This document is a LEED v4 NC Scorecard for the New Mexico State University (Thomas & Brown) building replacement project, involving a comprehensive sustainability assessment for a new construction project. The scorecard details the building's potential LEED certification performance across multiple categories including Location & Transportation, Sustainable Sites, Water Efficiency, Energy & Atmosphere, Materials & Resources, and Indoor Environmental Quality. The project is targeting LEED certification, with the current scorecard indicating 52 points, which falls between the Certified (40 points) and Silver (50 points) certification levels.

The scorecard highlights specific sustainability strategies and potential credits, such as integrative process implementation, sensitive land protection, energy performance optimization, water use reduction, and indoor environmental quality improvements. Notable focus areas include advanced energy metering, renewable energy considerations, construction waste management, low-emitting materials selection, and thermal comfort strategies. The document suggests ongoing coordination is required, with several comments indicating pending confirmations from the project team, such as finalizing strategies for IAQ, reviewing finishes schedules, and completing documentation for various sustainability credit paths. The project appears to be in an active planning and documentation phase, working to maximize its potential LEED certification level through detailed sustainable design and construction approaches.

View the file

Other files

File Type Posted
Addendum #2 - Q&A.pdf PDF
NMSU Construction TC 3-19-24 UGC -- Clean Copy.pdf PDF
2318 Thomas and Brown Set.html HTML file
ADDENDUM #1.pdf PDF
Subcontractor Listing.pdf PDF
Addendum #2.pdf PDF
BID Form rev 2.1.2024.pdf PDF
1270194-event.pdf PDF
Addendum #2 - LEED Req Info.xlsx XLSX spreadsheet
WAGE RATES.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D and C Design Construction

YNYN
10IPc1Integrative ProcessYSSp1Constr. Activity Pollution Prevention
10LTc1Sensitive Land Protection20WEc3Cooling Tower Water Use
20LTc2High Priority Site
50LTc3Surrounding Density and Diverse Uses60EAp1Commissioning
50LTc4Access to Quality Transit20EAc5Grid Harmonization
10LTc5Bicycle Facilities50EAc6Renewable Energy - 100%
10LTc6Reduced Parking Footprint
10LTc7Electric Vehicles2MRp2Construction Waste Management - 100%
1620MRc2Environmental Product Declaration
10SSc1Site Assessment20MRc3Sourcing of Raw Materials
20SSc2Protect or Restore Habitat20MRc4Material Ingredients
10SSc3Open Space
30SSc4Rainwater Management30EQc2Low-Emitting Materials
20SSc5Heat Island Reduction10EQc3Construction IAQ Management0
10SSc6Light Pollution Reduction20EQc4IAQ Assessment
10
2WEp1Outdoor Water Use Reduction - 100%10INcOccupant Comfort Survey
6WEp2Indoor Water Use Reduction - 100%10INcPurchasing - Lamps
YWEp2Building-Level Water Metering10INcInnovation
10WEc3Water Metering11INcPilot
911INcExemplary Peformance
10INcExemplary Peformance
18EAp2Energy Performance - 100%35Construction Points
YEAp3Building-Level Energy Metering
1EAp4Refrigerant Management
10EAc2Advanced Energy Metering
20
YMRp1Storage & Collection of Recyclables
50MRc1Building Life-Cycle Impact Reduction
YEQp1Minimum IAQ Performance
YEQp2ETS Control
20EQc1Enhanced IAQ Strategies
10EQc5Thermal Comfort
20EQc6Interior Lighting
30EQc7Daylight
10EQc8Quality Views0
10EQc9Acoustic Performance
10
70Design Points

Certified 40 points ◦ Silver 50 points ◦ Gold 60 points ◦ Platinum 80+ points

Scorecard List

NM State University (Thomas & Brown)LEED SCORECARD
52
YNCREDITPATHREQUIREMENTSNOTES
Integrative Process
1/1

1 0 IPc1 Integrative Process v4 Beginning in pre-design and continuing throughout the design phases, identify and use opportunities to achieve synergies across disciplines and building systems described below. Use the analyses to inform the owner’s project requirements (OPR), basis of design (BOD), design documents, and construction documents. Enter comment here.

Location & Transportation
7/16

1 0 LTc1 Sensitive Land Protection v4 Opt 1: Locate the development footprint on land that has been previously developed Opt2: Locate the development footprint on land that has been previously developed or that does not meet the following criteria for sensitive land:

- Prime Farmland, Floodplains, Habitat, Water Bodies, WetlandsEnter comment here.
02LTc2High Priority Sitev4.1 opt2 path 1Opt 2: Develop and implement an equity plan.Enter comment here.
23LTc3Surrounding Density and Diverse Usesv4.1 opt 3Opt 2: Locate on a site with a Walk Score® or equivalent third-party walkability assessment.Enter comment here.
32LTc4Access to Quality Transitv4.1Path 1: Locate any functional entry within walking distance of existing or planned public transportation stop and meet the minimums of trips.
Path 2: Commit to providing year-round transit service for regular occupants and visitors.Enter comment here.
01LTc5Bicycle Facilitiesv4Locate a functional entry or bicycle storage within walking distance with a bicycle network and provide storage and shower rooms for visitors and regular occupantsEnter comment here.
10LTc6Reduced Parking Footprintv4.1Opt 1: Do not exceed the minimum local code requirements for parking and make a 30% reduction of parking spaces.

Opt 2: Provide parking for carshare vehicles for at least 1% of total parking spaces.

