Addendum 1~2.pdf

PDF 2 MB Posted

Attached to
EWEB ITB 22-236-PW IP Switchgear Replacement
Solicitation number
S-P00140-00004924
Issued by
Lane County, Oregon

About this file

This document is an addendum to the Request for Proposals (RFP) for the IP Switchgear Replacement project issued by the Eugene Water & Electric Board (EWEB) in Eugene, Oregon. The project involves the installation of replacement switchgear and other related tasks at EWEB's steam turbine generation operation at the International Paper facility in Springfield, Oregon. The addendum provides additional information, including confirmed weights and dimensions of the switchgear, details on how the external and internal structures will go together, and the hanging and structural support of the bus duct. The revised closing date for the RFP is December 13, 2022, an extension from the original closing date of December 8, 2022.

The total estimated weight of the switchgear is 11,000 lbs. All conduit entry and bus duct is top entry/exit, and removable lifting eyes are provided for overhead lifting. The document also includes detailed drawings and diagrams of the various sections of the switchgear, as well as information on the control panels and components.

View the file

Other files

File Type Posted
Addendum 2~2.pdf PDF
ITB 22-236-PW IP Switchgear Replacement.pdf PDF
Notice of Intent to Award-all bidders~1.pdf PDF
Addendum 3~2.pdf PDF
RFP Ambassador with Exhibits PDF~1.pdf PDF
Addendum 4.pdf PDF
Bid Tab~4.pdf PDF
ITB 22-236-PW Pre-Bid Meeting Sign-In Sheet.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM # 1 November 29, 2022

Title: IP Switchgear Replacement

RFP # 22-236-PW

This addendum adds additional information to the original ITB document.

CHANGES TO ITB PROCESS:

Purchasing Contact is now Sandra Hahn. Kristin Kokkeler is no longer the Purchasing Contact.

Please send all communication to Sandra Hahn at Sandra.hahn@eweb.org.

QUESTION & ANSWER

Q1. Can you provide confirmed weights and dimensions of switchgear as well as lifting provisions and jacking points?

A1. Provided as follows:

Section 1 : 1150lbs without PT Drawers 1450 with PT Drawers 98” H X 36” W X 85.125” D With lifting provisions on top

Section 2 : 1400lbs without Breaker 1900 with PT Breaker 98” H X 36” W X 85.125” D With lifting provisions on top Section 3 : 950lbs without PT Drawer 1100 with PT Drawer 98” H X 36” W X 85.125” D With lifting provisions on top

Section 1 Top hat: 200 lbs 12” H X 36” W X 66” D

Bus Duct: 2000 lbs 4 PCS

Section 3 Extension: 300 lbs 90” H X 36” W X 12” D

Q2. Can switchgear be tilted or laid down to pass through doorway and are there any limitations to be noted?

A2. The gear can be laid down if the PT trays are removed first.

Q3. Can you provide information as to how the external and internal structures will go together, as well as the hanging and structural support of the bus duct?

A3. Please see attached Drawing #1 for additional direction. This drawing is not yet finalized, and any changes made after Intent to Award is announced will be made via amendment, to be signed by both parties.

The structure connections will require sections to be bolted together around perimeter of frame (typically about 25 bolts about ¼ - 20 between each section). The horizontal phase bus bars will bolt together using through bolts approx. ½” diameter / four per phase and then the connection will be either booted or tape wrapped to insulate the connection.

Regarding the anchoring method for the structures, in general it is estimated that this lineup will require 16-20 anchor points approx. 3/8” each.

CLOSING DATE AND TIME

REVISED CLOSING DATE: DECEMBER 13, 2022

Original Closing Date: December 8, 2022

This addendum constitutes a MATERIAL CHANGE to the Request for Proposals.

Addendum prepared by:

Sandra Hahn Purchasing Analyst

---PRELIMINARY DRAWING---

DO NOT USE FOR CONSTRUCTION

BUS PHASE ARRANGEMENT WHEN VIEWED FROM THE FRONT OF THE CABINET SHALL BE:

A-B-C-N LEFT TO RIGHT•

A-B-C-N FRONT TO BACK•

A-B-C-N TOP TO BOTTOM•

CONTRACTORS RESPONSIBILITY TO ENSURE CLOCKWISE ROTATION FOR ALL INCOMING

SOURCES.

INTERCONNECTS BETWEEN SWITCHGEAR, SHIPPING SPLITS AND ANY EXTERNAL EQUIPMENT

ARE CONTRACTORS RESPONSIBILITY.

ESTIMATED TOTAL WEIGHT: 11,000 LBS.

ALL CONDUIT ENTRY & BUSDUCT IS TOP ENTRY/EXIT.

REMOVABLE LIFTING EYES PROVIDED FOR OVERHEAD LIFTING.

12.000

36.000

95.000

108.25

36.000

SHIPPING SPLIT

5.000

36.000

SHIPPING SPLIT

36.000

SHIPPING SPLIT

FRONT VIEW

NEW CONTROLS TOPHAT

NEW WIREWAY

( IN REAR )

EXISTING TOPHAT

WITH CONDUITS

SECTION 1 SECTION 2 SECTION 3

BUS DUCT

85.000

35.500

90.000

66.000

17.750

12.000

99.625

184.625

12.000

23.500

65.813

RIGHT SIDE VIEW

EXISTING TOPHAT

WITH CONDUITS

NEW CONTROLS TOPHAT

NEW WIREWAY

BUS DUCT

DISTANCE BETWEEN BUILDING

COLUMN & EXISTING PULLBOX

TO BE VERIFIED BY CONTRACTOR

EXISTING BOX WILL BOLT TO NEW

WIRE AND ROOF TO CLOSE OFF

BOTTOM OF EXISTING BOX.

