121-071426JVC.pdf
PDF 2 MB Posted
- Solicitation number
- 121-071426JVC-S202
- Issued by
- Cabarrus County, North Carolina
About this file
This is an Invitation to Bid (IFB #121-071426JVC) issued by Rowan-Cabarrus Community College in Concord, North Carolina, for ceiling tile replacement and corridor re-painting at the South Campus Building S202. The project encompasses partial demolition and replacement of existing ceiling tiles and grids across three building levels, verification and correction of above-ceiling infrastructure including support for IT cabling, HVAC ductwork, fire alarm devices, and lighting systems, and installation of new ceiling grid and tiles aligned with existing HVAC and lighting systems. The scope includes three distinct work areas: ceiling tile replacements only, ceiling tile and grid replacement, and alternate ceiling tile and grid replacement, with new corridor walls to be re-painted in College-specified eggshell finish across all three levels. A mandatory pre-bid conference is required on Wednesday, August 12, 2026, at 10:00 a.m. at the project site, with attendance mandatory to submit a bid. Sealed bids must be submitted via email in PDF format (maximum 20 MB) to collegeenvironment@rccc.edu no later than 2:00 p.m. local time on Thursday, August 27, 2026, with public opening via Zoom immediately thereafter. All inquiries for clarifications must be received by Monday, August 17, 2026, at 1:00 p.m., with answers provided via addendum by August 19, 2026.
Bid bonds equal to 5% of the total bid amount are required, with checks mailed separately to Rowan-Cabarrus Community College by the 2:00 p.m. deadline on August 27, 2026. All bidders must be licensed North Carolina contractors with owner-approved sub-contractors and must be registered with the North Carolina Electronic Vendor Portal (eVP) prior to proposal submission, with failure to register resulting in disqualification. The contract must incorporate and adhere to the State of North Carolina's General Terms and Conditions. Deliverables include a construction schedule, material and subcontractor submittals outlining planned use and staffing, and warranty information per College standards as specified in the Facilities Design Manual. The project must comply with the Rowan-Cabarrus Community College Facilities Design Manual specifications and North Carolina Building Code requirements, with construction phasing coordinated to maintain campus access and emergency routes and final acceptance contingent upon visual inspection and specification compliance. Scope is based on provided mark-ups with major changes resulting from concealed conditions addressed through Requests for Information and formal change order processes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum_3_08.19.26.pdf | ||
| Addendum_2_08.07.26.docx.pdf | ||
| Addendum_1_07.27.26.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IFB # 121-071426JVC
South Campus Building S202 Ceiling Tile Replacement & Corridors Re-Painting
ROWAN-CABARRUS COMMUNITY COLLEGE
1531 Trinity Church Rd.
Concord, NC
INVITATION TO BID
NOTICE TO BID
Sealed bids for the Rowan-Cabarrus Community College, South Campus Building S202 Ceiling Tile Replacement and Corridors Re-Painting Project will be received via email, (pdf format only, maximum 20 MG) at collegeenvironment@rccc.edu until, but no later than 2:00 pm, local prevailing time, Thursday, August. 27, 2026, and then publicly opened and read immediately thereafter via ZOOM. Bidders are encouraged to view the bid opening in real time via a ZOOM link that follows.
The Bid Name and IFB # 121-071426JVC shall be referenced as the subject line of all emails.
Bidders shall be Contractors licensed in North Carolina, with Owner approved sub-contractors as required. The General Contractor shall be the Prime Contractor, and the bid shall contain all work required to ensure complete and satisfactory installation as designed. Bidders will receive an email receipt notification that their bids have been received.
Bids received after the announced time and date for submittal will be rejected. Bidders are responsible for ensuring their bid is received before the deadline indicated. All firms must be registered with the North Carolina Electronic Vendor Portal (eVP and Purchase Orders) prior to presenting a proposal. Failure to register may result in disqualification. North Carolina Electronic Vendor Portal may be found at https://evp.nc.gov/
Contractual Requirement: All bidders must agree to execute a contract that incorporates and adheres to the State of North Carolina's General Terms and Conditions. These terms are available for review at: https://www.doa.nc.gov/north-carolina-general-terms-and-conditions-5-2025/open.
Bid bonds are required in the amount of 5% of the total bid submitted. If paying by check, send to:
Rowan-Cabarrus Community College PO Box 1595, (1333 Jake Alexander Blvd. S, for courier, etc.)
Salisbury, NC 28145 ATTN: Ronda Holland
Checks must be received by 2:00 pm, Thursday, August 27, 2026. Only Bid Bond checks can be mailed, bids and other items must be sent via email.
