failure Signal from Powerhouse to Substation
VERIFY 50BFX relay on Substation Panel 6 DE-ENERGIZED
INSTALL temporary jumper on Terminals XX & XX in 13.8kV Switchgear (Breaker Failure Signal)
VERIFY 50BFX relay on Substation Panel 6 ENERGIZED
REMOVE temporary jumper on Terminals XX & XX in 13.8kV Switchgear (Breaker Failure Signal)
VERIFY 50BFX relay on Substation Panel 6 DE-ENERGIZED
13.8kV PCB 2790 Status Signal from Powerhouse to Substation
VERIFY 2790X relay on Substation Panel 6 DE-ENERGIZED
INSTALL temporary jumper on PCB 2790 Aux Contact (Terminals XX & XX) in 13.8kV Switchgear
VERIFY 2790X relay on Substation Panel 6 ENERGIZED
REMOVE temporary jumper on PCB 2790 Aux Contact (Terminals XX & XX) in 13.8kV Switchgear
115kV PCB 2750 Control Switch Trip Signal from Powerhouse to Substation
VERIFY CSTX relay on Substation Panel 6 DE-ENERGIZED
VERIFY Substation Annunciator 2 Window 7 OFF (PCB 2750 WEYCO 4 REM TRIP)
TURN PCB 2750 Control Switch to TRIP position and HOLD on Control Panel A
VERIFY CSTX relay on Substation Panel 6 ENERGIZED
VERIFY Substation Annunciator 2 Window 7 ON (PCB 2750 WEYCO 4 REM TRIP)
RELEASE PCB 2750 Control Switch on Control Panel A
Transformer Trip Signal from Substation to Powerhouse
VERIFY T4X relay in 13.8kV Switchgear DE-ENERGIZED
VERIFY Transformer 4 Trip Alarm CLEAR at Mark VI
INSTALL temporary jumper on Terminals 31 & 32 on Substation Panel 7
VERIFY T4X relay in 13.8kV Switchgear ENERGIZED
VERIFY Transformer 4 Trip Alarm IN at Mark VI
REMOVE temporary jumper on Terminals 31 & 32 on Substation Panel 7
115kV PCB 2750 Status Signal from Substation to Powerhouse
VERIFY 2750X relay in 13.8kV Switchgear DE-ENERGIZED
VERIFY Powerhouse RTU Input 11A-14 ON
VERIFY PCB 2750 Green Indicating Light ON on Control Panel A
CP-001 JMUX Devices Functional Testing Page 4 of 4 11/18/2022
VERIFY PCB 2750 Red Indicating Light OFF on Control Panel A
VERIFY PCB 2750 OPEN status at Mark VI
INSTALL temporary jumper on PCB 2750 Aux Contact (Terminals TB-55 & TB-56)
VERIFY 2750X relay in 13.8kV Switchgear ENERGIZED
VERIFY Powerhouse RTU Input 11A-14 OFF
VERIFY PCB 2750 Red Indicating Light ON on Control Panel A
VERIFY PCB 2750 Green Indicating Light OFF on Control Panel A
VERIFY PCB 2750 CLOSED status at Mark VI
REMOVE temporary jumper on PCB 2750 Aux Contact (Terminals TB-55 & TB-56)
Technician Signature(s) Please sign and date below, confirming (at least) the above testing has been completed:
Technician Technician / Apprentice Date Completed
Commissioning Procedure CP-002 115kV PCB 2750 Functional Testing
CP-002 115kV PCB 2750 Functional Testing Page 1 of 3 11/18/2022
This procedure is to verify the control and indication for 115kV PCB 2750, including close permissives and trip signals, and to verify interfaces with the Substation RTU.