Opt 3: Sell parking separately from all property sales or leases.Enter comment here.
01LTc7Electric Vehiclesv4.1Opt 1: Provide charging infrastructure for electric vehicles for on-site parking for at least 5% of total parking spaces
Opt 2: Make 10% of all parking spaces or at least 6 spaces EV Ready, whichever is greater.Enter comment here.
7

Sustainable Sites

4/10
YSSp1Constr. Activity Pollution Preventionv4Create and implement an erosion and sedimentation control plan for all construction activities associated with the project.Enter comment here.
10SSc1Site Assessmentv4Complete and document a site survey or assessment that includes information about Topography, Hydrology, Climate, Vegetation, Soils, Human Use and healt effects.Enter comment here.
02SSc2Protect or Restore Habitatv4.1Preserve and protect from all development and construction activity 40% of the greenfield area AND restore a portion of the site.Enter comment here.
10SSc3Open Spacev4Provide outdoor space greater than or equal to 30% of the total site area. 25% of that outdoor space must be vegetated.Enter comment here.
03SSc4Rainwater Managementv4.1Opt 1:Retain on site the runoff from the associated percentile of local rainfall events. The percentile event volume must be retained using Low-Impact Development / green infrastructure.
Opt 2: Calculate the difference between the projected runoff volume under the proposed design conditions and the runoff volume under natural land cover conditions.Enter comment here.
20SSc5Heat Island Reductionv4Opt 1: Use non roof measures and high reflectance roof to meet the requirements of SR and SRI.
Opt 2: Place a minimum of 75% of parking spaces under cover.Enter comment here.
01SSc6Light Pollution Reductionv4Uplight

Opt 1: Do not exceed the following luminaire uplight ratings, as defined in IES TM-15-11, Addendum A.

Opt 2: Do not exceed the following percentages of total lumens emitted above horizontal.

AND

Light trespass Opt 1: Do not exceed the following luminaire backlight and glare ratings, as defined in IES TM-15-11.

Opt 2: Do not exceed the following vertical illuminances at the lighting boundary.

Enter comment here.
4
Water Efficiency
8/11
YWEp1Outdoor Water Use Reductionv4Reduce the project’s landscape water requirement by at least 30% or demonstrate no irrigation is required.Enter comment here.
YWEp2Indoor Water Use Reductionv4Reduce indoor water consumption by 20% from the baseline, for the water fixtures and fittings.Enter comment here.
YWEp3Building-Level Water Meteringv4Install a permanent water meter that measure the total potable water use for the buildingEnter comment here.
20WEc1Outdoor Water Use Reduction - 100%v4Reduce the project’s landscape water requirement by 50% for 1 point or demonstrate no irrigation is required for 2 pointsEnter comment here.
60WEc2Indoor Water Use Reduction - 100%v4Reduce the indoor water consumption from 25% to 50% for 1 to 6 pointsEnter comment here.
00WEc3Cooling Tower Water Usev4Conduct a one-time potable water analysis, in order to optimize cooling tower cycles.Enter comment here.
00WEc4Water Meteringv4Install permanent water meters for two or more water subsystemsEnter comment here.
8

Energy & Atmosphere

15/33
YEAp1Fundamental Commissioningv4Complete the following commissioning (Cx) process activities for mechanical, electrical, plumbing, and renewable energy systems and assemblies, in accordance with ASHRAE Guideline 0-2005 and ASHRAE Guideline 1.1–2007 for HVAC&R Systems.Enter comment here.
YEAp2Minimum Energy Performancev4Opt 1: Demonstrate an improvement of 5% in the proposed building performance rating compared with the baseline building performance rating.
Opt 2:Comply with the mandatory and prescriptive provisions of ANSI/ASHRAE/IESNA Standard 90.1–2010Enter comment here.
YEAp3Building-Level Energy Meteringv4Install new or use existing energy meters, that can provide building-level data representing total building energy consumptionEnter comment here.
YEAp4Fundamental Refrigerant Managementv4Do not use chlorofluorocarbon (CFC)-based refrigerants in new HVAC&R systems.Enter comment here.
42EAc1Enhanced Commissioningv4Opt 1 Path 1: Appoint a Commissioning Authority during design, conduct functional testing, resolve issues, and submit comprehensive documentation to the owner.

Opt 1 Path 2: Achieve path 1 and develop monitoring-based procedures.

AND/OR

Opt 2:Meet the requirements of Prerequisite Fundamental Commissioning and Verification and complete the commissioning process (CxP) activities for the building’s thermal envelope.Enter comment here.
99EAc2Optimize Energy Performance - 100%v4Opt 1: Follow the criteria in Prerequisite Minimum Energy Performance to demonstrate a percentage improvement in the proposed building performance compared with the baseline.
Opt 2: Use Option 2 in EA Prerequisite Minimum Energy Performance. Implement and document compliance with the recommendations in Chapter 4, Design Strategies and Recommendations by Climate Zone.Enter comment here.
10EAc3Advanced Energy Meteringv4Install advanced energy metering for all whole-building energy sources and any individual energy that represent 10% or more of the total annual consumption.Enter comment here.
10EAc4Enhanced Refrigerant Managementv4Opt 1: Do not use refrigerants, or use only refrigerants that have an ozone depletion potential of zero and a global warming potential of less than 50.
Opt 2: Select refrigerants that are used HVAC&R equipment to minimize or eliminate the emission of compounds that contribute to ozone depletion and climate change.Enter comment here.
02EAc5Grid Harmonizationv4.1Design building and equipment for participation in demand response programs through load shedding or shifting.Enter comment here.
05EAc6Renewable Energy - 100%v4.1Use on-site renewable energy systems or procure renewable energy from offsite sources for all or a portion of the building’s annual building energy use.Enter comment here.
15

