This is Addendum #2 to Request for Proposals (RFP) #25-142-PSC issued by the Eugene Water and Electric Board (EWEB) for Stone Creek Environmental Compliance Monitoring services on the Oak Grove Fork of the Clackamas River in Oregon. The addendum clarifies that EWEB is open to alternative approaches for completing the work, including new technologies and real-time data access solutions, which proposers should describe in detail in Section 5.1 of their responses. The addendum also provides the most recent Stone Creek Project Article 103 and Fish Screen Maintenance Compliance Report for the period of July 1 through December 31, 2024, prepared by River Design Group, Inc. and SWCA Environmental Consultants. Additional discharge measurement reports and gage data will be provided via a subsequent Addendum #3. A material change to the RFP scoring criteria has been made: the first evaluation criterion in Section 4 has been corrected from "Project Understanding" to "Company Experience," maintaining the same value of 30 points. The closing date and time for proposal submission remain unchanged at August 27, 2025.
The compliance report documents EWEB's fulfillment of Federal Energy Regulatory Commission (FERC) License requirements under Articles 103 and 408, demonstrating minimum streamflow verification and fish screen maintenance activities throughout the third and fourth quarters of 2024. Streamflow monitoring occurred at two locations using digital gage height records and position analog transmitters, with mean daily streamflow maintained above required minimums at both the Diversion Gage and Powerhouse Gage. Fish screens were checked and cleaned weekly or more frequently, with debris accumulation generally moderate except during October's leaf fall and December's high flow events, totaling approximately 1 to 15 shovel loads per cleaning event. No fish were found in removed debris, and screen blockages were limited to short periods, with 95 percent of discharge records meeting USGS accuracy standards within 10 percent. Rating Curve #21 was used for Q3 and Q4 2024 compliance verification, and new Rating Curve #22 incorporates additional discharge measurements from September and November 2024 for use in Q1 and Q2 2025.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
August 14, 2025
ADDENDUM # 2
Title: Stone Creek Environmental Compliance Monitoring
RFP # 25-142-PSC
This addendum adds additional information to the original RFP document.
QUESTION & ANSWER
1. Is EWEB open to discussions about alternative approaches such as [real-time data access etc.]?
Response: Very much so. In Section 5.1 Company Experience, one of the questions to respond to is “Describe anticipated approach to completing the work.” You should discuss at least one solid approach to completing the work, but feel free to talk about any new ideas, new technology, etc.
here, as possible alternatives to your core approach. Provide enough detail to allow EWEB to determine whether alternative approaches are realistically viable.
2. Can you please provide the following documents:
a. the most recent semi-annual Stone Creek Project Article 103 and Fish Screen Maintenance Compliance Report
b. A copy of recent gage and flow monitoring reports / a file of discharge measurements for each of the gages, including date, time, stage, discharge, method and preferably over the history of the gages at their current location
Response: Per 2.a., the most recent compliance report is attached here. Per 2.b., we will see what we can release via Addendum #3.
CHANGES TO RFP DOCUMENT
In Section 4, the first criteria listed for scoring the RFP responses is “Project Understanding”. This is incorrect. Please replace with “Company Experience”. Points remain the same (30 pts).
CLOSING DATE AND TIME: August 27, 2025
Remains unchanged.
This addendum constitutes a MATERIAL CHANGE to the Request for Proposals.
Addendum prepared by:
Sandra Hahn
Purchasing Analyst
Second Half 2024 Compliance Report
Stone Creek Hydroelectric Project
(FERC 5264-OR)
Article 103 and 408 Semi-Annual Environmental Compliance Report
July 1 – December 31, 2024
Prepared for
Eugene Water and Electric Board 4200 Roosevelt Operations Center Eugene, Oregon 97402
Prepared by
River Design Group, Inc.
SWCA Environmental Consultants 311 SW Jefferson Avenue Corvallis, Oregon 97333 www.swca.com
February 28, 2025
Stone Creek Hydroelectric Project FERC 5264-OR www.swca.com i February 2025
Executive Summary
The Eugene Water and Electric Board (EWEB) owns and operates the Stone Creek Hydroelectric Project (Stone Creek Project, P-5264), located on the Oak Grove Fork of the Clackamas River. Per the Federal Energy Regulatory Commission (FERC) Operating License, EWEB is required to comply with minimum streamflow verification (Article 103) and fish screen cleaning (Article 408) and report these activities on a semi-annual (i.e., twice per year) basis. This report details Article 103 and 408 compliance activities from July 1 to December 31, 2024.
Minimum flow verification occurred for the third and fourth quarters of 2024 by evaluating digital records collected from position analog transmitters (PAT) maintained at stream gages located below the Stone Creek Project Diversion and above the Stone Creek Powerhouse. Mean daily streamflow at the Diversion Gage and the Powerhouse Gage was checked for compliance using Rating Curve #21 and was maintained above the required minimums throughout the period (Attachment 1).
Most of the digital data record for the third and fourth quarters were complete. The following digital records (collected every 15 minutes) were missing from the database:
• July 3 - 7:15 to 8:15; 11 - 15:45
• August 11 - 4:15
• October 7 - 9:15; 22 - 15:30; 26 - 4:15; 29 - 20:15
• December 6 - 0:30; 8 - 19:45; 17 - 13:15; 21 - 14:30
The missing data points were augmented by linearly interpolating gage height and diverted flow records from adjacent data points in the digital record.