Reference Drawings:
D-10469 PANEL 6 – COMMUNICATION EQUIPMENT – SCHEMATIC DIAGRAM
D-10561-2 METER AND RELAY – ONE-LINE DIAGRAM
D-10561-29 TRANSFORMER 4 – THREE LINE DIAGRAM
D-10561-29A TRANSFORMER 4 PROTECTION – SCHEMATIC DIAGRAM
D-10561-31 CONTROL PANEL 7 – CONNECTION DIAGRAM – SHEET 1
D-10561-31A CONTROL PANEL 7 – CONNECTION DIAGRAM – SHEET 2
D-10561-54A PCB 2750 – SCHEMATIC DIAGRAM
D-10561-54B PCB 2750 – CONNECTION DIAGRAM
D-12248-4 RTU 7-19 – LEFT SIDE – CONNECTION DIAGRAM
D-38389-N1 COMMUNICATION EQUIPMENT – SCHEMATIC DIAGRAM
Initial Conditions:
Verify the following initial conditions before beginning the procedure:
115kV PCB 2750 OPEN
115kV Disconnect Switches BSD2750 & XSD2750 OPEN
13.8kV Disconnect Switch XSD2790 OPEN
Generator Off-Line
13.8kV PCB 2790 OPEN or Racked Out
125VDC control power present at 115kV PCB 2750
115kV PCB 2750 Fuse Blocks 08C & 08T CLOSED
125VDC control power present at Substation Relay Panel 7
Substation Panel 7 Control Switch 43CO in BLOCKED position
Transformer 4 Lockout Relay 86T4 RESET
115kV Bus Lockout Relay 86B4 RESET
Substation Panel 7 Test Switch SW1D OPEN (all poles)
This procedure requires the energizing of various circuits and equipment that may introduce a risk of electrical shock. Working near energized parts requires properly trained and knowledgeable personnel. Test personnel shall be apprised of the hazards prior to testing. All necessary precautions shall be taken to protect test personnel from harm from all hazards. Proper safety clearance rules in accordance with EWEB’s policies and local, state, and federal laws shall be adhered to during all testing.
PCB 2750 Close Control RTU Input
VERIFY Substation RTU Input 12A-68 ON
TURN Substation Panel 7 Control Switch 43CO to IN SERVICE position
VERIFY Substation RTU Input 12A-68 OFF
Breaker Operation, DC Fused Disconnect Isolation, and Breaker Light Indication
VERIFY Substation Panel 7 Green Light ON, Red Light OFF
VERIFY Substation RTU Input 11A-11 OFF
CP-002 115kV PCB 2750 Functional Testing Page 2 of 3 11/18/2022
CLOSE PCB 2750 via Panel 7 Control Switch, PCB 2750 CLOSE
VERIFY Panel 7 Red Light ON, Green Light OFF
VERIFY Substation RTU Input 11A-11 ON
TRIP PCB 2750 via Panel 7 Control Switch, PCB 2750 TRIP
VERIFY Panel 7 Green Light ON, Red Light OFF
CLOSE PCB 2750 via Substation RTU, PCB 2750 CLOSE
TRIP PCB 2750 via Substation RTU, PCB 2750 TRIP
OPEN Fused Disconnect 08C, Panel 7 Green Light OFF
CLOSE PCB 2750 via Panel 7 Control Switch, no response
CLOSE PCB 2750 via Substation RTU, no response
CLOSE Fused Disconnect 08C, Panel 7 Green Light ON
CLOSE PCB 2750 via Panel 7 Control Switch, PCB 2750 CLOSE
VERIFY Panel 7 Red Light ON, Green Light OFF
OPEN Fused Disconnect 08T, Panel 7 Red Light OFF
TRIP PCB 2750 via Panel 7 Control Switch, no response
TRIP PCB 2750 via Substation RTU, no response
CLOSE Fused Disconnect 08T, Panel 7 Red Light ON
TRIP PCB 2750 via Panel 7 Control Switch, PCB 2750 TRIP
VERIFY Panel 7 Green Light ON, Red Light OFF
OPEN Fused Disconnect 08T, Panel 7 Green Light OFF
CLOSE Fused Disconnect 08T, Panel 7 Green Light ON
PCB 2750 Close Permissives
TURN Panel 7 Control Switch 43CO to BLOCKED position
CLOSE PCB 2750 via Panel 7 Control Switch, no response