Materials & Resources

5/13
YMRp1Storage & Collection of Recyclablesv4Provide dedicated areas accessible to waste haulers and building occupants for the collection and storage of recyclable materials for the entire building.Enter comment here.
YMRp2Construction Waste Planningv4.1Develop and implement a construction and demolition waste management planEnter comment here.
05MRc1Building Life-Cycle Impact Reductionv4.1Demonstrate reduced environmental effects by reusing existing building resources or demonstrating a reduction in materials use through life-cycle assessment.Enter comment here.
20MRc2Environmental Product Declarationv4.1Use at least 20 different permanently installed products sourced from at least five different manufacturers with EPD certificateEnter comment here.
11MRc3Sourcing of Raw Materialsv4.1Use products sourced from at least three different manufacturers that has responsible sourcing and extraction criteria for at least 15%, by cost for 1 point and 30% for 2 pointsEnter comment here.
11MRc4Material Ingredientsv4.1Use at least 20 different permanently installed products sourced from at least five different manufacturers with HPD or Declare certificateEnter comment here.
11MRc5Construction Waste Management - 100%v4.1Option 1. Divert at least 50% of the total construction and demolition materials from landfills and incineration facilities for 1 point.
Option 2. Divert at least 50% of all renovation and demolition waste, if any. Generate less than 10 lbs./ft2 (50 kg/m2) of waste materials for 2 points.Enter comment here.
5
Indoor Environmental Quality
4/16
YEQp1Minimum IAQ Performancev4Meet the requirements for both ventilation and monitoring.Enter comment here.
YEQp2ETS Controlv4.1Prohibit smoking inside the building. Prohibit smoking outside the building except in designated smoking areas located at least 25 feet from all entries, outdoor air intakes, and operable windows. Communicate the no-smoking policy.Enter comment here.
11EQc1Enhanced IAQ Strategiesv4.1Comply with 3 or 6 of the following strategies: Entryway systems, interior cross-contamination prevention, filtration of outdoor or recirculated air, increase ventilation 15% or 30%, operable windows, engineered natural ventilation, carbon dioxide monitorong and additional monitoring.Enter comment here.
03EQc2Low-Emitting Materialsv4.1Use materials on the building interior that meet the low-emitting criteria.Enter comment here.
10EQc3Construction IAQ Managementv4Develop and implement an indoor air quality (IAQ) management plan for the construction and preoccupancy phases of the building.Enter comment here.
02EQc4IAQ Assessmentv4.1Conduct a flush out or air testing after construction ends and the building has been completely cleaned.Enter comment here.
10EQc5Thermal Comfortv4Meet the requirements for both thermal comfort design and thermal comfort control.Enter comment here.
11EQc6Interior Lightingv4.1Meet 1 or 3 of the following strategies: Glare control, Color rendering, Lighting control and/or Surface reflectivity.Enter comment here.
03EQc7Daylightv4.1Provide manual or automatic (with manual override) glare-control devices for all regularly occupied spaces and meet one of the following options: Simulation of sDA and ASE, Illuminance calculations, On-site measurement.Enter comment here.
01EQc8Quality Viewsv4.1Provide occupants in the building with a view to the outdoor natural or urban environment for 75% of all regularly occupied floor area. Glass with a VLT above 40%.Enter comment here.
01EQc9Acoustic Performancev4For all occupied spaces, meet requirements for HVAC Background Noise, Sound isolation, Reverberation time, Sound reinforcement and masking systemsEnter comment here.
4

Innovation

4/6
10INc1Occupant Comfort Surveyv4Administer a occupant comfort survey to collect anonymous responses for the following: Acoustics, Building Cleanliness, Indoor air quality, Lighting and Thermal comfort.Enter comment here.
10INc2Purchasing - Lamps /v4Implement a purchasing plan that specifies an overall building average of 70 picograms of mercury per lumen-hour or less for all mercury-containing lamps purchased for the projectEnter comment here.
OR
INc2Green Building Educationv4Provide a educational program that meet two of the following elements: Signage program, Guideline or case study for the project, educational outreach program or guided tours.
01INc3Innovationv4Achieve at least one innovation credit. Review the LEED innovation catalog for optionsEnter comment here.
01INc4Pilotv4Achieve at least one pilot credit. Review the LEED Pilot credit library for options.Enter comment here.
10INc5Exemplary Peformancev4Achieve no more than two exemplary performance credits.Enter comment here.
10INLEED AP BD+Cv4At least one principal participant of the project team must be a LEED Accredited Professional (AP) with a specialty appropriate for the project.Enter comment here.
4
Regional Priority
4/6
10RPc1Indoor Water Use Reduction - 5ptsv4Meet the credit requirements. Required point threshold will depend on project locationEnter comment here.
10RPc2Access to Quality Transit - 2 ptsv4Meet the credit requirements. Required point threshold will depend on project locationEnter comment here.
01RPc3Renewable Energy - 2 ptsv4Meet the credit requirements. Required point threshold will depend on project locationEnter comment here.
10RPc4SD and Diverse Uses - 2 ptsv4Meet the credit requirements. Required point threshold will depend on project locationEnter comment here.
10RPc5Outdoor Water Use Reduction - 2 ptsv4Meet the credit requirements. Required point threshold will depend on project locationEnter comment here.
01RPc6Daylight - 2 ptsv4Meet the credit requirements. Required point threshold will depend on project locationEnter comment here.
4
520

Certified 40 points ◦ Silver 50 points ◦ Gold 60 points ◦ Platinum 80+ points

Scorecard NM State University (Thomas & Brown)

YNYNYN
Integrative ProcessEnergy & AtmosphereIndoor Environmental Quality
10IPc1Integrative ProcessYEAp1Fundamental CommissioningYEQp1Minimum IAQ Performance
YEAp2Minimum Energy PerformanceYEQp2ETS Control

tc={9B75392C-0645-407E-9785-0C5E499EBC64}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

The signed letter of commitment is still pending Y EAp3 Building-Level Energy Metering tc={E1F134D7-21C4-4AEC-8036-23A7BD247799}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

The signed letter of commitment is still pending 1 1 EQc1 Enhanced IAQ Strategies tc={FC724F69-1C06-4D35-AC49-00BA490A8411}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

We need to confirm with the team what are the strategies you want to pursue Location & Transportation Y EAp4 Fundamental Refrigerant Management 0 3 EQc2 Low-Emitting Materials tc={7D57A2B1-EE1A-4FDB-95BE-FB5CAB86CC51}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

EEI to review the finishes schedule to see if the project complies with at least 2 categories 4 2 EAc1 Enhanced Commissioning tc={C79FEEC4-A8B8-4A48-B27B-132F4C7E9011}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