A Mandatory Pre-Bid Conference will be held at 10:00 am on Wednesday, August 12, 2026, at the South Campus Building S202, 1531 Trinity Church Rd., Concord, NC. Attendees to gather at the left side Stair Tower Entry as viewed from the parking Lot. The purpose of this meeting will be to review the areas for rework as highlighted in the marked-up existing drawings. Attendance at the meeting is required to submit a bid.
https://evp.nc.gov/ https://www.doa.nc.gov/north-carolina-general-terms-and-conditions-5-2025/open
SCOPE OF WORK
1. Partial demolition and replacement of existing ceiling tiles and grids per marked-up plans provided,
2. Verification / corrections as needed for existing above ceiling infrastructure and independent structural support for any non-compliant anchoring or support of IT cabling, HVAC ductwork, fire alarm devices, lighting, and any other miscellaneous concealed conditions for corrective work,
3. Installation of new ceiling grid and tiles where marked on plans to re-align with existing HVAC and lighting already in place, which may need additional support.
a. NOTE: New corridor ceiling tiles and grid on second and third floors to be re-worked to center sprinkler heads in 2x2 ACT. Verifications with Facilities and College Environment on site for any issues.
b. Three areas for different installations (ref. attached plans):
i. Ceiling Tile replacements only
ii. Ceiling Tile and Grid replacement
iii. Add Alternate Ceiling Tile and Grid Replacement
4. Compliance with Rowan-Cabarrus Community College Facilities Design Manual (FDM) Specifications, and North Carolina Building Code requirements.
5. Re-painting all corridor walls for all three levels with College specified and approved color as noted in the Facilities Design Manual in eggshell finish.
PROJECT OVERVIEW / Additional Details for Compliance
1. Construction Phasing and Access
• Maintain campus access and emergency routes at all times.
• Coordinate construction sequencing with the College to minimize disruption.
• Provide temporary pedestrian control, barricades, and signage as required.
2. Quality Control and Acceptance
• Final acceptance is contingent upon visual inspection, and compliance with specifications.
3. Deliverables
• Construction schedule.
• Material and Subcontractor Submittals of planned use and staffing.
• Warranty information per College standards. See FDM.
4. Assumptions and Exclusions
• Scope is based on the provided mark-ups attached below, and listings above.
• Any major scope changes resulting from concealed conditions shall be addressed through Requests for
Information and any formal Change Order processes, if required.
All inquiries for clarifications and questions must be received via email to john.cole@rccc.edu by Monday, August 17, 2026 at 1:00 pm and will be answered via Addendum no later than 5:00 PM, August 19, 2026.
ATTACHMENTS
1. Drawings - South S202 High-lighted Former Project Drawings AD201 – First Level Reflected Ceiling Plan – Demolition - dated April 08, 2024 AD202 – Second Level Reflected Ceiling Plan – Demolition - dated April 08, 2024 AD203 – Third Level Reflected Ceiling Plan – Demolition - dated 04-08-24
2. Facility Design Manual Standards -2024 – Part 3 Ceiling Grid & Tiles – 3.9.2 mailto:john.cole@rccc.edu
BID OPENING ZOOM LINK
Join Zoom Meeting https://rccc-edu.zoom.us/j/93147817418
Meeting chat link https://rccc-edu.zoom.us/launch/jc/93147817418
Meeting ID: 931 4781 7418
One tap mobile +16465588656,,93147817418# US (New York)
+16469313860,,93147817418# US
Join instructions https://rccc-edu.zoom.us/meetings/93147817418/invitations?signature=yLFGPa26hxbkrFX5umdPoyHVjMZ75TgGQ 3FCosP6giY
END OF INVITATION TO BID
https://rccc-edu.zoom.us/j/93147817418 https://rccc-edu.zoom.us/launch/jc/93147817418 https://rccc-edu.zoom.us/meetings/93147817418/invitations?signature=yLFGPa26hxbkrFX5umdPoyHVjMZ75TgGQ3FCosP6giY https://rccc-edu.zoom.us/meetings/93147817418/invitations?signature=yLFGPa26hxbkrFX5umdPoyHVjMZ75TgGQ3FCosP6giY https://rccc-edu.zoom.us/meetings/93147817418/invitations?signature=yLFGPa26hxbkrFX5umdPoyHVjMZ75TgGQ3FCosP6giY
S
S
S S S S S
S S
S
OS
OS
OS OS
OS
OS
OS
OS
OS OS
OS
OS OS
F
F
F
F
F
F
F
F
F
F
S
F
S
S
S
S
S S
S
PLAN
N
TRUE
N
A A
B B
C C
D D
E E
CLASSROOM
CLASSROOM
OFFICE
104A
CLASSROOM
CLASSROOM
OFFICE
110B
CORRIDOR
101B
MECH./ELEC.
ELEV.
ELEVATOR
LOBBY
101A
JANITOR
ELEV.
MACH.