EXISTING DUCT SUPPORTS, TO BE

RAISED ON THE THREADED ROD TO

SUPPORT NEW DUCT

EXISTING DUCT SUPPORTS, TO BE

RAISED ON THE THREADED ROD TO

SUPPORT NEW DUCT

EXISTING DUCT SUPPORTS, TO BE

RAISED ON THE THREADED ROD TO

SUPPORT NEW DUCT

DIMENSION IS BASED OFF THE EXISTING POWELL DRAWING

STATES WAS PROVIDED FOR THE EXISTING DUCT & SWITCHGEAR.

FRONT OF GEAR TO BE IN EXACT SAME LOCATION AS THE

EXISTING GEAR.

8 7 6 5 4 3 2 1

A

B

C

D

E

F

G

H

MISCELLANEOUS NOTES

D

E

F

G

H

C

B

A

NA

SCALE

SHEET

SE22-75886

075886-1-1

THIS DOCUMENT IS THE PROPERTY OF STATES MANUFACTURING

IT CONTAINS PROPRIETARY AND CONFIDENTIAL INFORMATION

WHICH MUST NOT BE DUPLICATED, USED OR DISCLOSED OTHER

THAN AS EXPRESSLY AUTHORIZED BY STATES MANUFACTURING

LOCATED IN MINNEAPOLIS MINNESOTA.

ORDER NUMBER

SERIAL NUMBER

GENERATOR 4 REPLACEMENT SWGR

EUGENE, OR

INTERNATIONAL PAPER POWER PLANT 4

SHEET TITLE

JOB NAME

JG

JS7/18/2022

CHECK BYDRAWN BYDRAWN DATE

CONTRACTOR

DISTRIBUTOR

ENGINEER

BLACK WITH WHITE LETTERS

SLEEVE

18-14 AWG

12 AWG PT, 10 AWG CT

SIS

ANSI 61

11 GA GALVANEAL

NEMA 1

UL LISTED METAL CLAD

1 - 1/4" X 2" COPPER

COPPER

2000A

50KAIC

60 HZ

13.8KV

EXT. LABELS

WIRE LABELS

CONTROL WIRE SIZE

PT/CT WIRE SIZE

CONTROL WIRE TYPE

ENCL. PAINT

ENCL. MATERIAL

ENCL. TYPE

GND. BUS

BUS MATERIAL

CERTIFICATION

S.C. RATING

NEUTRAL BUS

PHASE BUS

FREQUENCY

WIRE

PHASE

VOLTAGE

CO

NS

TR

UC

TI

O

N

NO

TE

S

10/14/22

9/15/22

JG

JG

REVISION DESCRIPTIONBYDATEREV. #

REPLACEMENT METAL CLAD GEAR

SWG-MCS-15000-2000-1-1

ELEVATION DRAWINGS

UPDATED PER REVIEW COMMENTS ON 8-3-22

UPDATED DWGS, NOTES AND DETAIL PER SUBMITTAL COMMENTS

DRAWING TYPE

EL

Drawing #1 - Addendum #1

BUS PHASE ARRANGEMENT WHEN VIEWED FROM THE FRONT OF THE CABINET SHALL BE:

A-B-C-N LEFT TO RIGHT•

A-B-C-N FRONT TO BACK•

A-B-C-N TOP TO BOTTOM•

CONTRACTORS RESPONSIBILITY TO ENSURE CLOCKWISE ROTATION FOR ALL INCOMING

SOURCES.

INTERCONNECTS BETWEEN SWITCHGEAR, SHIPPING SPLITS AND ANY EXTERNAL EQUIPMENT

ARE CONTRACTORS RESPONSIBILITY.

ESTIMATED TOTAL WEIGHT: 11,000 LBS.

ALL CONDUIT ENTRY & BUSDUCT IS TOP ENTRY/EXIT.

REMOVABLE LIFTING EYES PROVIDED FOR OVERHEAD LIFTING.

FRONT VIEW

SECTION 1 SECTION 2 SECTION 3

NEW CONTROLS TOPHAT

EXISTING TOPHAT

WITH CONDUITS

NEW WIREWAY

( IN REAR )

PT DRAWER BEHIND

THIS DOOR

PT DRAWER BEHIND

THIS DOOR

PT DRAWER BEHIND

THIS DOOR

85.000

35.500

36.000 36.000

5.000

113.000

108.000

120.615

41.000

9.000

28.000

TOP VIEW

SECTION 1 SECTION 2 SECTION 3

NEW CONTROLS TOPHAT

NEW WIREWAY

BUS DUCT

EXISTING BOX WILL BOLT TO NEW

WIRE AND ROOF TO CLOSE OFF

BOTTOM OF EXISTING BOX.

HOLE FOR EXISTING CABLES TO BOLT TO SECTION 3

LUG PADS IN LOWER HALF OF SECTION.

8 7 6 5 4 3 2 1

A

B

C

D

E

F

G

H

MISCELLANEOUS NOTES

D

E

F

G

H

C

B

A

NA

SCALE

SHEET

SE22-75886

075886-1-1

THIS DOCUMENT IS THE PROPERTY OF STATES MANUFACTURING

IT CONTAINS PROPRIETARY AND CONFIDENTIAL INFORMATION

WHICH MUST NOT BE DUPLICATED, USED OR DISCLOSED OTHER

THAN AS EXPRESSLY AUTHORIZED BY STATES MANUFACTURING

LOCATED IN MINNEAPOLIS MINNESOTA.