EEI will conduct the Cx Visit upon the building's completion. 1 0 EQc3 Construction IAQ Management tc={8A89B5B5-1356-4EAA-85E7-B2AE5D9B089F}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

It's a plan to implement during construction process

99EAc2Optimize Energy Performance02EQc4IAQ Assessment
10LTc1Sensitive Land Protection10EAc3Advanced Energy Metering10EQc5Thermal Comfort
02LTc2High Priority Site10EAc4Enhanced Refrigerant Management11EQc6Interior Lighting
23LTc3Surrounding Density and Diverse Uses02EAc5Grid Harmonization03EQc7Daylight

tc={CE05DD95-70AF-46DD-A782-902873DEC66B}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Preliminary calculations demonstrate that the project do not comply with the 75% daylight levels

32LTc4Access to Quality Transit05EAc6Renewable Energy01EQc8Quality Views
01LTc5Bicycle Facilities1501EQc9Acoustic Performance
10LTc6Reduced Parking Footprint4
01LTc7Electric VehiclesMaterials & Resources
7Innovation
Sustainable SitesYMRp1Storage & Collection of Recyclables
YMRp2Construction Waste Planning10INc1Green Building Education

tc={FC07B1FE-87AA-4121-8C90-A3C12F591F17}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

EEI will confirm with NMU the info to include in the building and website

05MRc1Building Life-Cycle Impact Reduction10INc2Purchasing - Lamps
YSSp1Constr. Activity Pollution Prevention

tc={F8B9AF83-AC47-449B-A893-B60F174588F3}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

SWPP/ESC inspection reports during construction20MRc2Environmental Product Declaration01INc3Innovation
10SSc1Site Assessment

tc={B3F08999-2899-4A2D-B96E-5749C82F9D68}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

EEI will send the worksheet for Civil team to complete it.11MRc3Sourcing of Raw Materials01INc4Pilot
02SSc2Protect or Restore Habitat11MRc4Material Ingredients10INc5Exemplary Peformance: EPD
10SSc3Open Space11MRc5Construction Waste Management10INLEED AP BD+C
03SSc4Rainwater Management54
20SSc5Heat Island Reduction53
01SSc6Light Pollution Reduction

tc={4BE3B19C-6CCE-4C6A-9AA7-E641542C4051}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Please provide the vertical and horizontal photometric analysis tc={4E1297C9-CBB6-4885-A1E1-83AE9915BE94}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

EEI needs the manufacturer and model specified for the products and materials.

tc={F855336F-B8BE-40E7-8E9D-84F43732D7E2}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Total Material's Cost, Steel Cost and steel's recycled content letters are still pending tc={7A760F4F-1259-4201-B87E-C5F0C1BEC616}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

EEI needs the manufacturer and model specified for the products and materials.

tc={FC07B1FE-87AA-4121-8C90-A3C12F591F17}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

EEI will confirm with NMU the info to include in the building and website tc={732D719F-65AF-4A23-9B86-10B0707A617C}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

The project will need to consider recycling or reusing at least 50% of the demolition and construction waste. For documentation, we will need the waste tickets.Regional Priority
4
LEED Points
Water Efficiency10RPc1Indoor Water Use Reduction - 5pts
10RPc2Access to Quality Transit - 2 pts
01RPc3Renewable Energy - 2 pts
YWEp1Outdoor Water Use Reduction10RPc4SD and Diverse Uses - 2 pts
YWEp2Indoor Water Use Reduction10RPxOutdoor Water Use Reduction - 2 pts
YWEp3Building-Level Water Metering

tc={AE0B4369-7DF3-46C8-8EDC-04F5EB1131F9}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

The signed letter of commitment is still pending tc={E1F134D7-21C4-4AEC-8036-23A7BD247799}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

The signed letter of commitment is still pending tc={C79FEEC4-A8B8-4A48-B27B-132F4C7E9011}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

EEI will conduct the Cx Visit upon the building's completion.

tc={9B75392C-0645-407E-9785-0C5E499EBC64}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

The signed letter of commitment is still pending tc={FC724F69-1C06-4D35-AC49-00BA490A8411}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

We need to confirm with the team what are the strategies you want to pursue tc={7D57A2B1-EE1A-4FDB-95BE-FB5CAB86CC51}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

EEI to review the finishes schedule to see if the project complies with at least 2 categories tc={8A89B5B5-1356-4EAA-85E7-B2AE5D9B089F}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

It's a plan to implement during construction process tc={F8B9AF83-AC47-449B-A893-B60F174588F3}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

SWPP/ESC inspection reports during construction tc={B3F08999-2899-4A2D-B96E-5749C82F9D68}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

EEI will send the worksheet for Civil team to complete it.

tc={CE05DD95-70AF-46DD-A782-902873DEC66B}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Preliminary calculations demonstrate that the project do not comply with the 75% daylight levels01RPxDaylight - 2 pts
20WEc1Outdoor Water Use Reduction4
60WEc2Indoor Water Use Reduction
02WEc3Cooling Tower Water UseXXXInfo received to document it
10WEc4Water MeteringXXXPending Info to document it
9July 17, 2024
Certified 40 points ◦ Silver 50 points ◦ Gold 60 points ◦ Platinum 80+ points
Glossary | U.S. Green Building Council (usgbc.org)

Regional priority credit lookup | U.S. Green Building Council (usgbc.org) https://www.usgbc.org/glossaryhttps://www.usgbc.org/regional-priority-credits

PI

Project Information Resources / Tips

PIProject Information - v4BDC v4 Resource Guide
TagIntentRequirementsLEED OnlineComments
PIRegister Project

Agent's Authority Form Letter of Committment

TEMPLATE

Site area Date of substantial completion

UPLOAD

Site Plan Floor Plans Interiors / Exterior Renderings Sections / Elevations MEP Plans & Schedules Enter comment here. Enter Resources / Tips here.

file:///C:/Resources/Reference%20Guides/LEED%20v4/v4/BDC%20v4%20FINAL.pdf

IP

Integrative Process Resources / Tips

IPc1Integrative Process - v4Integrative Process - v4: Credit TemplateDownloaded from USGBC website - Template Version: v01
TagLEED OnlineRequirementsComments
IPc1TEMPLATE

No info to complete.