Overall, the gage height record was complete for both gages during the monitoring period between July 1 and December 31, 2024. The flow record for this period is considered to be of good reliability. U.S.
Geological Survey criteria for a “good” streamflow record require that 95 percent of the discharge records are accurate within 10 percent.
Additional field discharge measurements were collected in September and November 2024, and then used to develop Rating Curve #22, which is to be used for Q1 and Q2 of 2025.
Fish screens were checked and cleaned on a weekly or more frequent basis (Attachment 3). Debris accumulation was generally moderate during the reporting period with the highest accumulations occurring in October due to leaf fall and elevated streamflow. Debris was effectively removed, and any screen blockages were limited to a short period of time. No fish were found in the debris that was removed from the screens.
www.swca.com ii February 2025
Table of Contents
Executive Summary................................................................................................. i
1 Introduction
2 Stone Creek Diversion and Powerhouse Streamflow Monitoring
2.1 Introduction
2.2 Methods
2.2.1 Below Stone Creek Diversion Gaging Station
2.2.2 Above Stone Creek Powerhouse Gaging Station
2.3 Results
2.3.1 Diversion Gage
2.3.2 Powerhouse Gage
3 Fish Screen Maintenance Reporting
3.1 Introduction
3.2 Methods
3.3 Results
4 Summary
Attachment 1
Attachment 2
Attachment 3
Attachment 4 www.swca.com 1 February 2025
1 Introduction
The Eugene Water and Electric Board (EWEB) owns and operates the Stone Creek Hydroelectric Project (Stone Creek Project, P-5264). EWEB retained River Design Group, Inc. (RDG), now part of SWCA, Inc. to conduct routine compliance monitoring and reporting activities as required under Articles 103 and 408 of the Project’s Federal Energy Regulatory Commission (FERC) License (FERC 5264-OR). Under these two articles respectively, it is specified that EWEB must 1) monitor and verify minimum stream flows of the Oak Grove Fork of the Clackamas River (Figure 1-1) during project operation, and 2) provide monthly reports of fish screen maintenance and cleaning activities at the intake structure. Monitoring reports are required semi-annually. This report covers the period from July 1 to December 31, 2024.
Figure 1-1. Vicinity map of the Stone Creek Diversion and Powerhouse area on the Oak Grove Fork of the Clackamas River. Inset maps for the Powerhouse (A) and Diversion (B) are included. Approximate gage locations and cross-sections where discharge was measured (Q XS) are marked by red circle and line.
www.swca.com 2 February 2025
2 Stone Creek Diversion and Powerhouse Streamflow Monitoring
2.1 Introduction
As required by Article 103 of the Stone Creek Project License (FERC 5264-OR); EWEB must monitor and verify minimum streamflow of the Oak Grove Fork of the Clackamas River during project operation. EWEB has developed a FERC-approved streamflow monitoring plan to verify that streamflow immediately below the diversion does not drop below established required minimums and accretion within the diversion reach meets monthly assumed target values (Table 2-1).
Table 2-1. Mean monthly minimum streamflow requirements for the Stone Creek Project.
Month
Required Diversion Release
Assumed Accretion
Rate
Target Mean Powerhouse Flows with Full Assumed
Accretion
90% of Assumed Accretion
Target Mean Powerhouse Flows with 90% of Assumed Accretion
Jan 30 104 134 94 124
Feb 30 98 128 88 118
Mar 30 93 123 84 114
Apr 30 104 134 94 124
May 30 111 141 100 130
Jun 30 92 122 83 113
July 40 76 116 68 108
Aug 40 74 114 67 107
Sep 40 73 113 66 106
Oct 40 76 116 68 108
Nov 30 84 114 76 106
Dec 30 97 127 87 117
2.2 Methods
For the third and fourth quarters of 2024, minimum streamflow was verified using a combination of digital gage height and streamflow diversion records taken from two locations near the diversion structure and the powerhouse. Gage heights and streamflow diversions were measured every 30 minutes and electronically stored for evaluation and verification of project compliance with minimum streamflow requirements outlined in Table 2-1.
Continuous analog streamflow recorders (gages) have been in operation at their required locations since commencement of commercial operation on January 24, 1994. The gages are operated and maintained according to U.S. Geological Survey (USGS) standards with rating curve calibration and recorder servicing on an 8-week schedule. The Stone Creek Diversion is located upstream of the Diversion Gage and the Stone Creek Powerhouse is downstream of the Powerhouse Gage. Definition of streamflow variables, their location, and how they were calculated is given in (Figure 2-1).
www.swca.com 3 February 2025
2.2.1 Below Stone Creek Diversion Gaging Station
The base gage stilling well and instrument shelter are located on the right bank of the Oak Grove Fork Clackamas River approximately 200 feet downstream from the Stone Creek Diversion weir (Figure 2-2; see Figure 1-1 for relative location). The shelter houses a Stevens Type A-71 analog strip chart recorder and a Stevens Position Analog Transmitter (PAT). The gage is referenced to an enameled gage section in the well. An outside enameled section serves as a verification gage. Water level readings are transmitted to a computer in the powerhouse at one-half hour intervals. The gage monitors flow levels that bypass the Stone Creek Diversion.
Figure 2-2. Stone Creek Below Diversion Gage in June 2022. View is from approximately the center of the channel looking downstream.
