Addendum 3.pdf

PDF 371 KB Posted

Attached to
Central Florida Rail Corridor (CFRC) Track Improvements - Multiple Locations
Solicitation number
RFP-10060
Issued by
Volusia County, Florida

About this file

This document is an Addendum #3 from the Florida Department of Transportation (FDOT) for a Request for Proposal (RFP) related to the Central Florida Rail Corridor (CFRC) Track Improvements - Multiple Locations. The Addendum replaces Exhibit "A," Scope of Services, Appendix 2, Section 6.2, stating that FDOT will provide 1200 track ties, tie plates, and 1,000 tons of AREMA 4A ballast, and coordinate delivery with the vendor. The related state and local contract opportunity has a due date of October 2, 2024, at 10:00am for Technical and Price Proposals. A mandatory pre-proposal meeting was held on September 4, 2024. The contract is for CFRC Track Improvements at multiple locations.

The solicitation document is subject to change, and bidders must monitor the Vendor Information Portal for any addenda. All bidders must be registered in the State of Florida's MyFloridaMarketplace system, and out-of-state companies must be authorized to do business in Florida. Vendors must also be properly licensed if the business being provided requires licensing by the Florida Department of Business and Professional Regulation. The contract will be subject to a 1% MFMP Transaction Fee unless the transaction is exempt.

View the file

Other files

File Type Posted
Addendum 1.pdf PDF
Agreement between Dept and Contractor.pdf PDF
Exhibit B - Method of Compensation.pdf PDF
Exhibit D.pdf PDF
Exhibit G - G101.00 Disp SunRail Material.pdf PDF
Exhibit M - CFRC Track Chart APRIL 2023.pdf PDF
Exhibit N - SunRail CMP-SMCP R3.pdf PDF
Exhibit E - Insurance Provisions.pdf PDF
Exhibit G - G101.00 Disp SunRail Material.pdf PDF
Exhibit H - CFRC GENERAL ORDER NO. 6 TTSI 2.pdf PDF
Exhibit L - CFRC TRACK AND SIGNAL CHART.pdf PDF
Agreement between Dept and Contractor.pdf PDF
Exhibit C - FTA Provisions.pdf PDF
Exhibit D.pdf PDF
Exhibit G - G101.00 Disp SunRail Material.pdf PDF
Exhibit I - CWR.pdf PDF
Exhibit N - SunRail CMP-SMCP R3.pdf PDF
Exhibit B - Method of Compensation.pdf PDF
Exhibit D.pdf PDF
Exhibit E - Insurance Provisions.pdf PDF
Exhibit K - MOW MOS Operating Rules.pdf PDF
Exhibit L - CFRC TRACK AND SIGNAL CHART.pdf PDF
Addendum 4 Complete.pdf PDF
Agreement between Dept and Contractor.pdf PDF
Exhibit A - Scope of Services.pdf PDF
Exhibit B - Method of Compensation.pdf PDF
Exhibit F - Fence Policy.pdf PDF
Exhibit H - CFRC GENERAL ORDER NO. 6 TTSI 2.pdf PDF
Exhibit L - CFRC TRACK AND SIGNAL CHART.pdf PDF
Exhibit M - CFRC Track Chart APRIL 2023.pdf PDF
Exhibit N - SunRail CMP-SMCP R3.pdf PDF
Q&A 2 Complete.pdf PDF
Addendum 1.pdf PDF
Addendum 5 Complete - Part 2.pdf PDF
Agreement between Dept and Contractor.pdf PDF
Exhibit K - MOW MOS Operating Rules.pdf PDF
DOT-RFP-25-5002-TIML RFP.pdf PDF
Exhibit E - Insurance Provisions.pdf PDF
Exhibit I - CWR.pdf PDF
Exhibit K - MOW MOS Operating Rules.pdf PDF
Exhibit L - CFRC TRACK AND SIGNAL CHART.pdf PDF
Exhibit O - CFRC MWIs.pdf PDF
Addendum 1.pdf PDF
Exhibit A - Scope of Services.pdf PDF
Exhibit C - FTA Provisions.pdf PDF
Exhibit D.pdf PDF
Exhibit F - Fence Policy.pdf PDF
Exhibit K - MOW MOS Operating Rules.pdf PDF
Q&A 1.pdf PDF
Addendum 2.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Transportation

RON DESANTIS

GOVERNOR

605 Suwannee Street

Tallahassee, FL 32399-0450

JARED W. PERDUE, P.E.

SECRETARY

Improve Safety, Enhance Mobility, Inspire Innovation www.fdot.gov

Addendum #3

ADVERTISEMENT NUMBER: DOT-RFP-25-5002-TIML

DESCRIPTION: Central Florida Rail Corridor (CFRC) Track Improvements – Multiple Locations

DATE: 9/6/2024

You are hereby notified that the above referenced Request for Proposal (RFP) is modified as noted below:

Exhibit “A,” Scope of Services, Appendix 2, Section 6.2 is replaced with the paragraph below:

6.2 The Department shall provide 1200 track ties and coordinate delivery with the Vendor to the project site. The Department shall provide all tie plates for both new ties and existing ties not being replaced, and coordinate delivery with the Vendor to the project site. The Department shall provide the 1,000 tons of AREMA 4A ballast and coordinate delivery with the Vendor to the project site.

TO ACKNOWLEDGE RECEIPT OF THIS NOTICE AND ALL CHANGES, PLEASE SIGN AND

RETURN BY E-MAIL AT D5.PROCUREMENTQUESTIONS@DOT.STATE.FL.US PRIOR TO

October 2, 2024, at 10:00AM.

Name of Company:

Authorized Signature: Date:

FAILURE TO FILE A PROTEST WITHIN THE TIME PRESCRIBED IN SECTION 120.57(3),

F.S. SHALL CONSTITUTE A WAIVER OF PROCEEDINGS UNDER CHAPTER 120, F.S.

File details come from the government source that posted it. Updated .