Addendum 1.pdf

PDF 396 KB Posted

Attached to
Central Florida Rail Corridor (CFRC) Track Improvements - Multiple Locations
Solicitation number
RFP-10060
Issued by
Volusia County, Florida

About this file

This document is an Addendum #1 issued by the Florida Department of Transportation (FDOT) for a Request for Proposal (RFP) related to the Central Florida Rail Corridor (CFRC) Track Improvements - Multiple Locations. The addendum modifies the Scope of Services by requiring the vendor to install a total of eight (8) new insulated joints, four (4) on Mainline No 1 and four (4) on Mainline No 2, at locations specified by the CFRC Signal Team. The vendor must acknowledge receipt of this addendum by signing and returning the document via email prior to October 2, 2024, at 10:00 AM.

The document does not provide any information about pricing terms, set asides, incumbents, the current environment, funding requirements and sources, or any other salient details beyond the scope of work modification described in the addendum.

View the file

Other files

File Type Posted
DOT-RFP-25-5002-TIML RFP.pdf PDF
Exhibit E - Insurance Provisions.pdf PDF
Exhibit I - CWR.pdf PDF
Exhibit K - MOW MOS Operating Rules.pdf PDF
Exhibit L - CFRC TRACK AND SIGNAL CHART.pdf PDF
Exhibit O - CFRC MWIs.pdf PDF
Addendum 1.pdf PDF
Exhibit A - Scope of Services.pdf PDF
Exhibit C - FTA Provisions.pdf PDF
Exhibit D.pdf PDF
Exhibit F - Fence Policy.pdf PDF
Exhibit K - MOW MOS Operating Rules.pdf PDF
Q&A 1.pdf PDF
Addendum 2.pdf PDF
Addendum 3.pdf PDF
Exhibit A - Scope of Services.pdf PDF
Exhibit B - Method of Compensation.pdf PDF
Exhibit F - Fence Policy.pdf PDF
Exhibit H - CFRC GENERAL ORDER NO. 6 TTSI 2.pdf PDF
Exhibit J - GCOR.pdf PDF
Exhibit M - CFRC Track Chart APRIL 2023.pdf PDF
Exhibit O - CFRC MWIs.pdf PDF
Q&A 2 Complete.pdf PDF
Addendum 4 Complete.pdf PDF
DOT-RFP-25-5002-TIML RFP.pdf PDF
Exhibit A - Scope of Services.pdf PDF
Exhibit F - Fence Policy.pdf PDF
Exhibit J - GCOR.pdf PDF
Exhibit O - CFRC MWIs.pdf PDF
Q&A 1.pdf PDF
DOT-RFP-25-5002-TIML RFP.pdf PDF
Exhibit D.pdf PDF
Exhibit O - CFRC MWIs.pdf PDF
Addendum 2.pdf PDF
Addendum 3.pdf PDF
Exhibit A - Scope of Services.pdf PDF
Exhibit C - FTA Provisions.pdf PDF
Exhibit H - CFRC GENERAL ORDER NO. 6 TTSI 2.pdf PDF
Exhibit J - GCOR.pdf PDF
Q&A 2 Complete.pdf PDF
Exhibit H - CFRC GENERAL ORDER NO. 6 TTSI 2.pdf PDF
Agreement between Dept and Contractor.pdf PDF
Exhibit B - Method of Compensation.pdf PDF
Exhibit N - SunRail CMP-SMCP R3.pdf PDF
DOT-RFP-25-5002-TIML RFP.pdf PDF
Exhibit E - Insurance Provisions.pdf PDF
Exhibit L - CFRC TRACK AND SIGNAL CHART.pdf PDF
Q&A 1.pdf PDF
Addendum 2.pdf PDF
Addendum 3.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Transportation

RON DESANTIS

GOVERNOR

605 Suwannee Street

Tallahassee, FL 32399-0450

JARED W. PERDUE, P.E.

SECRETARY

Improve Safety, Enhance Mobility, Inspire Innovation www.fdot.gov

Addendum #1

ADVERTISEMENT NUMBER: DOT-RFP-25-5002-TIML

DESCRIPTION: Central Florida Rail Corridor (CFRC) Track Improvements – Multiple Locations

DATE: 8/27/2024

You are hereby notified that the above referenced Request for Proposal (RFP) is modified as noted below:

In Exhibit “A” Scope of Services, sheet 9 of 82 under Section 2.0 Services To Be Required, sentence 2.2, is replaced with the following:

“2.2 The Vendor shall install a total of eight (8) new insulated joints, four (4) on Mainline No 1 and four (4) on Mainline No 2, at locations to be specified by the CFRC Signal Team.”

TO ACKNOWLEDGE RECEIPT OF THIS NOTICE AND ALL CHANGES, PLEASE SIGN AND

RETURN BY E-MAIL AT D5.PROCUREMENTQUESTIONS@DOT.STATE.FL.US PRIOR TO

October 2, 2024, at 10:00AM.

Name of Company:

Authorized Signature: Date:

FAILURE TO FILE A PROTEST WITHIN THE TIME PRESCRIBED IN SECTION 120.57(3),

F.S. SHALL CONSTITUTE A WAIVER OF PROCEEDINGS UNDER CHAPTER 120, F.S.

File details come from the government source that posted it. Updated .