Addendum #2.pdf
PDF 16 MB Posted
- Attached to
- 4700 Thomas & Brown Building Replacement
- Solicitation number
- 2025-ITB-655
- Issued by
- New Mexico
About this file
This document is Addendum #2 for the Thomas and Brown New Facility project at New Mexico State University (NMSU) in Las Cruces, dated December 4, 2024. The addendum provides multiple revisions, additions, and clarifications to the original bidding documents, covering various aspects of the construction project. Key updates include salvaging specific items like an electrical transformer and antenna, coordinating communication terminations with NMSU's networking department, specifying conduit pathways for HVAC controls, and approving Texas Lighting Solutions for interior and exterior lighting fixtures. The document also includes modifications to structural steel framing requirements, aluminum column covers, entrances, windows, hardware, and glazing specifications.
The addendum details technical changes to architectural and engineering elements, such as specifying material thicknesses, finishes, and installation requirements for different building components. It provides precise instructions for contractors regarding equipment installation, electrical connections, and mechanical system specifications. The document includes updates to civil, structural, architectural, mechanical, electrical, and technology drawings, with specific modifications to site plans, floor plans, elevations, and system details. These changes appear designed to refine and clarify the original project specifications, ensuring more precise implementation of the building replacement project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum #2 - Q&A.pdf | ||
| NMSU Construction TC 3-19-24 UGC -- Clean Copy.pdf | ||
| 2318 Thomas and Brown Set.html | HTML file | |
| Addendum #2 - LEED v4 NC Scorecard_Docs Status_20241122.xlsx | XLSX spreadsheet | |
| ADDENDUM #1.pdf | ||
| Subcontractor Listing.pdf | ||
| BID Form rev 2.1.2024.pdf | ||
| 1270194-event.pdf | ||
| Addendum #2 - LEED Req Info.xlsx | XLSX spreadsheet | |
| WAGE RATES.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
so ut h m ai n, s tu di o d l as c ru ce s, n m p
.5
.3 f
.5
.3 w w w
.s tu di o-d.
bi z studio d architects architecture planning LEED services
ADDENDUM #2
Thomas and Brown New Facility New Mexico State University Las Cruces, New Mexico December 4, 2024
NOTICE TO BIDDERS: The following revisions, additions, and clarifications shall be incorporated in the Bidding Documents for this project. All other provisions of the Contract Documents shall remain unchanged. This Addendum is hereby made part of the Contract Documents to the same extent as though contained in the original documents and itemized listings thereof.
GENERAL
Item 1: List of Items to be salvaged to NMSU:
A. Coordinate with NMSU for delivery and storage location of items to be salvaged to Owner.
B. Existing Electrical Transformer in Room 100, coordinate with NMSU.
C. One Radio antenna and two Irrigation antenna located on roof, coordinate with NMSU. See additional drawing AD1.1.
D. Any additional left over furniture, equipment and misc. items left within the building are to be removed and disposed of by the Contractor.
Item 2: Fire Alarm and Fire Suppression design drawings are to be submitted to and approved by State of NM Fire Marshalls Office.
Item 3: Locations of existing IDF/MDF for communication terminations (fiber/copper) and computer centers in Goddard Hall, and Foster Hall are to be Coordinated with NMSU Networking department (Adrian Carnero acarnero@nmsu.edu). Termination is contingent on room naming and placement on as-built basis.
A. From Goddard 160J to Computer Center 131 through tunnel in innerduct-48ct single mode fiber.
B. From Goddard 160J to Foster E122 through tunnel – 25 pair copper.
Item 4: Conduit pathways and cabling for HVAC controls are the responsibility of the Div. 23/25 contractor(s) per MI series sheets and Div. 25 specifications. See also Div. 230549. Keyed Note EP04 and the Electrical Connection Schedule (E-702) are in regards to the Div. 26 electrical (power) connection characteristics for HVAC/Plumbing equipment.
mailto:acarnero@nmsu.edu so ut h m ai n, s tu di o d l as c ru ce s, p
.5
.3 f
.5
.3 w w w
.s tu di o-d.
bi z studio d architects architecture planning LEED services
Item 5: Prior Approval; Texas Lighting Solutions is approved to be used on this project. See attached prior approval submittal attached.
