472_21303.MAA_Thumb_Video Management SystemUpgrades _ Addendum 01.pdf

PDF 1 MB Posted

Attached to
472/21303. MAA; Thumb CF - Vid. Mgmt. Sys. Upgrade - Phase 1
Solicitation number
RFQ - 171 - 220000000458
Issued by
Tuscola County, Capac Village, Michigan

About this file

This document is an Addendum for a state and local contract opportunity for a Video Management System Upgrade - Phase 1 at the Thumb Correctional Facility in Lapeer, Michigan. The project is being managed by the Michigan Department of Technology, Management and Budget (DTMB) and Commtech Design, Inc. The Addendum provides updated specifications for the project, including revisions to various electrical sections. The bid opening date is August 17, 2022. No additional project signs are required for this bid. Bidders must acknowledge receipt of the Addendum.

The contract opportunity involves upgrading the video management system at the Thumb Correctional Facility. The project is funded through the DTMB's Maintenance Project account number 472TCFMaintProj. The Addendum includes revised specifications for electromagnetic investigations, basic electrical requirements, electrical power conductors and cables, grounding and bonding, raceways and boxes, sleeves and seals, identification, wiring devices, and exterior lighting.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 (Rev 12/17)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

CONSTRUCTION BID ADDENDUM NO. 1

This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.

TO:

ALL BIDDERS

DATE ISSUED

8/1/2022

PROJECT NAME

Video Management System Upgrade – Phase 1 - Thumb Correctional Facility3225 John Conley Drive - Lapeer, MI 48446

FILE NUMBER

472/21303.MAA

PROFESSIONAL

Commtech Design, Inc.

PROJECT DIRECTOR

Maria Alvaro

BID OPENING DATE:

8/17/2022

ADDENDUM ITEMS: (attach additional sheets and drawings if required)

Attachments

1. Specifications:

a. DIVISION 02 - EXISTING CONDITIONS

i. 023123 ELECTROMAGNETIC INVESTIGATIONS

b. DIVISION 26 - ELECTRICAL

i. 260010 BASIC ELECTRICAL REQUIREMENTS

ii. 260500 COMMON WORK RESULTS FOR ELECTRICAL

iii. 260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

iv. 260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

v. 260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

vi. 260533 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

vii. 260544 SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS

AND CABLING

viii. 260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS

ix. 262726 WIRING DEVICES

x. 265600 EXTERIOR LIGHTING

xi. 282150 TECHNOLOGY AND INSTALLATION STANDARDS

c. DIVISION 32 - EXTERIOR IMPROVEMENTS

i. 329200 TURF AND GRASSES

Clarification

1. Addendix IV – Required Project Signs is not required for this bid.

ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.

PROFESSIONAL: Bret Emerson, Commtech Design Inc. DATE: 8/1/2022

APPROVED BY:

PROJECT DIRECTOR: DATE: Click to enter date http://www.michigan.gov/SIGMAVSS

State of Michigan Matrix Project No. 21316.10 Department of Technology, Management and Budget Design and Construction Division Thumb Correctional Facility Video Management Upgrade – Phase 1 File No: 472/21303.MAA Funding Code No.: 472TCFMaintProj

ELECTROMAGNETIC INVESTIGATIONS 023123 - 1

SECTION 023123 – ELECTROMAGNETIC INVESTIGATIONS

PART 1 - GENERAL

1.1 SUMMARY

A. Work Included: Using Ground Penetrating Radar (GPR) to survey and locate below-grade elements including but not limited to:

1. Location of utility pipes.

2. Location of cables and conduits.

B. Related Sections:

1. Division 01: Administrative, procedural, and temporary work requirements.

1.2 SUBMITTALS

A. Submittals for Review:

1. GPR Survey plan.

2. CAD file overlay.

3. GPS map.

4. Report accompanying ground markings.

B. Quality Control Submittals: Submit prior to performing survey:

1. GPR Surveyor qualifications.

2. GPR Technician qualifications.

1.3 REFERENCES

A. ASTM International (ASTM):

1. D6432 – Standard Guide for Using the Surface Ground Penetrating Radar Method for Subsurface Investigation.

1.4 QUALITY ASSURANCE

A. GPR Surveyor Qualifications:

1. Minimum of ten years experience in performing ground penetrating radar subsurface investigations.

2. Technicians trained and certified by ground penetrating radar equipment manufacturer.

3. Technicians maintain OSHA safety training certificate.

State of Michigan Matrix Consulting Engineers, Inc.

Design and Construction Division

Newberry Correctional Facility

Repairs/Replace Light Pole Bases File No: 472/20298.TAP

Funding Code No.: 472NCFMAINTPROJ

ELECTROMAGNETIC INVESTIGATIONS 023123 - 2

4. Maintain General Liability Insurance of $1,000,000, Automobile Liability of $1,000,000 and Umbrella Liability of $6,000,000.

B. Pre-survey conference: Before beginning survey work, meet with Owner, Engineer and Contractor, and others whose Work requires survey results.

1. Review limits of survey area.

2. Review depth limits for the investigation.

3. Review project Geotechnical Report.

PART 2 - PRODUCTS

2.1 SERVICE PROVIDERS

A. Contract Documents are based on services by but not limited to:

1. Ground Penetrating Radar, Inc. (www.gp-radar.com).

a. Main Office:

6800 W. Central Ave., E-1 Toledo, OH 43617 419.843.9804

b. Regional Offices:

1) Michigan:

i) Detroit: 734.377.4551, 248.917.1763

ii) Lansing: 517.231.9383

2) Wisconsin:

i) Milwaukee: 414.795.6845

ii) Madison: 608.250.0650

B. Substitutions: Under provisions of General Conditions

PART 3 - EXECUTION

3.1 GPR SURVEY PLAN

A. Develop a detailed plan for GPR survey. Include:

http://www.gp-radar.com/index.html

Design and Construction Division

Newberry Correctional Facility

Repairs/Replace Light Pole Bases

ELECTROMAGNETIC INVESTIGATIONS 023123 - 3

1. Area of investigation.

2. Depth of investigation.

3. Elements to be located.

4. Operational constraints.

3.2 PREPARATION

A. Review existing topographic surveys, aerial photos, geotechnical reports, and other available information.

B. Review site for cultural sources of noise, including reflections from nearby vehicles, buildings, fences, power lines, lampposts trees and vegetation.