UPLOAD

Integrative Process Worksheet.

Water Balance Report. Integrative process | U.S. Green Building Council (usgbc.org) Enter comment here. Enter Resources / Tips here.

https://www.usgbc.org/credits/new-construction-core-and-shell-schools-new-construction-retail-new-construction-healthca-21?return=/credits/New%20Construction/v4file:///C:/Users/dave.hubka/Documents/1%20IP/IPc_Integrative_Process.pdf

LT

Location and Transportation Resources / Tips

LTc1Sensitive Land Protection - v4Sensitive Land Protection v4: Credit TemplateDownloaded from USGBC website - Template Version: v01
TagLEED OnlineRequirementsComments
Opt 1TEMPLATE
Narrative describing previous development.Sensitive land protection | U.S. Green Building Council (usgbc.org)Enter comment here.Enter Resources / Tips here.
Opt 2TEMPLATE

Narrative describing:

◦Prime Farmland.

◦Flood Hazard.

◦Land for Endangered Species.

Confirmation development footprint is not within 100ft of water body or 50ft of wetland. Enter comment here. Prime Farmland Map:

https://websoilsurvey.nrcs.usda.gov/app/WebSoilSurvey.aspx Flood Hazard Map:

https://msc.fema.gov/portal/home Critical Habitat (Endangered Species areas):

https://services.arcgis.com/QVENGdaPbd4LUkLV/ArcGIS/rest/services/USFWS_Critical_Habitat/FeatureServer Wetlands Mapper with nearby waterbodies identification:

https://www.fws.gov/wetlands/Data/Mapper.html

LTc2High Priority Site - v4 or Equitable Development - v4.1High Priority Site v4: Credit TemplateDownloaded from USGBC website - Template Version: v01
TagLEED OnlineRequirementsComments
v4
Opt 3UPLOAD

Soil and/or groundwater contamination.

Date of remediation and responsible parties.

Confirmation that remediation meets AHJ.High priority site | U.S. Green Building Council (usgbc.org)Enter comment here.Enter Resources / Tips here.
v4.1

Opt 2

Path 1UPLOAD
Develop and implement an Equity Plan.High Priority Site and Equitable Development | U.S. Green Building Council (usgbc.org)Enter comment here.Option 1: High Priority Site

Path 1: Economically Disadvantaged Community Location Find ave. HH income, poverty rate, unemployment rate:

https://geomap.ffiec.gov/FFIECGeocMap/GeocodeMap1.aspx Can also use this to find median income:

https://data.census.gov/cedsci/

LTc3Surrounding Density & Diverse Uses-v4 or Walkable Location-v4.1Surrounding Density & Diverse Uses v4: Credit TemplateDownloaded from USGBC website - Template Version: v01
TagLEED OnlineRequirementsComments
v4
Opt 1Surrounding Density

UPLOAD

Vicinity Map.

TEMPLATE

Density Table. Surrounding density and diverse uses | U.S. Green Building Council (usgbc.org) Enter comment here. Option 1: Surrounding Densities Measure SF of building (taller the building, more SF) Measure building (ruler icon in tools), count floors. Multiply SF by number of floors to find total estimated SF of building in Google Earth: https://www.google.com/earth/

v4
Opt 2Diverse Uses

UPLOAD

Vicinity Map.

TEMPLATE

Diverse Uses Table.Enter comment here.Enter Resources / Tips here.
v4.1
Opt 3Walkable Location

UPLOAD

Screenshot of Walk Score.

Surrounding Density and Diverse Uses | U.S. Green Building Council (usgbc.org) Enter comment here. Walk score lookup: https://www.walkscore.com/

LTc4Access to Quality Transit - v4 or Project-Sponsored Transit - v4.1Access to Quality Transit v4: Credit TemplateDownloaded from USGBC website - Template Version: v01
TagLEED OnlineRequirementsComments
v4
LTc4TEMPLATE

Transit Service Table

UPLOAD

Vicinity Map

Transit ScheduleAccess to quality transit | U.S. Green Building Council (usgbc.org)Enter comment here.Enter Resources / Tips here.
v4.1
LTc4TEMPLATE

none

UPLOAD

Project-Sponsored Transit narrative Transit Schedule Site plan Access to Quality Transit | U.S. Green Building Council (usgbc.org) The project is located on a prime farmland. Enter Resources / Tips here.

LTc5Bicycle Facilities - v4.1Bike Facilities v4: Credit TemplateDownloaded from USGBC website - Template Version: v01
TagLEED OnlineRequirementsComments
LTc5TEMPLATE

Short-Term Bike Storage Table Long-Term Bike Storage Table Shower Table

UPLOAD

Vicinity Plan Site Plan Bicycle Facilities | U.S. Green Building Council (usgbc.org) Enter comment here. Enter Resources / Tips here.

LTc6Reduced Parking Footprint-v4 or Reduced Parking Footprint-v4.1Reduced Parking Footprint v4: Credit TemplateDownloaded from USGBC website - Template Version: v01
TagLEED OnlineRequirementsComments
v4
LTc6TEMPLATE

Total Parking Capacity Table

UPLOAD

Parking Plan Preferred Parking Signage

Reduced parking footprint | U.S. Green Building Council (usgbc.org)Enter comment here.Enter Resources / Tips here.
v4.1
LTc6TEMPLATE

Total Parking Capacity Table

UPLOAD

Parking Plan

Reduced Parking Footprint | U.S. Green Building Council (usgbc.org) Enter comment here. Review local code requirements for parking capacity (or minimum parking requirements)

LTc7Green Vehicles - v4 or Electric Vehicles - v4.1Green Vehicles v4: Credit TemplateDownloaded from USGBC website - Template Version: v01
TagLEED OnlineRequirementsComments
v4

LTc7

TEMPLATE

List # of preferred parking spots List # of charging stations

UPLOAD

Parking Plan Preferred Parking Signage EVSE Parking Signage EVSE Spec Sheet

Green vehicles | U.S. Green Building Council (usgbc.org)Enter comment here.Enter Resources / Tips here.
v4.1

LTc7

TEMPLATE

List # of charging stations

UPLOAD

Parking Plan EVSE Parking Signage EVSE Spec Sheet

Electric Vehicles | U.S. Green Building Council (usgbc.org) Enter comment here. Form Version 1 (2019) only requires 2% of total parking.