CLOSE PCB 2750 via Substation RTU, no response
TURN Panel 7 Control Switch 43CO to IN SERVICE position
TRIP Lockout Relay 86T4
CLOSE PCB 2750 via Panel 7 Control Switch, no response
CLOSE PCB 2750 via Substation RTU, no response
RESET Lockout Relay 86T4
OPEN Panel 9 SW3C Test Switches (all poles)
TRIP Lockout Relay 86B4
CLOSE PCB 2750 via Panel 7 Control Switch, no response
CLOSE PCB 2750 via Substation RTU, no response
RESET Lockout Relay 86B4
CLOSE Panel 9 SW3C Test Switches (all poles)
INSTALL temporary jumper in Switchgear between Terminals XX & XX (2790 aux contact)
VERIFY 2790X relay in Panel 6 ENERGIZED
CLOSE PCB 2750 via Panel 7 Control Switch, no response
CLOSE PCB 2750 via Substation RTU, no response
REMOVE temporary jumper in Switchgear between Terminals XX & XX (2790 aux contact)
VERIFY 2790X relay in Substation Panel 6 DE-ENERGIZED
CLOSE PCB 2750 via Panel 7 Control Switch, PCB 2750 CLOSE
CP-002 115kV PCB 2750 Functional Testing Page 3 of 3 11/18/2022
PCB 2750 Trips
Lockout Relay 86T4:
CLOSE Panel 7 SW1D Test Switch A
TRIP Lockout Relay 86T4, PCB 2750 TRIP
RESET Lockout Relay 86T4
CLOSE PCB 2750 via Panel 7 Control Switch, PCB 2750 CLOSE
OPEN Panel 7 SW1D Test Switch A
TRIP Lockout Relay 86T4, no response
RESET Lockout Relay 86T4
Lockout Relay 86B4:
OPEN Panel 9 SW3C Test Switches (all poles)
CLOSE Panel 9 SW3C Test Switch C
TRIP Lockout Relay 86B4, PCB 2750 TRIP
RESET Lockout Relay 86B4
CLOSE PCB 2750 via Panel 7 Control Switch, PCB 2750 CLOSE
OPEN Panel 9 SW3C Test Switch C
TRIP Lockout Relay 86B4, no response
RESET Lockout Relay 86B4
CLOSE Panel 9 SW3C Test Switches (all poles)
Control Panel A Control Switch:
TRIP PCB 2750 via Control Panel A Control Switch, PCB 2750 TRIP
CLOSE PCB 2750 via Control Panel A Control Switch, no response
Commissioning Procedure CP-003 Field Breaker Functional Testing
CP-003 Field Breaker Functional Testing Page 1 of 2 11/18/2022
This procedure is to verify the control and indication for the generator field breaker, including close permissives and trip signals.
Reference Drawings:
D-10469 PANEL 6 – COMMUNICATION EQUIPMENT – SCHEMATIC DIAGRAM
D-10476-27 TURBINE 4 & EXCITER – INTERCONNECTION DIAGRAM
D-10561-29A TRANSFORMER 4 PROTECTION – SCHEMATIC DIAGRAM
D-11773-10 STATIC EXCITER-REGULATOR STANDARD – ELEMENTARY DIAGRAM
D-30385-2 DECS-300N, SCT-PPT RETROFIT W/FLASHING – INTERCONNECTION
DIAGRAM
D-38389-E5 METER AND RELAY – ONE-LINE DIAGRAM
D-38389-E9 SCHEMATICS – UNIT 4 LOCKOUT RELAYS 86G1, 86G2 & 86G3
D-38389-E10 SCHEMATICS – 13.8KV SWITCHGEAR MISC CONTROL
D-38389-E12 SCHEMATICS – GENERATOR 4 PROTECTION
Initial Conditions:
Verify the following initial conditions before beginning the procedure:
115kV PCB 2750 OPEN
115kV Disconnect Switches BSD2750 & XSD2750 OPEN
13.8kV Disconnect Switch XSD2790 OPEN
Generator Off-Line
13.8kV PCB 2790 OPEN or Racked Out
Field Breaker OPEN
125VDC control power present at Exciter Cabinet
125VDC control power present at 13.8kV Switchgear
125VDC control power present at Powerhouse Communication Panel
125VDC control power present at Substation Panel 6
Switchgear Fuse Blocks FU_ & FU_ CLOSED (11G4A & 11G4B relays)
Switchgear Fuse Block FU_ CLOSED (2750X & T4X relays)
Generator Lockout Relay 86G1 RESET
Transformer 4 Lockout Relay 86T4 RESET
