Addendum #2 - LEED Req Info.xlsx
XLSX spreadsheet 146 KB Posted
- Attached to
- 4700 Thomas & Brown Building Replacement
- Solicitation number
- 2025-ITB-655
- Issued by
- New Mexico
About this file
Addendum #2 is a LEED certification document for the Thomas & Brown Building Replacement project in New Mexico, detailing required documentation and deliverables for achieving LEED Core & Shell certification. The document comprehensively tracks the status of various technical submissions including architectural drawings, site plans, mechanical and electrical plans, landscape and irrigation specifications, and supporting documentation such as material cost breakdowns, steel recycled content letters, and environmental control plans. Multiple deliverables are currently marked as "Pending", including site assessment worksheets, exterior lighting photometrics, steel cost documentation, and glass specifications.
The addendum indicates a structured approach to LEED certification, requiring extensive technical documentation across multiple project domains. Key pending items include SWPP (Stormwater Pollution Prevention) reports, monthly waste tickets, indoor air quality reports, and commissioning documentation for systems like HVAC, lighting, and electrical infrastructure. The project appears to require detailed evidence of sustainable design practices, material sourcing, and environmental compliance, with specific emphasis on recycled content verification, energy monitoring, and comprehensive systems documentation. While specific budget details are not fully disclosed, the document suggests a methodical process for tracking and verifying sustainable building practices throughout the construction process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum #2 - Q&A.pdf | ||
| NMSU Construction TC 3-19-24 UGC -- Clean Copy.pdf | ||
| 2318 Thomas and Brown Set.html | HTML file | |
| Addendum #2 - LEED v4 NC Scorecard_Docs Status_20241122.xlsx | XLSX spreadsheet | |
| ADDENDUM #1.pdf | ||
| Subcontractor Listing.pdf | ||
| Addendum #2.pdf | ||
| BID Form rev 2.1.2024.pdf | ||
| 1270194-event.pdf | ||
| WAGE RATES.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Thomas & Brown - NC Project |
| Documents, Information and Drawings for LEED Certification |
LEED Required Deliverables Status Notes
| Drawings | ||
| Architectural | Received | Include floor plans, sections and elevations |
| Finishes Schedule | Received | Include the name of the product and the manufacturer |
EEI needs the manufacturer and model specified for the products and materials.
| Render/ Perspective/ Isometric | Received | A image or photo of the project |
| Site Plan | Received | A site plan showing the building footprint, parking spaces, roadways, site entrance and scale ruler |
| Site Survey (Civil Plans) | Pending | The survey or assessment should show the existing conditions: hydrology, topography, soils, and existing vegetation. |
| Lanscape & Irrigation | Received | Specify species and type of irrigation |
| Electrical | Received | Include plans, schedule and submittals. |
| Plumbing | Received | Include plans, schedule and submittals. |
Please include the plumbing schedule and the water fixtures data sheet
| Mechanical | Received | Include plans, schedule and submittals. |
| Mechanical / Electrical / Control | Received | Monitoring Device for OA fans (current transducers, airflow switches, or similar monitors for constant volume systems). Include wiring diagram and device submittal. |
Data sheet is still pending
| Exterior Ligthing Photometrics | Pending | Include vertical and horizontal photometric analysis and/or BUG specifications for lighting fixtures |
| Exterior Ligthing (w/ schedule) | Pending | Include plans, schedule and submittals. |
| Interor Lighting | Received | Include plans, schedule and submittals. |
| Info & Documents | ||
| Project's Schedule | Pending | |
| Site Assesment Worksheet | Pending | Complete: topography, hydrology, soils and vegetation |
| Integrative Process Worksheet | Received | Complete Energy and Water Sections |
| Total Materials' Cost | Pending | From Div 3-10, hard cost, excluding labor |
| Steel Cost | Pending | Divided by steel elements: beams, tube, deck, joist, etc. |
| Steel Recycled Content Letters | Pending | Letter from the manufacturer specifying the % of pre and post-consumer recycled content and indicating the fabricant facility. |
| Envelope's Glass Specification | Pending | Provide the glass/ window submittals |
| SWPP / ESC Control Plan | Pending | Provide a plan of the strategies |
| Reports | ||
| SWPP Reports (at least, monthly) | Pending | Monthly Reports |
| Waste Tickets (at least, monthly) | Pending | Monthly Reports |
| IAQ Reports | Pending | Provide photos of the IAQ strategies during construction process |
| Substantial Completion | ||
| Coordinate LEED Commissioning (Cx) Visit | Pending | LEED Cx Visit performed by Rivion considered the following systems: |
-HVAC systems and controls – GUH, EUH, Exhaust Fans, -Office RTUs -Lighting systems and controls -Electrical panels and distribution – visual inspection.
-Domestic Hot water production and fixtures
| Test and Balance Report | Pending | Is needed for the LEED Cx Visit |
| Factory or contractor start up checklists | Pending | Is needed for the LEED Cx Visit |
&G &"-,Bold" LEED Certification Core & Shell Projects
&G &"-,Bold"&10 LEED Certification New Construction image1.png
File details come from the government source that posted it. Updated .