Form Version 2 requires 5% of total parking.

https://www.usgbc.org/credits/new-construction-schools-new-construction-retail-new-construction-healthcare-data-centers--0?return=/credits/New%20Construction/v4https://www.usgbc.org/credits/new-construction-core-and-shell-retail-new-construction-healthcare-hospitality-new-constru-0?return=/credits/New%20Construction/v4/Location%20&%20transportationhttps://www.usgbc.org/credits/new-construction-core-and-shell-retail-new-construction-healthcare-data-centers-new-construc?return=/credits/New%20Construction/v4.1/Location%20&%20transportationfile:///C:/Users/dave.hubka/Documents/2%20LT/LT%20c1%20Sensitive%20Land%20Protection/LTc_Sensitive_Land_Protection.pdffile:///C:/Users/dave.hubka/Documents/2%20LT/LT%20c2%20High%20Priority%20Site/LTc_High_Priority_Site.pdffile:///C:/Users/dave.hubka/Documents/2%20LT/LT%20c3%20Surrounding%20Density%20and%20Diverse%20Uses/LTc_Density.pdffile:///C:/Users/dave.hubka/Documents/2%20LT/LT%20c4%20Access%20to%20Quality%20Transit/LTc_Quality_Transit.pdffile:///C:/Users/dave.hubka/Documents/2%20LT/LT%20c5%20Bicycle%20Facility/LTc_Density.pdffile:///C:/Users/dave.hubka/Documents/2%20LT/LT%20c6%20Reduced%20Parking%20Footprint/LTc_Parking_Footprint.pdffile:///C:/Users/dave.hubka/Documents/2%20LT/LT%20c7%20Electric%20Vehicles/LTc_Green_Vehicles.pdfhttps://www.usgbc.org/credits/new-construction-data-centers-new-construction-hospitality-new-construction-warehouse-and--0?return=/credits/New%20Construction/v4.1https://www.usgbc.org/credits/new-construction-schools-new-construction-retail-new-construction-healthcare-data-centers-ne?return=/credits/New%20Construction/v4https://www.usgbc.org/credits/new-construction-schools-new-construction-retail-new-construction-healthcare-data-centers--9?return=/credits/New%20Construction/v4.1https://www.usgbc.org/credits/new-construction-retail-nc-hospitality-nc-data-centers-nc/v2012/ltc4?return=/credits/New%20Construction/v4https://www.usgbc.org/credits/new-construction-retail-new-construction-hospitality-new-construction/v41/lt104?return=/credits/New%20Construction/v4.1https://www.usgbc.org/credits/new-construction-retail-new-construction-data-centers-new-construction-hospitality-new-const?return=/credits/New%20Construction/v4/Location%20&%20transportationhttps://www.usgbc.org/credits/new-construction-retail-new-construction-data-centers-new-construction-hospitality-new-con-3?return=/credits/New%20Construction/v4.1/Location%20&%20transportationhttps://www.usgbc.org/credits/new-construction-core-and-shell-schools-new-construction-retail-new-construction-healthca-20?return=/credits/New%20Construction/v4/Location%20&%20transportationhttps://www.usgbc.org/credits/new-construction-core-and-shell-schools-new-construction-retail-new-construction-healthc-155?return=/credits/New%20Construction/v4.1/Location%20&%20transportation

SS

Sustainable Sites Resources / Tips

SSp1Construction Activity Pollution Prevention - v4
TagLEED OnlineRequirementsComments
SSp1TEMPLATE

Narrative on compliance with 2012 EPA CGP

UPLOADS

ESC Plan & Inspections Construction activity pollution prevention | U.S. Green Building Council (usgbc.org) Enter comment here. Enter Resources / Tips here.

SSc1Site Assessment - v4
TagLEED OnlineRequirementsComments
SSc1TEMPLATE

none

UPLOADS

Site Survey Site Assessment Worksheet Site assessment | U.S. Green Building Council (usgbc.org) Enter comment here. Soil Survey Map:

https://websoilsurvey.nrcs.usda.gov/app/

SSc2Protect or Restore Habitat - v4 or Protect or Restore Habitat - v4.1
TagLEED OnlineRequirementsComments
SSc2TEMPLATE

List Greenfield / revegetated areas Describe how greenfield was protected Soil description

UPLOADS

Site Plan

Soil CharecteristicsSite development - protect or restore habitat | U.S. Green Building Council (usgbc.org)Enter comment here.Enter Resources / Tips here.
SSc2TEMPLATE

List Greenfield / revegetated areas Describe how greenfield was protected Soil description

UPLOADS

Site Plan Soil Charecteristics Protect or Restore Habitat | U.S. Green Building Council (usgbc.org) Enter comment here. Enter Resources / Tips here.

SSc3Open Space - v4
TagLEED OnlineRequirementsComments
SSc3TEMPLATE

List site areas Describe how Open Space meets criteria

UPLOADS

none Open space | U.S. Green Building Council (usgbc.org) Enter comment here. Enter Resources / Tips here.