Figure 2-1. Flow routing diagram and variable definition for the Stone Creek hydroelectric project, where TL is Timothy Lake, QAbvDiv is the calculated discharge above the diversion weir, QDiv is the measured diverted discharge also referred to as penstock flow (QPenstock), QBlwDiv is discharge below the diversion calculated from the rating curve also referred to as bypass flow (QBypass), Qaccr is the calculated accretion flow, QAbvPH is discharge above the powerhouse calculated from the rating curve, and QBlwPH is the calculated discharge below the powerhouse.
www.swca.com 4 February 2025
This gage was installed at this site on November 16, 1994, but it was not go on-line until February 12, 1995. The record had previously been provided by a pressure transducer gage at the diversion works.
Larry Hubbard, Michael Barclay, and Jed Huff surveyed water surface and gage levels at an arbitrary datum at the downstream gage on September 16, 1993. This datum was adjusted by plus 0.14 feet when the gage was installed on November 16, 1994. Peter Gruendike and Jack Zunka of RDG completed a topographic survey of the gage site and monumented discharge cross section on August 30, 2022. A combination of real time kinematic (RTK) GPS and total station was used to establish real-world elevations for the gage datum and water surface elevations. Figure 2-3 includes a plot of the completed topographic survey and reference water surface elevations at the gage discharge section.
Figure 2-3. Cross-section plot of ground survey of the Below Diversion gage discharge section (looking downstream). The black line represents the ground survey, and the blue and red lines represent the water surface elevations associated with the 30 cfs and 40 cfs compliance flows, respectively.
Stilling well water levels are transmitted to the computer at the Stone Creek Powerhouse. The analog chart recorder is used for verification and backup. There were 11 missing digital records for this monitoring period that were augmented by interpolating from adjacent data points. All the missing records were a single measurement, except for July 3 which had 1 hour of missing data. The gage height record is complete for the monitoring period.
Discharge data were collected at the cross-section located approximately 25 feet downstream of the Diversion Gage using a Sontek RS5 Acoustic Doppler Current Profiler (ADCP). The measurement cross-section is in approximately the same location as the former section used for discharge measurements prior to 2021. The ADCP unit was mounted to a hydroboard and tethered to a tag line and pulley system at the monumented cross-section location. The RS5 has a differential GPS unit that allows for accurate positioning and track reference to ensure consistent measurement distances at the monitoring section.
The RS5 also connects via Bluetooth to a streamside tablet that allows tracking velocity measurements and streamflow calculations in real-time through the RSQ software platform. Measurement statistics were summarized for each transect allowing the operator to determine if additional measurements are needed to minimize streamflow estimate error. A minimum of ten discharge measurements were collected per cross-section during each data collection to maximize measurement accuracy. In post-processing, any major outlier measurements were discarded, and then the mean discharge measurement was calculated and reported for the final discharge for the data collection event. The mean discharge was calculated from www.swca.com 5 February 2025 a minimum of eight individual discharge measurements from each data collection event. Figure 2-4 includes a graphical representation of channel velocities and the summary statistics for the ten discharge measurements taken at the Diversion Gage cross-section on April 5, 2022.
Figure 2-4. Example RSQ program output from a stream discharge measurement at the Stone Creek Below Diversion gage collected with RDG’s RS5 ADCP. The top graphic indicates water velocity and channel depth.
The tabular data provides a summary of 10 discharge measurements collected at the monumented cross-section with the ADCP.
Gage height records are correlated to predicted stream discharges by applying a recent rating curve equation generated from a series of field discharge measurements. Stage-discharge Rating #21 (Table 2-2) was calculated using 61 flow measurements from January 2009 through April 2024 and has an R2 value of
0.9756 and is used to check compliance in the third and fourth quarters of 2024. Each measurement in Rating #21 plotted less than ± 10% difference. Two additional discharge measurements were collected during the third and fourth quarter monitoring periods on September 6 and November 5, 2024. Two of these measurements were incorporated into Rating #22, which has an R2 value of 0.9740 and is used to calculate discharge in the first and second quarters of 2025 and is included herein in Attachment 3.
2.2.2 Above Stone Creek Powerhouse Gaging Station
The Above Powerhouse Gage is located approximately 150 feet upstream of the powerhouse on the right bank of the Oak Grove Fork Clackamas River (Figure 2-5; see Figure 1-1 for relative location). The base gage is a Stevens Type A-71 chart recorder driven by a float and pulley system housed in a plywood shelter over a corrugated pipe stilling well. The gage is referenced to an enameled gage section inside the well.
An outside enameled gage section serves as a verification gage. The chart recorder is linked with a Stevens PAT which transmits one-half hour water level data to the powerhouse computer. EWEB installed a redundant Campbell Scientific CS-451 pressure transducer in the gage stilling well in the fourth quarter of 2023. The gage monitors water levels of flow upstream from where the diversion flow re-enters the river at the Stone Creek Powerhouse. The hydraulic control for the gage was severely scoured by high flows in February 1996. A large log was placed on the scoured control in the stream to repair the scour damage and re-establish a stable gage pool in August 1999.
www.swca.com 6 February 2025
Figure 2-5. The Stone Creek Above Powerhouse Gage in January 2022. View is from the right bank of the Oak Grove Fork Clackamas River, looking from downstream to upstream.
The gage was installed at an arbitrary datum. Peter Gruendike and Jack Zunka of RDG completed a topographic survey of the gage site and monumented discharge cross section on August 30, 2022. A combination of real time kinematic (RTK) GPS and total station was used to establish real-world elevations for the gage datum and water surface elevations. Figure 2-6 includes a plot of the completed topographic survey and reference water surface elevations at the gage discharge section.
