This Addendum #3 document, issued by Rowan-Cabarrus Community College in Concord, North Carolina, provides clarifications and revisions to Invitation for Bid (IFB) #121-071426JVC for the South Campus Building S202 Ceiling Tile Replacement and Corridors Re-Painting project. The scope encompasses partial demolition and replacement of ceiling tiles and grids across three levels of the building, corridor re-painting in "Relaxed Khaki" SW6149 eggshell finish, and installation of new 2'x2' acoustical ceiling grids and tiles in designated areas. The addendum clarifies that specialty installations including sprinkler heads, fire alarm devices, security cameras, and sensors shall be cut in and reinstalled by the College's contractors, with ceiling tiles left adjacent to devices for final installation. Two add-alternate line items are designated: Third Floor Classrooms (Rooms 305 and 307) requiring replacement of existing 2'x4' ceiling grids with new 2'x2' grids while retaining projector and screen alignments, and First Floor Corridor Ceiling Renovation with sprinklers to be re-aligned by College-designated contractors. Sealed bids must be submitted via email to collegeenvironment@rccc.edu by 2:00 p.m. local time on Thursday, August 27, 2026, with public bid opening and reading via Zoom immediately thereafter. The bid opening will be streamed live via the provided Zoom link.
The addendum addresses twelve questions from prospective bidders regarding bonding requirements, contractor responsibilities, material specifications, and scope clarifications. Bid bonds equal to 5% of the bid amount are required; upon award, contractors must provide 100% performance and payment bonds per North Carolina General Statute 44A-26 and State Purchasing Office contract requirements, with bond riders required if change orders increase contract value. Contractors are responsible for removing and replacing electrical outlet and light switch covers during painting, protecting in-place items, and coordinating all site work with the College's Project Manager. Baseboards remain in place and are to be taped off for repainting with additional coats of the same color; any discovered damage must be promptly reported. Building S202 was completed in 1998 with no asbestos concerns. The preferred new ceiling tile is USG ClimaPlus "Frost" #414 per the College's Facility Design Manual specifications. Contractors must wear company identification and high-visibility vests at all times, obtain classroom usage schedules from the College to coordinate work with classroom occupancy, and access classrooms and offices only when accompanied by the Project Manager to maintain campus security protocols.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 121-071426JVC.pdf | ||
| Addendum_2_08.07.26.docx.pdf | ||
| Addendum_1_07.27.26.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IFB # 121-071426JVC
South Campus Building S202 Ceiling Tile Replacement & Corridors Re-Painting
ROWAN-CABARRUS COMMUNITY COLLEGE
1531 Trinity Church Rd.
Concord, NC
ADDENDUM # 3
DATE: August 19, 2026
NOTICE TO BIDDERS
This addendum is issued prior to receipt of bids, proposals, and its contents do hereby become a part of the documents for the above referenced project. All trade contractor bidders are responsible for assuring that their subcontractors and vendors are properly apprised of the contents of this Addendum. All information contained in this Addendum supersedes and takes precedence over any conflicting information in the documents.
This Addendum serves to clarify, revise and supersede information in the original Notice to Bid posted July 14, 2026.
All bidders must acknowledge receipt of this Addendum in the space provided on the Bid Form for their bid package.
GENERAL INFORMATION
1. Bids shall be submitted via email only to collegeenvironment@rccc.edu until, but no later than 2:00 pm, local prevailing time, Thursday, August 27, 2026, and then publicly opened and read immediately thereafter via ZOOM.
Bidders are encouraged to view the bid opening in real time via the ZOOM. The invite follows.
2. Refer to the North Carolina Electronic Vendor Portal (eVP), as listed in original Invitation to Bid posting, for any additional Addenda and documentation issued prior to the bid opening.
CLARIFICATIONS
1. Specialty installations, including sprinkler heads, fire alarm devices, security cameras, and sensors, shall be cut in and reinstalled by the College's contractors. Ceiling tiles shall be included in the Base Bid and left adjacent to devices for final installation.
2. Third Floor Classrooms (Rooms 305 and 307, indicated in magenta) are designated as Add Alternate Line Items. Retain existing projector and screen alignments. Replace the existing 2'x4' ceiling grid with a new 2'x2' ceiling grid and ceiling tiles only.
3. First Floor Corridor Ceiling Renovation (in “pink” shade) added by the College as “Add Alternate” for Scope of
Work. Sprinklers to be re-aligned (by College designated contractor) with existing lighting at center of corridors.
4. The School Calendar is available online at https://www.rccc.edu/ for exam, holiday, and special event considerations.
5. The awarded Contractor will be provided with the Classroom Usage Schedule to coordinate work activities with classroom occupancy and renovation constraints, including barricades, signage, overhead work, and after-hours work.
6. All classrooms and offices remain secured and locked when not in use or when required for campus security purposes. Common areas, including corridors, may be accessed during normal College operating hours for field verification and dimensional measurements. Contractors shall coordinate all site visits with the Project Manager to obtain any necessary access and to maintain campus security protocols. Personnel visiting the site shall wear company identification and company-logo apparel and/or high-visibility work vests at all times.
mailto:collegeenvironment@rccc.edu https://www.rccc.edu/
RESPONSES TO QUESTIONS (in RED):
1. We understand that a 5% bid bond is required with the bid. Please confirm whether the successful General Contractor will also be required to provide 100% Performance and Payment Bonds upon award. If required, please also confirm whether this requirement applies regardless of the final contract amount.
RESPONSE: Yes, a 5% bid bond is required. Per N.C.G.S. § 44A-26 and SCO contract requirements, performance and payment bonds must remain equal to 100% of the construction contract amount. Therefore, if a change order increases the contract value, the contractor should provide a bond rider increasing the performance and payment bonds to reflect the revised contract amount.
2. Is the GC or the owner responsible for moving furniture where necessary?
RESPONSE: Contractors shall not move furniture or computer equipment and will coordinate with Project Manager, especially in classrooms with ceiling work. All items left in place should be protected.
3. Will the existing baseboard in the receiving new paint remain or be replaced?
RESPONSE: Baseboards will remain in place as installed with re-painting taped off for additional coat(s) of same color (“Relaxed Khaki” SW6149 - “Eggshell” Finish) as already on walls. Any damage discovered within the work area shall be promptly reported to the Project Manager.
4. Will the existing light switch covers, electrical outlet covers, and other devices on walls receiving new paint be removed or remain to be painted around? If they are to be removed, will the GC or the owner be responsible for that?
RESPONSE: The contractor is responsible for any lighting switch or electrical receptacle covers removal prior to painting and replacement when walls have dried. Any signage should also be left in place, taped-off, and painted around including, wayfinding, room ID, schedule panels and all signage in Elevator Lobby areas.
