Addendum 2 - RFP 25-131-G Three Phase Network Transformers.pdf

PDF 168 KB Posted

Attached to
EWEB RFP 25-131 G Three Phase Network Transformers
Solicitation number
S-P00140-00014275
Issued by
Lane County, Oregon

About this file

Addendum #2 for RFP 25-131-G is issued by the Eugene Water & Electric Board (EWEB) for Three Phase Network Transformers. This addendum modifies the original bid documents by extending the bid submission deadline to 2:00 p.m. (PST) on Friday, August 22, 2025. The change constitutes a material modification to the original Request for Proposals, though bidders are not required to sign or return the addendum. The document is prepared by Kristin Kokkeler, Purchasing Analyst, with a copy to Tom Ossowski.

The addendum does not introduce any substantive changes to the technical specifications or scope of the original RFP. The primary purpose is to provide an updated bid submission timeline, potentially allowing bidders additional preparation time. The modification appears to be a standard procedural update common in complex procurement processes, particularly for specialized electrical infrastructure equipment like network transformers. The addendum maintains all other original bid terms and conditions, ensuring continuity in the procurement process for the specified electrical equipment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP 25-131-G Three Phase Network Transformers – Addendum #2

July 21, 2025

ADDENDUM #2

Three Phase Network Transformers

RFP 25-131-G

This addendum modifies the bidding document(s) for work only to the extent indicated herein.

All other areas not specifically mentioned or affected by this addendum shall remain in full force.

CLOSING DATE AND TIME

All references to the closing date and time are changed to the following:

Bid Submission no later than: 2:00 p.m. (PST); Friday, August 22, 2025

This addendum constitutes a MATERIAL CHANGE to the bid, but does not need to be signed or returned.

Addendum prepared by:

Kristin Kokkeler, Purchasing Analyst Cc: Tom Ossowski

End of Addendum