A. Interior and Exterior Lighting Fixtures – Div. 26 5100, 26 5612.
Substitute fixture manufacturers have been submitted for prior approval and may be considered for use on this project (subject to the following): The Engineer may allow minor deviations, subject to the Engineer’s judgment, as to whether such deviations would detract from the quality, reliability or function of the equipment. The equipment manufacturer shall be responsible for any and all redesign required to accommodate their equipment. Prior approval of other manufacturers’ equipment shall in no way relieve the Contractor of responsibility for submitting the specified shop drawings for approval or complying fully with all provisions of the specifications and drawings. Information detailing any deviations from plans and specifications shall be included with the shop drawings for approval. If prior approved equipment is used, the contractor shall, at his own expense, make any changes or additions in the structures, piping, electrical, etc. as necessary to accommodate the equipment. If engineering is required due to substitution of prior approved equipment, the contractor shall furnish and pay for all such engineering services.
Based on information submitted, and our knowledge of and previous experience with the companies and products represented, we feel that the following are capable of providing products and services equivalent to those specified
FIXTURE TYPE MANUFACTURER
A22/A22E TECHLIGHT
BV METALUX
D4/DVE COOPER/HALO
D6/D6E COOPER/HALO
E1 COOPER/SURE-LITES
E1-WG COOPER/SURE-LITES
L12 STARTEK
L12D STARTEK
LR20 STARTEK
STL/STLE METALUX
TL KELVIX
W2/W2E COOPER/LUMARK
W2-PC COOPER/LUMARK
SPECIFICATIONS
Item 6: Section 051200 – Structural Steel Framing
A. Part 1; Paragraph 1.3, sub-paragraph B. Fabricator – revise to read:
1. Company specializing in fabricating products specified in this Section with minimum five years' documented experience or have the following current AISC Certification:
a. Standard Steel Building Structures (STD).
b. Conventional Steel Building Structures (SBD).
c. Complex Steel Building Structures (CBD).
B. Part 1; Paragraph 1.3, sub-paragraph C. Erector – revise to read:
1. Company specializing in performing Work of this Section with minimum five years' documented experience or have the following current AISC Certification:
a. Certified Steel Erector (CSE).
b. Advanced Certified Steel Erector (ACSE).
so ut h m ai n, s tu di o d l as c ru ce s, p
.5
.3 f
.5
.3 w w w
.s tu di o-d.
C. Part 1; Paragraph 1.3, sub-paragraph D. Shop Painter – revise to read:
1. Company specializing in performing Work of this Section with minimum five years' documented experience or have the following current AISC Certification:
1) Sophisticated Paint Endorsement - Enclosed (P1).
2) Sophisticated Paint Endorsement - Covered (P2).
3) Sophisticated Paint Endorsement - Outside (P3).
Item 7: Section 055813 – Decorative Aluminum Column Covers
A. Part 2, Paragraph 2.03 Materials:
1. Exterior Column Covers to be 6mm Standard Core
2. Interior Column Covers to be 3mm Standard Core
B. Part 2, Paragraph 2.04 Finishes; All material shall be baked-on PVDF finish; color to be selected by owner/Arch from full range of standard colors.
Item 8: Section 084113 – Aluminum Entrances, Storefronts & Windows A. Part 2, Paragraph 2.01; Add Tubelite Architectural Framing Systems (tubeliteusa) as an acceptable manufacturer.
B. Aluminum Entrances, Storefronts, and Windows to be Dark Bronze Anodized finish for all interior and exterior frames and doors, typ.
Item 9: Section 084413 – Aluminum Curtain Wall A. Part 2, Paragraph 2.01; Add Tubelite Architectural Framing Systems (tubeliteusa) as an acceptable manufacturer.
B. Aluminum Curtain Walls to be Dark Bronze Anodized finish, typ.
Item 10: Section 087113 – Hardware:
A. Automatic Door Operators
1. Automatic Door Operators to be Best D-4990 Low Energy Operator; 628 Satin Alum.
Coordinate with automatic doors.
2. Automatic Door Actuator to be Best Push Button to be CL4163 SS Square Plate, quantity and location as indicated on drawings.
3. Provide PS490 Power Supply as Required.
Item 11: Section 08 8000 – Glazing: Replace section in its entirety with attached section.