The stilling well water levels are transmitted to the computer at the Stone Creek Powerhouse and provide the primary water level record. A difference of greater than 0.2 feet in measurements between the two redundant instruments in the stilling well initiates an alarm at the powerhouse. The analog chart recorder is used for data verification and back-up. There were two missing digital records for this monitoring period that were augmented by interpolating from adjacent data points.
www.swca.com 7 February 2025
Figure 2-6. Cross-section plot of ground survey of the Above Powerhouse gage discharge section (looking downstream). The black line represents the ground survey, and the blue and red lines represent the water surface elevations associated with the 106 cfs and 125 cfs compliance flows, respectively.
Beginning on September 2nd, 2021, discharge data have been collected at a cross-section established directly adjacent to the Powerhouse Gage using an ADCP. This cross-section location is approximately 250 feet downstream of the measurement cross-section used prior to September 2021. The newly established cross-section is more difficult to wade, but has adequate depths for the ADCP, and likely results in more consistent and accurate measurements than the previous section location. The methodology for collecting discharge data at the Powerhouse location is the same as described above for the Diversion location.
Figure 2-7 includes a graphical representation of channel velocities and the summary statistics for the 12 transect measurements collected at the Powerhouse Gage cross-section on September 2, 2021.
Figure 2-7. Example RSQ program output from a stream discharge measurement at the Stone Creek Above Powerhouse gage collected with RDG’s RS5 ADCP. The top graphic indicates water velocity and channel depth.
The tabular data provides a summary of 12 discharge measurements collected at the monumented cross-section with the ADCP.
Stage-discharge Rating #21 was used to calculate predicted discharge for the digital gage height records.
Rating #21 was calculated using 48 measurements from October 2010 through June 2024 with an R2 value www.swca.com 8 February 2025 of 0.9583. Rating #21 was used to check compliance in the third and fourth quarters of 2024. Each measurement in the rating curve plotted less than ± 10% difference. Two additional discharge measurements were collected during the third and fourth quarter monitoring periods on September 6 and November 5, 2024. These measurements were incorporated into Rating #22, which has an R2 value of 0.9427 and is used to calculate discharge in the first and second quarters of 2025 and is included herein in Attachment 3.
2.3 Results
Minimum streamflow verification occurred for the third and fourth quarters of 2024 by evaluating digital records as well as paper chart records collected from position analog transmitters (PAT) maintained at stream gages located below the Stone Creek Project Diversion and above the Stone Creek Powerhouse.
The results of stream gage monitoring of the Oak Grove Fork of the Clackamas River for July 1, 2024, through December 31, 2024, at the sites below the Stone Creek Diversion and above the Stone Creek Powerhouse are presented below.
Most of the digital data record for the third and fourth quarters were complete. The following digital records (collected every 15 minutes) were missing from the database:
• July 3 - 7:15 to 8:15; 11 - 15:45
• August 11 - 4:15
• October 7 - 9:15; 22 - 15:30; 26 - 4:15; 29 - 20:15
• December 6 - 0:30; 8 - 19:45; 17 - 13:15; 21 - 14:30
The missing data points were augmented by linearly interpolating gage height and diverted flow records from adjacent data points in the digital record.
Mean daily streamflow at both the Diversion and Powerhouse gages were maintained above the required minimums throughout the period (Attachment 1).
Overall, the gage height record was complete for both gages during the monitoring period between July 1 and December 31, 2024. The flow record for this period is considered to be of good reliability. USGS criteria for a “good” stream flow record require that 95 percent of the discharge records are accurate within 10 percent.
An overview of the average daily hydrograph is presented in Figure 2-8 and Figure 2-9. The diverted discharge (i.e., penstock flow) was not reported in Q3 and Q4, so the discharges above the diversion and below powerhouse were not able to be calculated.
2.3.1 Diversion Gage
The Diversion Gage operated properly during the monitoring period. Streamflow records were computed by applying discharge directly from Rating #21 (Table 2-2). Additional flow measurements were taken in September and November during Q3 and Q4 of 2024, and these measurements were incorporated into Rating #22 for Q1 and Q2 for 2025. The flow record for this period is considered to be of good reliability.
Stream flows at the Diversion Gage were maintained above the target minimums for all of Q3 and Q4.
www.swca.com 9 February 2025
Figure 2-8 and Figure 2-9 include the Q3 and Q4 hydrographs, respectively, for the two gages. Table 2-2 includes the rating table for the Diversion Gage and monthly mean and minimum daily stream flow tables are included in Attachment 1. A summary of recent discharge measurements is included in Attachment 2.
A sediment wedge, sourced from gravel augmentation operations downstream of the diversion, has migrated into the Diversion Gage area during recent high flow events. Gravels associated with the sediment wedge have filled in around the large clasts at the gage site and could impact current and future rating tables. The sediment wedge will be monitored, and measurement adjustments will be made if needed to maintain the rating curve.
2.3.2 Powerhouse Gage
The Powerhouse Gage operated properly during the monitoring period. Streamflow records were computed by applying discharge directly from Rating #21 ( www.swca.com 10 February 2025
Table 2-3). Additional flow measurements were taken in September and November during the Q3 and Q4 of 2024 and were incorporated into Rating #22 for Q1 and Q2 for 2025. The flow record for this period is considered to be of good reliability. Streamflow at the Powerhouse Gage was maintained above the target for all of Q1 and Q2.