ORDER NUMBER

SERIAL NUMBER

GENERATOR 4 REPLACEMENT SWGR

EUGENE, OR

INTERNATIONAL PAPER POWER PLANT 4

SHEET TITLE

JOB NAME

JG

JS7/18/2022

CHECK BYDRAWN BYDRAWN DATE

CONTRACTOR

DISTRIBUTOR

ENGINEER

BLACK WITH WHITE LETTERS

SLEEVE

18-14 AWG

12 AWG PT, 10 AWG CT

SIS

ANSI 61

11 GA GALVANEAL

NEMA 1

UL LISTED METAL CLAD

1 - 1/4" X 2" COPPER

COPPER

2000A

50KAIC

60 HZ

13.8KV

EXT. LABELS

WIRE LABELS

CONTROL WIRE SIZE

PT/CT WIRE SIZE

CONTROL WIRE TYPE

ENCL. PAINT

ENCL. MATERIAL

ENCL. TYPE

GND. BUS

BUS MATERIAL

CERTIFICATION

S.C. RATING

NEUTRAL BUS

PHASE BUS

FREQUENCY

WIRE

PHASE

VOLTAGE

CO

NS

TR

UC

TI

O

N

NO

TE

S

10/14/22

9/15/22

JG

JG

REVISION DESCRIPTIONBYDATEREV. #

REPLACEMENT METAL CLAD GEAR

SWG-MCS-15000-2000-1-1

ELEVATION DRAWINGS

UPDATED PER REVIEW COMMENTS ON 8-3-22

UPDATED DWGS, NOTES AND DETAIL PER SUBMITTAL COMMENTS

DRAWING TYPE

BUS PHASE ARRANGEMENT WHEN VIEWED FROM THE FRONT OF THE CABINET SHALL BE:

A-B-C-N LEFT TO RIGHT•

A-B-C-N FRONT TO BACK•

A-B-C-N TOP TO BOTTOM•

CONTRACTORS RESPONSIBILITY TO ENSURE CLOCKWISE ROTATION FOR ALL INCOMING

SOURCES.

INTERCONNECTS BETWEEN SWITCHGEAR, SHIPPING SPLITS AND ANY EXTERNAL EQUIPMENT

ARE CONTRACTORS RESPONSIBILITY.

ESTIMATED TOTAL WEIGHT: 11,000 LBS.

ALL CONDUIT ENTRY & BUSDUCT IS TOP ENTRY/EXIT.

REMOVABLE LIFTING EYES PROVIDED FOR OVERHEAD LIFTING.

FRONT VIEW

SECTION 3SECTION 2SECTION 1

EXISTING TOPHAT

WITH CONDUITS

NEW WIREWAY

( IN REAR )

NEW CONTROLS TOPHAT

PT DRAWER BEHIND

THIS DOOR

PT DRAWER BEHIND

THIS DOOR

PT DRAWER BEHIND

THIS DOOR

REAR VIEW

SECTION 3 SECTION 2 SECTION 1

EXISTING TOPHAT

WITH CONDUITS

NEW WIREWAY

NEW CONTROLS TOPHAT

IR WINDOWS

FLUKE 100 SERIES

IR WINDOWS

FLUKE 100 SERIES

8 7 6 5 4 3 2 1

A

B

C

D

E

F

G

H

MISCELLANEOUS NOTES

D

E

F

G

H

C

B

A

NA

SCALE

SHEET

SE22-75886

075886-1-1

THIS DOCUMENT IS THE PROPERTY OF STATES MANUFACTURING

IT CONTAINS PROPRIETARY AND CONFIDENTIAL INFORMATION

WHICH MUST NOT BE DUPLICATED, USED OR DISCLOSED OTHER

THAN AS EXPRESSLY AUTHORIZED BY STATES MANUFACTURING

LOCATED IN MINNEAPOLIS MINNESOTA.

ORDER NUMBER

SERIAL NUMBER

GENERATOR 4 REPLACEMENT SWGR

EUGENE, OR

INTERNATIONAL PAPER POWER PLANT 4

SHEET TITLE

JOB NAME

JG

JS7/18/2022

CHECK BYDRAWN BYDRAWN DATE

CONTRACTOR

DISTRIBUTOR

ENGINEER

BLACK WITH WHITE LETTERS

SLEEVE

18-14 AWG

12 AWG PT, 10 AWG CT

SIS

ANSI 61

11 GA GALVANEAL

NEMA 1

UL LISTED METAL CLAD

1 - 1/4" X 2" COPPER

COPPER

2000A

50KAIC

60 HZ

13.8KV

EXT. LABELS

WIRE LABELS

CONTROL WIRE SIZE

PT/CT WIRE SIZE

CONTROL WIRE TYPE

ENCL. PAINT

ENCL. MATERIAL

ENCL. TYPE

GND. BUS

BUS MATERIAL

CERTIFICATION

S.C. RATING

NEUTRAL BUS

PHASE BUS

FREQUENCY

WIRE

PHASE

VOLTAGE

CO

NS

TR

UC

TI

O

N

NO

TE

S

10/14/22

9/15/22

JG

JG

REVISION DESCRIPTIONBYDATEREV. #

REPLACEMENT METAL CLAD GEAR

SWG-MCS-15000-2000-1-1

ELEVATION DRAWINGS

UPDATED PER REVIEW COMMENTS ON 8-3-22

UPDATED DWGS, NOTES AND DETAIL PER SUBMITTAL COMMENTS

BUS PHASE ARRANGEMENT WHEN VIEWED FROM THE FRONT OF THE CABINET SHALL BE:

A-B-C-N LEFT TO RIGHT•

A-B-C-N FRONT TO BACK•

A-B-C-N TOP TO BOTTOM•

CONTRACTORS RESPONSIBILITY TO ENSURE CLOCKWISE ROTATION FOR ALL INCOMING

SOURCES.

INTERCONNECTS BETWEEN SWITCHGEAR, SHIPPING SPLITS AND ANY EXTERNAL EQUIPMENT

ARE CONTRACTORS RESPONSIBILITY.

ESTIMATED TOTAL WEIGHT: 11,000 LBS.

ALL CONDUIT ENTRY & BUSDUCT IS TOP ENTRY/EXIT.