DRAWINGS
Item 12: Ref. Civil Sheets: The following sheets have been updated:
A. C-1 Site Plan, see additional irrigation meter and backflow information provided.
B. C-2 Grading Plan C. C-3 Utility Plan – added sheet, see additional information for sewer line from south of Goddard
Hall.
D. C-3.1 Utility Details – added sheet, see additional information for sewer manhole and sewer line details.
Item 13: Ref. Structural Drawings: The following sheets have been updated:
A. Sheet S300, 2nd Floor Framing Plan – See revisions to columns and beams.
B. Sheet S301, 3rd Floor Framing Plan – See revisions to columns and beams.
C. Sheet S500, Typ. Framing Details – See revisions to Base Plate Schedule.
so ut h m ai n, s tu di o d l as c ru ce s, p
.5
.3 f
.5
.3 w w w
.s tu di o-d.
Item 14: Sheet A100, Dimension Floor Plan:
A. Keyed Note #12; add the following information:
1. Contractor to provide metal lockers as provided by ASI Storage Solutions, or equal.
a. Double Tier Metal Locker System; Traditional Collection.
b. 16ga lockers with louvered doors.
c. Provide hood with continuous slope
d. 6” legs with base closure panels
e. 2 mil powder coat finish color as selected by owner from full range of standard color options.
Item 15: Sheet A201 and A202, Frame Types:
A. General; all exterior window/entrance systems are to be provided with Low-E coating.
B. Frame Types A, B, C, D, E, M, and Door Frame F1
1. Spandrel Glass for these units is to be a 1” insulated unit with an opaque coating.
2. Spandrel Glass Color as selected by owner from full range of standard color options.
C. Door Frame Type F1; remove ‘Opaque Privacy Film”.
Item 16: Sheet A201, Window Frame Types A. Aluminum Frame A:
1. Provide G5 Tinted Glass at all glass from adjacent finish floor elevation up to 24” min. above adjacent finish floor elevation.
2. Provide G6 Tinted Glass at all glass 24” min. above adjacent finish floor elevation.
B. Aluminum Frame B:
1. Provide G5 Tinted Glass at all glass from adjacent finish floor elevation up to 24” min. above adjacent finish floor elevation.
2. Provide G6 Tinted Glass at all glass 24” min. above adjacent finish floor elevation.
C. Aluminum Frame E:
1. Provide G5 Tinted Glass at lower 24” of window system.
2. Provide G6 Tinted Glass at all glass above 24” of window system.
D. Aluminum Frame M:
1. Provide G5 Tinted Glass at all glass from adjacent finish floor elevation up to 24” min. above adjacent finish floor elevation.
2. Provide G6 Tinted Glass at all glass 24” min. above adjacent finish floor elevation.
E. Aluminum Frame AA:
1. Provide G6 Tinted Glass at all glass in window system.
F. Aluminum Frame BB:
1. Provide G6 Tinged Glass at all glass in window system.
Item 17: Sheet A202, Door Frame Types, Door Types:
A. Door Types; Aluminum Door D1
1. Revise Door Styles and top rail to 5” as specified.
B. Revise Door bottom rail to 10”.
C. Door Frame Type F1; remove ‘Opaque Privacy Film”.
Item 18: Sheet A700 & 701:
A. Re: Interior Elevation 8/A701, Add revised Display Case Elevation and Millwork Section. See attached additional drawing AD1.0.
so ut h m ai n, s tu di o d l as c ru ce s, p
.5
.3 f
.5
.3 w w w
.s tu di o-d.
Item 19: Sheet A701, Interior Elevations: See attached updated sheet.
A. Re: interior Elevation 10/A701 – Contractor to Provide lettering center on west furrdown as shown in updated interior elevation.
1. Gemini Flat Cut Steel Letters, or equal.
a. 1/2” thick standard cut letters.
b. Stud mount with optional spacer sleeve, 1” spacer.
c. Paint finish, color as selected by owner/Arch from full range of standard color options.
1) All letters are to be pre-finished from factory.