C. Review site for cellular antennas, television and radio transmitters and other possible sources of EM transmissions that may induce noise on the radar record.

D. Review site soil conditions to determine if they are conducive to successful data gathering via the GPR process.

1. If soil conditions are too wet to permit accurate imaging, allow soil to dry before proceeding.

E. Take initial sets of GPR measurements to confirm adequate depth of penetration exists.

F. Unless shielded antennas are being used, assess signal-to-noise ratio to determine the need for antenna shielding.

G. Technician to have two antennas onsite to ensure required ground penetrations can be achieved.

H. Do not proceed with survey work until unacceptable conditions are corrected.

3.3 CALIBRATION AND STANDARDIZATION

A. Follow equipment manufacturer’s recommendations for calibration and standardization of equipment.

B. Conduct an operational check of the equipment before each project and before each day’s work begins.

3.4 SURVEY

A. Perform survey work in compliance with ASTM D6432 and the equipment manufacturer’s recommendations.

B. Establish radar system control settings and maintain the settings throughout the survey area depending on site conditions. Record any changes to GPR settings and locations where the changes occurred.

Design and Construction Division

Newberry Correctional Facility

Repairs/Replace Light Pole Bases

ELECTROMAGNETIC INVESTIGATIONS 023123 - 4

C. Lay out survey lines as straight as possible.

D. Place station marks at equal intervals along the survey line using survey flags and tape, measuring wheel, electronic measuring device or GPS device.

E. Locate survey lines relative to a permanent location so the survey grid can be revisited at a later date.

F. Document any changes to the planned field procedures.

G. Document any weather conditions, natural or cultural noise that could impact survey results.

H. Utility location: Use electromagnetic induction equipment to supplement GPR in identification of utilities.

3.5 RECORDING FINDINGS

A. Mark findings on the surface of the site.

1. Provide written report to accompany ground markings.

B. Provide CAD overlay of located sub-surface elements. CAD overlay is in AUTOCAD Release

13.

C. Provide GPS map on GoogleEarth image.

END OF SECTION 023123

Design and Construction Division Thumb Correctional Facility Video Management Upgrade – Phase 1

BASIC ELECTRICAL REQUIREMENTS 260010- 1

SECTION 260010 - BASIC ELECTRICAL REQUIREMENTS

PART 1 - GENERAL

1.1 DESCRIPTION OF WORK

A. Work includes all electrical items and systems shown on the contract drawings and specified herein.

B. Unless specifically dimensioned, the work shown on the drawings is diagrammatic, and is intended only to show general arrangement.

C. Include in the work all accessories and devices necessary for the intended operation of any system, whether or not specifically shown or specified.

1.2 STANDARDS OF QUALITY

A. The specifications establish the standard of quality required, either by description of by references to brand name, name of manufacturers or manufacturer’s model number.

B. Where one product only is specifically identified by name of manufacturer’s model number, the Contractor shall base his bid on the use of the name product. Where multiple names are used, the Contractor shall base his bid on the use of any of those products named.

C. The Contractor may submit with his bid, the names of products which are proposed as substitutions for products named in specifications. Each proposed substitution shall be accompanied by a written sum of money to be added or deducted from his bid. The Owner reserves the sole right to accept or reject said substitutions with or without cause.

D. When equipment and/or materials are proposed to be purchased from a manufacturer other than those specified, the Contractor shall provide complete data adequate for the Engineer’s evaluation of the proposed substitution.

E. When the equipment other than that specified is used, the Contractor shall be responsible for any extra cost of required revisions such as structural steel, concrete, electrical, piping, etc.

Such additional costs shall be identified at the time such substitutions are proposed.

1.3 SUMMARY

A. This Section includes general administrative and procedural requirements for electrical installations.

1. Submittals

2. Maintenance Manuals

3. Rough-ins

4. Electrical Installations

Design and Construction Division Thumb Correctional Facility Video Management Upgrade – Phase 1

BASIC ELECTRICAL REQUIREMENTS 260010- 2

1.4 SUBMITTALS

A. The Contractor shall review, approve and submit shop drawings, with promptness so as to cause no delay in his work or in that of others. No submissions will be accepted by the Engineer without the signed review and approval of the Contractor.

B. The Contractor shall check and verify pertinent field measurements, quantities of equipment and materials required.

C. Submittals shall be identified by reference to the drawings, sections of specifications, or equipment symbols to which they relate.

D. Shop drawings, when required, shall include:

1. Verification of information given in Contract Documents such as performance, dimensions, weight, materials, construction, types, models, manufacturer, etc.

2. Equipment layouts drawn to scale as required.

3. Wiring diagrams and schematics for equipment.

4. Any special construction conditions.

5. Other information/data as may be requested.

6. All items being provide must be highlighted.

7. All shops being submitted as a PDF must be flatten.

8. Size of the file of PDFS must not exceed 6 MB.

If the shops do not meet the above requirements they will be rejected.

E. All submittals shall identify the specific details of the product or assembly. All optional features being proposed shall be so noted, or the submittal will be rejected.

F. Any work that is done prior to approved shop drawings is at contractor’s risk.

G. Review is only for general conformance with the design concept of the project and general compliance with the information given in the contract documents. Any action shown is subject to the requirements of the plans and specification. Contractor is responsible for dimensions which shall be confirmed and correlated at the job site; fabrication processes and techniques of construction; coordination of his work with that of all other trades; and the satisfactory performance of his work.

H. For items being resubmitted, clearly identify changes made from the initial submittal requested by the Engineer. The Engineer will review only those changes requested and identified by the Contractor.