REMOVABLE LIFTING EYES PROVIDED FOR OVERHEAD LIFTING.

C

C

FRONT VIEW

PT DRAWER BEHIND

THIS DOOR

PT DRAWER BEHIND

THIS DOOR

SECTION 1

REAR VIEW

13.8KV CAPITORS

SECTION C-C

SCALE 1 : 20

RIGHT SIDE VIEW

13.8KV CAPITORS

8 7 6 5 4 3 2 1

A

B

C

D

E

F

G

H

MISCELLANEOUS NOTES

D

E

F

G

H

C

B

A

NA

SCALE

SHEET

SE22-75886

075886-1-1

THIS DOCUMENT IS THE PROPERTY OF STATES MANUFACTURING

IT CONTAINS PROPRIETARY AND CONFIDENTIAL INFORMATION

WHICH MUST NOT BE DUPLICATED, USED OR DISCLOSED OTHER

THAN AS EXPRESSLY AUTHORIZED BY STATES MANUFACTURING

LOCATED IN MINNEAPOLIS MINNESOTA.

ORDER NUMBER

SERIAL NUMBER

GENERATOR 4 REPLACEMENT SWGR

EUGENE, OR

INTERNATIONAL PAPER POWER PLANT 4

SHEET TITLE

JOB NAME

JG

JS7/18/2022

CHECK BYDRAWN BYDRAWN DATE

CONTRACTOR

DISTRIBUTOR

ENGINEER

BLACK WITH WHITE LETTERS

SLEEVE

18-14 AWG

12 AWG PT, 10 AWG CT

SIS

ANSI 61

11 GA GALVANEAL

NEMA 1

UL LISTED METAL CLAD

1 - 1/4" X 2" COPPER

COPPER

2000A

50KAIC

60 HZ

13.8KV

EXT. LABELS

WIRE LABELS

CONTROL WIRE SIZE

PT/CT WIRE SIZE

CONTROL WIRE TYPE

ENCL. PAINT

ENCL. MATERIAL

ENCL. TYPE

GND. BUS

BUS MATERIAL

CERTIFICATION

S.C. RATING

NEUTRAL BUS

PHASE BUS

FREQUENCY

WIRE

PHASE

VOLTAGE

CO

NS

TR

UC

TI

O

N

NO

TE

S

10/14/22

9/15/22

JG

JG

REVISION DESCRIPTIONBYDATEREV. #

REPLACEMENT METAL CLAD GEAR

SWG-MCS-15000-2000-1-1

SECTION 1 DETAIL

UPDATED PER REVIEW COMMENTS ON 8-3-22

UPDATED DWGS, NOTES AND DETAIL PER SUBMITTAL COMMENTS

BUS PHASE ARRANGEMENT WHEN VIEWED FROM THE FRONT OF THE CABINET SHALL BE:

A-B-C-N LEFT TO RIGHT•

A-B-C-N FRONT TO BACK•

A-B-C-N TOP TO BOTTOM•

CONTRACTORS RESPONSIBILITY TO ENSURE CLOCKWISE ROTATION FOR ALL INCOMING

SOURCES.

INTERCONNECTS BETWEEN SWITCHGEAR, SHIPPING SPLITS AND ANY EXTERNAL EQUIPMENT

ARE CONTRACTORS RESPONSIBILITY.

ESTIMATED TOTAL WEIGHT: 11,000 LBS.

ALL CONDUIT ENTRY & BUSDUCT IS TOP ENTRY/EXIT.

REMOVABLE LIFTING EYES PROVIDED FOR OVERHEAD LIFTING.

95.000

36.000

D

D

FRONT VIEW

MAIN BREAKER

BEHIND DOOR

SECTION 2

REAR VIEW

BUS DUCT CONNECTS TO

REAR TOP

12.7KV ARRESTORS

SECTION D-D

SCALE 1 : 20

RIGHT SIDE VIEW

BUS DUCT CONNECTS TO

REAR TOP

8 7 6 5 4 3 2 1

A

B

C

D

E

F

G

H

MISCELLANEOUS NOTES

D

E

F

G

H

C

B

A

NA

SCALE

SHEET

SE22-75886

075886-1-1

THIS DOCUMENT IS THE PROPERTY OF STATES MANUFACTURING

IT CONTAINS PROPRIETARY AND CONFIDENTIAL INFORMATION

WHICH MUST NOT BE DUPLICATED, USED OR DISCLOSED OTHER

THAN AS EXPRESSLY AUTHORIZED BY STATES MANUFACTURING

LOCATED IN MINNEAPOLIS MINNESOTA.

ORDER NUMBER

SERIAL NUMBER

GENERATOR 4 REPLACEMENT SWGR

EUGENE, OR

INTERNATIONAL PAPER POWER PLANT 4

SHEET TITLE

JOB NAME

JG

JS7/18/2022

CHECK BYDRAWN BYDRAWN DATE

CONTRACTOR

DISTRIBUTOR

ENGINEER

BLACK WITH WHITE LETTERS

SLEEVE

18-14 AWG

12 AWG PT, 10 AWG CT

SIS

ANSI 61

11 GA GALVANEAL

NEMA 1

UL LISTED METAL CLAD

1 - 1/4" X 2" COPPER

COPPER

2000A

50KAIC

60 HZ

13.8KV

EXT. LABELS

WIRE LABELS

CONTROL WIRE SIZE

PT/CT WIRE SIZE

CONTROL WIRE TYPE

ENCL. PAINT

ENCL. MATERIAL

ENCL. TYPE

GND. BUS

BUS MATERIAL

CERTIFICATION

S.C. RATING

NEUTRAL BUS

PHASE BUS

FREQUENCY

WIRE

PHASE

VOLTAGE

CO

NS

TR

UC

TI

O

N

NO

TE

S

10/14/22

9/15/22

JG

JG

REVISION DESCRIPTIONBYDATEREV. #

REPLACEMENT METAL CLAD GEAR

SWG-MCS-15000-2000-1-1

SECTION 2 DETAILS

UPDATED PER REVIEW COMMENTS ON 8-3-22

UPDATED DWGS, NOTES AND DETAIL PER SUBMITTAL COMMENTS

BUS PHASE ARRANGEMENT WHEN VIEWED FROM THE FRONT OF THE CABINET SHALL BE:

A-B-C-N LEFT TO RIGHT•

A-B-C-N FRONT TO BACK•

A-B-C-N TOP TO BOTTOM•

CONTRACTORS RESPONSIBILITY TO ENSURE CLOCKWISE ROTATION FOR ALL INCOMING

SOURCES.