Item 20: Ref. Mechanical Drawings: The following sheets have been updated:
A. Sheets MH101, MH102, MH103; Modify General Note E – See Sheets M501-M504 for Mechanical
Details
B. Sheet MH101, HVAC First Floor Plan
1. Add Keyed Note callout 4.
2. Add Exhaust Duct Size.
C. Sheet MH102, HVAC Second Floor Plan
1. Add keyed note callouts 4 and 5.
2. Add exhaust duct size.
3. Modify diffuser cfm.
D. Sheet MP103, Mechanical Piping Third Floor Plan
1. Modify detail number in General Note B: SEE DETAIL D2/M-502 FOR PIPE PENETRATION
DETAIL.
E. Sheet M-104, Enlarged Mechanical Plans
1. Modify text on Enlarged Air Handling Units diagram.
2. Modify pipe routing in Mechanical Room M160.
3. Add piping sizes.
4. Change 6” housekeeping pad to 4” housekeeping pad in keyed notes 1, 2, 14, 15, & 16.
5. Modify keyed note 10.
F. Sheet M-502, Mechanical Details
1. Modify keyed note 11 on A2: Plate and Frame Heat Exchanger Piping Detail.
G. Sheet M-503, Mechanical Details
1. Modify keyed note 10 and 11 on B1- VRV FAN COIL UNIT DETAIL.
2. Modify keyed note callout on B1: VRV FAN COIL UNIT DETAIL.
3. Modify keyed note 6 on A3: FAN COIL UNIT DETAIL.
4. Modify keyed note callouts on A3: FAN COIL UNIT DETAIL.
H. Sheet M-601, Mechanical Diagrams
1. Modify text on Piping Schematic.
I. Sheet M-701, Mechanical Schedules
1. Modify values for TU1-01 and TU1-11 in Terminal Units Schedule.
so ut h m ai n, s tu di o d l as c ru ce s, p
.5
.3 f
.5
.3 w w w
.s tu di o-d.
J. Sheet M-702, Mechanical Schedules
1. Modify values for FC-3 and FC-7 in Indoor Split System Schedule.
2. Modify values for CU-7 in Outdoor Split System Schedule.
Item 21: Ref Sheets E-702 and M-701; in reference to electrical connections to mechanical equipment schedule and ILP Units:
A. Combo motor starter/disconnects are required for ILP-1 thru ILP-4 and are to be provided by the
Div. 26 contractor.
B. The pumps are provided by Div. 23. See also KN# EP141(Sheet EP-401) and Div. 230549.
C. See Revisions to the Electrical Connections Schedule (sheet E-702).
Item 22: Ref. Electrical Drawings: The following sheets have been updated:
A. Sheet EP102, Power Second Floor Plan; revise circuit home run tags in Rm. 250 to reflect correct number of conductors.
B. Sheet E-401, Enlarged Electrical Plan
1. Added meter cabinets to plan to clarify the intended location in Electrical Room 114
C. Sheet E-601, Electrical Diagrams; see revised sheet attached.
1. Adjusted information on Voltage Drop Calculations for some equipment and removed extraneous information.
2. Adjusted information on the Fault Current Calculations for some equipment and removed extraneous information.
3. Added SPD’s to various panels on One-Line diagram.
4. Revised Keyed Note #6 to clarify that SPD’s should be integral to panelboards/switchboards.
D. Sheet E-702 Electrical Panel Schedules; see revised sheet attached.
1. Adjusted AIC ratings for various panelboards.
2. Added notes to applicable panel schedules to clarify requirement for integral SPD.
3. Adjusted the notes column on the Electrical Connections Schedule for proper alignment with the rest of the schedule.
E. Sheet E-703 Electrical Panel Schedules; see revised sheet attached.
1. Added notes to applicable panel schedules to clarify requirement for integral SPD.
F. Sheet E-704 Electrical Panel Schedules; see revised sheet attached.
1. Adjusted AIC rating for panelboard M3B.
2. Added notes to the applicable panel schedules to clarify requirement for integral SPD.
3. Added note to Panel H2A, Circuit #4 to indicate as a metered circuit.
4. Clarified breaker size and loads served by circuits #4 & 8 in panel H2A.
Item 23: Ref. Technology Drawings: The following sheets have been updated:
A. Sheet TS101, Technology Site Plan; add coordination stemten for termination on TS06 and TS07.
B. Sheet T-101, Technology Systems 1st Floor Plan; see revised sheet attached.
1. Added J-box to feed video wall
2. Added (2) 2” conduits routed from back boxes to J-hook pathway
3. Moved J-hook pathway towards video wall through the overhang so ut h m ai n, s tu di o d l as c ru ce s, p
.5
.3 f
.5
.3 w w w
.s tu di o-d.