5. There are currently some electrical outlets in the ceiling onsite that might need to be removed for the new work, then reinstalled. Will that be the responsibility of the GC or the owner?
RESPONSE: Any specialty devices should be evaluated and re-worked by College contractors. This shall be coordinated with the ceiling grid and tiles work.
6. The 3/16"=1' scale given on the drawings seems to be incorrect and does not give accurate measurements. Can you please confirm or clarify.
RESPONSE: Marked drawings were for reference only with the Scope of Work identified by colorized areas.
“Grey or Black” notes and scale should be considered non-applicable. Refer to the attached marked-up original three (3) drawings for modifications and clarification of the indicated areas.
7. SOW specifies painting the walls in all corridors. We attended the pre bid, but so we can communicate clearly with subcontractors, can drawings be provided that highlight the areas that need to be painted? It is unclear if vestibules are going to be painted on AD201.
RESPONSE: See the original color-coded drawings, now designated as another Add Alternate for the First Floor Ceiling. Vestibule conditions are clarified by the colored areas shown on the attached drawings, and clouded notation: “No re-painting at [tall] Vestibules or Stair Towers (typical)”.
8. Quick clarification regarding the yellow areas: does the 2' x 2' ceiling grid scope require complete replacement of the existing grid system, including mains, cross tees, and wall angles, or is the intent to modify the existing 2' x 4' grid by adding cross tees?
RESPONSE: See Item #2 on Page 1 of this Addendum, Original Released drawings and attached mark-ups noting scope as “New 2x2 Grid and Tile”
9. Proof of no asbestos/when was the building built?
RESPONSE: Building S202 was completed in 1998.
10. Should any HVAC, electrical, or fire suppression work be necessary, will the owner be supplying these?
RESPONSE: See Clarifications #1 & 3 above re: Sprinklers and Specialty work by College.
11. Are the entrances being painted or just the corridors?
RESPONSE: Please refer to the drawings and scope of work, as well as Question Response #7 above.
12. Are the first-floor corridor ceiling tiles being added as an alternate?
RESPONSE: See Response #7 and refer to the drawings and scope of work.
ATTACHMENTS
1. Pre-Bid Sign-In Sheet
2. Price Sheet
3. Revised Drawings
3.1. AD201 – First Floor
3.2. AD202 – Second Floor
3.3. AD203 – Third Floor
BID OPENING ZOOM LINK
Join Zoom Meeting https://rccc-edu.zoom.us/j/93147817418
Meeting chat link https://rccc-edu.zoom.us/launch/jc/93147817418
Meeting ID: 931 4781 7418 One tap mobile +16465588656,,93147817418# US (New York)
+16469313860,,93147817418# US
Join instructions https://rcccedu.zoom.us/meetings/93147817418/invitations?signature=yLFGPa26hxbkrFX5umdPoyHVjMZ75TgGQ 3FCosP6giY
END OF ADDENDUM 3
https://rccc-edu.zoom.us/j/93147817418 https://rccc-edu.zoom.us/launch/jc/93147817418 https://rcccedu.zoom.us/meetings/93147817418/invitations?signature=yLFGPa26hxbkrFX5umdPoyHVjMZ75TgGQ3FCosP6giY https://rcccedu.zoom.us/meetings/93147817418/invitations?signature=yLFGPa26hxbkrFX5umdPoyHVjMZ75TgGQ3FCosP6giY
SCO-Proposal Form 7.07.2026 1 of 3
F O R M OF P R O P O S A L
Bldg.S202 Ceiling Tile Replacement & Corridor Re-Painting Contract:
Rowan-Cabarrus Community College Bidder:
Date: August 27, 2026
The undersigned, as bidder, hereby declares that the only person or persons interested in this proposal as principal or principals is or are named herein and that no other person than herein mentioned has any interest in this proposal or in the contract to be entered into; that this proposal is made without connection with any other person, company or parties making a bid or proposal;
and that it is in all respects fair and in good faith without collusion or fraud. The bidder further declares that he has examined the site of the work and the contract documents relative thereto and has read all special provisions furnished prior to the opening of bids; that he has satisfied himself relative to the work to be performed. The bidder further declares that he and his subcontractors have fully complied with NCGS 64, Article 2 in regards to E-Verification as required by Section 2.(c) of Session
Law 2013-418, codified as N.C. Gen. Stat. § 143-129(j).
The Bidder proposes and agrees if this proposal is accepted to contract with the
Rowan-Cabarrus Community College in the form of contract specified below, to furnish all necessary materials, equipment, machinery, tools, apparatus, means of transportation and labor necessary to complete the construction of
South Campus Building S202 Ceiling Tile Replacement and Corridors Re-Painting in full in complete accordance with the plans, specifications and contract documents, to the full and entire satisfaction of the Rowan-Cabarrus Community College; with a definite understanding that no money will be allowed for extra work except as set forth in the General Conditions and the contract documents, for the sum of:
SINGLE PRIME CONTRACT: (GENERAL CONTRACTOR)
Base Bid:
Dollars($)
General Contractor:
Lic
Ceiling Subcontractor:
Lic
Drywall Subcontractor:
Lic
Painting Subcontractor:
Lic
Other Subcontractor:
Lic
GS143-128(d) requires all single prime bidders to identify their subcontractors for the above subdivisions of work. A contractor whose bid is accepted shall not substitute any person as subcontractor in the place of the subcontractor listed in the original bid, except (i) if the listed subcontractor's bid is later determined by the contractor to be non-responsible or non-responsive or the listed subcontractor refuses to enter into a contract for the complete performance of the bid work, or (ii) with the approval of the awarding authority for good cause shown by the contractor.
SCO-Proposal Form 7.07.2026 2 of 3
ALTERNATES:
Should any of the alternates as described in the contract documents be accepted, the amount written below shall be the amount to be "added to" or "deducted from" the base bid. (Strike out "Add" or "Deduct" as appropriate.)
GENERAL CONTRACT:
Alternate No. 1 (Third Floor Classrooms 303 and 305 Ceiling 2x2 Grid and Tile Replacement)
(Add) Dollars($)
Alternate No. 2 (First Floor Corridors 2x2 Ceiling Grid Centering and Tile Replacement)
(Add) Dollars($)
UNIT PRICES
Unit prices quoted and accepted shall apply throughout the life of the contract, except as otherwise specifically noted. Unit prices shall be applied, as appropriate, to compute the total value of changes in the base bid quantity of the work all in accordance with the contract documents.