INTERCONNECTS BETWEEN SWITCHGEAR, SHIPPING SPLITS AND ANY EXTERNAL EQUIPMENT

ARE CONTRACTORS RESPONSIBILITY.

ESTIMATED TOTAL WEIGHT: 11,000 LBS.

ALL CONDUIT ENTRY & BUSDUCT IS TOP ENTRY/EXIT.

REMOVABLE LIFTING EYES PROVIDED FOR OVERHEAD LIFTING.

95.000

36.000

A

A

FRONT VIEW

PT DRAWER BEHIND

THIS DOOR

TOP PLATE AND BOTTOM

CLOSURE PLATE FOR EXISTING

CONDUIT BOXSECTION 3

E

REAR VIEW

6 NEMA PATTERN HOLES

FOR EXISTING CABLES TO

SUBSTATION

15.3KV ARRESTORS

TOP PLATE AND BOTTOM

CLOSURE PLATE FOR EXISTING

CONDUIT BOX

90.000

43.500

20.272 5.500

SECTION A-A

SCALE 1 : 20

TOP PLATE AND BOTTOM

CLOSURE PLATE FOR EXISTING

CONDUIT BOX

RIGHT SIDE VIEW

.0

.625

2.375 DETAIL E

SCALE 1 : 8

TYPICAL ON

ALL PADS

8 7 6 5 4 3 2 1

A

B

C

D

E

F

G

H

MISCELLANEOUS NOTES

D

E

F

G

H

C

B

A

NA

SCALE

SHEET

SE22-75886

075886-1-1

THIS DOCUMENT IS THE PROPERTY OF STATES MANUFACTURING

IT CONTAINS PROPRIETARY AND CONFIDENTIAL INFORMATION

WHICH MUST NOT BE DUPLICATED, USED OR DISCLOSED OTHER

THAN AS EXPRESSLY AUTHORIZED BY STATES MANUFACTURING

LOCATED IN MINNEAPOLIS MINNESOTA.

ORDER NUMBER

SERIAL NUMBER

GENERATOR 4 REPLACEMENT SWGR

EUGENE, OR

INTERNATIONAL PAPER POWER PLANT 4

SHEET TITLE

JOB NAME

JG

JS7/18/2022

CHECK BYDRAWN BYDRAWN DATE

CONTRACTOR

DISTRIBUTOR

ENGINEER

BLACK WITH WHITE LETTERS

SLEEVE

18-14 AWG

12 AWG PT, 10 AWG CT

SIS

ANSI 61

11 GA GALVANEAL

NEMA 1

UL LISTED METAL CLAD

1 - 1/4" X 2" COPPER

COPPER

2000A

50KAIC

60 HZ

13.8KV

EXT. LABELS

WIRE LABELS

CONTROL WIRE SIZE

PT/CT WIRE SIZE

CONTROL WIRE TYPE

ENCL. PAINT

ENCL. MATERIAL

ENCL. TYPE

GND. BUS

BUS MATERIAL

CERTIFICATION

S.C. RATING

NEUTRAL BUS

PHASE BUS

FREQUENCY

WIRE

PHASE

VOLTAGE

CO

NS

TR

UC

TI

O

N

NO

TE

S

10/14/22

9/15/22

JG

JG

REVISION DESCRIPTIONBYDATEREV. #

REPLACEMENT METAL CLAD GEAR

SWG-MCS-15000-2000-1-1

SECTION 3 DETAILS

UPDATED PER REVIEW COMMENTS ON 8-3-22

UPDATED DWGS, NOTES AND DETAIL PER SUBMITTAL COMMENTS

BUS PHASE ARRANGEMENT WHEN VIEWED FROM THE FRONT OF THE CABINET SHALL BE:

A-B-C-N LEFT TO RIGHT•

A-B-C-N FRONT TO BACK•

A-B-C-N TOP TO BOTTOM•

CONTRACTORS RESPONSIBILITY TO ENSURE CLOCKWISE ROTATION FOR ALL INCOMING

SOURCES.

INTERCONNECTS BETWEEN SWITCHGEAR, SHIPPING SPLITS AND ANY EXTERNAL EQUIPMENT

ARE CONTRACTORS RESPONSIBILITY.

ESTIMATED TOTAL WEIGHT: 11,000 LBS.

ALL CONDUIT ENTRY & BUSDUCT IS TOP ENTRY/EXIT.

REMOVABLE LIFTING EYES PROVIDED FOR OVERHEAD LIFTING.

FRONT VIEW

UPPER CONTROL DOOR

SECTION 1

11G4A

SEL-700G

SW6ASW5ASW4A

SW3ASW2ASW1A

SW1B SW2B SW3B

SW4B SW5B SW6B

11G4B

SEL-700G

LOWER CONTROL DOOR

SECTION 1

SW1HEXC AM51E

SEL-751

SW1C SW2C SW3C

11L1

SEL-311C

SW3DSW2DSW1D

SW3ESW2ESW1E

87L

SEL-387L

8 7 6 5 4 3 2 1

A

B

C

D

E

F

G

H

MISCELLANEOUS NOTES

D

E

F

G

H

C

B

A

NA

SCALE

SHEET

SE22-75886

075886-1-1

THIS DOCUMENT IS THE PROPERTY OF STATES MANUFACTURING

IT CONTAINS PROPRIETARY AND CONFIDENTIAL INFORMATION

WHICH MUST NOT BE DUPLICATED, USED OR DISCLOSED OTHER

THAN AS EXPRESSLY AUTHORIZED BY STATES MANUFACTURING

LOCATED IN MINNEAPOLIS MINNESOTA.