13.8kV Switchgear Test Switch SW1F OPEN (all poles)
Substation Relay Panel 7 Test Switch SW1D OPEN (all poles) risk of electrical shock. Working near energized parts requires properly trained and knowledgeable personnel. Test personnel shall be apprised of the hazards prior to testing. All necessary precautions shall be taken to protect test personnel from harm from all
Disable Exciter Controls
PULL Fuses C1FU & C2FU in Exciter Cabinet to disable exciter controls
Commissioning Procedure CP-003 Field Breaker Functional Testing
CP-003 Field Breaker Functional Testing Page 2 of 2 11/18/2022
Field Breaker Control and Indication
VERIFY Control Panel A Green Light ON, Red Light OFF
CLOSE Field Breaker via Control Panel A Control Switch, Field Breaker CLOSE
VERIFY Control Panel A Green Light OFF, Red Light ON
TRIP Field Breaker via Control Panel A Control Switch, Field Breaker TRIP
Field Close Permissives
TRIP Lockout Relay 86G1
CLOSE Field Breaker via Control Panel A Control Switch, no response
RESET Lockout Relay 86G1
CLOSE Substation Panel 7 SW1D Test Switch B
TRIP Lockout Relay 86T4 on Substation Panel 7
CLOSE Field Breaker via Control Panel A Control Switch, no response
RESET Lockout Relay 86T4 on Substation Panel 7
CLOSE Field Breaker via Control Panel A Control Switch, Field Breaker CLOSE
Field Breaker Trips
Lockout Relay 86G1:
CLOSE Switchgear SW1F Test Switch B
TRIP Lockout Relay 86G1, Field Breaker TRIP
RESET Lockout Relay 86G1
CLOSE Field Breaker via Control Panel A Control Switch, Field Breaker CLOSE
OPEN Switchgear SW1F Test Switch B
TRIP Lockout Relay 86G1, no response
RESET Lockout Relay 86G1
Lockout Relay 86T4:
TRIP Lockout Relay 86T4, Field Breaker TRIP
RESET Lockout Relay 86T4
CLOSE Field Breaker via Control Panel A Control Switch, Field Breaker CLOSE
OPEN Substation Panel 7 SW1D Test Switch B
TRIP Lockout Relay 86T4, no response
RESET Lockout Relay 86T4
TRIP Field Breaker via Control Panel A Control Switch, Field Breaker TRIP
Enable Exciter Controls
REINSTALL Fuses C1FU & C2FU in Exciter Cabinet to enable exciter controls
Commissioning Procedure CP-004 13.8kV PCB 2790 Functional Testing
CP-004 13.8kV PCB 2790 Functional Testing Page 1 of 5 11/18/2022
This procedure is to verify the control and indication for 13.8kV PCB 2790, both locally from the 13.8kV Switchgear and remotely from Control Panel A, including close permissives and trip signals, and to verify interfaces with the Powerhouse RTU and Mark VI Control System.
Reference Drawings:
D-10469 PANEL 6 – COMMUNICATION EQUIPMENT – SCHEMATIC DIAGRAM
D-10561-54A PCB 2750 – SCHEMATIC DIAGRAM
D-11773-10 STATIC EXCITER-REGULATOR STANDARD – ELEMENTARY DIAGRAM
C-11773-12 STATIC EXCITER-REGULATOR STANDARD – ELEMENTARY DIAGRAM
D-12261-4 RTU 8-21 – LEFT SIDE – CONNECTION DIAGRAM
D-30385-2 DECS 300-N, SCT-PPT RETROFIT W/FLASHING – INTERCONNECTION
DIAGRAM
D-38389-E5 METER AND RELAY – ONE-LINE DIAGRAM
D-38389-E7 THREE LINE DIAGRAM – GENERATOR 4 BREAKER
D-38389-E8 SCHEMATICS PCB 2790 – GENERATOR 4 BREAKER
D-38389-E9 SCHEMATICS – UNIT 4 LOCKOUT RELAYS 86G1, 86G2 & 86G3
D-38389-E10 SCHEMATICS – 13.8KV SWITCHGEAR MISC CONTROL
D-38389-E12 SCHEMATICS – GENERATOR 4 PROTECTION
D-38389-E51 WIRING DIAGRAM – 13.8KV SWITCHGEAR SECTION 1