1.5 MAINTENANCE MANUALS

A. Prepare maintenance manuals including the following information for equipment items:

1. Description of function, normal operating characteristics and limitations, performance curves, engineering data and tests, and complete nomenclature and commercial numbers of replacement parts.

Design and Construction Division Thumb Correctional Facility Video Management Upgrade – Phase 1

BASIC ELECTRICAL REQUIREMENTS 260010- 3

2. Manufacturer’s printed operating procedures to include start-up, break-in, and routine and normal operating instructions; regulation, control, stopping, shutdown, and emergency instructions; and summer and winter operating instructions.

3. Maintenance procedures for routine preventative maintenance and troubleshooting;

disassembly, repair, and reassembly; aligning and adjusting instructions.

4. Servicing instructions and lubrication charts and schedules.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Deliver products to the project properly identified with names, model numbers, types, grades, compliance labels, and other information needed for identification.

1.7 PERMITS, FEES, AND CERTIFICATES OF APPROVAL

A. Contractor shall acquire all permits and certificates.

B. Contractor shall provide all labor and instruments required for tests and cleaning of systems.

C. Whenever tests are required, three (3) copies of the test reports shall be submitted to the Engineer.

D. Tests may be observed by the Engineer or his representative. Notify the Engineer a minimum of three weeks in advance of the test dates.

1.8 COMPLIANCE WITH CODES, STANDARDS AND REGULATIONS

A. In the absence of specific instruction in the technical specifications, equipment and installation shall conform to the following applicable codes, standards and regulations, latest editions:

1. American Society for Testing Materials (ASTM).

2. American National Standard Institute (ANSI).

3. Underwriter’s Laboratories, Inc. (UL).

4. American Welding Society Code (AWSC).

5. Local Building, Electrical, and Fire Codes.

6. National Electrical Code (NEC).

7. Service Rules and Regulations of Local Electrical Utility Company.

8. National Electrical Manufacturer’s Association (NEMA).

9. U.S. Department of Health & Human Services “HRS-M-HF” 84-1.

10. Occupational Safety and Health Act (OSHA).

11. National Fire Protection Association (NFPA).

12. Americans with Disabilities Act (ADA).

Design and Construction Division Thumb Correctional Facility Video Management Upgrade – Phase 1

BASIC ELECTRICAL REQUIREMENTS 260010- 4

PART 2 - PRODUCTS - Not Used.

PART 3 - EXECUTION

3.1 ROUGH-IN

A. Verify final locations for rough-ins with field measurements and with requirements of the actual equipment to be connected.

3.2 ELECTRICAL INSTALLATIONS

A. General: Sequence, coordinate, and integrate the various elements of electrical systems, materials, and equipment. Comply with the following requirements:

1. Coordinate electrical systems, equipment, and materials installation with other building components.

2. Verify all dimensions by field measurements.

3. Sequence, coordinate, and integrate installations of electrical materials and equipment for efficient flow of the work. Give particular attention to large equipment requiring positioning prior to closing in the building.

4. Where mounting heights are not detailed or dimensioned, install systems, materials, and equipment to provide the maximum headroom possible.

5. Install systems, materials, and equipment to conform with approved submittal data, including coordination drawings, to greatest extent possible. Conform to arrangements indicated by the Contract Documents, recognizing that portions of the Work are shown only in diagrammatic form. Where coordination requirements conflict with individual system requirements, refer conflict to the Engineer.

6. Install systems, materials, and equipment level and plumb, parallel and perpendicular to other building systems and components, where installed exposed in finished spaces.

7. Install electrical equipment to facilitate servicing, maintenance, and repair or replacement of equipment components. As much as practical, connect equipment for ease of disconnecting, with minimum of interference with other installations.

8. Install access panel or doors where units are concealed behind finished surfaces.

9. Install systems, material, and equipment giving right-of-way priority to systems required to be installed at a specified slope.

10. Coordinate all electrical requirements with other trades and their shop drawings prior to installing conduit, wire, switches and breakers. Notify engineer of any discrepancies between document and actual supplied equipment.

3.3 CUTTING AND PATCHING

A. General: Performing cutting and patching in accordance with the following requirements:

1. Perform cutting, fitting, and patching of electrical equipment and materials required to:

a. Uncover work to provide for installation of ill-timed work.

b. Remove and replace defective work.

Design and Construction Division Thumb Correctional Facility Video Management Upgrade – Phase 1

BASIC ELECTRICAL REQUIREMENTS 260010- 5

c. Remove and replace work not conforming to requirements of the contract documents.

d. Upon written instruction from the Engineer, uncover and restore work to provide for Engineer observation of concealed work.

END OF SECTION 260010

Design and Construction Division Thumb Correctional Facility Video Management Upgrade – Phase 1

COMMON WORK RESULTS FOR ELECTRICAL 260500 - 1

SECTION 260500 - COMMON WORK RESULTS FOR ELECTRICAL

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Electrical equipment coordination and installation.

2. Common electrical installation requirements.

1.2 COORDINATION

A. Coordinate arrangement, mounting, and support of electrical equipment:

1. To allow maximum possible headroom unless specific mounting heights that reduce headroom are indicated.

2. To provide for ease of disconnecting the equipment with minimum interference to other installations.

3. To allow right of way for piping and conduit installed at required slope.

4. So that connecting raceways, cables, wireways, cable trays, and busways will be clear of obstructions and of the working and access space of other equipment.

B. Coordinate installation of required supporting devices and set sleeves in cast-in-place concrete, masonry walls, and other structural components as they are constructed.

C. Coordinate location of access panels and doors for electrical items that are behind finished surfaces or otherwise concealed.

PART 2 - PRODUCTS – Not Used.

PART 3 - EXECUTION

3.1 COMMON REQUIREMENTS FOR ELECTRICAL INSTALLATION

A. Comply with NECA 1.

B. Measure indicated mounting heights to bottom of unit for suspended items and to center of unit for wall-mounting items.