ORDER NUMBER

SERIAL NUMBER

GENERATOR 4 REPLACEMENT SWGR

EUGENE, OR

INTERNATIONAL PAPER POWER PLANT 4

SHEET TITLE

JOB NAME

JG

JS7/18/2022

CHECK BYDRAWN BYDRAWN DATE

CONTRACTOR

DISTRIBUTOR

ENGINEER

BLACK WITH WHITE LETTERS

SLEEVE

18-14 AWG

12 AWG PT, 10 AWG CT

SIS

ANSI 61

11 GA GALVANEAL

NEMA 1

UL LISTED METAL CLAD

1 - 1/4" X 2" COPPER

COPPER

2000A

50KAIC

60 HZ

13.8KV

EXT. LABELS

WIRE LABELS

CONTROL WIRE SIZE

PT/CT WIRE SIZE

CONTROL WIRE TYPE

ENCL. PAINT

ENCL. MATERIAL

ENCL. TYPE

GND. BUS

BUS MATERIAL

CERTIFICATION

S.C. RATING

NEUTRAL BUS

PHASE BUS

FREQUENCY

WIRE

PHASE

VOLTAGE

CO

NS

TR

UC

TI

O

N

NO

TE

S

10/14/22

9/15/22

JG

JG

REVISION DESCRIPTIONBYDATEREV. #

REPLACEMENT METAL CLAD GEAR

SWG-MCS-15000-2000-1-1

SECTION 1 DOOR DETAIL

UPDATED PER REVIEW COMMENTS ON 8-3-22

UPDATED DWGS, NOTES AND DETAIL PER SUBMITTAL COMMENTS

BUS PHASE ARRANGEMENT WHEN VIEWED FROM THE FRONT OF THE CABINET SHALL BE:

A-B-C-N LEFT TO RIGHT•

A-B-C-N FRONT TO BACK•

A-B-C-N TOP TO BOTTOM•

CONTRACTORS RESPONSIBILITY TO ENSURE CLOCKWISE ROTATION FOR ALL INCOMING

SOURCES.

INTERCONNECTS BETWEEN SWITCHGEAR, SHIPPING SPLITS AND ANY EXTERNAL EQUIPMENT

ARE CONTRACTORS RESPONSIBILITY.

ESTIMATED TOTAL WEIGHT: 11,000 LBS.

ALL CONDUIT ENTRY & BUSDUCT IS TOP ENTRY/EXIT.

REMOVABLE LIFTING EYES PROVIDED FOR OVERHEAD LIFTING.

FRONT VIEW

UPPER CONTROL DOOR

SECTION 2

PM

SEL-735

SW1G

86G1 86G2 86G3

SW1F SW2F SW3F

LOWER CONTROL DOOR

SECTION 2

GL

OPEN

CS

2000A VCB

RL

CLOSED

8 7 6 5 4 3 2 1

A

B

C

D

E

F

G

H

MISCELLANEOUS NOTES

D

E

F

G

H

C

B

A

NA

SCALE

SHEET

SE22-75886

075886-1-1

THIS DOCUMENT IS THE PROPERTY OF STATES MANUFACTURING

IT CONTAINS PROPRIETARY AND CONFIDENTIAL INFORMATION

WHICH MUST NOT BE DUPLICATED, USED OR DISCLOSED OTHER

THAN AS EXPRESSLY AUTHORIZED BY STATES MANUFACTURING

LOCATED IN MINNEAPOLIS MINNESOTA.

ORDER NUMBER

SERIAL NUMBER

GENERATOR 4 REPLACEMENT SWGR

EUGENE, OR

INTERNATIONAL PAPER POWER PLANT 4

SHEET TITLE

JOB NAME

JG

JS7/18/2022

CHECK BYDRAWN BYDRAWN DATE

CONTRACTOR

DISTRIBUTOR

ENGINEER

BLACK WITH WHITE LETTERS

SLEEVE

18-14 AWG

12 AWG PT, 10 AWG CT

SIS

ANSI 61

11 GA GALVANEAL

NEMA 1

UL LISTED METAL CLAD

1 - 1/4" X 2" COPPER

COPPER

2000A

50KAIC

60 HZ

13.8KV

EXT. LABELS

WIRE LABELS

CONTROL WIRE SIZE

PT/CT WIRE SIZE

CONTROL WIRE TYPE

ENCL. PAINT

ENCL. MATERIAL

ENCL. TYPE

GND. BUS

BUS MATERIAL

CERTIFICATION

S.C. RATING

NEUTRAL BUS

PHASE BUS

FREQUENCY

WIRE

PHASE

VOLTAGE

CO

NS

TR

UC

TI

O

N

NO

TE

S

10/14/22

9/15/22

JG

JG

REVISION DESCRIPTIONBYDATEREV. #

REPLACEMENT METAL CLAD GEAR

SWG-MCS-15000-2000-1-1

SECTION 2 DOOR DETAIL

UPDATED PER REVIEW COMMENTS ON 8-3-22

UPDATED DWGS, NOTES AND DETAIL PER SUBMITTAL COMMENTS

BUS PHASE ARRANGEMENT WHEN VIEWED FROM THE FRONT OF THE CABINET SHALL BE:

A-B-C-N LEFT TO RIGHT•

A-B-C-N FRONT TO BACK•

A-B-C-N TOP TO BOTTOM•

CONTRACTORS RESPONSIBILITY TO ENSURE CLOCKWISE ROTATION FOR ALL INCOMING

SOURCES.