GENERAL CONTRACT: (Subcontracor Materials and Labor)
No. 1 Ceiling Grid and Acoustical Ceiling Tile (SqFt) Unit Price ($)
No. 2 Drywall Repairs, Patching, Prep for Paint (SqFt) Unit Price ($)
No. 3 Painting Corridor Walls and GWB Repairs (SqFt) Unit Price ($)
The bidder further proposes and agrees hereby to commence work under this contract on a date to be specified in a written order of the designer (Notice to Proceed) and shall fully complete all work thereunder within the time specified in the Supplementary General Conditions Article 23. Applicable liquidated damages amount is also stated in the Supplementary General Conditions Article 23.
Addendum received and used in computing bid (Initials or N/A at each):
Addendum No. 1
Addendum No. 2
Addendum No. 3
SCO-Proposal Form 7.07.2026 3 of 3
Proposal Signature Page
The undersigned further agrees that in the case of failure on his part to execute the said contract and the bonds within ten (10) consecutive calendar days after being given written notice of the award of contract, the certified check, cash or bid bond accompanying this bid shall be paid into the funds of the owner's account set aside for the project, as liquidated damages for such failure; otherwise the certified check, cash or bid bond accompanying this proposal shall be returned to the undersigned.
Respectfully submitted this day of
(Name of firm or corporation making bid)
By:
Signature
Name:
Print or type
Title______________ (Owner/Partner/Pres./V.Pres)
Address
License No.
Email Address:
S
S
S S S S S
S S
S
OS
OS
OS OS
OS
OS
OS
OS
OS OS
OS
OS OS
F
F
F
F
F
F
F
F
F
F
S
F
S
S
S
S
S S
S
PLAN
N
TRUE
N
A A
B B
C C
D D
E E
CLASSROOM
CLASSROOM
OFFICE
104A
CLASSROOM
CLASSROOM
OFFICE
110B
CORRIDOR
101B
MECH./ELEC.
ELEV.
ELEVATOR
LOBBY
101A
JANITOR
ELEV.
MACH.
180B
STAIR #1
STAIR #2
WOMEN
MEN
STORAGE
BOILER
180A
WELDING
LAB
OFFICE
110A
CORRIDOR
101C
CORRIDOR
101D
CORRIDOR
101E
OFFICE
104B
OPEN
OFFICE
CORRIDOR
101F
OFFICE
CLASSROOM
C.1 C.1
C.1
C.1
C.1
C.3
C.0
EXISTING GWB HEADER TO
REMAIN
C.1
C.1
C.7 C.8
C.1
C.1C.1 C.1
C.2
C.2 C.2
C.2
C.2 C.2
C.2 C.2
R R
R
R
R
R R
R
R
R
C.1
C.1
R
R
REMOVE PORTION OF EXISTING CEILING
GRID TO INSTALL NEW GWB HEADER
NO CEILING WORK IN AREAS
SHOWN SHADED, TYPICAL
EXISTING WINDOW SHADES
TO REMAIN, UNLESS NOTED
OTHERWISE
EXISTING GWB HEADER TO
REMAIN
REMOVE EXISTING WINDOW SHADES
DURING DEMOLITION AND NEW WORK,
AND REINSTALL IN SAME LOCATION AT
END OF PROJECT
REMOVE EXISTING WINDOW SHADES
DURING DEMOLITION AND NEW WORK,
AND REINSTALL IN SAME LOCATION AT
END OF PROJECT
EXISTING WINDOW SHADES
TO REMAIN, UNLESS NOTED
OTHERWISE
C.0
C.0
C.0
C.0
C.0
C.0
C.0
C.0R
C.2 C.2
C.2
C.2
C.2
C.2
REMOVE EXISTING CEILING
TILE, 2x2 GRID TO REMAIN
OTS
OTS
CLASSROOM
C.3 C.3 C.3 C.3
C.3 C.3 C.3 C.3
C.3
REMOVE EXISTING CEILING GRID AND
TILE SHOWN DOTTED
REMOVE EXISTING ROLL DOWN PROJECTION
SCREEN, PROJECTOR AND SPEAKERS AND
RETURN TO OWNER
REMOVE EXISTING LIGHT FIXTURES
SHOWN DOTTED AND RE-USE IN
ELSEWHERE IN NEW WORK, SEE SHEET
A102 AND ELECTRICAL DRAWINGS
REMOVE EXISTING SPRINKLER HEADS AND
RE-INSTALL IN NEW CEILING, SEE SHEET A102
REMOVE EXISTING CEILING GRID AND
TILE SHOWN DOTTED, TYPICAL
REMOVE EXISTING LIGHT FIXTURES
SHOWN DOTTED AND RE-USE IN NEW
WORK, SEE SHEET A201 AND ELECTRICAL
DRAWINGS
REMOVE EXISTING SPRINKLER HEADS
IN CEILINGS TO BE REMOVED, TYPICAL
SEE FIRE PROTECTION DRAWINGS
REMOVE EXISTING HVAC DIFFUSERS
IN CEILINGS TO BE REMOVED, TYPICAL
SEE MECHANICAL DRAWINGS
REMOVE EXISTING FIRE ALARM
DEVICES, SMOKE DETECTORS,
OCCUPANCY SENSORS ETC, IN
CEILINGS TO BE REMOVED, TYPICAL
SEE ELECTRICAL DRAWINGS
REFLECTED CEILING PLAN KEYED NOTES
NO WORKC.0
REMOVE EXISTING CEILING TILES, EXISTING GRID TO REMAINC.1
REMOVE EXISTING LIGHT FIXTURE, SEE ELECTRICAL DRAWINGSC.2
REMOVE EXISTING LIGHT FIXTURE AND RE-USE IN NEW WORK, SEE ELECTRICAL DRAWINGSC.3
INFILL NEW CEILING GRID TEES TO MATCH EXISTING FOR 2X2 LAYOUT AND PROVIDE NEW CEILING TILE
NEW LIGHT FIXTURE, SEE ELECTRICAL DRAWINGS
EXISTING LIGHT FIXTURE RE-USED IN NEW LOCATION, SEE ELECTRICAL DRAWINGS
C.4
C.5
C.6
EXISTING CEILING MOUNTED PROJECTOR TO REMAIN, RELOCATE MOUNT SLIGHTLY AS
NECESSARY TO INSTALL NEW CEILING GRID TEES
C.7
EXISTING WALL MOUNTED ROLL DOWN SCREEN TO REMAINC.8
REMOVE EXISTING WALL MOUNTED ROLL DOWN SCREEN AND RE-USE IN NEW WORK.C.9
EXISTING WALL TO BE REMOVED
EXISTING WALL TO REMAIN
WALL LEGEND
NEW WALL
EXISTING 2 HR RATED WALL TO REMAIN
NOTE: WALL SYMBOLOGY FOR GRAPHICAL PURPOSES ONLY.