180B
STAIR #1
STAIR #2
WOMEN
MEN
STORAGE
BOILER
180A
WELDING
LAB
OFFICE
110A
CORRIDOR
101C
CORRIDOR
101D
CORRIDOR
101E
OFFICE
104B
OPEN
OFFICE
CORRIDOR
101F
OFFICE
CLASSROOM
C.1 C.1
C.1
C.1
C.1
C.3
C.0
EXISTING GWB HEADER TO
REMAIN
C.1
C.1
C.7 C.8
C.1
C.1C.1 C.1
C.2
C.2 C.2
C.2
C.2 C.2
C.2 C.2
R R
R
R
R
R R
R
R
R
C.1
C.1
R
R
REMOVE PORTION OF EXISTING CEILING
GRID TO INSTALL NEW GWB HEADER
NO CEILING WORK IN AREAS
SHOWN SHADED, TYPICAL
EXISTING WINDOW SHADES
TO REMAIN, UNLESS NOTED
OTHERWISE
EXISTING GWB HEADER TO
REMAIN
REMOVE EXISTING WINDOW SHADES
DURING DEMOLITION AND NEW WORK,
AND REINSTALL IN SAME LOCATION AT
END OF PROJECT
REMOVE EXISTING WINDOW SHADES
DURING DEMOLITION AND NEW WORK,
AND REINSTALL IN SAME LOCATION AT
END OF PROJECT
EXISTING WINDOW SHADES
TO REMAIN, UNLESS NOTED
OTHERWISE
C.0
C.0
C.0
C.0
C.0
C.0
C.0
C.0R
C.2 C.2
C.2
C.2
C.2
C.2
REMOVE EXISTING CEILING
TILE, 2x2 GRID TO REMAIN
OTS
OTS
CLASSROOM
C.3 C.3 C.3 C.3
C.3 C.3 C.3 C.3
C.3
REMOVE EXISTING CEILING GRID AND
TILE SHOWN DOTTED
REMOVE EXISTING ROLL DOWN PROJECTION
SCREEN, PROJECTOR AND SPEAKERS AND
RETURN TO OWNER
REMOVE EXISTING LIGHT FIXTURES
SHOWN DOTTED AND RE-USE IN
ELSEWHERE IN NEW WORK, SEE SHEET
A102 AND ELECTRICAL DRAWINGS
REMOVE EXISTING SPRINKLER HEADS AND
RE-INSTALL IN NEW CEILING, SEE SHEET A102
REMOVE EXISTING CEILING GRID AND
TILE SHOWN DOTTED, TYPICAL
REMOVE EXISTING LIGHT FIXTURES
SHOWN DOTTED AND RE-USE IN NEW
WORK, SEE SHEET A201 AND ELECTRICAL
DRAWINGS
REMOVE EXISTING SPRINKLER HEADS
IN CEILINGS TO BE REMOVED, TYPICAL
SEE FIRE PROTECTION DRAWINGS
REMOVE EXISTING HVAC DIFFUSERS
IN CEILINGS TO BE REMOVED, TYPICAL
SEE MECHANICAL DRAWINGS
REMOVE EXISTING FIRE ALARM
DEVICES, SMOKE DETECTORS,
OCCUPANCY SENSORS ETC, IN
CEILINGS TO BE REMOVED, TYPICAL
SEE ELECTRICAL DRAWINGS
REFLECTED CEILING PLAN KEYED NOTES
NO WORKC.0
REMOVE EXISTING CEILING TILES, EXISTING GRID TO REMAINC.1
REMOVE EXISTING LIGHT FIXTURE, SEE ELECTRICAL DRAWINGSC.2
REMOVE EXISTING LIGHT FIXTURE AND RE-USE IN NEW WORK, SEE ELECTRICAL DRAWINGSC.3
INFILL NEW CEILING GRID TEES TO MATCH EXISTING FOR 2X2 LAYOUT AND PROVIDE NEW CEILING TILE
NEW LIGHT FIXTURE, SEE ELECTRICAL DRAWINGS
EXISTING LIGHT FIXTURE RE-USED IN NEW LOCATION, SEE ELECTRICAL DRAWINGS
C.4
C.5
C.6
EXISTING CEILING MOUNTED PROJECTOR TO REMAIN, RELOCATE MOUNT SLIGHTLY AS
NECESSARY TO INSTALL NEW CEILING GRID TEES
C.7
EXISTING WALL MOUNTED ROLL DOWN SCREEN TO REMAINC.8
REMOVE EXISTING WALL MOUNTED ROLL DOWN SCREEN AND RE-USE IN NEW WORK.C.9
EXISTING WALL TO BE REMOVED
EXISTING WALL TO REMAIN
WALL LEGEND
NEW WALL
EXISTING 2 HR RATED WALL TO REMAIN
NOTE: WALL SYMBOLOGY FOR GRAPHICAL PURPOSES ONLY.
REFER TO PARTITION TYPES AND WALL SECTIONS FOR ACTUAL
WALL CONSTRUCTION.
EXISTING 1 HR RATED WALL TO REMAIN
NEW 1 HR RATED WALL
CEILING LEGEND
RECESSED LED DOWN LIGHT
2x4 RECESSED LED FIXTURE
2x2 RECESSED LED FIXTURE
SMOKE DETECTOR
OCCUPANCY SENSOROS
CEILING MOUNTED LIGHT
S
EXIT SIGN
DIRECTIONAL EXIT SIGN
UPRIGHT SPRINKLER HEAD
SPRINKLER HEAD MOUNTED IN CEILING
SUPPLY AIR DIFFUSER
RETURN AIR DIFFUSER /
EXHAUST GRILLE
LINEAR SUPPLY AIR DIFFUSER
INDICATES CEILING MOUNTED DEVICES, SPRINKLER HEADS, ETC. TO BE REMOVED
INDICATES CEILING MOUNTED DEVICES, SPRINKLER HEADS, ETC. TO BE RELOCATED
LOCATED IN CENTER OF NEW CEILING TILE, TYPICAL
R
SPEAKER WITH GRILLES
FIRE ALARM DEVICEF
CAMERA
101C 101D 101E 104A 104B 105 106 107 107A 111 112 117A 117B 117C 118A 118B 118C
REFLECTED CEILING BASE BID / ALTERNATE
WORK SHOWN IN THE FOLLOWING ROOMS IS BASE BID.