Figure 2-8 and Figure 2-9 include the Q3 and Q4 hydrographs, respectively, for the two gages. Table 2-3 includes the rating table for the Powerhouse Gage and monthly mean and minimum daily stream flow tables are included in Attachment 1. A summary of recent discharge measurements is included in Attachment 2.
www.swca.com 11 February 2025
Figure 2-8. Stone Creek daily average discharge hydrograph for Q3, 2024. Diverted Q was not reported in Q3.
www.swca.com 12 February 2025
Figure 2-9. Stone Creek daily average discharge hydrograph for Q4, 2024. Diverted Q was not reported in Q4.
www.swca.com 13 February 2025
Table 2-2. Discharge rating #21 for Oak Grove Fork below Stone Creek Diversion used for 2024 Q3 and Q4.
www.swca.com 14 February 2025
Table 2-3. Discharge rating #21 for Oak Grove Fork above Stone Creek Powerhouse used for 2024 Q3 and Q4.
www.swca.com 15 February 2025
3 Fish Screen Maintenance Reporting
3.1 Introduction
The Eugene Water and Electric Board (EWEB) owns and operates the Stone Creek Hydroelectric Project (Stone Creek Project, P-5264). As required by Article 408 of the Stone Creek Project Federal Energy Regulatory Commission (FERC) License (P-5264); EWEB must provide monthly reports of fish screen maintenance and cleaning activities at the intake structure. These reports are to include the following information: 1) dates and times of screen maintenance; 2) amount of debris on the screen; and 3) the type of debris on the screen. Fish screen monitoring reports are required semi-annually.
3.2 Methods
Fish screens are typically checked and cleaned at least once per week. Screens are not cleaned during times when streamflow was not being diverted. Approximate volume and composition of debris removed is recorded in the daily screen maintenance logs. The screen maintenance logs for July through December 2024 are provided in Attachment 3: Stone Creek Debris Removal Reports.
3.3 Results
Debris accumulation was generally moderate during the winter and spring months, with screen blockages ranging from 9 to 33 percent between July and December 2024. Highest debris accumulations were typically associated with high leaf loads in September and October and then high flows from storm events in December. Screens were cleaned frequently during this time period, with up to 15 shovel loads of debris removed per day. Screens were cleaned at least once per week throughout the compliance period.
Debris accumulated on the screens was typically comprised of detritus and aquatic weeds. No fish were found in the debris that was removed from the screens.
4 Summary
EWEB owns and operates the Stone Creek Hydroelectric Project (Stone Creek Project, P-5264). EWEB retained RDG to conduct routine compliance monitoring and reporting activities as required under Articles 103 and 408 of the Project’s FERC License (FERC 5264-OR). Under these two articles respectively, EWEB must 1) monitor and verify minimum streamflow of the Oak Grove Fork of the Clackamas River during project operation, and 2) provide monthly reports of fish screen maintenance and cleaning activities at the intake structure. This required semi-annual monitoring report covers the period from July 1, 2024, through December 31, 2024 (Q3 and Q4).
Minimum streamflow was verified using a combination of digital gage height and streamflow diversion records taken from two locations near the diversion structure and the powerhouse. Streamflow at the Diversion and Powerhouse gages were maintained above the target minimums throughout the period and thereby are compliant with Article 103 of the license conditions of FERC 5264-OR.
Fish screens were typically checked and cleaned on a weekly or more frequent basis, with the exception of times when site access was limited or during times when flow was not being diverted. Debris accumulation was generally moderate, with higher debris loads occurring during storms and high flow www.swca.com 16 February 2025 events. Debris was effectively removed, and any screen blockages were limited to a short period of time.
No fish were found in the debris that was removed from the screens. Monthly fish screen reports are provided in compliance with Article 408 of license conditions of FERC 5264-OR.
www.swca.com A-1 February 2025
Attachment 1
Oak Grove Fork and Stone Creek Diversion
Daily Streamflow Data www.swca.com A-2 February 2025 www.swca.com A-3 February 2025 www.swca.com A-4 February 2025 www.swca.com A-5 February 2025 www.swca.com A-6 February 2025 www.swca.com A-7 February 2025 www.swca.com A-8 February 2025
Attachment 2
Streamflow Measurement Summary Data www.swca.com A-9 February 2025 www.swca.com A-10 February 2025 www.swca.com A-11 February 2025
Attachment 3
Rating Curves #22 for 2025 Q1 and Q2 www.swca.com A-12 February 2025 www.swca.com A-13 February 2025 www.swca.com A-14 February 2025
Attachment 4
Stone Creek Debris Removal Reports
Month July
Date Time Total Time Type of Debris
Amount (Shovels)
Daily Total #1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 Total Before After Remarks - Status
1-Jul 13:00 1 Aquatic weeds 1.5 1.5 10% 11% 11% 8% 7% 7% 6% 6% 10% 10% 11% 9% 0.32 0.10 Cleaned 11-Jul 13:00 1 Aquatic weeds 1 1 11% 11% 10% 7% 7% 7% 6% 6% 12% 10% 11% 9% 0.25 0.10 Cleaned 18-Jul 13:00 1 Aquatic weeds 1 1 10% 11% 10% 7% 7% 7% 6% 6% 11% 12% 11% 9% 0.25 0.10 Cleaned 25-Jul 13:00 1 Aquatic weeds 1 1 11% 12% 11% 7% 7% 7% 6% 6% 13% 11% 11% 9% 0.25 0.10 Cleaned 30-Jul 13:00 1 Aquatic weeds 1 1 14% 12% 12% 7% 7% 7% 6% 7% 12% 12% 11% 10% 0.24 0.10 Cleaned
Screen #1 is next to the fence. Screen #11 is next to the fish ladder.
Screen DP
2024Year
Stone Creek Debris Removal Report
Screen Blockage
Month August
Total Time Type of Debris
Amount (Shovels)
Daily Total #1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 Total Before After Remarks - Status
1-Aug 13:00 1 Aquatic weeds 1 1 10% 11% 11% 8% 7% 7% 6% 6% 10% 10% 11% 9% 0.28 0.10 Cleaned 8-Aug 13:00 1 Aquatic weeds 1 1 11% 11% 10% 7% 7% 7% 6% 6% 12% 11% 11% 9% 0.26 0.10 Cleaned
14-Aug 13:00 1 Aquatic weeds 1 1 10% 11% 10% 7% 7% 7% 6% 6% 11% 12% 11% 9% 0.24 0.10 Cleaned 15-Aug 13:00 1 Aquatic weeds 3.5 3.5 28% 30% 31% 28% 30% 29% 29% 28% 34% 35% 33% 30% 0.90 0.21 Cleaned 25-Jul 13:00 1 Aquatic weeds 1 1 11% 12% 11% 7% 7% 7% 6% 6% 13% 11% 11% 9% 0.22 0.10 Cleaned 30-Jul 13:00 1 Aquatic weeds 1 1 14% 12% 12% 7% 7% 7% 6% 7% 12% 12% 11% 10% 0.22 0.10 Cleaned
Screen #1 is next to the fence. Screen #11 is next to the fish ladder.
Screen DP
2024Year
Month September
Total Time Type of Debris
Amount (Shovels)
Daily Total #1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 Total Before After Remarks - Status
2-Sep 13:00 1 Leaves 4 4 14% 15% 16% 8% 7% 7% 6% 11% 15% 14% 16% 12% 0.74 0.25 Cleaned 7-Sep 13:00 1 Leaves 5 5 14% 14% 15% 8% 8% 8% 6% 11% 11% 14% 16% 11% 0.78 0.24 Cleaned 8-Sep 13:00 1 Leaves 3 3 16% 16% 17% 14% 14% 11% 11% 11% 17% 17% 16% 15% 0.78 0.28 Cleaned
10-Sep 13:00 1 Leaves 4 4 17% 16% 18% 11% 9% 11% 9% 15% 15% 14% 16% 14% 0.77 0.27 Cleaned 12-Sep 13:00 1 Leaves 5 5 17% 20% 18% 11% 9% 11% 9% 16% 16% 17% 16% 15% 0.76 0.26 Cleaned 13-Sep 13:00 1 Leaves 3 3 18% 19% 18% 11% 12% 13% 12% 12% 18% 18% 17% 15% 0.81 0.25 Cleaned 14-Sep 13:00 1 Leaves 3 3 17% 17% 17% 7% 7% 7% 6% 6% 16% 15% 17% 12% 0.88 0.27 Cleaned 15-Sep 13:00 1 Leaves 3 3 21% 24% 26% 18% 17% 11% 11% 15% 27% 28% 27% 20% 0.86 0.25 Cleaned 16-Sep 13:00 1 Leaves 5 5 24% 25% 25% 15% 16% 16% 16% 17% 28% 23% 31% 21% 0.87 0.24 Cleaned 18-Sep 13:00 1 Leaves 4 4 26% 25% 27% 13% 13% 12% 11% 11% 28% 31% 31% 21% 0.89 0.22 Cleaned 19-Sep 13:00 1 Leaves 3.5 3.5 15% 15% 15% 11% 12% 12% 12% 12% 16% 16% 17% 14% 0.84 0.26 Cleaned 20-Sep 13:00 1 Leaves 3 3 17% 18% 18% 10% 11% 11% 12% 18% 19% 19% 20% 16% 0.90 0.25 Cleaned 21-Sep 13:00 1 Leaves 6 6 21% 24% 27% 12% 16% 16% 15% 28% 29% 31% 34% 23% 0.92 0.24 Cleaned 22-Sep 13:00 1 Leaves 5 5 22% 25% 27% 15% 15% 16% 16% 31% 30% 31% 33% 24% 0.95 0.23 Cleaned 23-Sep 13:00 1 Leaves 7 7 22% 26% 28% 14% 14% 12% 14% 30% 30% 31% 33% 23% 0.96 0.25 Cleaned 24-Sep 13:00 1 Leaves 6 6 25% 26% 29% 21% 21% 21% 21% 29% 30% 31% 33% 26% 0.94 0.22 Cleaned 25-Sep 13:00 1 Leaves 7 7 28% 28% 27% 22% 21% 21% 21% 31% 21% 26% 32% 25% 0.95 0.26 Cleaned 26-Sep 13:00 1 Leaves 6 6 26% 29% 33% 24% 24% 24% 25% 33% 33% 38% 38% 30% 0.96 0.21 Cleaned 27-Sep 13:00 1 Leaves 8 8 27% 31% 33% 24% 24% 24% 24% 35% 34% 35% 37% 30% 0.94 0.25 Cleaned 29-Sep 13:00 1 Leaves 7 7 28% 31% 33% 22% 22% 21% 21% 35% 36% 35% 37% 29% 0.95 0.27 Cleaned 30-Sep 13:00 1 Leaves 8 8 29% 35% 36% 17% 17% 17% 18% 34% 36% 37% 37% 28% 0.97 0.25 Cleaned
9/31/202413:00 1 Leaves 9 9 30% 29% 31% 17% 17% 17% 16% 33% 36% 36% 37% 27% 0.94 0.23 Cleaned Screen #1 is next to the fence. Screen #11 is next to the fish ladder.
Screen DP
2024Year
Month October
Total Time Type of Debris
Amount (Shovels)
Daily Total #1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 Total Before After Remarks - Status
3-Oct 13:00 1 Leaves 3 3 14% 15% 16% 8% 7% 7% 6% 11% 15% 14% 16% 12% 0.74 0.25 Cleaned 4-Oct 13:00 1 Leaves 12 12 23% 25% 28% 25% 25% 25% 25% 22% 31% 31% 31% 26% 0.78 0.24 Cleaned 6-Oct 13:00 1 Leaves 4 4 16% 16% 17% 14% 14% 17% 17% 17% 17% 17% 16% 16% 0.78 0.28 Cleaned 7-Oct 13:00 1 Leaves 3 3 17% 16% 18% 11% 16% 11% 16% 15% 15% 14% 16% 15% 0.77 0.27 Cleaned 8-Oct 13:00 1 Leaves 6 6 17% 20% 18% 11% 16% 11% 16% 16% 16% 17% 16% 16% 0.76 0.26 Cleaned 9-Oct 13:00 1 Leaves 5 5 18% 19% 18% 11% 12% 13% 12% 12% 18% 18% 17% 15% 0.81 0.25 Cleaned
10-Oct 13:00 1 Leaves 5 5 17% 17% 17% 16% 16% 15% 15% 15% 16% 15% 17% 16% 0.88 0.27 Cleaned 12-Oct 13:00 1 Leaves 6 6 21% 24% 26% 18% 17% 11% 11% 15% 27% 28% 27% 20% 0.86 0.25 Cleaned 13-Oct 13:00 1 Leaves 6 6 24% 25% 25% 15% 16% 16% 16% 17% 28% 23% 31% 21% 0.87 0.24 Cleaned 14-Oct 13:00 1 Leaves 10 10 26% 25% 27% 21% 22% 22% 31% 33% 33% 31% 31% 27% 0.89 0.22 Cleaned 15-Oct 13:00 1 Leaves 7 7 15% 15% 15% 11% 12% 12% 12% 12% 16% 16% 17% 14% 0.84 0.26 Cleaned 16-Oct 13:00 1 Leaves 12 12 25% 25% 25% 25% 24% 24% 25% 25% 25% 25% 25% 25% 0.90 0.25 Cleaned 17-Oct 13:00 1 Leaves 8 8 21% 24% 27% 12% 16% 16% 15% 28% 29% 31% 34% 23% 0.92 0.24 Cleaned 18-Oct 13:00 1 Leaves 8 8 22% 25% 27% 15% 15% 16% 16% 31% 30% 31% 33% 24% 0.95 0.23 Cleaned 19-Oct 13:00 1 Leaves 10 10 22% 26% 28% 14% 14% 12% 14% 30% 30% 31% 33% 23% 0.96 0.25 Cleaned 20-Oct 13:00 1 Leaves 15 15 31% 33% 33% 33% 28% 27% 27% 34% 34% 34% 34% 32% 0.94 0.22 Cleaned 21-Oct 13:00 1 Leaves 13 13 28% 28% 27% 22% 28% 28% 28% 31% 31% 13% 33% 27% 0.95 0.26 Cleaned 22-Oct 13:00 1 Leaves 11 11 26% 29% 33% 24% 24% 24% 25% 33% 33% 38% 38% 30% 0.96 0.21 Cleaned 23-Oct 13:00 1 Leaves 8 8 27% 31% 33% 24% 24% 24% 24% 35% 34% 35% 37% 30% 0.94 0.25 Cleaned 24-Oct 13:00 1 Leaves 14 14 36% 31% 31% 31% 31% 31% 31% 35% 36% 35% 37% 33% 0.95 0.27 Cleaned 25-Oct 13:00 1 Leaves 5 5 29% 35% 36% 17% 17% 17% 18% 34% 36% 37% 37% 28% 0.90 0.25 Cleaned 26-Oct 13:00 1 Leaves 4 4 21% 21% 21% 17% 16% 16% 16% 22% 2% 22% 22% 18% 0.90 0.25 Cleaned 27-Oct 13:00 1 Leaves 9 9 28% 22% 27% 22% 22% 22% 22% 22% 29% 30% 30% 25% 0.89 0.25 Cleaned 28-Oct 13:00 1 Leaves 5 5 26% 27% 25% 17% 17% 17% 17% 17% 21% 21% 21% 21% 0.91 0.24 Cleaned 29-Oct 13:00 1 Leaves 6 6 26% 26% 25% 21% 21% 16% 16% 16% 22% 22% 21% 21% 0.88 0.24 Cleaned 30-Oct 13:00 1 Leaves 5 5 22% 25% 22% 16% 16% 16% 16% 16% 22% 22% 21% 21% 0.88 0.24 Cleaned 31-Oct 13:00 1 Leaves 5 5 22% 29% 22% 17% 17% 17% 16% 22% 22% 22% 22% 21% 0.88 0.23 Cleaned
Screen #1 is next to the fence. Screen #11 is next to the fish ladder.
Screen DP
2024Year
Month November
Total Time Type of Debris
Amount (Shovels)
Daily Total #1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 Total Before After Remarks - Status
2-Nov 13:00 1 aquatic weeds 3 3 11% 11% 11% 8% 7% 7% 6% 11% 15% 14% 16% 11% 0.67 0.22 Cleaned 4-Nov 13:00 1 aquatic weeds 3 3 12% 12% 12% 12% 11% 11% 11% 11% 12% 12% 11% 12% 0.72 0.24 Cleaned 6-Nov 13:00 1 aquatic weeds 3 3 14% 14% 13% 13% 13% 13% 13% 13% 13% 13% 13% 13% 0.73 0.25 Cleaned 7-Nov 13:00 1 aquatic weeds 2 2 11% 11% 12% 12% 12% 11% 16% 12% 12% 12% 12% 12% 0.72 0.22 Cleaned
11-Nov 13:00 1 aquatic weeds 2 2 11% 11% 18% 11% 16% 11% 12% 12% 12% 12% 12% 13% 0.65 0.26 Cleaned 14-Nov 13:00 1 aquatic weeds 2 2 11% 11% 12% 11% 12% 13% 12% 12% 18% 18% 17% 13% 0.68 0.25 Cleaned 18-Nov 13:00 1 aquatic weeds 3 3 11% 14% 12% 13% 13% 13% 13% 13% 13% 13% 11% 13% 0.67 0.23 Cleaned 21-Nov 13:00 1 aquatic weeds 3 3 11% 11% 11% 11% 12% 12% 11% 15% 12% 12% 12% 12% 0.69 0.22 Cleaned 26-Nov 13:00 1 aquatic weeds 2 2 11% 12% 12% 12% 12% 16% 16% 17% 16% 15% 12% 14% 0.65 0.20 Cleaned
Screen #1 is next to the fence. Screen #11 is next to the fish ladder.
Screen DP
2024Year
Month December
Total Time Type of Debris
Amount (Shovels)
Daily Total #1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 Total Before After Remarks - Status
2-Dec 13:00 1 aquatic weeds 2 2 11% 11% 11% 10% 10% 10% 10% 11% 15% 14% 16% 12% 0.67 0.22 Cleaned 9-Dec 13:00 1 aquatic weeds 3 3 13% 14% 13% 12% 11% 11% 11% 11% 12% 12% 11% 12% 0.72 0.24 Cleaned 12-Dec 13:00 1 aquatic weeds 2 2 14% 14% 13% 13% 13% 13% 13% 13% 13% 13% 13% 13% 0.73 0.25 Cleaned 16-Dec 13:00 1 aquatic weeds 2 2 12% 12% 12% 12% 12% 11% 16% 12% 12% 12% 12% 12% 0.72 0.22 Cleaned 19-Dec 13:00 1 aquatic weeds 3 3 14% 15% 18% 11% 16% 11% 12% 12% 12% 12% 12% 13% 0.65 0.26 Cleaned 23-Dec 13:00 1 aquatic weeds 4 4 19% 21% 22% 22% 21% 21% 21% 22% 22% 22% 22% 21% 0.88 0.56 Cleaned 25-Dec 13:00 1 aquatic weeds 8 8 23% 26% 27% 22% 22% 21% 32% 33% 33% 35% 31% 28% 0.95 0.48 Cleaned 26-Dec 13:00 1 aquatic weeds 9 9 29% 31% 32% 23% 26% 27% 25% 33% 34% 35% 33% 30% 1.01 0.38 Cleaned 28-Dec 13:00 1 aquatic weeds 9 9 31% 33% 33% 29% 31% 31% 31% 33% 34% 35% 33% 32% 0.95 0.41 Cleaned
Screen #1 is next to the fence. Screen #11 is next to the fish ladder.
Screen DP
2024Year
| Blank Page |
| RDG_EWEB Compliance Rpt 2024 July-Dec Q3Q4 Final.pdf |
| RDG_Compliance Rpt 2024 Jul-Dec DRAFT v2 |
| Executive Summary |
| 1 Introduction |
| 2 Stone Creek Diversion and Powerhouse Streamflow Monitoring |
| 2.1 Introduction |
| 2.2 Methods |
| 2.2.1 Below Stone Creek Diversion Gaging Station |
| 2.2.2 Above Stone Creek Powerhouse Gaging Station |
| 2.3 Results |
| 2.3.1 Diversion Gage |
| 2.3.2 Powerhouse Gage |
| 3 Fish Screen Maintenance Reporting |
| 3.1 Introduction |
| 3.2 Methods |
| 3.3 Results |
| 4 Summary |
| Attachment 1 |
| Attachment 2 |
| Attachment 3 |
| Attachment 4 |
| SCH Debris Logs Q3&Q4 2024 |
| SCH Debris Removal Report 24_7_31 |
| Sheet 1 |
| SCH Debris Removal Report 24_8_30 |
| Sheet 1 |
| SCH Debris Removal Report 24_9_30 |
| Sheet 1 |
| SCH Debris Removal Report 24_10_31 |
| Sheet 1 |
| SCH Debris Removal Report 24_11_26 |
| Sheet 1 |
| SCH Debris Removal Report 24_12_30 |
| Sheet 1 |