REFER TO PARTITION TYPES AND WALL SECTIONS FOR ACTUAL
WALL CONSTRUCTION.
EXISTING 1 HR RATED WALL TO REMAIN
NEW 1 HR RATED WALL
CEILING LEGEND
RECESSED LED DOWN LIGHT
2x4 RECESSED LED FIXTURE
2x2 RECESSED LED FIXTURE
SMOKE DETECTOR
OCCUPANCY SENSOROS
CEILING MOUNTED LIGHT
S
EXIT SIGN
DIRECTIONAL EXIT SIGN
UPRIGHT SPRINKLER HEAD
SPRINKLER HEAD MOUNTED IN CEILING
SUPPLY AIR DIFFUSER
RETURN AIR DIFFUSER /
EXHAUST GRILLE
LINEAR SUPPLY AIR DIFFUSER
INDICATES CEILING MOUNTED DEVICES, SPRINKLER HEADS, ETC. TO BE REMOVED
INDICATES CEILING MOUNTED DEVICES, SPRINKLER HEADS, ETC. TO BE RELOCATED
LOCATED IN CENTER OF NEW CEILING TILE, TYPICAL
R
SPEAKER WITH GRILLES
FIRE ALARM DEVICEF
CAMERA
101C 101D 101E 104A 104B 105 106 107 107A 111 112 117A 117B 117C 118A 118B 118C
REFLECTED CEILING BASE BID / ALTERNATE
WORK SHOWN IN THE FOLLOWING ROOMS IS BASE BID.
ALL OTHER WORK SHOWN ON THE REFLECTED CEILING PLAN IS TO BE INCLUDED IN ALTERNATE #2
OWNERSHIP OF INSTRUMENTS OF SERVICE:
All reports, specifications, plans, computer files, field data, notes, and other documents and instruments of service shall remain the property of the Design Professional. The Design Professional shall retain all common law, statutory and other reserved rights, including the copyright thereto.
This drawing is the property of Yates - Chreitzberg - Hughes Architects and is not to be reproduced or copied in whole or any part. It is not to be used on any other project and is to be returned upon request.
© Copyright 2024
R C
C C
B ui dl in g S2
R en ov at io ns
T rin ity
C hu rc h
R d
C on co rd , N
C
CONSULTANT:
PROFESSIONAL SEALS:
CLIENT:
YCHA COM.#:
REVISIONS:
PHASE & DATE:
SHEET TITLE:
ARCHITECTURAL:
7035 NORTHWINDS DR NW
CONCORD, NC 28027
704.788.2000 www.ycharch.com
I T ZBERG - H UGH ES ARCH I TECTS
PA
O
DROCNC
, N. C.CAROL I NA
HTRON
O O
RE
GI
ST
ER
ED
ARCHI TECTURAL C
RP
RATION
CERT. NO.
YA
TE
S-
CH
RE
SCO #22-25351-02A
NCCCS #2692
S:
\R ev it
Lo ca l F ile s\
9.
R
C C
C B ui ld in g
S2
Re no va tio ns _b illh yc ha rc h.
co m
.rv t
4/
/2
6:
:1
PM
22219.00
FIRST LEVEL
REFLECTED CEILING
PLAN - DEMOLITION
AD201
CONSTRUCTION DOCUMENTS
04-08-24
AD201 3/16" = 1'-0"
1 FIRST LEVEL REFLECTED CEILING PLAN - DEMOLITION
disenhour Area Measurement
639.32 sf disenhour Typewritten Text Base Bid:
New ACT Grid and Tile In Yellow Areas (4) disenhour Area Measurement
72.3 sf disenhour Area Measurement
83.08 sf disenhour Area Measurement
83.84 sf john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Line john.cole Line john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Line john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Cloud john.cole Arrow john.cole Arrow john.cole Arrow john.cole Arrow john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Typewritten Text Scope Edits and mark-ups by JV Cole / RCCC 8.12.26 john.cole Line john.cole Cloud john.cole Typewritten Text
* Add Alternate (Line Item)* :
New ACT Grid and Tile In "Pink" Corridor and Vestibule Areas; Specialty "cut-ins" by RCCC Subs (coordination):
Sprinkler (center in corridor);
Fire Alarm; IT; Security;
Mega-Dot Signs, etc.
john.cole Arrow john.cole Cloud john.cole Arrow john.cole Arrow john.cole Text Box
* Floor Plan for Reference Only...
Do not use former Reno Notes...
Ceiling Reno as marked in color areas only - ACT Grid to become 2x2 at 2x4 areas - Centered on Corridors, and Exist. Lighting.
john.cole Cloud john.cole Typewritten Text
* Preferred New Ceiling Tile = campus standard:
USG ClimaPlus "Frost" #414 per Facility Design Manual Spec's (typical all facilities / buildings).
john.cole Cloud john.cole Arrow john.cole Typewritten Text Re-paint and misc. Drywall Repairs at Existing Main Corridors - "Relaxed Khaki" SW6149 -remove plates at switches but retain wallbase and signage "as is" for re-paint "touch-ups" only -typical for all 3 floors...
john.cole Typewritten Text Exist. Lighting HVAC and Devices to remain (Typ.)
Tile cuts and tie-ups by Specialty Subs/Owner john.cole Cloud john.cole Cloud
SS S SS
SSS
S
OS
OS
OS
OS
OS
OS
OS
OS OS
OSOS
OS
OSOS
OS
OS
OS
OS
F
F
F F
F
F
F
F
F
FF
F
F
F
S
FOSOS
S S
S S
S
S
S
S S
S
SS
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
PLAN
N
TRUE
N
A A
B B
C C
D D
E E
OFFICE
STORAGE
212C
STORAGE
212B
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
MEN
WOMEN
CORRIDOR
201A
CORRIDOR
201C
OFFICE
212A
STOR.
ENTRANCE
200 ENTRANCE
STOR.
214A
STOR.
214B
STOR.
STOR.
217A
STOR.
216A
CORRIDOR
ELEC.
JANITOR
223 OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
ELEV.
ELEV.
