Addendum 3 21303.pdf

PDF 5 MB Posted

Attached to
472/21303. MAA; Thumb CF - Vid. Mgmt. Sys. Upgrade - Phase 1
Solicitation number
RFQ - 171 - 220000000458
Issued by
Tuscola County, Capac Village, Michigan

About this file

This document is an Addendum to the Construction Bid for the Video Management System Upgrade - Phase 1 project at the Thumb Correctional Facility in Lapeer, Michigan. The addendum provides clarifications, drawing changes, and answers to questions related to the project. Key details include:

The project involves upgrading the video management system at the Thumb Correctional Facility, including changes to the fiber network, network switches, monitoring PCs, and other system components. The addendum addresses items such as revised quantities of equipment, changes to network and fiber layouts, and clarifications on power supply requirements for switches. The bid opening date is August 24, 2022. The addendum also includes the sign-in sheet from the mandatory pre-bid meeting held on August 3, 2022.

The contract opportunity is for the State of Michigan, specifically the Department of Technology, Management and Budget. The project is funded by the state and involves work within Tuscola County and Capac Village. The addendum provides guidance on pricing considerations, such as recommended replacements for discontinued equipment components.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 (Rev 12/17)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

CONSTRUCTION BID ADDENDUM NO. 3

This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.

TO:

ALL BIDDERS

DATE ISSUED

8/18/2022

PROJECT NAME

Video Management System Upgrade – Phase 1 - Thumb Correctional Facility3225 John Conley Drive - Lapeer, MI 48446

FILE NUMBER

472/21303.MAA

PROFESSIONAL

Commtech Design, Inc.

PROJECT DIRECTOR

Maria Alvaro

BID OPENING DATE:

8/24/2022

ADDENDUM ITEMS: (attach additional sheets and drawings if required) Attachments;

1. Meeting Attendance record, Pre-Bid sign-in sheets.

2. Drawings TC105, TC106, TC107, TC109, TC112, TC201, TC209, TC301 and TC309

Drawings reissued

1. TC105

a. Change fiber panel in building 600 to existing. It is not to be a new fiber panel as part of this project

b. Change note about existing perimeter fiber. All existing perimeter cabinet fiber is singlemode

2. TC106 and TC107

a. See rack layout changes

3. TC109

a. Revised quantity of Monitoring PC’s to be provided

b. See changes in network switches and existing servers and subsequent connectivity.

c. See addition of new KVM Switch

d. Revised Quantity of Ethernet Switches in Admin building

4. TC112

a. Changed camera type in Greenhouse

5. TC201

a. Revised Quantity and location of new and replaced Monitoring PC’s

6. TC209

a. Add notes to perimeter cabinets to reference detail sheet http://www.michigan.gov/SIGMAVSS

7. TC301

a. Revised Quantity and location of new and replaced Monitoring PC’s

8. TC309

a. Change location of Greenhouse camera.

Questions;

1. TC102 network cabinet detail 1/TC102. Are we to provide a new CommNet switch and a SFP for every cabinet?

Answer. Yes. Provide a new Switch, power supply and SFP module for each Perimeter cabinet.

2. Rack layouts do not show any copper patch panels for new cabling. Are there existing patch panels?

Answer. See updated rack layouts.

3. Print TC105. There is single mode fiber from admin to cab 1, then mullite mode from cab 1 to cab 6, then back to single mode from cab 6 to admin. Is this correct?

Answer. See updated fiber optic plan Sheet TC105

4. Are there pole replacements on this project?

Answer. Yes. See electrical drawings

5. TC105 calls for a new fiber panel in building 600. Print TC107 rack layout 6/TC105 does not show the new fiber panel. Please advise.

Answer. See update TC105. Issued as part of this Addendum

6. TC301 shows new 192 strand of fiber from hand hole HH2 to admin and 24 strand from admin to building

200. Print TC309 does not have this information on it, can you provide more detail.

Answer. See update TC105. Issued as part of this Addendum

7. TC109: Switch in Admin Comm Room A1 - noted as building switch "NC" but should be core switch "NE?"

Answer. No. stay as shown

8. Switch in Admin Comm Room A2 noted as building switch "NC" but should be core switch "NB?" Or "NE +

NB?"

Answer. See update TC109. Issued as part of this Addendum

9. Switch in Admin Comm Room A2 - Shows fiber homeruns from Cabinet 001-008 to the Core Switch, but TC114 and TC115 show fiber is daisy chained through the Exterior (NA) switches. Which one is the actual layout?

Answer. Fiber cable is daisy chained but connections patch thru each cabinet for direct connections at Admin building to each cabinet.