C. Headroom Maintenance: If mounting heights or other location criteria are not indicated, arrange and install components and equipment to provide maximum possible headroom consistent with these requirements.

Design and Construction Division Thumb Correctional Facility Video Management Upgrade – Phase 1

COMMON WORK RESULTS FOR ELECTRICAL 260500 - 2

D. Equipment: Install to facilitate service, maintenance, and repair or replacement of components of both electrical equipment and other nearby installations. Connect in such a way as to facilitate future disconnecting with minimum interference with other items in the vicinity.

E. Right of Way: Give to piping systems installed at a required slope.

END OF SECTION 260500

Design and Construction Division Thumb Correctional Facility Video Management Upgrade – Phase 1

LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 260519 - 1

SECTION 260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Building wires and cables rated 600 V and less.

2. Connectors, splices, and terminations rated 600 V and less.

PART 2 - PRODUCTS

2.1 CONDUCTORS AND CABLES

A. Copper Conductors: Comply with NEMA WC 70/ICEA S-95-658.

B. Conductor Insulation: Comply with NEMA WC 70/ICEA S-95-658 for Type THHN-2-THWN-2.

2.2 CONNECTORS AND SPLICES

A. Description: Factory-fabricated connectors and splices of size, ampacity rating, material, type, and class for application and service indicated.

2.3 SYSTEM DESCRIPTION

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

B. Comply with NFPA 70.

PART 3 - EXECUTION

3.1 CONDUCTOR MATERIAL APPLICATIONS

A. Feeders: Copper. Solid for No. 10 AWG and smaller; stranded for No. 8 AWG and larger.

B. Branch Circuits: Copper. Stranded for No. 12 AWG and larger, except VFC cable, which shall be extra flexible stranded.

Design and Construction Division Thumb Correctional Facility Video Management Upgrade – Phase 1

LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 260519 - 2

3.2 CONDUCTOR INSULATION AND MULTICONDUCTOR CABLE APPLICATIONS AND WIRING

METHODS

A. Exposed Feeders: Type THHN-2-THWN-2, single conductors in raceway.

B. Feeders Concealed in Concrete, below Slabs-on-Grade, and Underground: Type THHN-2-

THWN-2, single conductors in raceway.

C. Exposed Branch Circuits, Including in Crawlspaces: Type THHN-2-THWN-2, single conductors in raceway.

D. Branch Circuits Concealed in Ceilings, Walls, and Partitions: Type THHN-2-THWN-2, single conductors in raceway.

E. Branch Circuits Concealed in Concrete, below Slabs-on-Grade, and Underground:

Type THHN-2-THWN-2, single conductors in raceway.

3.3 INSTALLATION OF CONDUCTORS AND CABLES

A. Conceal cables in finished walls, ceilings, and floors unless otherwise indicated.

B. Complete raceway installation between conductor and cable termination points according to

Section 260533 "Raceways and Boxes for Electrical Systems" prior to pulling conductors and cables.

C. Use manufacturer-approved pulling compound or lubricant where necessary; compound used must not deteriorate conductor or insulation. Do not exceed manufacturer's recommended maximum pulling tensions and sidewall pressure values.

D. Use pulling means, including fish tape, cable, rope, and basket-weave wire/cable grips, that will not damage cables or raceway.

E. Install exposed cables parallel and perpendicular to surfaces of exposed structural members, and follow surface contours where possible.

F. Support cables according to Section 260529 "Hangers and Supports for Electrical Systems."

3.4 CONNECTIONS

A. Tighten electrical connectors and terminals according to manufacturer's published torque-tightening values. If manufacturer's torque values are not indicated, use those specified in

UL 486A-486B.

B. Make splices, terminations, and taps that are compatible with conductor material and that possess equivalent or better mechanical strength and insulation ratings than unspliced conductors.

1. Use oxide inhibitor in each splice, termination, and tap for aluminum conductors.

Design and Construction Division Thumb Correctional Facility Video Management Upgrade – Phase 1

LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 260519 - 3

C. Wiring at Outlets: Install conductor at each outlet, with at least 6 inches of slack.

3.5 IDENTIFICATION

A. Identify and color-code conductors and cables according to Section 260553 "Identification for Electrical Systems."

B. Identify each spare conductor at each end with identity number and location of other end of conductor, and identify as spare conductor.

3.6 SLEEVE AND SLEEVE-SEAL INSTALLATION FOR ELECTRICAL PENETRATIONS

A. Install sleeves and sleeve seals at penetrations of exterior floor and wall assemblies. Comply with requirements in Section 260544 "Sleeves and Sleeve Seals for Electrical Raceways and Cabling."

3.7 FIRESTOPPING

A. Apply firestopping to electrical penetrations of fire-rated floor and wall assemblies to restore original fire-resistance rating of assembly.

3.8 FIELD QUALITY CONTROL

A. Perform the following tests and inspections with the assistance of a factory-authorized service representative:

1. After installing conductors and cables and before electrical circuitry has been energized, test for compliance with requirements.

2. Perform each visual and mechanical inspection and electrical test stated in NETA Acceptance Testing Specification. Certify compliance with test parameters.

B. Test and Inspection Reports: Prepare a written report to record the following:

1. Procedures used.

2. Results that comply with requirements.

3. Results that do not comply with requirements and corrective action taken to achieve compliance with requirements.

C. Cables will be considered defective if they do not pass tests and inspections.

END OF SECTION 260519

Design and Construction Division Thumb Correctional Facility Video Management Upgrade – Phase 1

GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 260526 - 1

SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes grounding and bonding systems and equipment.