LOBBY
VESTIBULE
201E
CORRIDOR
201B
CORRIDOR
201D
CLASSROOM
R R R R R R RRR R R
R R
R
RR
R
R
R
R
RR
R
EXISTING WINDOW SHADES
TO REMAIN, TYPICAL
EXISTING GWB HEADER TO
REMAIN
REMOVE EXISTING CEILING MOUNTED
PROJECTORS AND SPEAKERS, RE-USE
IN NEW WORK, SEE SHEET A203
REMOVE EXISTING CEILING MOUNTED
PROJECTORS AND SPEAKERS, RE-USE
IN NEW WORK, SEE SHEET A203 AND
ELECTRICAL DRAWINGS
REMOVE EXISTING CEILING GRID AND
TILE SHOWN DOTTEDREMOVE WALL MOUNTED ROLL DOWN
PROJECTION SCREENS AND RE-USE IN NEW
WORK, SEE SHEET A203
REMOVE EXISTING CEILING GRID AND
TILE SHOWN DOTTED
EXISTING GWB HEADER TO
REMAIN
EXISTING GWB HEADER TO REMAIN
EXISTING WINDOW SHADES
TO REMAIN, TYPICAL
REMOVE EXISTING CEILING
TILE, 2x2 GRID TO REMAIN
REMOVE EXISTING CEILING MOUNTED
PROJECTOR, CAMERA AND SPEAKERS,
AND RETURN TO OWNER
C.1
C.1
C.1
C.0
C.0 C.1
C.1
C.1 C.1
C.1 C.1
C.0 C.0 C.0 C.0
C.0
C.7 C.7
RRRRRR
R
R RRRRRR RRRRRRR RR
R
C.8C.8
R
R
C.1 C.1
C.1
C.1 C.1
C.1 C.1
C.1
R
R
R
R R R R R
R R R
R
R
R R
R R R
R R R
R R
R
R
OPEN TO ABOVE OPEN TO ABOVE
REMOVE EXISTING LIGHT FIXTURES
SHOWN DOTTED AND RE-USE IN NEW
WORK, SEE SHEET A202 AND ELECTRICAL
DRAWINGS
NO CEILING WORK IN AREAS
SHOWN SHADED, TYPICAL
C.0
C.0
C.0
C.0
C.1
C.1
C.2
C.2
R
C.1 C.2 C.2
C.2 C.2
R
C.0
C.0
REMOVE EXISTING WALL MOUNTED
ROLL DOWN PROJECTION SCREEN
AND RETURN TO OWNER
EXISTING CUBICLE CURTAIN
AND TRACK TO REMAIN
REFLECTED CEILING PLAN KEYED NOTES
NO WORKC.0
REMOVE EXISTING CEILING TILES, EXISTING GRID TO REMAINC.1
REMOVE EXISTING LIGHT FIXTURE, SEE ELECTRICAL DRAWINGSC.2
REMOVE EXISTING LIGHT FIXTURE AND RE-USE IN NEW WORK, SEE ELECTRICAL DRAWINGSC.3
INFILL NEW CEILING GRID TEES TO MATCH EXISTING FOR 2X2 LAYOUT AND PROVIDE NEW CEILING TILE
NEW LIGHT FIXTURE, SEE ELECTRICAL DRAWINGS
EXISTING LIGHT FIXTURE RE-USED IN NEW LOCATION, SEE ELECTRICAL DRAWINGS
C.4
C.5
C.6
EXISTING CEILING MOUNTED PROJECTOR TO REMAIN, RELOCATE MOUNT SLIGHTLY AS
NECESSARY TO INSTALL NEW CEILING GRID TEES
C.7
EXISTING WALL MOUNTED ROLL DOWN SCREEN TO REMAINC.8
REMOVE EXISTING WALL MOUNTED ROLL DOWN SCREEN AND RE-USE IN NEW WORK.C.9
EXISTING WALL TO BE REMOVED
EXISTING WALL TO REMAIN
WALL LEGEND
NEW WALL
EXISTING 2 HR RATED WALL TO REMAIN
NOTE: WALL SYMBOLOGY FOR GRAPHICAL PURPOSES ONLY.
REFER TO PARTITION TYPES AND WALL SECTIONS FOR ACTUAL
WALL CONSTRUCTION.
EXISTING 1 HR RATED WALL TO REMAIN
NEW 1 HR RATED WALL
CEILING LEGEND
RECESSED LED DOWN LIGHT
2x4 RECESSED LED FIXTURE
2x2 RECESSED LED FIXTURE
SMOKE DETECTOR
OCCUPANCY SENSOROS
CEILING MOUNTED LIGHT
S
EXIT SIGN
DIRECTIONAL EXIT SIGN
UPRIGHT SPRINKLER HEAD
SPRINKLER HEAD MOUNTED IN CEILING
SUPPLY AIR DIFFUSER
RETURN AIR DIFFUSER /
EXHAUST GRILLE
LINEAR SUPPLY AIR DIFFUSER
INDICATES CEILING MOUNTED DEVICES, SPRINKLER HEADS, ETC. TO BE REMOVED
INDICATES CEILING MOUNTED DEVICES, SPRINKLER HEADS, ETC. TO BE RELOCATED
LOCATED IN CENTER OF NEW CEILING TILE, TYPICAL
R
SPEAKER WITH GRILLES
FIRE ALARM DEVICEF
CAMERA
REFLECTED CEILING BASE BID / ALTERNATE
WORK SHOWN IN THE FOLLOWING ROOMS IS BASE BID.
204 205 207 210 218 219 220 221 222
ALL OTHER WORK SHOWN ON THE REFLECTED CEILING PLAN IS TO BE INCLUDED IN ALTERNATE #2
OWNERSHIP OF INSTRUMENTS OF SERVICE:
All reports, specifications, plans, computer files, field data, notes, and other documents and instruments of service shall remain the property of the Design Professional. The Design Professional shall retain all common law, statutory and other reserved rights, including the copyright thereto.
This drawing is the property of Yates - Chreitzberg - Hughes Architects and is not to be reproduced or copied in whole or any part. It is not to be used on any other project and is to be returned upon request.
© Copyright 2024
R C
C C
B ui dl in g S2
R en ov at io ns
T rin ity
C hu rc h
R d
C on co rd , N
C
CONSULTANT:
PROFESSIONAL SEALS:
CLIENT:
YCHA COM.#:
REVISIONS:
PHASE & DATE:
SHEET TITLE:
ARCHITECTURAL:
7035 NORTHWINDS DR NW
CONCORD, NC 28027
704.788.2000 www.ycharch.com
I T ZBERG - H UGH ES ARCH I TECTS
PA
O
DROCNC
, N. C.CAROL I NA
HTRON
O O
RE
GI
ST
ER
ED
ARCHI TECTURAL C
RP
RATION
CERT. NO.
YA
TE
S-
CH
RE
SCO #22-25351-02A
NCCCS #2692
S:
\R ev it
Lo ca l F ile s\
9.