INTERCONNECTS BETWEEN SWITCHGEAR, SHIPPING SPLITS AND ANY EXTERNAL EQUIPMENT

ARE CONTRACTORS RESPONSIBILITY.

ESTIMATED TOTAL WEIGHT: 11,000 LBS.

ALL CONDUIT ENTRY & BUSDUCT IS TOP ENTRY/EXIT.

REMOVABLE LIFTING EYES PROVIDED FOR OVERHEAD LIFTING.

12.000

36.000

FRONT VIEW

36.000

66.000

38.500

27.500

TOP VIEW

REMOVABLE ACCESS COVER

REMOVABLE COVER

FOR EXISTING

CONTROL CONDUITS

12.000

66.000

RIGHT SIDE VIEW BOLTED TO TOP OF SECTION 1

ISOMETRIC VIEW

BOLTED TO TOP OF SECTION 1

REMOVABLE ACCESS COVER

REMOVABLE COVER

FOR EXISTING

CONTROL CONDUITS

8 7 6 5 4 3 2 1

A

B

C

D

E

F

G

H

MISCELLANEOUS NOTES

D

E

F

G

H

C

B

A

NA

SCALE

SHEET

SE22-75886

075886-1-1

THIS DOCUMENT IS THE PROPERTY OF STATES MANUFACTURING

IT CONTAINS PROPRIETARY AND CONFIDENTIAL INFORMATION

WHICH MUST NOT BE DUPLICATED, USED OR DISCLOSED OTHER

THAN AS EXPRESSLY AUTHORIZED BY STATES MANUFACTURING

LOCATED IN MINNEAPOLIS MINNESOTA.

ORDER NUMBER

SERIAL NUMBER

GENERATOR 4 REPLACEMENT SWGR

EUGENE, OR

INTERNATIONAL PAPER POWER PLANT 4

SHEET TITLE

JOB NAME

JG

JS7/18/2022

CHECK BYDRAWN BYDRAWN DATE

CONTRACTOR

DISTRIBUTOR

ENGINEER

BLACK WITH WHITE LETTERS

SLEEVE

18-14 AWG

12 AWG PT, 10 AWG CT

SIS

ANSI 61

11 GA GALVANEAL

NEMA 1

UL LISTED METAL CLAD

1 - 1/4" X 2" COPPER

COPPER

2000A

50KAIC

60 HZ

13.8KV

EXT. LABELS

WIRE LABELS

CONTROL WIRE SIZE

PT/CT WIRE SIZE

CONTROL WIRE TYPE

ENCL. PAINT

ENCL. MATERIAL

ENCL. TYPE

GND. BUS

BUS MATERIAL

CERTIFICATION

S.C. RATING

NEUTRAL BUS

PHASE BUS

FREQUENCY

WIRE

PHASE

VOLTAGE

CO

NS

TR

UC

TI

O

N

NO

TE

S

10/14/22

9/15/22

JG

JG

REVISION DESCRIPTIONBYDATEREV. #

REPLACEMENT METAL CLAD GEAR

SWG-MCS-15000-2000-1-1

TOPHAT 02 DETAIL

UPDATED PER REVIEW COMMENTS ON 8-3-22

UPDATED DWGS, NOTES AND DETAIL PER SUBMITTAL COMMENTS

BUS PHASE ARRANGEMENT WHEN VIEWED FROM THE FRONT OF THE CABINET SHALL BE:

A-B-C-N LEFT TO RIGHT•

A-B-C-N FRONT TO BACK•

A-B-C-N TOP TO BOTTOM•

CONTRACTORS RESPONSIBILITY TO ENSURE CLOCKWISE ROTATION FOR ALL INCOMING

SOURCES.

INTERCONNECTS BETWEEN SWITCHGEAR, SHIPPING SPLITS AND ANY EXTERNAL EQUIPMENT

ARE CONTRACTORS RESPONSIBILITY.

ESTIMATED TOTAL WEIGHT: 11,000 LBS.

ALL CONDUIT ENTRY & BUSDUCT IS TOP ENTRY/EXIT.

REMOVABLE LIFTING EYES PROVIDED FOR OVERHEAD LIFTING.

166.875

17.750

185.625

55.000

SHIPPING SPLIT

55.000

SHIPPING SPLIT

46.625

SHIPPING SPLIT

27.865

SHIPPING

SPLIT

9.000

9.563

10.000

53.313

RIGHT SIDE VIEW

HEATER HEATER HEATER

36.000

63.313

48.000 B

FRONT VIEW

36.000 38.000 48.000

24.000

24.000

9.000

TOP VIEW

2 DEGREE

ROOF SLOPE

BUS PIECES TO BE VERIFIED

& MADE AFTER REPLACEMENT

IS STARTED

.563 THRU

.750 2.500

DETAIL B

SCALE 1 : 8

8 7 6 5 4 3 2 1

A

B

C

D

E

F

G

H

MISCELLANEOUS NOTES

D

E

F

G

H

C

B

A

NA

SCALE

SHEET

SE22-75886

075886-1-1

THIS DOCUMENT IS THE PROPERTY OF STATES MANUFACTURING

IT CONTAINS PROPRIETARY AND CONFIDENTIAL INFORMATION

WHICH MUST NOT BE DUPLICATED, USED OR DISCLOSED OTHER

THAN AS EXPRESSLY AUTHORIZED BY STATES MANUFACTURING

LOCATED IN MINNEAPOLIS MINNESOTA.