1.2 INFORMATIONAL SUBMITTALS

A. As-Built Data: Plans showing dimensioned as-built locations of grounding features specified in

"Field Quality Control" Article, including the following:

1. Ground rods.

B. Qualification Data: For testing agency and testing agency's field supervisor.

C. Field quality-control reports.

1.3 CLOSEOUT SUBMITTALS

A. Operation and Maintenance Data: For grounding to include in emergency, operation, and maintenance manuals.

1.4 QUALITY ASSURANCE

A. Testing Agency Qualifications: Member company of NETA or an NRTL.

1. Testing Agency's Field Supervisor: Certified by NETA to supervise on-site testing.

B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

C. Comply with UL 467 for grounding and bonding materials and equipment.

PART 2 - PRODUCTS

2.1 SYSTEM DESCRIPTION

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

B. Comply with UL 467 for grounding and bonding materials and equipment.

Design and Construction Division Thumb Correctional Facility Video Management Upgrade – Phase 1

GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 260526 - 2

2.2 CONDUCTORS

A. Insulated Conductors: Copper wire or cable insulated for 600 V unless otherwise required by applicable Code or authorities having jurisdiction.

B. Bare Copper Conductors:

1. Solid Conductors: ASTM B 3.

2. Stranded Conductors: ASTM B 8.

3. Tinned Conductors: ASTM B 33.

4. Bonding Cable: 28 kcmil, 14 strands of No. 17 AWG conductor, 1/4 inch in diameter.

5. Bonding Conductor: No. 4 or No. 6 AWG, stranded conductor.

6. Bonding Jumper: Copper tape, braided conductors terminated with copper ferrules; 1-5/8 inches wide and 1/16 inch thick.

7. Tinned Bonding Jumper: Tinned-copper tape, braided conductors terminated with copper ferrules; 1-5/8 inches wide and 1/16 inch thick.

C. Grounding Bus: Predrilled rectangular bars of annealed copper, 1/4 by 4 inches in cross section, with 9/32-inch holes spaced 1-1/8 inches apart. Stand-off insulators for mounting shall comply with UL 891 for use in switchboards, 600 V and shall be Lexan or PVC, impulse tested at 5000 V.

2.3 CONNECTORS

A. Listed and labeled by an NRTL acceptable to authorities having jurisdiction for applications in which used and for specific types, sizes, and combinations of conductors and other items connected.

B. Bolted Connectors for Conductors and Pipes: Copper or copper alloy.

C. Welded Connectors: Exothermic-welding kits of types recommended by kit manufacturer for materials being joined and installation conditions.

D. Bus-Bar Connectors: Mechanical type, cast silicon bronze, solderless compression-type wire terminals, and long-barrel, two-bolt connection to ground bus bar.

2.4 GROUNDING ELECTRODES

A. Ground Rods: Copper-clad steel; 5/8 by 96 inches.

PART 3 - EXECUTION

3.1 APPLICATIONS

A. Conductors: Install stranded conductors for No. 8 AWG and larger unless otherwise indicated.

B. Grounding Bus: Install in cabinets.

Design and Construction Division Thumb Correctional Facility Video Management Upgrade – Phase 1

GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 260526 - 3

1. Install bus horizontally, on insulated spacers 2 inches minimum from housing.

C. Conductor Terminations and Connections:

1. Pipe and Equipment Grounding Conductor Terminations: Bolted connectors.

2. Underground Connections: Welded connectors except at test wells and as otherwise indicated.

3. Connections to Ground Rods at Test Wells: Bolted connectors.

3.2 GROUNDING UNDERGROUND DISTRIBUTION SYSTEM COMPONENTS

A. Comply with IEEE C2 grounding requirements.

B. Grounding Manholes and Handholes: Install a driven ground rod through manhole or handhole floor, close to wall, and set rod depth so 4 inches will extend above finished floor. If necessary, install ground rod before manhole is placed and provide No. 1/0 AWG bare, tinned-copper conductor from ground rod into manhole through a waterproof sleeve in manhole wall. Protect ground rods passing through concrete floor with a double wrapping of pressure-sensitive insulating tape or heat-shrunk insulating sleeve from 2 inches above to 6 inches below concrete. Seal floor opening with waterproof, non-shrink grout.

C. Grounding Connections to Manhole Components: Bond exposed-metal parts such as inserts, cable racks, pulling irons, ladders, and cable shields within each manhole or handhole, to ground rod or grounding conductor. Make connections with No. 4 AWG minimum, stranded, hard-drawn copper bonding conductor. Train conductors level or plumb around corners and fasten to manhole walls. Connect to cable armor and cable shields according to written instructions by manufacturer of splicing and termination kits.

D. Pad-Mounted Cabinets: Install two ground rods and ground ring around the pad. Ground pad-mounted equipment and noncurrent-carrying metal items associated with substations by connecting them to underground cable and grounding electrodes. Install tinned-copper conductor not less than No. 2 AWG for ground ring and for taps to equipment grounding terminals. Bury ground ring not less than 6 inches from the foundation.

3.3 EQUIPMENT GROUNDING

A. Install insulated equipment grounding conductors with all feeders and branch circuits.

B. Install insulated equipment grounding conductors with the following items, in addition to those required by NFPA 70:

1. Feeders and branch circuits.

2. Lighting circuits.

3. Receptacle circuits.

4. Flexible raceway runs.

C. Poles Supporting Outdoor Lighting Fixtures: Install grounding electrode and a separate insulated equipment grounding conductor in addition to grounding conductor installed with branch-circuit conductors.

Design and Construction Division Thumb Correctional Facility Video Management Upgrade – Phase 1

GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 260526 - 4

3.4 INSTALLATION

A. Grounding Conductors: Route along shortest and straightest paths possible unless otherwise indicated or required by Code. Avoid obstructing access or placing conductors where they may be subjected to strain, impact, or damage.

B. Ground Rods: Drive rods until tops are 2 inches below finished floor or final grade unless otherwise indicated.

1. Interconnect ground rods with grounding electrode conductor below grade and as otherwise indicated. Make connections without exposing steel or damaging coating if any.

C. Bonding Straps and Jumpers: Install in locations accessible for inspection and maintenance except where routed through short lengths of conduit.

1. Bonding to Structure: Bond straps directly to basic structure, taking care not to penetrate any adjacent parts.

2. Bonding to Equipment Mounted on Vibration Isolation Hangers and Supports: Install bonding so vibration is not transmitted to rigidly mounted equipment.