10. Switch in Admin Comm Room A2 - Existing Cold Store Storage servers #1-4 - what is the existing physical fiber connection? MMF or SMF? 1 or 10G? ST, SC, or LC connector?

Answer. These are copper connections. See updated TC109

11. Switch in Admin Comm Room A2 - Existing Archive servers - what are these physical connections?

Answer. These are copper connections. See updated TC109

12. Switch in Admin Comm Room A2 - Is camera number TCF1123 a CG or CC camera?

Answer. Shall be as shown, a CE Camera

13. Switch in Admin Comm Room A2 - Is TCF-StarneT2-LT Comm Room-A2 Laptop a replacement or new to the system?

Answer. See revised TC109. That laptop is no longer referenced as part of this project.

14. TC111 - MM Fiber connection between switches in 300 Education BLDG Comm Room ED1 & ED2 to be 1G or 10G?

Answer. This shall be a 10 Gigabit connection

15. DATA NETWORK 286200 - -2.02 Core Switch - Does not state a redundant power supply as requirement, so spec switches with only a single power supply?

Answer. Ethernet Switches do not require redundant power supplies. Bid as specified. Only single power supplies required.

16. DATA NETWORK 286200 2.02.A - What are these physical connections and counts? (not show in TC109)

a. Fortinet router and time sync device

b. Rounding Reader system

c. Senstar-Starnet Fence detection system.

d. Paging audio system

e. Access control System

i. Other systems that are currently connected

Answer. Each of these has one connection to the core network

17. DATA NETWORK 286200 2.03 Building Switch - Does not state a redundant power supply as requirement, so spec switches with only a single power supply?

Answer. Provide as currently specified

18. DATA NETWORK 286200 2.06.C - States: 1. Software licensing for Cisco Switches shall include: 1. Cisco DNA Premier 2. ISE Base and ISE Tracker 3. PLS Tracker. This Cisco license level is no longer sold. Should licensing then be Essential or Advantage levels? Based on required features in sections 2.02.H and 2.03.G, the Essential license level meets these requirements for all 3 switch types but looking for confirmation.

Answer. Switches shall be equipped with Cisco Essentials

19. SECURITY RECORDING 283600 2.04 Monitoring PC’s for Genetec Software. The I9-9940x processor is no longer available. What is your recommended replacement?

Answer. Provide processor that is equivalent in processing speed and capabilities.

20. In Section 283600 Security Recording part 3.04 E2 it states: Move other systems such as those below to the new secure network switches: a. Rounding Reader system b. Senstar-Starnet Fence detection system c.

Paging audio system d. Access control System e. Move these to the new Ethernet Switches in the buildings.

Will the contractor be required to physically move any of the systems listed above?

Answer. Physical movement of these PC’s or servers is not required. Move refers to Ethernet connection movement.

21. The 240 GB Solid State Drive is no longer available. What is your recommended replacement?

Answer. Provide a Solid State drive equal to or larger. Not smaller.

22. The Dual NVIDIA® GeForce® RTX 2080 video card is no longer available. What is your recommended replacement?

Answer. Nvidia #RTX 3080Ti

23. 3A The 11th Gen Intel® Core™ i7-1165G7 is no longer available. What is your recommended replacement?

Answer. Provide processor that is equivalent in processing speed and capabilities.

24. How many monitors are on each Monitoring PC?

Answer. New monitors that are required as part of this project are shown on the one-line diagrams.

25. Is there room accounted for in existing or new it racks for the new Genetec servers and archivers?

Answer. A new Rack is to be installed as part of this project. See rack layouts and Admin second floor plan drawing.

26. Is it required to provide a new KVM?

Answer. Yes, a new KVM shall be provided. See revised TC109

27. Are you requiring a new POE injector for any existing PTZ camera presently installed staying in the system or just for the new PTZ cameras being installed?

Answer. All PTZ existing and new shall receive a new POE injector for powering the camera.

ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.