ALL OTHER WORK SHOWN ON THE REFLECTED CEILING PLAN IS TO BE INCLUDED IN ALTERNATE #2
OWNERSHIP OF INSTRUMENTS OF SERVICE:
All reports, specifications, plans, computer files, field data, notes, and other documents and instruments of service shall remain the property of the Design Professional. The Design Professional shall retain all common law, statutory and other reserved rights, including the copyright thereto.
This drawing is the property of Yates - Chreitzberg - Hughes Architects and is not to be reproduced or copied in whole or any part. It is not to be used on any other project and is to be returned upon request.
© Copyright 2024
R C
C C
B ui dl in g S2
R en ov at io ns
T rin ity
C hu rc h
R d
C on co rd , N
C
CONSULTANT:
PROFESSIONAL SEALS:
CLIENT:
YCHA COM.#:
REVISIONS:
PHASE & DATE:
SHEET TITLE:
ARCHITECTURAL:
7035 NORTHWINDS DR NW
CONCORD, NC 28027
704.788.2000 www.ycharch.com
I T ZBERG - H UGH ES ARCH I TECTS
PA
O
DROCNC
, N. C.CAROL I NA
HTRON
O O
RE
GI
ST
ER
ED
ARCHI TECTURAL C
RP
RATION
CERT. NO.
YA
TE
S-
CH
RE
SCO #22-25351-02A
NCCCS #2692
S:
\R ev it
Lo ca l F ile s\
9.
R
C C
C B ui ld in g
S2
Re no va tio ns _b illh yc ha rc h.
co m
.rv t
4/
/2
6:
:1
PM
22219.00
FIRST LEVEL
REFLECTED CEILING
PLAN - DEMOLITION
AD201
CONSTRUCTION DOCUMENTS
04-08-24
AD201 3/16" = 1'-0"
1 FIRST LEVEL REFLECTED CEILING PLAN - DEMOLITION
disenhour Area Measurement
639.32 sf disenhour Typewritten Text New ACT Grid and Tile In Yellow Area disenhour Area Measurement
72.3 sf disenhour Area Measurement
83.08 sf disenhour Area Measurement
83.84 sf
SS S SS
SSS
S
OS
OS
OS
OS
OS
OS
OS
OS OS
OSOS
OS
OSOS
OS
OS
OS
OS
F
F
F F
F
F
F
F
F
FF
F
F
F
S
FOSOS
S S
S S
S
S
S
S S
S
SS
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
PLAN
N
TRUE
N
A A
B B
C C
D D
E E
OFFICE
STORAGE
212C
STORAGE
212B
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
MEN
WOMEN
CORRIDOR
201A
CORRIDOR
201C
OFFICE
212A
STOR.
ENTRANCE
200 ENTRANCE
STOR.
214A
STOR.
214B
STOR.
STOR.
217A
STOR.
216A
CORRIDOR
ELEC.
JANITOR
223 OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
ELEV.
ELEV.
LOBBY
VESTIBULE
201E
CORRIDOR
201B
CORRIDOR
201D
CLASSROOM
R R R R R R RRR R R
R R
R
RR
R
R
R
R
RR
R
EXISTING WINDOW SHADES
TO REMAIN, TYPICAL
EXISTING GWB HEADER TO
REMAIN
REMOVE EXISTING CEILING MOUNTED
PROJECTORS AND SPEAKERS, RE-USE
IN NEW WORK, SEE SHEET A203
REMOVE EXISTING CEILING MOUNTED
PROJECTORS AND SPEAKERS, RE-USE
IN NEW WORK, SEE SHEET A203 AND
ELECTRICAL DRAWINGS
REMOVE EXISTING CEILING GRID AND
TILE SHOWN DOTTEDREMOVE WALL MOUNTED ROLL DOWN
PROJECTION SCREENS AND RE-USE IN NEW
WORK, SEE SHEET A203
REMOVE EXISTING CEILING GRID AND
TILE SHOWN DOTTED
EXISTING GWB HEADER TO
REMAIN
EXISTING GWB HEADER TO REMAIN
EXISTING WINDOW SHADES
TO REMAIN, TYPICAL
REMOVE EXISTING CEILING
TILE, 2x2 GRID TO REMAIN
REMOVE EXISTING CEILING MOUNTED
PROJECTOR, CAMERA AND SPEAKERS,
AND RETURN TO OWNER
C.1
C.1
C.1
C.0
C.0 C.1
C.1
C.1 C.1
C.1 C.1
C.0 C.0 C.0 C.0
C.0
C.7 C.7
RRRRRR
R
R RRRRRR RRRRRRR RR
R
C.8C.8
R
R
C.1 C.1
C.1
C.1 C.1
C.1 C.1
C.1
R
R
R
R R R R R
R R R
R
R
R R
R R R
R R R
R R
R
R
OPEN TO ABOVE OPEN TO ABOVE
REMOVE EXISTING LIGHT FIXTURES
SHOWN DOTTED AND RE-USE IN NEW
WORK, SEE SHEET A202 AND ELECTRICAL
DRAWINGS
NO CEILING WORK IN AREAS
SHOWN SHADED, TYPICAL
C.0
C.0
C.0
C.0
C.1
C.1
C.2
C.2
R
C.1 C.2 C.2
C.2 C.2
R
C.0
C.0
REMOVE EXISTING WALL MOUNTED
ROLL DOWN PROJECTION SCREEN
AND RETURN TO OWNER
EXISTING CUBICLE CURTAIN
AND TRACK TO REMAIN
REFLECTED CEILING PLAN KEYED NOTES
NO WORKC.0
REMOVE EXISTING CEILING TILES, EXISTING GRID TO REMAINC.1
REMOVE EXISTING LIGHT FIXTURE, SEE ELECTRICAL DRAWINGSC.2
REMOVE EXISTING LIGHT FIXTURE AND RE-USE IN NEW WORK, SEE ELECTRICAL DRAWINGSC.3
INFILL NEW CEILING GRID TEES TO MATCH EXISTING FOR 2X2 LAYOUT AND PROVIDE NEW CEILING TILE
NEW LIGHT FIXTURE, SEE ELECTRICAL DRAWINGS
EXISTING LIGHT FIXTURE RE-USED IN NEW LOCATION, SEE ELECTRICAL DRAWINGS
C.4
C.5
C.6
EXISTING CEILING MOUNTED PROJECTOR TO REMAIN, RELOCATE MOUNT SLIGHTLY AS
NECESSARY TO INSTALL NEW CEILING GRID TEES
C.7
EXISTING WALL MOUNTED ROLL DOWN SCREEN TO REMAINC.8
REMOVE EXISTING WALL MOUNTED ROLL DOWN SCREEN AND RE-USE IN NEW WORK.C.9
EXISTING WALL TO BE REMOVED
EXISTING WALL TO REMAIN
WALL LEGEND
NEW WALL
EXISTING 2 HR RATED WALL TO REMAIN
NOTE: WALL SYMBOLOGY FOR GRAPHICAL PURPOSES ONLY.