R
C C
C B ui ld in g
S2
Re no va tio ns _b illh yc ha rc h.
co m
.rv t
4/
/2
6:
:2
PM
22219.00
SECOND LEVEL
REFLECTED CEILING
PLAN - DEMOLITION
AD202
CONSTRUCTION DOCUMENTS
04-08-24
AD202 3/16" = 1'-0"
1 SECOND LEVEL REFLECTED CEILING PLAN - DEMOLITION
disenhour Area Measurement 1,696.92 sf disenhour Area Measurement
90.03 sf disenhour Area Measurement
90.22 sf disenhour Typewritten Text New ACT Grid and Tile In Yellow Area - Re-Center ALL 2x2 Fixtures and align with Lighting disenhour Area Measurement
82.87 sf john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Rectangle john.cole Rectangle john.cole Line john.cole Rectangle john.cole Line john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Arrow john.cole Arrow john.cole Arrow john.cole Arrow john.cole Cloud john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Cloud john.cole Typewritten Text
* Preferred New Ceiling Tile = campus standard:
USG ClimaPlus "Frost" #414 per Facility Design Manual Spec's (typical all facilities / buildings).
john.cole Cloud john.cole Typewritten Text Scope Edits and mark-ups by JV Cole / RCCC 8.12.26 john.cole Text Box
* Floor Plan for Reference Only...
Do not use former Reno Notes...
Ceiling Reno as marked in color areas only - ACT Grid to become 2x2 at 2x4 areas - Centered on Corridors, and Exist. Lighting.
john.cole Cloud john.cole Typewritten Text Exist. Lighting HVAC and Devices to remain (Typ.)
Tile cuts and tie-ups by Specialty Subs/Owner john.cole Cloud john.cole Arrow john.cole Typewritten Text Re-paint and misc. Drywall Repairs at Existing Main Corridors - "Relaxed Khaki" SW6149 -remove plates at switches but retain wallbase and signage "as is" for re-paint "touch-ups" only -typical for all 3 floors...
OS
F
OS
F
OS
F
OS
F
OS
F
OSOS
OSOSOS
S
OS
OS
F
OS
F
OS
OS F
F
OS
OSF
OS
F
S S
S
SSSS
S
S
S
S
SS S
S
S
S
S
SS
S
S
S
S
S S
PLAN
N
TRUE
N
A A
B B
C C
D D
E E
EXISTING WINDOW SHADES
TO REMAIN, TYPICAL
EXISTING GWB HEADER TO
REMAIN
NO CEILING WORK IN AREAS
SHOWN SHADED, TYPICAL
R RR R RR R RRR
R
RRRRRRRRR RR
R
R R R
R
RR
R
R R R
RRR
R
RRRR
R R R
D
R
R
R R
R R
R
R
C.3
C.0
C.0
C.1
C.3
REMOVE EXISTING CEILING MOUNTED
PROJECTORS, SPEAKERS AND CAMERAS,
RE-USE IN NEW WORK, SEE SHEET A203
AND ELECTRICAL DRAWINGS
C.3 C.3
C.3 C.3
C.3C.3C.3
C.1
C.3 C.3
C.3C.3
C.3C.3C.3
C.3
D
C.3C.3
C.3C.3
C.3
RRR
C.7 C.7
C.7
C.7 C.7
C.1
R
C.1
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
MEN
WOMEN
CORRIDOR
301A
CORRIDOR
301C
IDF
381A
IDF
CORRIDOR
ELEC.
OFFICE
314A
OFFICE
314B
OFFICE
314C
OFFICE
314D
OFFICE
314E
OFFICE
ELEV.
STOR.
OFFICE
308A
OFFICE
309A
STOR.
308B
ELEVATOR
LOBBY
ENTRANCE
202ENTRANCE
VESTIBULE
301E
CORRIDOR
301B
CORRIDOR
301D
C.1 C.1
C.0
C.1
C.1
C.0
C.1
C.0
EXISTING GWB ON SHAFT AT
ROOF LADDER TO REMAIN
C.0
C.1
C.1
C.1
R
C.1 C.1 C.1
C.7 C.7 C.8
C.1
C.8
C.1
C.1
C.1
C.1
REMOVE WALL MOUNTED ROLL DOWN
PROJECTION SCREENS AND RE-USE IN NEW
WORK, SEE SHEET A203
REMOVE EXISTING CEILING GRID AND TILE
SHOWN DOTTED
C.3
C.1
C.1
C.1 C.1
C.8
C.1
C.2 C.2
C.2 C.2
C.2 C.2
C.2 C.2 C.2
C.2C.2C.2
EXISTING GWB HEADER TO
REMAIN
C.1
C.1
C.2C.2
C.2C.2
C.2C.2
C.2C.2C.2
C.2 C.2 C.2
EXISTING GWB HEADER TO
REMAIN
EXISTING WINDOW SHADES
TO REMAIN, TYPICAL
REMOVE EXISTING CEILING
TILE, 2x2 GRID TO REMAIN
REMOVE EXISTING CEILING
TILE, 2x2 GRID TO REMAIN
REMOVE EXISTING CEILING MOUNTED
PROJECTORS, SPEAKERS AND CAMERAS,
RE-USE IN NEW WORK, SEE SHEET A203
REMOVE EXISTING CEILING GRID AND
TILE SHOWN DOTTED
REMOVE EXISTING LIGHT FIXTURES
SHOWN DOTTED AND RE-USE IN NEW
WORK, SEE SHEET A202 AND ELECTRICAL
DRAWINGS
C.0
C.2
C.2
C.2
C.2
C.2 C.2
C.2 C.2
C.2C.2
C.2 C.2
C.2
C.2
REMOVE ALL EXISTING DOWNLIGHTS
IN EXTERIOR GWB SOFFIT
REMOVE ALL EXISTING DOWNLIGHTS
IN EXTERIOR GWB SOFFIT
R
R R R
R RR R
CLASSROOM
CLASSROOM
CLASSROOM
WORK IN THIS AREA TO BE ALTERNATE #1
REMOVE EXISTING CEILING SPEAKERS AND
CAMERAS, RE-USE IN NEW WORK, SEE ELEC.
DWGS., TYPICAL
C
BASE BID FOR EXISTING CLASSROOMS 202, 204 AND 206:
REMOVE EXISTING CEILING TILES, EXISTING GRID TO REMAIN
C
REFLECTED CEILING PLAN KEYED NOTES
NO WORKC.0
REMOVE EXISTING CEILING TILES, EXISTING GRID TO REMAINC.1
REMOVE EXISTING LIGHT FIXTURE, SEE ELECTRICAL DRAWINGSC.2
REMOVE EXISTING LIGHT FIXTURE AND RE-USE IN NEW WORK, SEE ELECTRICAL DRAWINGSC.3
INFILL NEW CEILING GRID TEES TO MATCH EXISTING FOR 2X2 LAYOUT AND PROVIDE NEW CEILING TILE
NEW LIGHT FIXTURE, SEE ELECTRICAL DRAWINGS
EXISTING LIGHT FIXTURE RE-USED IN NEW LOCATION, SEE ELECTRICAL DRAWINGS
C.4
C.5
C.6
EXISTING CEILING MOUNTED PROJECTOR TO REMAIN, RELOCATE MOUNT SLIGHTLY AS
NECESSARY TO INSTALL NEW CEILING GRID TEES
C.7
EXISTING WALL MOUNTED ROLL DOWN SCREEN TO REMAINC.8
REMOVE EXISTING WALL MOUNTED ROLL DOWN SCREEN AND RE-USE IN NEW WORK.C.9
EXISTING WALL TO BE REMOVED
EXISTING WALL TO REMAIN
WALL LEGEND
NEW WALL
EXISTING 2 HR RATED WALL TO REMAIN
NOTE: WALL SYMBOLOGY FOR GRAPHICAL PURPOSES ONLY.
REFER TO PARTITION TYPES AND WALL SECTIONS FOR ACTUAL
WALL CONSTRUCTION.
EXISTING 1 HR RATED WALL TO REMAIN
NEW 1 HR RATED WALL
CEILING LEGEND
RECESSED LED DOWN LIGHT
2x4 RECESSED LED FIXTURE
2x2 RECESSED LED FIXTURE
SMOKE DETECTOR
OCCUPANCY SENSOROS
CEILING MOUNTED LIGHT
S
EXIT SIGN
DIRECTIONAL EXIT SIGN
UPRIGHT SPRINKLER HEAD
SPRINKLER HEAD MOUNTED IN CEILING
SUPPLY AIR DIFFUSER
RETURN AIR DIFFUSER /
EXHAUST GRILLE
LINEAR SUPPLY AIR DIFFUSER
INDICATES CEILING MOUNTED DEVICES, SPRINKLER HEADS, ETC. TO BE REMOVED
INDICATES CEILING MOUNTED DEVICES, SPRINKLER HEADS, ETC. TO BE RELOCATED
LOCATED IN CENTER OF NEW CEILING TILE, TYPICAL
R
SPEAKER WITH GRILLES
FIRE ALARM DEVICEF
CAMERAREFLECTED CEILING BASE BID / ALTERNATES
WORK SHOWN IN THE FOLLOWING ROOMS IS BASE BID: 307 308A 309A 314 314A 314B 314C 314D 314E
ALL OTHER WORK SHOWN ON THE REFLECTED CEILING PLAN IS TO BE ALTERNATE #2
ALTERNATE #1 - REMOVE ALL CEILING GRID, TILE, LIGHTS, DIFFUSERS, ETC. IN ROOMS 302 304 306
BASE BID FOR EXISTING CLASSROOMS: 302 304 306
REMOVE EXISTING CEILING TILES, EXISTING GRID, LIGHTS, DIFFUSERS, ETC. TO REMAIN
OWNERSHIP OF INSTRUMENTS OF SERVICE:
All reports, specifications, plans, computer files, field data, notes, and other documents and instruments of service shall remain the property of the Design Professional. The Design Professional shall retain all common law, statutory and other reserved rights, including the copyright thereto.
This drawing is the property of Yates - Chreitzberg - Hughes Architects and is not to be reproduced or copied in whole or any part. It is not to be used on any other project and is to be returned upon request.
© Copyright 2024
R C
C C
B ui dl in g S2
R en ov at io ns
T rin ity
C hu rc h
R d
C on co rd , N
C
CONSULTANT:
PROFESSIONAL SEALS:
CLIENT:
YCHA COM.#:
REVISIONS:
PHASE & DATE:
SHEET TITLE:
ARCHITECTURAL:
7035 NORTHWINDS DR NW
CONCORD, NC 28027
704.788.2000 www.ycharch.com
I T ZBERG - H UGH ES ARCH I TECTS
PA
O
DROCNC
, N. C.CAROL I NA
HTRON
O O
RE
GI
ST
ER
ED
ARCHI TECTURAL C
RP
RATION
CERT. NO.
YA
TE
S-
CH
RE
SCO #22-25351-02A
NCCCS #2692
S:
\R ev it
Lo ca l F ile s\
9.
R
C C
C B ui ld in g
S2
Re no va tio ns _b illh yc ha rc h.
co m
.rv t
4/
/2
6:
:3
PM
22219.00
THIRD LEVEL
REFLECTED CEILING
PLAN - DEMOLITION
AD203
CONSTRUCTION DOCUMENTS
04-08-24
AD203 3/16" = 1'-0"
1 THIRD LEVEL REFLECTED CEILING PLAN - DEMOLITION
disenhour Area Measurement 2,399.63 sf disenhour Area Measurement
207.42 sf disenhour Area Measurement
884.93 sf disenhour Area Measurement
874.93 sf disenhour Area Measurement 1,008.76 sf disenhour Area Measurement
885.03 sf disenhour Area Measurement 1,032.15 sf disenhour Area Measurement 1,853.87 sf disenhour Typewritten Text New ACT Tile Only In Teal Area disenhour Typewritten Text New 2x2 ACT Grid and Tile In Yellow Areas disenhour Area Measurement
81.73 sf disenhour Area Measurement
583.59 sf disenhour Area Measurement
602.39 sf disenhour Typewritten Text Price Magenta Rooms as an Add Alternate - New 2x2 ACT Grid and Tile john.cole Typewritten Text Exist. Lighting HVAC and Devices to remain (Typ.)
Tile cuts and tie-ups by Specialty Subs/Owner john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Text Box
* Floor Plan for Reference Only...
Do not use former Reno Notes...
Ceiling Reno as marked in color areas only - ACT Grid to become 2x2 at 2x4 areas - Centered on Corridors, and Exist. Lighting.
john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Typewritten Text No work in Exist.
Hard Ceiling Areas -just color areas for 2x4 grid to upgrade to 2x2 (Typ.)
john.cole Arrow john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Line john.cole Arrow john.cole Cloud john.cole Cloud john.cole Cloud john.cole Typewritten Text Re-paint and misc. Drywall Repairs at Existing Main Corridors - "Relaxed Khaki" SW6149 -remove plates at switches but retain wallbase and signage "as is" for re-paint "touch-ups" only -typical for all 3 floors...
john.cole Arrow john.cole Arrow john.cole Typewritten Text No re-painting at Vestibules or Stair towers (typical) john.cole Cloud john.cole Arrow john.cole Arrow john.cole Typewritten Text Scope Edits and mark-ups by JV Cole / RCCC 8.12.26 john.cole Cloud john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Typewritten Text
* Preferred New Ceiling Tile = campus standard:
USG ClimaPlus "Frost" #414 per Facility Design Manual Spec's (typical all facilities / buildings).
john.cole Cloud john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle john.cole Rectangle
Facility Design Manual
Issue: November 15, 2020 College Standards Page 3-21 Revised: February 1, 2024
Level 3 This gypsum board finish is typically specified in appearance areas that will receive heavy or medium texture finishes before final painting or in areas where heavy-duty commercial-grade wallcoverings will be applied as the final decoration. Level 3 is not recommended for smooth wall designs or applications where light textures; non-continuous textures or lightweight wallcoverings will be applied. After wiping joints with a joint knife, leaving a thin layer of compound over all joints and interior angles, add a separate coat of joint compound over all joints and interior angles.
Cover fastener heads and accessories with two layers of joint compound.
Make sure the surface is smooth and free of tool marks.
Level 4 Finish Level 4 is typically specified in appearance areas where smooth wall designs are going to be decorated with flat paints, light textures or non-continuous textures or where wallcoverings will be applied. This level of finish is not recommended in spaces where non-flat or dark/deep-tone paints are going to be applied. As in previous levels, all joints and interior angles have tape embedded in the joint compound. After wiping joints with a joint knife, leaving a thin layer of compound over all joints, add two coats of joint compound over all flat joints. After wiping interior angles with a joint knife, leaving a thin layer of compound, add one separate coat of joint compound over interior angles. Cover fastener heads and accessories with three layers of joint compound. Make sure the surface is smooth and free of tool marks. If finishing glass mat or fiber-reinforced gypsum panels, check with the manufacturer for finishing recommendations.
Level 5 Gypsum board finishing Level 5 is typically specified in appearance areas where smooth wall designs are decorated with non-flat paints, glossy or decorative finishes, or dark/deep-tone paints or where critical lighting conditions occur. Level 5 provides a uniform surface and minimizes the possibility of joint photographing and/or fasteners showing through the final decoration. In Level 5, all joints and interior angles have tape embedded in the joint compound. All joints are then wiped with a joint knife, leaving a thin layer of compound over all joints and interior angles. Add two coats of joint compound over all flat joints. Add one coat of joint compound over interior angles. Cover fastener heads and accessories with three coats of joint compound. Apply a skim coat of joint compound or material manufactured for this purpose to the entire surface. Make sure the surface is smooth and free of tool marks.
3.9.2. Acoustical Tile Ceilings
Acoustical tile ceilings shall be exposed grid, lay-in system. Acoustical tiles shall be two feet square (2’x2’) lay-in tiles composed of non-combustible materials.
3.9.2.1. The standard Acoustical ceiling tile suspension systems shall be wide faces, double web, steel which are hot-dip galvanized with prefinished 15/16” flanges. They shall be rated for intermediate duty. Color: White. Acceptable manufacturers are Armstrong, USG, and Chicago Metallic Corporation.
3.9.2.2. The standard acoustical ceiling tiles shall be ¾” thick, white, mineral based, treated with mold/mildew inhibitor. They shall have a reflectance of no less than LR 0.83, with a Noise Reduction Coefficient (NRC) of 0.70, and a Ceiling Attenuation Class on not less than 40 Armstrong Tundra, medium texture with tegular edge shall be the basis of design. Acceptable john.cole Highlight
3.9.2. Acoustical Tile Ceilings
john.cole Highlight The standard acoustical ceiling tiles shall be ¾” thick, white, mineral based, treated with mold/mildew inhibitor. They shall have a reflectance of no less than LR 0.83, with a Noise Reduction Coefficient (NRC) of 0.70, and a Ceiling Attenuation Class on not less than 40
Facility Design Manual
Issue: November 15, 2020 College Standards Page 3-22 Revised: February 1, 2024 manufacturers are Armstrong, USG, and CertainTeed. 3.9.2.1. USG Frost™ ClimaPlus™ #414, 2'x2'x3/4", Shadowline Edge with Bevel – Flat White 050.
3.9.2.3. Open Office and Collaboration spaces will have ceilings with high NRC and CAC characteristics.
3.9.2.4. Class A “Fire-Rated” materials shall be specified to complete a UL fire-rated ceiling system for fire protection of structural components, where fire-rated assembly is required by Code.
3.9.3. Flooring
The following materials are preferred at the locations indicated:
3.9.3.1. Terrazzo or non-slip porcelain tile – high traffic areas such as lobbies and corridors.
At ornamental stairs, treads and risers shall match the adjacent materials with non-slip nosings.
3.9.3.2. Luxury Vinyl Tile (LVT) – low traffic lobbies and corridors, general purpose rooms, labs, classrooms where appropriate.
3.9.3.3. Carpet Tile – offices, conference rooms, auditorium aisles (with permanent seating), lounges, classrooms as appropriate, music or language listening rooms.
3.9.3.4. Porcelain Tile – restroom, bathrooms and showers.
3.9.3.5. Quarry Tile or Anti-bacterial Cement – food service areas.
3.9.3.6. Sealed Concrete – mechanical rooms, storage rooms, custodial rooms.
3.9.3.7. Raised, Removable Panels supported on interconnecting grids and pedestals, providing an under-floor plenum for air distribution and utilities may be utilized in Server Rooms, and other appropriate spaces.
3.9.3.8. Steel Trowel Finish Concrete – treads and risers with non-slip nosings for service and egress stairs.
3.9.3.9. Walk- off Carpet Tiles - building entrances.
3.9.4. Tile Carpeting
All carpet shall be selected from the North Carolina Qualified Products List (QPL) established by the State Purchasing Department.
Light colors (such as white, yellow, or gold) and solid colors which immediately show all traffic patterns and any stain must be avoided.
All carpet to be 24” x 24” tiles to facilitate replacement of damaged carpet and storage of attic stock.
Use of broadloom carpet must be approved by the College.
All newly carpeted areas shall be appropriately covered with plastic or brown paper to protect the carpet from construction debris. Carpet shall be in clean, like new condition when turned over to the College.
Tile carpeting with a hard composition backing, but not containing PVC, is preferred for public spaces where floor access is desirable and for ease of repair. A mixed pattern with high soil and stain hiding capabilities is preferred.
3.9.4.1. Carpet Specification Requirements
john.cole Highlight USG Frost™ ClimaPlus™ #414, 2'x2'x3/4", Shadowline Edge with Bevel – Flat White 050.