PROFESSIONAL: Bret Emerson, Commtech Design Inc. DATE: 8/18/2022

APPROVED BY:

PROJECT DIRECTOR: Maria Alvaro DATE: 8/18/2022

Meeting Topic:

Mandatory Pre-Bid Meeting

PHONE/CELL

EMAIL

bret@commtechdesign.com isovis@matrixceinc.com jbosworth@matrixceinc.com whiter12@michigan.gov albrechtd@michigan.gov

SeversonC@michigan.gov

AlvaroMl@michigan.gov poagj@michigan.gov artisf@michigan.gov blackj4Amichigan.gov hohrunl@michigan.gov

517- 7-3O - q335-

5l' - 28 - 30?4!)

mcdonaldm6@michigan.gov

TIME:

1:00 PM

Rinsn

NAM OID

iechnologY, Management & Budget

Commtech Design 6581 Belding Rd. NE, Suite 101 Rockford. MI 49341

MEETING ATTENDANCE RECORD

MICHIGAN DEPARTMENT OF TECHNOLOGY MANAGEMENT AND BUDGET

FACILITIES AND BUSINESS ADMINISTRATION- DESIGN AND CONSTRUCTION DIVISION

PROJECT DESCRIPTION/LOCATION:

Thumb Correctional Facility (TCF) - 3225 John Conley Drive, Lapeer, MI 48446 Video Management System Upgrade - Phase 1

DATE:

August 3, 2022

NAME

Bret Emerson

Joe Sovis

Jake Bosworth

Richard White

David Albrecht

Chris Severson

Maria Alvaro

Jason Poag

Fredeane Artis

John Black

Mark Hohn

Mark McDonald v"

FIRM

Commtech Design, Inc.

Matrix

Matrix

MDOC

MDOC

MDOC

DTMB

DTMB

MDOC - Thumb

MDOC - Thumb

MDOC - Thumb

MDOC - Thumb

Sigma Coding: FILE NUMBER:

472DRFMaintProj

472/20113.TYC

MEETING PLACE:

On Site at Thumb C.F. - Warden's Conference Room

Steve Zubek MDOC - Thumb ZubekS@michigan. goy

InfrA4.-e ((ear\

000144

445LS

[ Tr a/C AIS c<0 wcs. \\t01,4 at ) )( ?

711/ W

.0-1/41-9V zq os ? 4F, 6g _

1,),)iic 6 le,- L60 - 359

-1-vv.sr?-i-5 0) rkti<64,: co„,77

1014eCrAw1o detecAtIG .4.4r

-13Scrt -nN));-- 6244q jAkoib 055oc:cd-e5 IIC . (ow%

M4/66 /A45 P.— ArklCoMel tA)C, ct-rAio

;d ot c c cp,te vl4,4 vk

TC105

THUMB FIBER BACKBONE CONNECTIVITY TC105

THUMB

FIBER BACKBONE

CONNECTIVITY

C om m te ch

D es ig n

C O

U R

TL

AN

D S

T.

, S

U

IT

E

R

O C

KF

O

R D

, M

IC

H

IG

AN

W W

W .C

O M

M

TE

C H

D

ES

IG

N

.C O

M

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A C

IL

IT

IE

S

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

M a t r ix

TC106

THUMB EDUCATION BLDG 300

SECOND FLOOR COMM ROOM E2 2

TC106

THUMB EDUCATION BLDG 300

FIRST FLOOR COMM ROOM E1

TC106

THUMB ADMINSTRATION BLDG 100

SECOND FLOOR COMM ROOMS A1 & A2

TC106

THUMB HOUSING UNIT 700 - AUBURN

UPPER LEVEL COMM ROOM A2

TC106

THUMB

RACK LAYOUTS

C om m te ch

D es ig n

C O

U R

TL

AN

D S

T.

, S

U

IT

E

R

O C

KF

O

R D

, M

IC

H

IG

AN

W W

W .C

O M

M

TE

C H

D

ES

IG

N

.C O

M

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A C

IL

IT

IE

S

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

M a t

TC107

THUMB SUPPORT SERVICES BLDG 200

SECOND FLOOR COMM ROOM S2 1

TC107

THUMB HOUSING UNIT 400 - DURANT

UPPER LEVEL COMM ROOM D2

TC107

THUMB HOUSING UNIT 400 - CORD

UPPER LEVEL COMM ROOM C2

TC107

THUMB HOUSING UNIT 500 - ESSEX

UPPER LEVEL COMM ROOM E2

TC107

THUMB HOUSING UNIT FRANKLIN

UPPER LEVEL COMM ROOM F26

TC107

THUMB 600 BUILDING MSI

ALL FLOORS COMM ROOM G1

TC107

THUMB

RACK LAYOUTS

C om m te ch

D es ig n

C O

U R

TL

AN

D S

T.

, S

U

IT

E

R

O C

KF

O

R D

, M

IC

H

IG

AN

W W

W .C

O M

M

TE

C H

D

ES

IG

N

.C O

M

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A C

IL

IT

IE

S

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

M a t

TC109

THUMB SECURITY CAMERA

ONE LINE DIAGRAMS TC109

THUMB

SECURITY CAMERA

ONE LINE DIAGRAMS

C om m te ch

D es ig n

C O

U R

TL

AN

D S

T.