SSc4Rainwater Management - v4 or Rainwater Management - v4.1
TagLEED OnlineRequirementsComments
SSc4TEMPLATE

Describe LID / GI strategies

UPLOADS

Rainfall Events Calculator Runoff Calculations LID Documentation Rainwater management | U.S. Green Building Council (usgbc.org) Enter comment here. PRECIPITATION FREQUENCY ESTIMATES:

https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html?bkmrk=wi SSc4 TEMPLATE Describe LID / GI strategies

UPLOADS

Rainfall Events Calculator Runoff Calculations LID Documentation Rainwater Management | U.S. Green Building Council (usgbc.org) Enter comment here. LID / GI

Rain Gardens Vegetated Swales and buffers Permeable pavement Rainwater harvesting Soil amendments Bio retention

SSc5Heat Island Reduction - v4
TagLEED OnlineRequirementsComments
Opt 1TEMPLATE

Non-Roof Measures Table High-Reflectance Roof Table

UPLOADS

Site Plan Spec Sheet(s) Heat island reduction | U.S. Green Building Council (usgbc.org) Enter comment here. LI 10411 lists SR values of typical hardscapes so that testing is not required.

Compliant roof allows asphalt - up to 1/3 of total compliant roof area - and still achieve the credit.

Opt 2 TEMPLATE ParkingTable

UPLOADS

Spec Sheet(s) Enter comment here. Enter Resources / Tips here.

SSc6Light Pollution Reduction - v4
TagLEED OnlineRequirementsComments
SSc6TEMPLATE

Uplight Table

UPLOADS

Site Lighting Plan Vertical Illuminance Calculations Light pollution reduction | U.S. Green Building Council (usgbc.org) Enter comment here. Enter Resources / Tips here.

https://www.usgbc.org/credits/new-construction-core-and-shell-schools-new-construction-retail-new-construction-healthca-13?return=/credits/New%20Construction/v4/Sustainable%20siteshttps://www.usgbc.org/credits/new-construction-core-and-shell-schools-new-construction-retail-new-construction-data-6?return=/credits/New%20Construction/v4/Sustainable%20siteshttps://www.usgbc.org/credits/new-construction-core-and-shell-retail-new-construction-data-centers-new-construction-0?return=/credits/New%20Construction/v4/Sustainable%20siteshttps://www.usgbc.org/credits/new-construction-core-and-shell-retail-new-construction-data-centers-new-construction-hospit?return=/credits/New%20Construction/v4.1/Sustainable%20siteshttps://www.usgbc.org/credits/new-construction-core-and-shell-schools-new-construction-retail-new-construction-data-7?return=/credits/New%20Construction/v4/Sustainable%20siteshttps://www.usgbc.org/credits/new-construction-core-and-shell-schools-new-construction-retail-new-construction-data-8?return=/credits/New%20Construction/v4/Sustainable%20siteshttps://www.usgbc.org/credits/new-construction-core-and-shell-schools-new-construction-retail-new-construction-data-cent-3?return=/credits/New%20Construction/v4.1/Sustainable%20siteshttps://www.usgbc.org/credits/new-construction-core-and-shell-schools-new-construction-retail-new-construction-hospitali-1?return=/credits/New%20Construction/v4/Sustainable%20siteshttps://www.usgbc.org/credits/new-construction-core-shell-schools-nc-retail-nc-healthcare-hospitality-nc-data-centers-nc-w?return=/credits/New%20Construction/v4/Sustainable%20sites

WE

Water Efficiency Resources / Tips

WEpcOutdoor Water Use Reduction - v4
TagLEED OnlineRequirementsComments
WEp1
opt 1TEMPLATE

List plant species and water needs

UPLOADS

none Outdoor water use reduction | U.S. Green Building Council (usgbc.org) Enter comment here. P = 30% 1 = 50% 2 = 100% Plant type = Trees, shrubs, ground cover, or turf.

Ground cover is any plant that grows over an area of ground.

Shrub is a woody plant.

Turf is a grass used for playing surfaces like golf/baseball.

Water Requirement = low, medium, or high.

Irrigation type = (drip standard, drip press comp, fixed spray, micro spray, rotor, or no irrigation.

WEc1 Opt 1

TEMPLATE

none

UPLOADS

none

Select Threshold Outdoor Water Use Reduction | U.S. Green Building Council (usgbc.org) Enter comment here. PEAK MONTH = Water Budget Tool:

https://www.epa.gov/watersense/water-budget-tool

ALL MONTHS = AQUASTAT climate Information tool https://aquastat.fao.org/climate-information-tool/ PEAK MONTH is used for Outdoor Water Use prereq/credit.

ALL MONTHS are used for Whole Project Water Use Reduction ACP.

WEpcIndoor Water Use Reduction - v4
TagLEED OnlineRequirementsComments
WEp2TEMPLATE

List percent reduction Appliances Table Process Water Table

UPLOADS

Indoor Water Use Reduction Calculator Plumbing Fixture Spec Sheets Process Equipment / Appliances Spec Sheet Indoor water use reduction | U.S. Green Building Council (usgbc.org) Enter comment here. P = 20% 1 = 25% 2 = 30% 3 = 35% 4 = 40% 5 = 45% 6 = 50% WEc2 TEMPLATE none

UPLOADS

none

Select Threshold Indoor water use reduction | U.S. Green Building Council (usgbc.org) Enter comment here. Watersense Label Product Search:

https://lookforwatersense.epa.gov/products/

WEpcWater Metering - v4
TagLEED OnlineRequirementsComments
WEp3TEMPLATE

none

UPLOADS

Letter of Committment

Building-level water metering | U.S. Green Building Council (usgbc.org)Enter comment here.Enter Resources / Tips here.
WEc4TEMPLATE

Describe the submeters

UPLOADS

none Water metering | U.S. Green Building Council (usgbc.org) Enter comment here. Enter Resources / Tips here.