bi z studio d architects architecture planning LEED services
C. Sheet T-504, Audio Visual; see revised sheet attached.
1. Removed J-Boxes from detail C1.
D. Sheet T601, Technology Diagrams; see revised sheet attached.
1. Added pathway diagram for Video Wall.
END OF ADDENDUM NO. 2
NMSU 4700 THOMAS & BROWN NEW FACILITY
Nov 26 2024 Quote number 24-5215
PRIOR APPROVALS- NMSU 4700 THOMAS & BROWN
NEW FACILITY
PRIOR APPROVALS- NMSU 4700 THOMAS & BROWN NEW
FACILITY
NMSU 4700 THOMAS & BROWN NEW FACILITY
Quote Number 24-5215
Table of Contents
Datasheets New Section
Type Manufacturer Model Number Pg.
A22 TECHLIGHT CBS22-50-3L-3 2
A22E TECHLIGHT CBS22-50-3L-3 4
B1 LUMUX LIGHTING BL344-WHITE-5000K-120-277-ASY-FT-CBA 6
B2 LUMUX LIGHTING BL344-TALL 98"-WHITE-5000K-120-277-ASY-FT-CBA 10
BV METALUX CORP 4VT3-LD5-5-PPC-UNV-L840-CD1-U 14
D4 HALO COMM HCSQ415D010/HM40525840/41SQ-CBA 18
D4E HALO COMM HCSQ415D010/HM40525840/41SQ-CBA 28
D6 HALO COMM HCSQ620D010/HM6025840/61SQ-CBA 38
E1 SURE LITES EUX6-X-G 48
E1-WG SURE LITES LPXW-6-X-R 52
ELZR SURE LITES LPX7SD 53
EM EVENLITE INC TCL4-W 56
L12 STARTEK LIGHTING AMERICA BEAMD-12-500-SD-40K-90-CBA-ACW10-U-1C 58
L12D STARTEK LIGHTING AMERICA BEAMDI-12-300-300-SD-CL-40K-90-CBA-ACW10-U-1C 68
L32 SPI LIGHTING AIP12071/8FT-L40W/120-277V 4000K/OAH-XX" 78
L32E SPI LIGHTING AIP12071/8FT-L40W/120-277V 4000K/EMC/OAH-XX" 83
LR20 STARTEK LIGHTING AMERICA PSLIM-20-350-GRZ-40K-90-F-CBA-XX-R2.5-U-1C 88
N1W METALUX CORP 4SNX-45SL-LW-UNV-L840-CD1-WLS4-U 100
N2W METALUX CORP 8TSNX-90SL-LW-UNV-L840-CD1-WLS4-U 110
P4 SPI LIGHTING AIP11848/L75W-CBA-120-277V/4000K/90/H05/FB00/SIA/
OAH-XX
P6 SPI LIGHTING AIP11997/L113-CBA-120-277V/4000K/90/H05/FB00/SIA/O
AH-XX"
New Section (continued)
Type Manufacturer Model Number Pg.
P10 SPI LIGHTING AIP12099/L198W-CBA-120-277V/4000K/90/H05/FB00/SIA
/OAH-XX"
STL METALUX CORP 4SNX-57SL-LW-UNV-L840-CD1-U 141
STLE METALUX CORP 4SNX-57SL-LW-UNV-L840-CD1-U 151
TL-12' KELVIX UNI2-WL-I-750-40K-24V-12 161
TL-6' KELVIX UNI2-WL-I-750-40K-24V-6 171
W1 LUMUX LIGHTING SL650-WHITE-4000K-120-277V-XX/CPX 181
W1E LUMUX LIGHTING SL650-WHITE-4000K-120-277V-XX/CPX 186
W2 LUMOUTDOOR AXCS4A-C-CBA 191
W2-PC LUMOUTDOOR AXCS4A-C-CBA-PC 197
W2E LUMOUTDOOR AXCS4A-C-CBA 203
WS1 SPI LIGHTING EIW12398/L44W-CBA-120-277V/3500K/SSB/WA 209
PRIOR APPROVALS- NMSU 4700 THOMAS & BROWN NEW
FACILITY
NMSU 4700 THOMAS & BROWN NEW FACILITY
Quote Number 24-5215
Notes Summary
New Section
Type Notes Pg.
