This document is Addendum #2 containing questions and answers for the 4700 Thomas & Brown Building Replacement project at New Mexico State University (NMSU). The document covers a wide range of technical and logistical inquiries from potential contractors, including specifications for Division 25 Integrated Automation, steel fabrication requirements, mechanical equipment schedules, demolition site access, building contents removal, staging area considerations, communications infrastructure, LEED certification details, automatic door operators, glazing and column cover specifications, and HVAC control conduit responsibilities.

Key points include the contractor being responsible for removing and disposing of furniture, equipment, and miscellaneous items from the building, coordinating site access and staging areas with NMSU, and clarifying various technical specifications through addendum updates. Several responses require contractors to coordinate directly with NMSU networking and facilities departments, and many technical details will be provided in subsequent addenda. The project appears to involve complex renovation or replacement work with specific requirements for sustainability (LEED certification), mechanical systems, glazing, and electrical infrastructure.

View the file

Other files

File Type Posted
NMSU Construction TC 3-19-24 UGC -- Clean Copy.pdf PDF
2318 Thomas and Brown Set.html HTML file
Addendum #2 - LEED v4 NC Scorecard_Docs Status_20241122.xlsx XLSX spreadsheet
ADDENDUM #1.pdf PDF
Subcontractor Listing.pdf PDF
Addendum #2.pdf PDF
BID Form rev 2.1.2024.pdf PDF
1270194-event.pdf PDF
Addendum #2 - LEED Req Info.xlsx XLSX spreadsheet
WAGE RATES.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. QUESTION: SECTION 25 - I am writing to inquire about the opportunity to submit a bid for Division 25 of Integrated Automation, specifically regarding temperature control valves, meters, and instrumentation. Could you please let us know when would be an appropriate time to present our offer? Additionally, if there is any manual or documentation available that outlines the requirements for this bid, we would greatly appreciate it if you could share it with us for review.

ANSWER: Email was sent to vendor on 11/1/2024 with instructions on how to access the bid documents.

2. QUESTION: AISC REQUIREMENT - Submitting for New Mexico steel. Fabricators NM Steel Fabricators is a non AISC steel fabricator. We have fabricated more complicated projects with conditions that periodic welding inspections be done by a certified welding inspector. Would New Mexico Steel Fabricators still be allowed to participate on this project with these conditions. Uriel Marquez Jr

ANSWER: see updated specifications requirements.

3. QUESTION: DISPLAY CASE - The keynote for the display case refers us to the millwork sheets. I'm not seeing any details for the display case. Please advise.

ANSWER: see additional millwork section provided for display case.

4. QUESTION: METAL LOCKERS - This specification is missing. Please provide more information on the lockers to be provided.

ANSWER: additional information provided.

5. QUESTION: MECH EQUIPMENT SCHEDULE - Page E-702 Mech equipment schedule shows ILP-4 being supplied by Div 26 but the rest are by other divisions and on page M-701 schedules it does not show any of the ILP units with supplied with starters or disconnects please advise.

ANSWER: Combo motor starter/disconnects are required for ILP-1 thru ILP-4 and are to be provided by the Div. 26 contractor. The pumps themselves are provided by Div. 23. See also KN# EP141(Sheet EP-401) and Div. 230549. Adjustments to the Electrical Connections Schedule (sheet E-702) will be issued by Addendum to re-align the scheduled notes to the correct corresponding equipment item.

6. QUESTION: DEMOLITION SITE VISIT - We’ve received requests from our demolition contractors to conduct a site visit to review the structure firsthand. Allowing them access to the site would be highly beneficial, as it would enable them to provide more accurate pricing and address any necessary safety precautions, especially given the close proximity of surrounding buildings. If a site visit isn’t feasible, please provide photos of the building interior and exterior to assist in their review.

ANSWER: Coordinate with NMSU

7. QUESTION: FOR BASIL GLASS INC-ON GLAZING - Please specify glazing color, SGHC and Visible Light Transmittance. There are many types of Low-E glazing please specify.

ANSWER: updated section provided with requested information.

8. BUILDING CONTENTS - There is a significant amount of leftover equipment, furniture, and miscellaneous items still in the building. Will NMSU be responsible for removing these items before the Notice to Proceed, or should the demolition contractor include their removal in their scope of work?

ANSWER: furniture, equipment, and misc. left over items to be removed and disposed of by contractor, see addendum 01.

9. QUESTION: STAGING AREA - Due to the requirements of this LEED project, including the need for multiple sorting dumpsters, a washout pit, and an area for recycling construction waste—the proposed area may not be sufficient. Additionally, the project will require an office trailer, portable toilets, storage containers and work truck parking. Is there an off-site location available for additional laydown space?

ANSWER: Contractor to coordinate with NMSU

10. QUESTION: SALVAGE - Are there any salvage items or equipment NMSU wants other than the lamp posts called out in the electrical documents? If so, will NMSU transport the items or should we figure delivering them to the physical plant or other location?

ANSWER: Salvage items as noted in the addendum 01.

11. QUESTION: COMMUNICATIONS - Please provide exact locations of IDF/MDF for communication terminations (fiber/ copper) in Goddard Hall, Foster Hall and Computer Center.

ANSWER: Coordinate with NMSU Networking department (Adrian Carnero acarnero@nmsu.edu). Termination is contingent on room naming and placement on as built basis. Room names and as built drawings are unavailable to the design team.

12. QUESTION: LEED SCORECARD - Please provide the LEED Scorecard for this project.

ANSWER: coordinate with NMSU

13. QUESTION: AUTO DOOR OPERATORS - What is the model and make of the automatic door operators. The hardware schedule refers us to section 08 7113 but is not in the documents.

ANSWER: additional information provided in addendum.

14. QUESTION: GLAZING AND COLUMN COVERS - • Is Tubelite an acceptable storefront and curtain wall manufacturer? • Is Class 1 Clear Anodized an acceptable finish for storefront and curtain wall frames. • Clarify what silicone sealant is to be used at exterior perimeter of aluminum storefront frames and curtain wall frames. • Clarify if the spandrel panels shown on frame types A, B, C, D, E, M, F1 should be an aluminum infill panel or if they should be an insulated unit with an opaci-coat. • Clarify what the color of tinted glass should be. • Clarify if 5" aluminum door stiles per specifications are to be used or if 8" Stiles per the drawings are to be used? • Are 10" bottom rails acceptable at aluminum entrances as they are ADA compliant? • Clarify if solar film will be required at all exterior storefront and curtain wall frames. • Clarify if opaque privacy film is to be used at curtain wall frame F1 only. • Clarify thickness and finish of column covers

ANSWER: additional information provided in addendum.

15. QUESTION: CONDUIT FOR HVAC CONTROLS - Is it the electricians responsibility to install all conduit per DrawingEP101Note EP04 FOR EACH UNIT, REFER TO SHEET SERIES "M-700" FOR MECHANICAL EQUIPMENT

CHARACTERISTICS. REFER TO SHEET E-702 FOR ELECTRICAL CONNECTION

AND OTHER INFORMATION

ANSWER: Conduit pathways and cabling for HVAC controls are the responsibility of the Div. 23/25 contractor(s) per MI series sheets and Div. 25 specifications. See also Div. 230549. Keyed Note EP04 and the Electrical Connection Schedule (E-702) are in regards to the Div. 26 electrical (power) connection characteristics for HVAC/Plumbing equipment.