REFER TO PARTITION TYPES AND WALL SECTIONS FOR ACTUAL
WALL CONSTRUCTION.
EXISTING 1 HR RATED WALL TO REMAIN
NEW 1 HR RATED WALL
CEILING LEGEND
RECESSED LED DOWN LIGHT
2x4 RECESSED LED FIXTURE
2x2 RECESSED LED FIXTURE
SMOKE DETECTOR
OCCUPANCY SENSOROS
CEILING MOUNTED LIGHT
S
EXIT SIGN
DIRECTIONAL EXIT SIGN
UPRIGHT SPRINKLER HEAD
SPRINKLER HEAD MOUNTED IN CEILING
SUPPLY AIR DIFFUSER
RETURN AIR DIFFUSER /
EXHAUST GRILLE
LINEAR SUPPLY AIR DIFFUSER
INDICATES CEILING MOUNTED DEVICES, SPRINKLER HEADS, ETC. TO BE REMOVED
INDICATES CEILING MOUNTED DEVICES, SPRINKLER HEADS, ETC. TO BE RELOCATED
LOCATED IN CENTER OF NEW CEILING TILE, TYPICAL
R
SPEAKER WITH GRILLES
FIRE ALARM DEVICEF
CAMERA
REFLECTED CEILING BASE BID / ALTERNATE
WORK SHOWN IN THE FOLLOWING ROOMS IS BASE BID.
204 205 207 210 218 219 220 221 222
ALL OTHER WORK SHOWN ON THE REFLECTED CEILING PLAN IS TO BE INCLUDED IN ALTERNATE #2
OWNERSHIP OF INSTRUMENTS OF SERVICE:
All reports, specifications, plans, computer files, field data, notes, and other documents and instruments of service shall remain the property of the Design Professional. The Design Professional shall retain all common law, statutory and other reserved rights, including the copyright thereto.
This drawing is the property of Yates - Chreitzberg - Hughes Architects and is not to be reproduced or copied in whole or any part. It is not to be used on any other project and is to be returned upon request.
© Copyright 2024
R C
C C
B ui dl in g S2
R en ov at io ns
T rin ity
C hu rc h
R d
C on co rd , N
C
CONSULTANT:
PROFESSIONAL SEALS:
CLIENT:
YCHA COM.#:
REVISIONS:
PHASE & DATE:
SHEET TITLE:
ARCHITECTURAL:
7035 NORTHWINDS DR NW
CONCORD, NC 28027
704.788.2000 www.ycharch.com
I T ZBERG - H UGH ES ARCH I TECTS
PA
O
DROCNC
, N. C.CAROL I NA
HTRON
O O
RE
GI
ST
ER
ED
ARCHI TECTURAL C
RP
RATION
CERT. NO.
YA
TE
S-
CH
RE
SCO #22-25351-02A
NCCCS #2692
S:
\R ev it
Lo ca l F ile s\
9.
R
C C
C B ui ld in g
S2
Re no va tio ns _b illh yc ha rc h.