B1 SPECIFY COLOR BY ARCHITECT 6
B2 SPECIFY COLOR BY ARCHITECT 10
D4 SPECIFY FINISH BY ARCHITECT 18
D4E SPECIFY FINISH BY ARCHITECT 28
D6 SPECIFY FINISH BY ARCHITECT 38
E1 SPECIFY FACE OPTION BY ARCHITECT 48
E1-WG SPECIFY FACE OPTION BY ARCHITECT 52
L12 SPECIFY COLOR BY ARCHITECT 58
L12D SPECIFY COLOR BY ARCHITECT 68
L32 SPECIFY LENGTH BY ARCHITECT 78
L32E SPECIFY LENGTH BY ARCHITECT 83
LR20 SPECIFY COLOR/MOUNTING BY ARCHITECT 88
P4 SPECIFY COLOR/LENGTH BY ARCHITECT 120
P6 SPECIFY COLOR/LENGTH BY ARCHITECT 127
P10 SPECIFY COLOR/LENGTH BY ARCHITECT 134
W1 SPECIFY COLOR BY ARCHITECT 181
W1E SPECIFY COLOR BY ARCHITECT 186
W2 SPECIFY COLOR BY ARCHITECT 191
W2-PC SPECIFY COLOR BY ARCHITECT 197
W2E SPECIFY COLOR BY ARCHITECT 203
WS1 SPECIFY COLOR BY ARCHITECT 209
4700 Thomas and Brown Building Replacement Glazing
23.18 08 8000 - 1
SECTION 08 8000
GLAZING
PART 1. GENERAL
1.01 SECTION INCLUDES
A. Glass, plastic, and glazing for sections referencing this section for Products and installation.
1.02 RELATED SECTIONS
A. Section 07 9000 - Joint Sealers: Sealant and back-up material.
1.03 REFERENCES
A. ANSI Z97.1 - Safety Performance Specifications and Methods of Test for Safety Glazing Used in Buildings.
B. ASTM C669 - Glazing Compounds for Back Bedding and Face Glazing of Metal Sash.
C. ASTM C864 - Dense Elastomeric Compression Seal Gaskets, Setting Blocks, and Spacers.
D. ASTM C920 - Elastomeric Joint Sealants.
E. ASTM C1036 - Flat Glass.
F. ASTM C1048 - Heat-Treated Flat Glass - Kind HS, Kind FT Coated and Uncoated Glass.
G. ASTM C1172 - Laminated Architectural Safety Glass.
H. ASTM E84 - Surface Burning Characteristics of Building Materials.
I. ASTM E283 - Test Method For Rate of Air Leakage Through Exterior Windows, Curtain Walls and Doors.
J. ASTM E330 - Structural Performance of Exterior Windows, Curtain Walls, and Doors by Uniform Static Air Pressure Difference.
K. ASTM E546 - Test Method For Frost Point of Sealed Insulating Glass Units.
L. ASTM E576 - Test Method For Dew/Frost Point of Sealed Insulating Glass Units in Vertical Position.
M. ASTM E773 - Test Method for Seal Durability of Sealed Insulating Glass Units.
N. ASTM E774 - Sealed Insulating Glass Units.
O. FGMA - Glazing Manual.
P. FGMA - Sealant Manual.
Q. Laminators Safety Glass Association - Standards Manual.
23.18 08 8000 - 2
R. SIGMA - Sealed Insulated Glass Manufacturers Association.
1.04 PERFORMANCE REQUIREMENTS
A. Exterior Glazing: Provide glazing assemblies which will withstand normal conditions without failure, loss of weathertightness, or deterioration.
1. Design to accommodate thermal movement resulting from:
a. Air temperature range of 120 degrees F.
b. Material temperature range of 180 degrees F.
2. Design to withstand wind loading as specified by applicable code for parts/portions of buildings. Size glass to withstand dead loads and positive and negative live loads acting normal to plane of glass as calculated in accordance with the building code and those required by the curtainwall system manufacturer, for this application.
a. Statistical probability of breakage: 8 per 1000, maximum, at 60-second wind load.
b. Deflection: Limit glass deflection to L/175 or flexure limit of glass with full recovery of glazing materials, whichever is less. In no case shall deflection exceed 3/8".
3. Failure includes loss or breakage of glass, due to wind load, exceeding that reasonably expected under the performance requirements specified.
B. Deterioration includes:
1. For insulating glass:
a. Moisture or dirt between panes.
b. Development of condensation between panes.
c. Damage to internal coating, if any.
d. Development of other visible indication of seal failure.
2. For coated glass: Development of visible defects in coating.
C. Provide glass and glazing materials for continuity of building enclosure vapor retarder and air barrier:
1. To maintain a continuous air barrier and vapor retarder throughout the glazed assembly from glass pane to heel bead of glazing sealant.
1.05 SUBMITTALS FOR REVIEW
A. Section 01 3300 – Submittals.
B. Product Data on Glass and Plastic Types: Provide structural, physical and environmental characteristics, size limitations, special handling or installation requirements.
C. Product Data on Glazing Compounds: Provide chemical, functional, and environmental characteristics, limitations, special application requirements. Identify available colors.
D. Samples: Submit two samples 12 x 12 inch in size, exampling glass and plastic units, coloration, and design.
1.06 QUALITY ASSURANCE
A. Installer Qualifications: Company specializing in performing the work of this section with minimum three years documented experience.
23.18 08 8000 - 3
B. Standard for Fire-Resistance Rated Glass: ASTM E 163; each piece labeled by:
1. Underwriters Laboratories Inc. (UL).
2. Other agency acceptable to governing authorities.
C. Certified Safety Glazing: Provide Category II products which comply with test requirements of 16 CFR 1201 and
ANSI Z97.1 and permanently marked with label of:
1. Safety Glazing Certification Council (SGCC).
D. Sealed Insulating Units for Structural Adhesive Glazing: Perform testing, or provide samples to entity performing testing, to demonstrate compatibility between seal materials and structural adhesive, refer to additional requirements in framing system section.
1.07 ENVIRONMENTAL REQUIREMENTS
A. Section 01 6000 - Material and Equipment: Environmental conditions affecting products on site.
B. Do not install glazing when ambient temperature is less than 50 degrees F.
C. Maintain minimum ambient temperature before, during and 24 hours after installation of glazing compounds.
1.08 WARRANTY
A. Refer to Section 01 7700 - Contract Closeout.
B. Provide a five (5) year warranty to include coverage for glass units from tint or reflective film failure, stress fracturing, hermetic seal failure, edge separation, delamination, and internal material obstruction of vision through the glass surface.
C. Provide a five (5) year warranty to include coverage for yellowing of polycarbonate material and replacement of same.
D. Provide a ten (10) year warranty for mirror glass against silver spoilage due to manufacturing defects.
PART 2. PRODUCTS
2.01 FLAT GLASS MATERIALS
A. Type 1 transparent flat, Class 1, Quality q3 glazing; 1/4" thick (minimum) as scheduled.
B. Low E glass: ¼” thick (minimum) as scheduled.
1. Minimum Visible Light Transmittance: 53%
2. Solar Heat Gain Coefficient: ≤0.45
C. Heat Strengthened and Tempered Glass as scheduled:
1. Comply with ASTM C 1048 for type listed.
2. Kind FT (Tempered Glass) and HT (Heat Strengthened), Type I, Class 1, Quality q3; 1/4" thick
(minimum) as scheduled.
3. Process in horizontal position so that inherent roller distortion will run parallel to building floor lines after installation.
23.18 08 8000 - 4
4. All sidelights as part of door assemblies shall be of this type glass, unless noted otherwise.
D. Fabrication Tolerances: ASTM C 1036 and C 1048.
E. Glass identification:
1. Apply manufacturer's label indicating type and the thickness to each light of glass. Show position of exterior face when installed, where applicable.
2. Etch manufacturer's label on each light of tempered glass.
2.02 GLAZING COMPOUNDS
A. Polyurethane Sealant: ASTM C920, Type S, Grade NS, Class A; single component, chemical curing, non-staining, non-bleeding, Shore A Hardness Range 20 to 35; color as selected.
B. Silicone Sealant: ASTM C920, Type S, Grade NS, Class A; single component; chemical curing; capable of water immersion without loss of properties; non-bleeding, non-staining, cured Shore A hardness of 15 to 25;
color as selected.