D-38389-E52 WIRING DIAGRAM – 13.8KV SWITCHGEAR SECTION 2
Initial Conditions:
Verify the following initial conditions before beginning the procedure:
115kV PCB 2750 OPEN
115kV Disconnect Switches BSD2750 & XSD2750 OPEN
13.8kV Disconnect Switch XSD2790 OPEN
Generator Off-Line
13.8kV PCB 2790 in TEST position
13.8kV PCB 2790 OPEN
125VDC control power present at Exciter Cabinet
125VDC control power present at Volts/Hertz Panel
125VDC control power present at 13.8kV Switchgear
125VDC control power present at Powerhouse Communication Panel
125VDC control power present at Substation Panel 6
Switchgear Fuse Blocks FU1 & FU2 OPEN (PCB 2790 close & trip circuits)
Switchgear Fuse Blocks FU_ & FU_ CLOSED (11G4A & 11G4B relays)
Switchgear Fuse Block FU_ CLOSED (2750X & T4X relays)
Generator Lockout Relays 86G1, 86G2 & 86G3 RESET
Control Panel A Synch Switch 43SS in ON position
Substation Panel 7 Control Switch 43CO in BLOCKED position
Transformer 4 Lockout Relay 86T4 RESET
115kV Bus Lockout Relay 86B4 RESET
13.8kV Switchgear Test Switches SW1A, SW2A, SW3A, SW4A, SW5A, SW6A, SW1B, SW2B, SW3B, SW4B, SW5B, SW6B, SW1F, SW2F, SW3F OPEN (all poles)
Substation Relay Panel 7 Test Switch SW1D OPEN (all poles)
CP-004 13.8kV PCB 2790 Functional Testing Page 2 of 5 11/18/2022 risk of electrical shock. Working near energized parts requires properly trained and knowledgeable personnel. Test personnel shall be apprised of the hazards prior to testing. All necessary precautions shall be taken to protect test personnel from harm from all
Disable Remote Trip Signals
PULL Fuses C1FU & C2FU in Exciter Cabinet to disable exciter controls
CLOSE Field Breaker via Control Panel A Control Switch, Field Breaker CLOSE
TURN Panel 7 Control Switch 43CO to IN SERVICE position
CLOSE PCB 2750 via Substation Panel 7 Control Switch, PCB 2750 CLOSE
VERIFY 2750X relay in Switchgear ENERGIZED
PCB 2790 DC Power
CHECK for shorts and grounds on Switchgear Fuse Blocks FU1 & FU2
CLOSE Switchgear Fuse Block FU2
VERIFY operation of Spring Charging Motor
CLOSE Switchgear Fuse Block FU1, Switchgear Green Light ON
Breaker Operation in Test Position, DC Fuse Isolation, and Breaker Light Indication
CLOSE PCB 2790 via Control Panel A Control Switch, no response
CLOSE PCB 2790 via Switchgear Control Switch, PCB 2790 CLOSE
VERIFY Switchgear Green Light OFF, Red Light ON
VERIFY Control Panel A Green Light OFF, Red Light ON
OPEN Fuse Block FU1, Red Lights turn OFF
TRIP PCB 2790 via Switchgear Control Switch, no response
TRIP PCB 2790 via Control Panel A Control Switch, no response
CLOSE Fuse Block FU1, Red Lights turn ON
TRIP PCB 2790 via Switchgear Control Switch, PCB 2790 TRIP
VERIFY Switchgear Green Light ON, Red Light OFF
VERIFY Control Panel A Green Light ON, Red Light OFF
CLOSE PCB 2790 via Switchgear Control Switch, PCB 2790 CLOSE
TRIP PCB 2790 via Control Panel A Control Switch, PCB 2790 TRIP
OPEN Fuse Block FU2
CLOSE PCB 2790 via Switchgear Control Switch, no response
CLOSE Fuse Block FU2
Breaker Operation in Connected Position and Status Indication
RACK PCB 2790 in to CONNECTED position
VERIFY Powerhouse RTU Input 11A-2 ON
VERIFY PCB 2790 OPEN status at Mark VI
VERIFY 52G/b relay in Volts/Hertz Panel ENERGIZED