co m
.rv t
4/
/2
6:
:2
PM
22219.00
SECOND LEVEL
REFLECTED CEILING
PLAN - DEMOLITION
AD202
CONSTRUCTION DOCUMENTS
04-08-24
AD202 3/16" = 1'-0"
1 SECOND LEVEL REFLECTED CEILING PLAN - DEMOLITION
disenhour Area Measurement 1,696.92 sf disenhour Area Measurement
90.03 sf disenhour Area Measurement
90.22 sf disenhour Typewritten Text New ACT Grid and Tile In Yellow Area disenhour Area Measurement
82.87 sf
OS
F
OS
F
OS
F
OS
F
OS
F
OSOS
OSOSOS
S
OS
OS
F
OS
F
OS
OS F
F
OS
OSF
OS
F
S S
S
SSSS
S
S
S
S
SS S
S
S
S
S
SS
S
S
S
S
S S
PLAN
N
TRUE
N
A A
B B
C C
D D
E E
EXISTING WINDOW SHADES
TO REMAIN, TYPICAL
EXISTING GWB HEADER TO
REMAIN
NO CEILING WORK IN AREAS
SHOWN SHADED, TYPICAL
R RR R RR R RRR
R
RRRRRRRRR RR
R
R R R
R
RR
R
R R R
RRR
R
RRRR
R R R
D
R
R
R R
R R
R
R
C.3
C.0
C.0
C.1
C.3
REMOVE EXISTING CEILING MOUNTED
PROJECTORS, SPEAKERS AND CAMERAS,
RE-USE IN NEW WORK, SEE SHEET A203
AND ELECTRICAL DRAWINGS
C.3 C.3
C.3 C.3
C.3C.3C.3
C.1
C.3 C.3
C.3C.3
C.3C.3C.3
C.3
D
C.3C.3
C.3C.3
C.3
RRR
C.7 C.7
C.7
C.7 C.7
C.1
R
C.1
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
MEN
WOMEN
CORRIDOR
301A
CORRIDOR
301C
IDF
381A
IDF
CORRIDOR
ELEC.
OFFICE
314A
OFFICE
314B
OFFICE
314C
OFFICE
314D
OFFICE
314E
OFFICE
ELEV.
STOR.
OFFICE
308A
OFFICE
309A
STOR.
308B
ELEVATOR
LOBBY
ENTRANCE
202ENTRANCE
VESTIBULE
301E
CORRIDOR
301B
CORRIDOR
301D
C.1 C.1
C.0
C.1
C.1
C.0
C.1
C.0
EXISTING GWB ON SHAFT AT
ROOF LADDER TO REMAIN
C.0
C.1
C.1
C.1
R
C.1 C.1 C.1
C.7 C.7 C.8
C.1
C.8
C.1
C.1
C.1
C.1
REMOVE WALL MOUNTED ROLL DOWN
PROJECTION SCREENS AND RE-USE IN NEW
WORK, SEE SHEET A203
REMOVE EXISTING CEILING GRID AND TILE
SHOWN DOTTED
C.3
C.1
C.1
C.1 C.1
C.8
C.1
C.2 C.2
C.2 C.2
C.2 C.2
C.2 C.2 C.2
C.2C.2C.2
EXISTING GWB HEADER TO
REMAIN
C.1
C.1
C.2C.2
C.2C.2
C.2C.2
C.2C.2C.2
C.2 C.2 C.2
EXISTING GWB HEADER TO
REMAIN
EXISTING WINDOW SHADES
TO REMAIN, TYPICAL
REMOVE EXISTING CEILING
TILE, 2x2 GRID TO REMAIN
REMOVE EXISTING CEILING
TILE, 2x2 GRID TO REMAIN
REMOVE EXISTING CEILING MOUNTED
PROJECTORS, SPEAKERS AND CAMERAS,
RE-USE IN NEW WORK, SEE SHEET A203
REMOVE EXISTING CEILING GRID AND
TILE SHOWN DOTTED
REMOVE EXISTING LIGHT FIXTURES
SHOWN DOTTED AND RE-USE IN NEW
WORK, SEE SHEET A202 AND ELECTRICAL
DRAWINGS
C.0
C.2
C.2
C.2
C.2
C.2 C.2
C.2 C.2
C.2C.2
C.2 C.2
C.2
C.2
REMOVE ALL EXISTING DOWNLIGHTS
IN EXTERIOR GWB SOFFIT
REMOVE ALL EXISTING DOWNLIGHTS
IN EXTERIOR GWB SOFFIT
R
R R R
R RR R
CLASSROOM
CLASSROOM
CLASSROOM
WORK IN THIS AREA TO BE ALTERNATE #1
REMOVE EXISTING CEILING SPEAKERS AND
CAMERAS, RE-USE IN NEW WORK, SEE ELEC.
DWGS., TYPICAL
C
BASE BID FOR EXISTING CLASSROOMS 202, 204 AND 206:
REMOVE EXISTING CEILING TILES, EXISTING GRID TO REMAIN
C
REFLECTED CEILING PLAN KEYED NOTES
NO WORKC.0
REMOVE EXISTING CEILING TILES, EXISTING GRID TO REMAINC.1
REMOVE EXISTING LIGHT FIXTURE, SEE ELECTRICAL DRAWINGSC.2
REMOVE EXISTING LIGHT FIXTURE AND RE-USE IN NEW WORK, SEE ELECTRICAL DRAWINGSC.3
INFILL NEW CEILING GRID TEES TO MATCH EXISTING FOR 2X2 LAYOUT AND PROVIDE NEW CEILING TILE
NEW LIGHT FIXTURE, SEE ELECTRICAL DRAWINGS
EXISTING LIGHT FIXTURE RE-USED IN NEW LOCATION, SEE ELECTRICAL DRAWINGS
C.4
C.5
C.6
EXISTING CEILING MOUNTED PROJECTOR TO REMAIN, RELOCATE MOUNT SLIGHTLY AS
NECESSARY TO INSTALL NEW CEILING GRID TEES
C.7
EXISTING WALL MOUNTED ROLL DOWN SCREEN TO REMAINC.8
REMOVE EXISTING WALL MOUNTED ROLL DOWN SCREEN AND RE-USE IN NEW WORK.C.9
EXISTING WALL TO BE REMOVED
EXISTING WALL TO REMAIN
WALL LEGEND
NEW WALL
EXISTING 2 HR RATED WALL TO REMAIN
NOTE: WALL SYMBOLOGY FOR GRAPHICAL PURPOSES ONLY.
REFER TO PARTITION TYPES AND WALL SECTIONS FOR ACTUAL
WALL CONSTRUCTION.
EXISTING 1 HR RATED WALL TO REMAIN
NEW 1 HR RATED WALL
CEILING LEGEND
RECESSED LED DOWN LIGHT
2x4 RECESSED LED FIXTURE
2x2 RECESSED LED FIXTURE
SMOKE DETECTOR
OCCUPANCY SENSOROS
CEILING MOUNTED LIGHT
S
EXIT SIGN
DIRECTIONAL EXIT SIGN
UPRIGHT SPRINKLER HEAD
SPRINKLER HEAD MOUNTED IN CEILING
SUPPLY AIR DIFFUSER
RETURN AIR DIFFUSER /
EXHAUST GRILLE
LINEAR SUPPLY AIR DIFFUSER
INDICATES CEILING MOUNTED DEVICES, SPRINKLER HEADS, ETC. TO BE REMOVED
INDICATES CEILING MOUNTED DEVICES, SPRINKLER HEADS, ETC. TO BE RELOCATED
LOCATED IN CENTER OF NEW CEILING TILE, TYPICAL
R
SPEAKER WITH GRILLES
FIRE ALARM DEVICEF
CAMERAREFLECTED CEILING BASE BID / ALTERNATES
WORK SHOWN IN THE FOLLOWING ROOMS IS BASE BID: 307 308A 309A 314 314A 314B 314C 314D 314E
ALL OTHER WORK SHOWN ON THE REFLECTED CEILING PLAN IS TO BE ALTERNATE #2
ALTERNATE #1 - REMOVE ALL CEILING GRID, TILE, LIGHTS, DIFFUSERS, ETC. IN ROOMS 302 304 306
BASE BID FOR EXISTING CLASSROOMS: 302 304 306
REMOVE EXISTING CEILING TILES, EXISTING GRID, LIGHTS, DIFFUSERS, ETC. TO REMAIN
OWNERSHIP OF INSTRUMENTS OF SERVICE:
All reports, specifications, plans, computer files, field data, notes, and other documents and instruments of service shall remain the property of the Design Professional. The Design Professional shall retain all common law, statutory and other reserved rights, including the copyright thereto.
This drawing is the property of Yates - Chreitzberg - Hughes Architects and is not to be reproduced or copied in whole or any part. It is not to be used on any other project and is to be returned upon request.
© Copyright 2024
R C
C C
B ui dl in g S2
R en ov at io ns
T rin ity
C hu rc h
R d
C on co rd , N
C
CONSULTANT:
PROFESSIONAL SEALS:
CLIENT:
YCHA COM.#:
REVISIONS:
PHASE & DATE:
SHEET TITLE:
ARCHITECTURAL:
7035 NORTHWINDS DR NW
CONCORD, NC 28027
704.788.2000 www.ycharch.com
I T ZBERG - H UGH ES ARCH I TECTS
PA
O
DROCNC
, N. C.CAROL I NA
HTRON
O O
RE
GI
ST
ER
ED
ARCHI TECTURAL C
RP
RATION
CERT. NO.
YA
TE
S-
CH
RE
SCO #22-25351-02A
NCCCS #2692
S:
\R ev it
Lo ca l F ile s\
9.
R
C C
C B ui ld in g
S2
Re no va tio ns _b illh yc ha rc h.
co m
.rv t
4/
/2
6:
:3
PM
22219.00
THIRD LEVEL
REFLECTED CEILING
PLAN - DEMOLITION
AD203
CONSTRUCTION DOCUMENTS
04-08-24
AD203 3/16" = 1'-0"
1 THIRD LEVEL REFLECTED CEILING PLAN - DEMOLITION
disenhour Area Measurement 2,399.63 sf disenhour Area Measurement
289.45 sf disenhour Area Measurement
289.5 sf disenhour Area Measurement
207.42 sf disenhour Area Measurement
884.93 sf disenhour Area Measurement
874.93 sf disenhour Area Measurement 1,008.76 sf disenhour Area Measurement
885.03 sf disenhour Area Measurement 1,032.15 sf disenhour Area Measurement 1,853.87 sf disenhour Typewritten Text New ACT Tile Only In Blue Area disenhour Typewritten Text New ACT Grid and Tile In Yellow Area disenhour Area Measurement
81.73 sf disenhour Area Measurement
583.59 sf disenhour Area Measurement
602.39 sf disenhour Typewritten Text Price Pink Rooms as an Alternate
Facility Design Manual
Issue: November 15, 2020 College Standards Page 3-21 Revised: February 1, 2024
Level 3 This gypsum board finish is typically specified in appearance areas that will receive heavy or medium texture finishes before final painting or in areas where heavy-duty commercial-grade wallcoverings will be applied as the final decoration. Level 3 is not recommended for smooth wall designs or applications where light textures; non-continuous textures or lightweight wallcoverings will be applied. After wiping joints with a joint knife, leaving a thin layer of compound over all joints and interior angles, add a separate coat of joint compound over all joints and interior angles.