3. Use exothermic-welded connectors for outdoor locations; if a disconnect-type connection is required, use a bolted clamp.

3.5 FIELD QUALITY CONTROL

A. Testing Agency: Engage a qualified testing agency to perform tests and inspections.

B. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect, test, and adjust components, assemblies, and equipment installations, including connections.

C. Perform tests and inspections.

1. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect components, assemblies, and equipment installations, including connections, and to assist in testing.

D. Tests and Inspections:

1. After installing grounding system but before permanent electrical circuits have been energized, test for compliance with requirements.

2. Inspect physical and mechanical condition. Verify tightness of accessible, bolted, electrical connections with a calibrated torque wrench according to manufacturer's written instructions.

3. Test completed grounding system at each location where a maximum ground-resistance level is specified at individual ground rods. Make tests at ground rods before any conductors are connected.

a. Measure ground resistance no fewer than two full days after last trace of precipitation and without soil being moistened by any means other than natural drainage or seepage and without chemical treatment or other artificial means of reducing natural ground resistance.

Design and Construction Division Thumb Correctional Facility Video Management Upgrade – Phase 1

GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 260526 - 5

b. Perform tests by fall-of-potential method according to IEEE 81.

4. Prepare dimensioned Drawings locating each ground rod and other grounding electrodes. Identify each by letter in alphabetical order, and key to the record of tests and observations. Include the number of rods driven and their depth at each location, and include observations of weather and other phenomena that may affect test results.

Describe measures taken to improve test results.

E. Grounding system will be considered defective if it does not pass tests and inspections.

F. Prepare test and inspection reports.

G. Report measured ground resistances that exceed the following values:

1. Power and Lighting Equipment or System with Capacity of 500 kVA and Less: 10 ohms.

2. Power Distribution Units or Panelboards Serving Electronic Equipment: 1 ohm(s).

3. Manhole Grounds: 10 ohms.

H. Excessive Ground Resistance: If resistance to ground exceeds specified values, notify Architect promptly and include recommendations to reduce ground resistance.

END OF SECTION 260526

Design and Construction Division Thumb Correctional Facility Video Management Upgrade – Phase 1

HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 260529 - 1

SECTION 260529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Hangers and supports for electrical equipment and systems.

1.2 PERFORMANCE REQUIREMENTS

A. Design equipment supports capable of supporting combined operating weight of supported equipment and connected systems and components.

B. Rated Strength: Adequate in tension, shear, and pullout force to resist maximum loads calculated or imposed for this Project, with a minimum structural safety factor of five times the applied force.

1.3 QUALITY ASSURANCE

A. Welding: Qualify procedures and personnel according to AWS D1.1/D1.1M, "Structural Welding Code - Steel."

B. Comply with NFPA 70.

1.4 COORDINATION

A. Coordinate size and location of concrete bases. Cast anchor-bolt inserts into bases. Concrete, reinforcement, and formwork requirements are specified together with concrete Specifications.

PART 2 - PRODUCTS

2.1 SUPPORT, ANCHORAGE, AND ATTACHMENT COMPONENTS

A. Steel Slotted Support Systems: Comply with MFMA-4, factory-fabricated components for field assembly.

1. Metallic Coatings: Hot-dip galvanized after fabrication and applied according to MFMA-4.

2. Painted Coatings: Manufacturer's standard painted coating applied according to MFMA-

4.

3. Channel Dimensions: Selected for applicable load criteria.

Design and Construction Division Thumb Correctional Facility Video Management Upgrade – Phase 1

HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 260529 - 2

B. Raceway and Cable Supports: As described in NECA 1 and NECA 101.

C. Conduit and Cable Support Devices: Steel hangers, clamps, and associated fittings, designed for types and sizes of raceway or cable to be supported.

D. Structural Steel for Fabricated Supports and Restraints: ASTM A 36/A 36M, steel plates, shapes, and bars; black and galvanized.

E. Mounting, Anchoring, and Attachment Components: Items for fastening electrical items or their supports to building surfaces include the following:

1. Compression fittings

2. Two-Hole straps mounted five feet on center.

3. Tamper-proof Security Hardware.

2.2 FABRICATED METAL EQUIPMENT SUPPORT ASSEMBLIES

A. Description: Welded or bolted, structural-steel shapes, shop or field fabricated to fit dimensions of supported equipment.

PART 3 - EXECUTION

3.1 APPLICATION

A. Comply with NECA 1 and NECA 101 for application of hangers and supports for electrical equipment and systems except if requirements in this Section are stricter.

B. Maximum Support Spacing and Minimum Hanger Rod Size for Raceway: Space supports for

EMT, IMC, and RMC as required by NFPA 70. Minimum rod size shall be 1/4 inch in diameter.

C. Spring-steel clamps designed for supporting single conduits without bolts may be used for 1-

1/2-inch and smaller raceways serving branch circuits and communication systems above suspended ceilings and for fastening raceways to trapeze supports.

3.2 SUPPORT INSTALLATION IN NON SECURED AREAS

A. Comply with NECA 1 and NECA 101 for installation requirements except as specified in this

Article.

B. Raceway Support Methods: In addition to methods described in NECA 1, EMT, IMC, and RMC may be supported by openings through structure members, as permitted in NFPA 70.

C. Strength of Support Assemblies: Where not indicated, select sizes of components so strength will be adequate to carry present and future static loads within specified loading limits. Minimum

Design and Construction Division Thumb Correctional Facility Video Management Upgrade – Phase 1

HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 260529 - 3

static design load used for strength determination shall be weight of supported components plus 200 lb.

D. Mounting and Anchorage of Surface-Mounted Equipment and Components: Anchor and fasten electrical items and their supports to building structural elements by the following methods unless otherwise indicated by code:

1. To Wood: Fasten with lag screws or through bolts.

2. To New Concrete: Bolt to concrete inserts.

3. To Masonry: Approved toggle-type bolts on hollow masonry units and expansion anchor fasteners on solid masonry units.

4. To Existing Concrete: Expansion anchor fasteners.

5. Instead of expansion anchors, powder-actuated driven threaded studs provided with lock washers and nuts may be used in existing standard-weight concrete 4 inches thick or greater. Do not use for anchorage to lightweight-aggregate concrete or for slabs less than 4 inches thick.

6. To Steel: Welded threaded studs complying with AWS D1.1/D1.1M, with lock washers and nuts.

7. To Light Steel: Sheet metal screws.

8. Items Mounted on Hollow Walls and Nonstructural Building Surfaces: Mount cabinets, panelboards, disconnect switches, control enclosures, pull and junction boxes, transformers, and other devices on slotted-channel racks attached to substrate.

E. Drill holes for expansion anchors in concrete at locations and to depths that avoid reinforcing bars.

F. Support conduit within 12 inches of enclosures to which attached.

G. Boxes shall have independent supports.

3.3 INSTALLATION OF FABRICATED METAL SUPPORTS

A. Comply with installation requirements.

B. Cut, fit, and place miscellaneous metal supports accurately in location, alignment, and elevation to support and anchor electrical materials and equipment.

C. Field Welding: Comply with AWS D1.1/D1.1M.

D. Support conduit within 12 inches of enclosures to which attached.

E. Boxes shall have independent supports.

END OF SECTION 260529

Design and Construction Division Thumb Correctional Facility Video Management Upgrade – Phase 1

RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533 - 1

SECTION 260533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Metal conduits, tubing, and fittings.

2. Nonmetal conduits, tubing, and fittings.

3. Metal wireways and auxiliary gutters.

4. Boxes, enclosures, and cabinets.

5. Handholes and boxes for exterior underground cabling.

1.2 ACTION SUBMITTALS

A. Product Data: For fittings, floor boxes, hinged-cover enclosures, and cabinets.

B. Shop Drawings: For custom enclosures and cabinets. Include plans, elevations, sections, and attachment details.

PART 2 - PRODUCTS

2.1 METAL CONDUITS, TUBING, AND FITTINGS

A. Listing and Labeling: Metal conduits, tubing, and fittings shall be listed and labeled as defined in

NFPA 70, by a qualified testing agency, and marked for intended location and application.

B. GRC: Comply with ANSI C80.1 and UL 6.

C. ARC: Comply with ANSI C80.5 and UL 6A.

D. IMC: Comply with ANSI C80.6 and UL 1242.

E. EMT: Comply with ANSI C80.3 and UL 797.

F. LFMC: Flexible steel conduit with PVC jacket and complying with UL 360.

G. Fittings for Metal Conduit: Comply with NEMA FB 1 and UL 514B.

1. Fittings for EMT:

a. Material: Steel.

b. Type: Compression.

Design and Construction Division Thumb Correctional Facility Video Management Upgrade – Phase 1

RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533 - 2

H. Joint Compound for IMC, GRC, or ARC: Approved, as defined in NFPA 70, by authorities having jurisdiction for use in conduit assemblies, and compounded for use to lubricate and protect threaded conduit joints from corrosion and to enhance their conductivity.

2.2 TYPE EMT-S RACEWAYS AND ELBOWS

A. Steel Electrical Metal Tubing (EMT-S) and Elbows:

1. Applicable Standards:

a. Regulatory Requirements: Listed and labeled in accordance with NFPA 70 and marked for intended location and use.

b. General Characteristics:

1) Reference Standards: UL 797 and UL Category Control Number FJMX.

2) Material: Steel.

3) Exterior Coating: Zinc

4) Interior Coating: Zinc

c. Options:

1) Minimum Trade Size: 3/4 inch

2) Colors: As indicated on Drawings.

2.3 TYPE EPEC RACEWAYS AND FITTINGS

A. Schedule 40 Electrical HDPE Underground Conduit (EPEC-40):

1. Applicable Standards:

a. Regulatory Requirements: Listed and labeled in accordance with NFPA 70 and marked for intended location and use.

b. General Characteristics:

1) Reference Standards: UL 651A and UL Category Control Number EAZX.

2) Dimensional Specifications: Schedule 40.

c. Options:

1) Minimum Trade Size: 3/4 inch.

Design and Construction Division Thumb Correctional Facility Video Management Upgrade – Phase 1

RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533 - 3

2.4 NONMETALLIC CONDUITS, TUBING, AND FITTINGS

A. Listing and Labeling: Nonmetallic conduits, tubing, and fittings shall be listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

B. ENT: Comply with NEMA TC 13 and UL 1653.

C. RNC: Type EPC-40-PVC, complying with NEMA TC 2 and UL 651 unless otherwise indicated.

D. LFNC: Comply with UL 1660.

E. Rigid HDPE: Comply with UL 651A.

F. Continuous HDPE: Comply with UL 651B.

G. Coilable HDPE: Preassembled with conductors or cables, and complying with ASTM D 3485.

H. RTRC: Comply with UL 1684A and NEMA TC 14.

I. Fittings for ENT and RNC: Comply with NEMA TC 3; match to conduit or tubing type and material.

J. Fittings for LFNC: Comply with UL 514B.

K. Solvent cements and adhesive primers shall have a VOC content of 510 and 550 g/L or less, respectively, when calculated according to 40 CFR 59, Subpart D (EPA Method 24).

L. Solvent cements and adhesive primers shall comply with the testing and product requirements of the California Department of Health Services' "Standard Practice for the Testing of Volatile Organic Emissions from Various Sources Using Small-Scale Environmental Chambers."

2.5 METAL WIREWAYS AND AUXILIARY GUTTERS

A. Description: Sheet metal, complying with UL 870 and NEMA 250, Type 3R unless otherwise indicated, and sized according to NFPA 70.

1. Metal wireways installed outdoors shall be listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

B. Fittings and Accessories: Include covers, couplings, offsets, elbows, expansion joints, adapters, hold-down straps, end caps, and other fittings to match and mate with wireways as required for complete system.