INSTALL temporary jumper in Switchgear between terminals XX & XX (synch check contacts from Mark VI and 11G4A/11G4B relays)
CLOSE PCB 2790 via Switchgear Control Switch, no response
CLOSE PCB 2790 via Control Panel A Control Switch, PCB 2790 CLOSE
VERIFY Powerhouse RTU Input 11A-2 OFF
CP-004 13.8kV PCB 2790 Functional Testing Page 3 of 5 11/18/2022
VERIFY PCB 2790 CLOSED status at Mark VI
VERIFY 52G/b relay in Volts/Hertz Panel DE-ENERGIZED
TRIP PCB 2790 via Control Panel A Control Switch, PCB 2790 TRIP
JUMPER Terminals 1B4-3 & 1B4-5 in Mark VI Cabinet, PCB 2790 CLOSE
TRIP PCB 2790 via Switchgear Control Switch, PCB 2790 TRIP
Anti-Pump Scheme
CLOSE PCB 2790 via Control Panel A Control Switch and HOLD until after completing next step, PCB 2790 CLOSE
TRIP PCB 2790 via Switchgear Control Switch, PCB 2790 TRIP
VERIFY PCB 2790 doesn’t CLOSE while Control Panel A Control Switch is held in the CLOSE position
RELEASE Control Panel A Control Switch, no response
REMOVE temporary jumper in Switchgear between terminals XX & XX (synch check)
Generator Protection Relays DC Power
CLOSE Switchgear SW6A Test Switches I & J, Relay 11G4A (SEL-700G) powers up
CLOSE Switchgear SW6B Test Switches I & J, Relay 11G4B (SEL-700G) powers up
PCB 2790 Close Permissives
INSTALL temporary jumper between Terminals 1B4-5 & 1B4-7 in Mark VI Cabinet
11G4A OUT402:
CLOSE Switchgear SW3A Test Switches A & B
FORCE 11G4A OUT402 CLOSED
CLOSE PCB 2790 via Control Panel A Control Switch, PCB 2790 CLOSE
TRIP PCB 2790 via Control Panel A Control Switch, PCB 2790 TRIP
OPEN SW3A Test Switch A
CLOSE PCB 2790 via Control Panel A Control Switch, no response
CLOSE SW3A Test Switch A
OPEN SW3A Test Switch B
CLOSE PCB 2790 via Control Panel A Control Switch, no response
CLOSE SW3A Test Switch B
RETURN 11G4A OUT402 to Normal
CLOSE PCB 2790 via Control Panel A Control Switch, no response
OPEN SW3A Test Switches A & B
11G4B OUT402:
CLOSE Switchgear SW3B Test Switches A & B
FORCE 11G4B OUT402 CLOSED
CLOSE PCB 2790 via Control Panel A Control Switch, PCB 2790 CLOSE
TRIP PCB 2790 via Control Panel A Control Switch, PCB 2790 TRIP
OPEN SW3B Test Switch A
CLOSE PCB 2790 via Control Panel A Control Switch, no response
CLOSE SW3B Test Switch A
OPEN SW3B Test Switch B
CLOSE PCB 2790 via Control Panel A Control Switch, no response
CLOSE SW3B Test Switch B
RETURN 11G4B OUT402 to Normal
CLOSE PCB 2790 via Control Panel A Control Switch, no response
FORCE 11G4B OUT402 CLOSED
CP-004 13.8kV PCB 2790 Functional Testing Page 4 of 5 11/18/2022
TURN Control Panel A Synch Switch 43SS to OFF position
CLOSE PCB 2790 via Control Panel A Control Switch, no response
TURN Control Panel A Synch Switch 43SS to ON position
TRIP Lockout Relay 86G1
CLOSE PCB 2790 via Control Panel A Control Switch, no response
RESET Lockout Relay 86G1
TRIP Lockout Relay 86G2
CLOSE PCB 2790 via Control Panel A Control Switch, no response
RESET Lockout Relay 86G2
TRIP Lockout Relay 86G3
CLOSE PCB 2790 via Control Panel A Control Switch, no response
RESET Lockout Relay 86G3
TRIP Lockout Relay 86T4 on Substation Panel 7
CLOSE PCB 2790 via Control Panel A Control Switch, no response
RESET Lockout Relay 86T4 on Substation Panel 7
TRIP Field Breaker via Control Panel A Control Switch, Field Breaker TRIP
CLOSE PCB 2790…