ORDER NUMBER

SERIAL NUMBER

GENERATOR 4 REPLACEMENT SWGR

EUGENE, OR

INTERNATIONAL PAPER POWER PLANT 4

SHEET TITLE

JOB NAME

JG

JS7/18/2022

CHECK BYDRAWN BYDRAWN DATE

CONTRACTOR

DISTRIBUTOR

ENGINEER

BLACK WITH WHITE LETTERS

SLEEVE

18-14 AWG

12 AWG PT, 10 AWG CT

SIS

ANSI 61

11 GA GALVANEAL

NEMA 1

UL LISTED METAL CLAD

1 - 1/4" X 2" COPPER

COPPER

2000A

50KAIC

60 HZ

13.8KV

EXT. LABELS

WIRE LABELS

CONTROL WIRE SIZE

PT/CT WIRE SIZE

CONTROL WIRE TYPE

ENCL. PAINT

ENCL. MATERIAL

ENCL. TYPE

GND. BUS

BUS MATERIAL

CERTIFICATION

S.C. RATING

NEUTRAL BUS

PHASE BUS

FREQUENCY

WIRE

PHASE

VOLTAGE

CO

NS

TR

UC

TI

O

N

NO

TE

S

10/14/22

9/15/22

JG

JG

REVISION DESCRIPTIONBYDATEREV. #

REPLACEMENT METAL CLAD GEAR

SWG-MCS-15000-2000-1-1

BUS DUCT DETAIL

UPDATED PER REVIEW COMMENTS ON 8-3-22

UPDATED DWGS, NOTES AND DETAIL PER SUBMITTAL COMMENTS

BUS PHASE ARRANGEMENT WHEN VIEWED FROM THE FRONT OF THE CABINET SHALL BE:

A-B-C-N LEFT TO RIGHT•

A-B-C-N FRONT TO BACK•

A-B-C-N TOP TO BOTTOM•

CONTRACTORS RESPONSIBILITY TO ENSURE CLOCKWISE ROTATION FOR ALL INCOMING

SOURCES.

INTERCONNECTS BETWEEN SWITCHGEAR, SHIPPING SPLITS AND ANY EXTERNAL EQUIPMENT

ARE CONTRACTORS RESPONSIBILITY.

ESTIMATED TOTAL WEIGHT: 11,000 LBS.

ALL CONDUIT ENTRY & BUSDUCT IS TOP ENTRY/EXIT.

REMOVABLE LIFTING EYES PROVIDED FOR OVERHEAD LIFTING.

.563 X .813

TYP OF ALL

MOUNTING HOLES

.3

3.

5.

7.

4.

.5

.9

.2

.5

48.000

24.000

6.750

41.250

BOTTOM VIEW

ATTACHED TO

SECTION 2

BUS PIECES TO BE VERIFIED

& MADE AFTER REPLACEMENT

IS STARTED

PLATE ATTACHES TO EXISTING

BUS DUCT CONNECTION BOX

HEATER HEATER HEATER

8 7 6 5 4 3 2 1

A

B

C

D

E

F

G

H

MISCELLANEOUS NOTES

D

E

F

G

H

C

B

A

NA

SCALE

SHEET

SE22-75886

075886-1-1

THIS DOCUMENT IS THE PROPERTY OF STATES MANUFACTURING

IT CONTAINS PROPRIETARY AND CONFIDENTIAL INFORMATION

WHICH MUST NOT BE DUPLICATED, USED OR DISCLOSED OTHER

THAN AS EXPRESSLY AUTHORIZED BY STATES MANUFACTURING

LOCATED IN MINNEAPOLIS MINNESOTA.

ORDER NUMBER

SERIAL NUMBER

GENERATOR 4 REPLACEMENT SWGR

EUGENE, OR

INTERNATIONAL PAPER POWER PLANT 4

SHEET TITLE

JOB NAME

JG

JS7/18/2022

CHECK BYDRAWN BYDRAWN DATE

CONTRACTOR

DISTRIBUTOR

ENGINEER

BLACK WITH WHITE LETTERS

SLEEVE

18-14 AWG

12 AWG PT, 10 AWG CT

SIS

ANSI 61

11 GA GALVANEAL

NEMA 1

UL LISTED METAL CLAD

1 - 1/4" X 2" COPPER

COPPER

2000A

50KAIC

60 HZ

13.8KV

EXT. LABELS

WIRE LABELS

CONTROL WIRE SIZE

PT/CT WIRE SIZE

CONTROL WIRE TYPE

ENCL. PAINT

ENCL. MATERIAL

ENCL. TYPE

GND. BUS

BUS MATERIAL

CERTIFICATION

S.C. RATING

NEUTRAL BUS

PHASE BUS

FREQUENCY

WIRE

PHASE

VOLTAGE

CO

NS

TR

UC

TI

O

N

NO

TE

S

10/14/22

9/15/22

JG

JG

REVISION DESCRIPTIONBYDATEREV. #

REPLACEMENT METAL CLAD GEAR

SWG-MCS-15000-2000-1-1

BUS DUCT DETAIL

UPDATED PER REVIEW COMMENTS ON 8-3-22

UPDATED DWGS, NOTES AND DETAIL PER SUBMITTAL COMMENTS

Drawing 1 - 75886-ASM-EL-10142022.pdf
EL-01
Drawing View1
Drawing View2
EL-02
Drawing View3
Drawing View4
EL-03
Drawing View5
Drawing View6
EL-04
Drawing View7
Drawing View9
Section View C-C
EL-05
Drawing View10
Drawing View12
Section View D-D
EL-06
Drawing View13
Drawing View15
Section View A-A
Detail View E (1 : 8)
EL-07
Drawing View16
Drawing View17
Drawing View18
EL-08
Drawing View19
Drawing View20
Drawing View21
EL-09
Drawing View28
Drawing View29
Drawing View30
Drawing View31
EL-10
Drawing View33
Drawing View34
Drawing View35
Detail View B (1 : 8)
EL-11
Drawing View42

File details come from the government source that posted it. Updated .