WEc3Cooling Tower Water Use - v4
TagLEED OnlineRequirementsComments
WEc3TEMPLATE

Potable Water Analysis Table

UPLOADS

Potable Water Analysis Cooling tower water use | U.S. Green Building Council (usgbc.org) Enter comment here. Enter Resources / Tips here.

https://www.usgbc.org/credits/new-construction-core-and-shell-schools-new-construction-retail-new-construction-healthca-11?return=/credits/New%20Construction/v4/Water%20efficiencyhttps://www.usgbc.org/credits/new-construction-schools-new-construction-retail-new-construction-data-centers-new-constru-2?return=/credits/New%20Construction/v4.1https://www.usgbc.org/credits/new-construction-core-and-shell-data-centers-new-construction-warehouse-and-distribution?return=/credits/New%20Construction/v4https://www.usgbc.org/credits/new-construction-core-and-shell-data-centers-new-construction-warehouse-and-distribution-cen?return=/credits/New%20Construction/v4/Water%20efficiencyhttps://www.usgbc.org/credits/new-construction-core-and-shell-schools-new-construction-retail-new-construction-healthca-32?return=/credits/New%20Construction/v4/Water%20efficiencyhttps://www.usgbc.org/credits/new-construction-core-and-shell-schools-new-construction-retail-new-construction-data-0?return=/credits/New%20Construction/v4/Water%20efficiencyhttps://www.usgbc.org/credits/new-construction-core-and-shell-schools-new-construction-retail-new-construction-healthca-12?return=/credits/New%20Construction/v4/Water%20efficiency

EA

Energy and Atmosphere Resources / Tips

EApcCommissioning - v4
TagLEED OnlineRequirementsComments
EApcResponsibility of CxAFundamental commissioning and verification | U.S. Green Building Council (usgbc.org)
Enter comment here.Enter Resources / Tips here.
EAc1Responsibility of CxAEnhanced commissioning | U.S. Green Building Council (usgbc.org)Enter comment here.
EApcEnergy Peformance - v4
TagLEED OnlineRequirementsComments
EApcResponsibility of Energy ModelerMinimum energy performance | U.S. Green Building Council (usgbc.org)Process related energy saving strategies include:

#1. Process Saving Strategy.

#2. Process Saving Strategy.

#3. Process Saving Strategy.

#4. Process Saving Strategy.

Expected % process load savings = X%

Info needed to complete process calcs include:

Enter info needed here.Enter Resources / Tips here.
EAc2Responsibility of Energy ModelerOptimize energy performance | U.S. Green Building Council (usgbc.org)Enter Resources / Tips here.
EApcEnergy Metering - v4
TagLEED OnlineRequirementsComments
EAp3TEMPLATE

none

UPLOADS

Letter of Committment

Building-level energy metering | U.S. Green Building Council (usgbc.org)Enter comment here.Enter Resources / Tips here.
EAc3TEMPLATE

Advanced Meters Table

UPLOADS

Submeter Spec Sheets Advanced energy metering | U.S. Green Building Council (usgbc.org) Enter comment here. Enter Resources / Tips here.

EAcRefrigerant Management - v4
TagLEED OnlineRequirementsComments
EAp4TEMPLATE

Refrigerant Table

UPLOADS

noneFundamental refrigerant management | U.S. Green Building Council (usgbc.org)Enter comment here.Enter Resources / Tips here.
EAc4TEMPLATE

Refrigerant Table

UPLOADS

Refrigerant-Containing Equipment Schedules Enhanced refrigerant management | U.S. Green Building Council (usgbc.org) Enter comment here. Enter Resources / Tips here.

EAc5Grid Harmonization - v4.1
TagLEED OnlineRequirementsComments

Case 1 TEMPLATE List electricity peak/demand reduction

UPLOADS

Demand Response Erollment Document Grid Harmonization | U.S. Green Building Council (usgbc.org) Enter comment here. Enter Resources / Tips here.

Case 2 TEMPLATE List electricity peak/demand reduction

UPLOADS

none Enter comment here. Enter Resources / Tips here.

EAc6Renewable Energy - v4.1
TagLEED OnlineRequirementsComments
EAc6TEMPLATE

none

UPLOADS

Renewable Energy Contract Narrative explaining which Tier Renewable Energy | U.S. Green Building Council (usgbc.org) Enter comment here. Enter Resources / Tips here.

https://www.usgbc.org/credits/new-construction-commercial-interiors-core-and-shell-schools-new-construction-retail-new-c-6?return=/credits/New%20Construction/v4/Energy%20&%20atmospherehttps://www.usgbc.org/credits/new-construction-core-and-shell-warehouse-and-distribution-centers-new-construction-0?return=/credits/New%20Construction/v4/Energy%20&%20atmospherehttps://www.usgbc.org/credits/new-construction-core-and-shell-schools-new-construction-warehouse-and-distribution-centers?return=/credits/New%20Construction/v4/Energy%20&%20atmospherehttps://www.usgbc.org/credits/new-construction-schools-new-construction-retail-new-construction-healthcare-hospitality-n-0?return=/credits/New%20Construction/v4/Energy%20&%20atmospherehttps://www.usgbc.org/credits/new-construction-schools-new-construction-retail-new-construction-healthcare-data-centers--2?return=/credits/New%20Construction/v4/Energy%20&%20atmospherehttps://www.usgbc.org/credits/new-construction-core-and-shell-schools-new-construction-retail-new-construction-healthcar-0?return=/credits/New%20Construction/v4/Energy%20&%20atmospherehttps://www.usgbc.org/credits/new-construction-core-and-shell-schools-new-construction-healthcare-data-centers-new-constru?return=/credits/New%20Construction/v4/Energy%20&%20atmospherehttps://www.usgbc.org/credits/new-construction-core-and-shell-schools-new-construction-retail-new-construction-healthc-176?return=/credits/New%20Construction/v4.1/Energy%20&%20atmospherehttps://www.usgbc.org/credits/new-construction-core-and-shell-schools-new-construction-retail-new-construction-healthc-175?return=/credits/New%20Construction/v4.1/Energy%20&%20atmospherehttps://www.usgbc.org/credits/new-construction-core-and-shell-schools-new-construction-retail-new-construction-healthca-17?return=/credits/New%20Construction/v4/Energy%20&%20atmosphere

MR

Materials and Resources Resources / Tips

MRp1Storage and Collection of Recyclables - v4

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .