Addendum 3 RFP 24-015 Q and A.pdf

PDF 137 KB Posted

Attached to
Insulation at Fire Stations 3 and 4
Solicitation number
24-015
Issued by
Macomb County, St. Louis City, Michigan

About this file

This document is Addendum 3 for RFP 24-015, issued by Macomb Township in Michigan, addressing an insulation project for Fire Stations 3 and 4. The addendum provides clarifications and answers to questions raised during a pre-proposal meeting, specifically addressing floor plans, wall painting responsibilities, and insulation materials. Key details include the township's commitment to provide floor plans for both fire stations through BidNet, a confirmation that the township will handle wall painting after insulation installation, and an affirmation that cellulose insulation is acceptable for soundproofing interior walls.

The addendum does not include specific pricing information or funding details, but it demonstrates the township's effort to provide additional guidance to potential bidders. The document emphasizes the importance of proposers acknowledging the addendum by including the addendum number on the signature page, indicating that this is part of a formal procurement process for the insulation project at the two fire station locations.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP 24-015

Insulation at Fire Stations 3 and 4 January 13, 2025

ADDENDUM 3: Questions and Answers

Please be advised that the Macomb Township Finance Department has authorized the following addition and changes to the stated RFP. Acknowledgment of receipt of this Addendum and the Proposer’s acceptance of these revised conditions prior to the submittal of the Proposal shall be indicated by adding the Addendum number in the space provided in the Signature Page.

The following is a summary of clarifications, questions and answers that were discussed at the

Pre-Proposal meeting.

Questions Answers

1 Can the Township provide Floor Plans for Both Fire Stations?

Yes, we will Post as an Addendum to BidNet.

Since both Buildings are the same, only on set of prints will be provided through the Upload to BidNet.

2 In the scope of work, item B and C, it states to paint the wall with the existing color, but during the walk through We were told The Township would paint the walls?

This has been changed to the Township will perform painting. After the Insulation is installed, Walls will be repaired, sanded, primered and prepped for Paint. The

Township will perform the painting.

3 Can Cellulose Insulation be used for the Bunk Room Interior walls?

Yes, Cellulose Insulation is acceptable for Soundproofing on interior walls.