, S

U

IT

E

R

O C

KF

O

R D

, M

IC

H

IG

AN

W W

W .C

O M

M

TE

C H

D

ES

IG

N

.C O

M

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A C

IL

IT

IE

S

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

M a t

TC112

THUMB SECURITY CAMERA

ONE LINE DIAGRAMS TC112

THUMB

SECURITY CAMERA

ONE LINE DIAGRAMS

C om m te ch

D es ig n

C O

U R

TL

AN

D S

T.

, S

U

IT

E

R

O C

KF

O

R D

, M

IC

H

IG

AN

W W

W .C

O M

M

TE

C H

D

ES

IG

N

.C O

M

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A C

IL

IT

IE

S

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

M a t

PC

PC-EX

PC-EX

PC-EX

LT-EX

PC-EX

PC-EXPC-EX

PC-EX

PC-EX

LT-EX

TC201

THUMB 100 - ADMINISTRATION

SECOND FLOOR - EXISTING

N

TC201

THUMB 100 - ADMINISTRATION

FIRST FLOOR - EXISTING

N

C om m te ch

D es ig n

C O

U R

TL

AN

D S

T.

, S

U

IT

E

R

O C

KF

O

R D

, M

IC

H

IG

AN

W W

W .C

O M

M

TE

C H

D

ES

IG

N

.C O

M

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A C

IL

IT

IE

S

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

M a t r ix

KEYED SECURITY NOTES

GENERAL SECURITY NOTES

TC201

THUMB 100 ADMIN.

FIRST & SECOND FLOORS

EXISTING

F28

F29

F30

F31

F32

F33

F35

F36

F37

F38

F39

F44

F43

F42

F41

F40

F27

F26

F25

F24

F23

F22

F21

F20

F19

F18

F17

F16

F15

F14 F13F12

F11F10

F9

F8 F7F6F5F4

F3

F2

F1

P17

P16

P4

P5

P10

F34

P17A

F37A

F1A

FXX

TC209

THUMB CORRECTIONAL FACILITY

SITE PLAN - EXISTING

N

C om m te ch

D es ig n

C O

U R

TL

AN

D S

T.

, S

U

IT

E

R

O C

KF

O

R D

, M

IC

H

IG

AN

W W

W .C

O M

M

TE

C H

D

ES

IG

N

.C O

M

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A C

IL

IT

IE

S

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

M a t r ix

KEYED SECURITY NOTES

GENERAL SECURITY NOTES

TC209

THUMB

CORRECTIONAL FACILITY

SITE PLAN - EXISTING

PC-REP

PC-REP

PC-NEW

PC-REP

PC-REP

PC-REPPC-REP

PC-REP

PC-REPPC-REP

PCLT-REP

TC301

THUMB 100 BLDG. - ADMINISTRATION

SECOND FLOOR - NEW & REPLACE

N

TC301

THUMB BLDG. 100 - ADMINISTRATION

FIRST FLOOR - NEW & REPLACE

N

C om m te ch

D es ig n

C O

U R

TL

AN

D S

T.

, S

U

IT

E

R

O C

KF

O

R D

, M

IC

H

IG

AN

W W

W .C

O M

M

TE

C H

D

ES

IG

N

.C O

M

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A C

IL

IT

IE

S

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

M a t r ix

KEYED SECURITY NOTES

GENERAL SECURITY NOTES

TC301

THUMB 100 ADMIN.

FIRST & SECOND FLOORS

NEW & REPLACE

F28

F29

F30

F31

F32

F33

F35

F36

F37

F38

F39

F44

F43

F42

F41

F40

F27

F26

F25

F24

F23

F22

F21

F20

F19

F18

F17

F16

F15

F14 F13F12

F11F10

F9

F8 F7F6F5F4

F3

F2

F1

P17

P16

P4

P5

P10

F34

P17A

F37A

F1A

FXX

TC309

THUMB CORRECTIONAL FACILITY

SITE PLAN - NEW & REPLACE

N

C om m te ch

D es ig n

C O

U R

TL

AN

D S

T.

, S

U

IT

E

R

O C

KF

O

R D

, M

IC

H

IG

AN

W W

W .C

O M

M

TE

C H

D

ES

IG

N

.C O

M

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A C

IL

IT

IE

S

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

M a t r ix

KEYED SECURITY NOTES

GENERAL SECURITY NOTES

TC309

THUMB CORRECTIONAL

FACILITY - SITE PLAN

NEW & REPLACE

File details come from the government source that posted it. Updated .