Cover fastener heads and accessories with two layers of joint compound.
Make sure the surface is smooth and free of tool marks.
Level 4 Finish Level 4 is typically specified in appearance areas where smooth wall designs are going to be decorated with flat paints, light textures or non-continuous textures or where wallcoverings will be applied. This level of finish is not recommended in spaces where non-flat or dark/deep-tone paints are going to be applied. As in previous levels, all joints and interior angles have tape embedded in the joint compound. After wiping joints with a joint knife, leaving a thin layer of compound over all joints, add two coats of joint compound over all flat joints. After wiping interior angles with a joint knife, leaving a thin layer of compound, add one separate coat of joint compound over interior angles. Cover fastener heads and accessories with three layers of joint compound. Make sure the surface is smooth and free of tool marks. If finishing glass mat or fiber-reinforced gypsum panels, check with the manufacturer for finishing recommendations.
Level 5 Gypsum board finishing Level 5 is typically specified in appearance areas where smooth wall designs are decorated with non-flat paints, glossy or decorative finishes, or dark/deep-tone paints or where critical lighting conditions occur. Level 5 provides a uniform surface and minimizes the possibility of joint photographing and/or fasteners showing through the final decoration. In Level 5, all joints and interior angles have tape embedded in the joint compound. All joints are then wiped with a joint knife, leaving a thin layer of compound over all joints and interior angles. Add two coats of joint compound over all flat joints. Add one coat of joint compound over interior angles. Cover fastener heads and accessories with three coats of joint compound. Apply a skim coat of joint compound or material manufactured for this purpose to the entire surface. Make sure the surface is smooth and free of tool marks.
3.9.2. Acoustical Tile Ceilings
Acoustical tile ceilings shall be exposed grid, lay-in system. Acoustical tiles shall be two feet square (2’x2’) lay-in tiles composed of non-combustible materials.
3.9.2.1. The standard Acoustical ceiling tile suspension systems shall be wide faces, double web, steel which are hot-dip galvanized with prefinished 15/16” flanges. They shall be rated for intermediate duty. Color: White. Acceptable manufacturers are Armstrong, USG, and Chicago Metallic Corporation.
3.9.2.2. The standard acoustical ceiling tiles shall be ¾” thick, white, mineral based, treated with mold/mildew inhibitor. They shall have a reflectance of no less than LR 0.83, with a Noise Reduction Coefficient (NRC) of 0.70, and a Ceiling Attenuation Class on not less than 40 Armstrong Tundra, medium texture with tegular edge shall be the basis of design. Acceptable
Facility Design Manual
Issue: November 15, 2020 College Standards Page 3-22 Revised: February 1, 2024 manufacturers are Armstrong, USG, and CertainTeed. 3.9.2.1. USG Frost™ ClimaPlus™ #414, 2'x2'x3/4", Shadowline Edge with Bevel – Flat White 050.
3.9.2.3. Open Office and Collaboration spaces will have ceilings with high NRC and CAC characteristics.
3.9.2.4. Class A “Fire-Rated” materials shall be specified to complete a UL fire-rated ceiling system for fire protection of structural components, where fire-rated assembly is required by Code.
3.9.3. Flooring
The following materials are preferred at the locations indicated:
3.9.3.1. Terrazzo or non-slip porcelain tile – high traffic areas such as lobbies and corridors.
At ornamental stairs, treads and risers shall match the adjacent materials with non-slip nosings.
3.9.3.2. Luxury Vinyl Tile (LVT) – low traffic lobbies and corridors, general purpose rooms, labs, classrooms where appropriate.
3.9.3.3. Carpet Tile – offices, conference rooms, auditorium aisles (with permanent seating), lounges, classrooms as appropriate, music or language listening rooms.
3.9.3.4. Porcelain Tile – restroom, bathrooms and showers.
3.9.3.5. Quarry Tile or Anti-bacterial Cement – food service areas.
3.9.3.6. Sealed Concrete – mechanical rooms, storage rooms, custodial rooms.
3.9.3.7. Raised, Removable Panels supported on interconnecting grids and pedestals, providing an under-floor plenum for air distribution and utilities may be utilized in Server Rooms, and other appropriate spaces.
3.9.3.8. Steel Trowel Finish Concrete – treads and risers with non-slip nosings for service and egress stairs.
3.9.3.9. Walk- off Carpet Tiles - building entrances.
3.9.4. Tile Carpeting
All carpet shall be selected from the North Carolina Qualified Products List (QPL) established by the State Purchasing Department.
Light colors (such as white, yellow, or gold) and solid colors which immediately show all traffic patterns and any stain must be avoided.
All carpet to be 24” x 24” tiles to facilitate replacement of damaged carpet and storage of attic stock.
Use of broadloom carpet must be approved by the College.
All newly carpeted areas shall be appropriately covered with plastic or brown paper to protect the carpet from construction debris. Carpet shall be in clean, like new condition when turned over to the College.
Tile carpeting with a hard composition backing, but not containing PVC, is preferred for public spaces where floor access is desirable and for ease of repair. A mixed pattern with high soil and stain hiding capabilities is preferred.
3.9.4.1. Carpet Specification Requirements
File details come from the government source that posted it. Updated .