C. Wireway Covers: Flanged-and-gasketed type unless otherwise indicated.

D. Finish: Manufacturer's standard enamel finish.

Design and Construction Division Thumb Correctional Facility Video Management Upgrade – Phase 1

RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533 - 4

2.6 BOXES, ENCLOSURES, AND CABINETS

A. General Requirements for Boxes, Enclosures, and Cabinets: Boxes, enclosures, and cabinets installed in wet locations shall be listed for use in wet locations.

B. Sheet Metal Outlet and Device Boxes: Comply with NEMA OS 1 and UL 514A.

C. Small Sheet Metal Pull and Junction Boxes: NEMA OS 1.

D. Box extensions used to accommodate new building finishes shall be of same material as recessed box.

E. Device Box Dimensions: 4 inches square by 2-1/8 inches deep.

F. Gangable boxes are prohibited.

G. Cabinets:

1. NEMA 250, Type 3R galvanized-steel box with removable interior panel and removable front, finished inside and out with manufacturer's standard enamel.

2. Hinged door in front cover with flush latch and concealed hinge.

3. Key latch to match panelboards.

4. Metal barriers to separate wiring of different systems and voltage.

5. Accessory feet where required for freestanding equipment.

2.7 HANDHOLES AND BOXES FOR EXTERIOR UNDERGROUND WIRING

A. General Requirements for Boxes:

1. Boxes and handholes for use in underground systems shall be designed and identified as defined in NFPA 70, for intended location and application.

2. Boxes installed in wet areas shall be listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

3. Bell Type with no knock-outs.

2.8 SOURCE QUALITY CONTROL FOR UNDERGROUND ENCLOSURES

A. Pull-Box Prototype Test: Test prototypes boxes for compliance with SCTE 77. Strength tests shall be for specified tier ratings of products supplied.

1. Tests of materials shall be performed by an independent testing agency.

2. Strength tests of complete boxes and covers shall be by either an independent testing agency or manufacturer. A qualified registered professional engineer shall certify tests by manufacturer.

3. Testing machine pressure gages shall have current calibration certification complying with ISO 9000 and ISO 10012 and traceable to NIST standards.

4. Where direct-buried conductors, raceway, or cables are subject to movement by settlement or frost, direct-buried conductors, raceway, or cables shall be arranged so as to prevent damage to the enclosed conductors or to equipment connected to raceways.

Design and Construction Division Thumb Correctional Facility Video Management Upgrade – Phase 1

RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533 - 5

PART 3 - EXECUTION

3.1 RACEWAY APPLICATION

A. Outdoors: Apply raceway products as specified below unless otherwise indicated:

1. Exposed Conduit: GRC.

2. Concealed Conduit, Aboveground: GRC.

3. Underground Conduit: RNC, Type EPC-40-PVC,.

4. Connection to Vibrating Equipment (Including Transformers and Hydraulic, Pneumatic, Electric Solenoid, or Motor-Driven Equipment): LFMC or LFNC.

5. Boxes and Enclosures, Aboveground: NEMA 250, Type 3R.

B. Indoors: Apply raceway products as specified below unless otherwise indicated:

1. Exposed, Not Subject to Physical Damage: EMT.

2. Concealed in Ceilings and Interior Walls and Partitions: EMT.

3. Connection to Vibrating Equipment (Including Transformers and Hydraulic, Pneumatic, Electric Solenoid, or Motor-Driven Equipment): LFMC.

4. Damp or Wet Locations: GRC.

5. Boxes and Enclosures: NEMA 250, Type 1, except use NEMA 250, Type 4 stainless steel in institutional and commercial kitchens and damp or wet locations.

C. Minimum Raceway Size: 3/4-inch trade size.

D. Raceway Fittings: Compatible with raceways and suitable for use and location.

1. Rigid and Intermediate Steel Conduit: Use threaded rigid steel conduit fittings unless otherwise indicated. Comply with NEMA FB 2.10.

2. EMT: Use Compression fittings. Comply with NEMA FB 2.10.

3. Flexible Conduit: Use only fittings listed for use with flexible conduit. Comply with

NEMA FB 2.20.

E. Install nonferrous conduit or tubing for circuits operating above 60 Hz. Where aluminum raceways are installed for such circuits and pass through concrete, install in nonmetallic sleeve.

F. Do not install aluminum conduits, boxes, or fittings in contact with concrete or earth.

G. Do not install nonmetallic conduit where ambient temperature exceeds 120 deg F.

3.2 INSTALLATION

A. Comply with NECA 1 and NECA 101 for installation requirements except where requirements on Drawings or in this article are stricter. Comply with NECA 102 for aluminum conduits.

Comply with NFPA 70 limitations for types of raceways allowed in specific occupancies and number of floors.

B. Keep raceways at least 6 inches away from parallel runs of flues and steam or hot-water pipes.

Install horizontal raceway runs above water and steam piping.

Design and Construction Division Thumb Correctional Facility Video Management Upgrade – Phase 1

RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533 - 6

C. Complete raceway installation before starting conductor installation.

D. Comply with requirements in Section 260529 "Hangers and Supports for Electrical Systems" for hangers and supports.

E. Arrange stub-ups so curved portions of bends are not visible above finished slab.

F. Install no more than the equivalent of three 90-degree bends in any conduit run except for control wiring conduits, for which fewer bends are allowed. Support within 12 inches of changes in direction.

G. Conceal conduit and EMT within finished walls, ceilings, and floors unless otherwise indicated.

Install conduits parallel or perpendicular to building lines.

H. Support conduit within 12 inches of enclosures to which attached.

I. Stub-ups to Above Recessed Ceilings:

1. Use EMT, IMC, or RMC for raceways.

2. Use a conduit bushing or insulated fitting to terminate stub-ups not terminated in hubs or in an enclosure.

J. Threaded Conduit Joints, Exposed to…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .