Addendum #2 - LEED Req Info.xlsx

XLSX spreadsheet 146 KB Posted

Attached to
4700 Thomas & Brown Building Replacement
Solicitation number
2025-ITB-655
Issued by
New Mexico

About this file

Addendum #2 is a LEED certification document for the Thomas & Brown Building Replacement project in New Mexico, detailing required documentation and deliverables for achieving LEED Core & Shell certification. The document comprehensively tracks the status of various technical submissions including architectural drawings, site plans, mechanical and electrical plans, landscape and irrigation specifications, and supporting documentation such as material cost breakdowns, steel recycled content letters, and environmental control plans. Multiple deliverables are currently marked as "Pending", including site assessment worksheets, exterior lighting photometrics, steel cost documentation, and glass specifications.

The addendum indicates a structured approach to LEED certification, requiring extensive technical documentation across multiple project domains. Key pending items include SWPP (Stormwater Pollution Prevention) reports, monthly waste tickets, indoor air quality reports, and commissioning documentation for systems like HVAC, lighting, and electrical infrastructure. The project appears to require detailed evidence of sustainable design practices, material sourcing, and environmental compliance, with specific emphasis on recycled content verification, energy monitoring, and comprehensive systems documentation. While specific budget details are not fully disclosed, the document suggests a methodical process for tracking and verifying sustainable building practices throughout the construction process.

View the file

Other files

File Type Posted
Addendum #2 - Q&A.pdf PDF
NMSU Construction TC 3-19-24 UGC -- Clean Copy.pdf PDF
2318 Thomas and Brown Set.html HTML file
Addendum #2 - LEED v4 NC Scorecard_Docs Status_20241122.xlsx XLSX spreadsheet
ADDENDUM #1.pdf PDF
Subcontractor Listing.pdf PDF
Addendum #2.pdf PDF
BID Form rev 2.1.2024.pdf PDF
1270194-event.pdf PDF
WAGE RATES.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Thomas & Brown - NC Project
Documents, Information and Drawings for LEED Certification

LEED Required Deliverables Status Notes

Drawings
ArchitecturalReceivedInclude floor plans, sections and elevations
Finishes ScheduleReceivedInclude the name of the product and the manufacturer

EEI needs the manufacturer and model specified for the products and materials.

Render/ Perspective/ IsometricReceivedA image or photo of the project
Site PlanReceivedA site plan showing the building footprint, parking spaces, roadways, site entrance and scale ruler
Site Survey (Civil Plans)PendingThe survey or assessment should show the existing conditions: hydrology, topography, soils, and existing vegetation.
Lanscape & IrrigationReceivedSpecify species and type of irrigation
ElectricalReceivedInclude plans, schedule and submittals.
PlumbingReceivedInclude plans, schedule and submittals.

Please include the plumbing schedule and the water fixtures data sheet

MechanicalReceivedInclude plans, schedule and submittals.
Mechanical / Electrical / ControlReceivedMonitoring Device for OA fans (current transducers, airflow switches, or similar monitors for constant volume systems). Include wiring diagram and device submittal.

Data sheet is still pending

Exterior Ligthing PhotometricsPendingInclude vertical and horizontal photometric analysis and/or BUG specifications for lighting fixtures
Exterior Ligthing (w/ schedule)PendingInclude plans, schedule and submittals.
Interor LightingReceivedInclude plans, schedule and submittals.
Info & Documents
Project's SchedulePending
Site Assesment WorksheetPendingComplete: topography, hydrology, soils and vegetation
Integrative Process WorksheetReceivedComplete Energy and Water Sections
Total Materials' CostPendingFrom Div 3-10, hard cost, excluding labor
Steel CostPendingDivided by steel elements: beams, tube, deck, joist, etc.
Steel Recycled Content LettersPendingLetter from the manufacturer specifying the % of pre and post-consumer recycled content and indicating the fabricant facility.
Envelope's Glass SpecificationPendingProvide the glass/ window submittals
SWPP / ESC Control PlanPendingProvide a plan of the strategies
Reports
SWPP Reports (at least, monthly)PendingMonthly Reports
Waste Tickets (at least, monthly)PendingMonthly Reports
IAQ ReportsPendingProvide photos of the IAQ strategies during construction process
Substantial Completion
Coordinate LEED Commissioning (Cx) VisitPendingLEED Cx Visit performed by Rivion considered the following systems:

-HVAC systems and controls – GUH, EUH, Exhaust Fans, -Office RTUs -Lighting systems and controls -Electrical panels and distribution – visual inspection.

-Domestic Hot water production and fixtures

Test and Balance ReportPendingIs needed for the LEED Cx Visit
Factory or contractor start up checklistsPendingIs needed for the LEED Cx Visit

&G &"-,Bold" LEED Certification Core & Shell Projects

&G &"-,Bold"&10 LEED Certification New Construction image1.png

File details come from the government source that posted it. Updated .