C. Glazing Compound: Modified oil type, non-hardening, knife grade consistency, color as selected.
2.03 GLAZING ACCESSORIES
A. Setting Blocks: ASTM C864 Option I, Neoprene 80 to 90 Shore A durometer hardness, length of 0.1 inch for each square foot of glazing or minimum 4 inch x width of glazing rabbet space minus 1/16 inch x height to suit glazing method and pane weight and area.
B. Glazing Gaskets: ASTM C864, extruded silicone type, 75 to 85 Shore A durometer.
C. Structural Silicone Glazing Sealant: Single component, neutral curing, medium to high modulus, minimum ultimate tensile strength of 100 PSI when tested using the H section method.
D. Glazing Tape: Preformed butyl compound; 10 to 15 Shore A durometer hardness; Coiled on release paper;
size as required.
E. Glazing Clips: Manufacturer's standard type.
2.04 GLAZING FABRICATION
A. Sealed Insulating Glass: Comply with ASTM E 774, Grade CBA, fabricate spacer bar frame of tubular aluminum or galvanized steel with desicant fill; bond spacer bar to glass with twin primary seals; fill space outside frame to glass edge with elastomeric sealant compatible with materials with which the unit will contact.
PART 3. EXECUTION
3.01 EXAMINATION
A. Section 01 3100 - Coordination: Verification of existing conditions before starting work.
B. Verify that openings for glazing are correctly sized and within tolerance.
23.18 08 8000 - 5
C. Verify that surfaces of glazing channels or recesses are clean, free of obstructions that may impede moisture movement, weeps are clear, and ready to receive glazing.
3.02 PREPARATION
A. Clean contact surfaces with solvent and wipe dry.
B. Seal porous glazing channels or recesses with substrate compatible primer or sealer.
C. Prime surfaces scheduled to receive sealant.
D. Install sealant in accordance with manufacturer's instructions.
3.03 INSTALLATION - INTERIOR DRY METHOD (TAPE AND TAPE)
A. Cut glazing tape to length and set against permanent stops, projecting 1/16 inch above sight line.
B. Place setting blocks at 1/4 points with edge block no more than 6 inches from corners.
C. Rest glazing on setting blocks and push against tape for full contact at perimeter of pane or unit.
D. Place glazing tape on free perimeter of glazing in same manner described above.
E. Install removable stop without displacement of tape. Exert pressure on tape for full continuous contact.
F. Knife trim protruding tape.
3.04 INSTALLATION - INTERIOR WET/DRY METHOD (TAPE AND SEALANT)
A. Cut glazing tape to length and install against permanent stops, projecting 1/16 inch above sight line.
B. Place setting blocks at 1/4 points with edge block no more than 6 inches from corners.
C. Rest glazing on setting blocks and push against tape to ensure full contact at perimeter of pane or unit.
D. Install removable stops, spacer shims inserted between glazing and applied stops at 24 inch intervals, 1/4 inch below sight line.
E. Fill gaps between pane and applied stop with sealant to depth equal to bite on glazing, to uniform and level line.
F. Trim protruding tape edge.
3.05 INSTALLATION - GLAZING COMPOUND
A. Fill voids between glass and stops with glazing compound and tool material to a straight line.
3.06 INSTALLATION - GASKET GLAZING
A. Set glass against compression gasket in fixed stop; roll in wedge gasket beginning at two adjacent corners
23.18 08 8000 - 6 working to the center points avoiding stretching the gasket material; apply metal snap on members once gasket is installed.
3.07 FIELD QUALITY CONTROL
A. Section 01 4000 - Quality Control.
B. Inspection will monitor quality of glazing.
3.08 CLEANING
A. Section 01 7700 - Contract Closeout: Cleaning installed work.
B. Remove glazing materials from finish surfaces.
C. Remove labels after Work is complete.
D. Clean glass and adjacent surfaces.
3.09 PROTECTION OF FINISHED WORK
A. Section 01 7700 - Contract Closeout: Protecting installed work.
B. After installation, mark pane with an 'X' by using removable plastic tape or paste.
3.10 SCHEDULE
A. Type G1 – 1” Insulated, Low E, Tempered Glass:
1. Description: Two ¼” sheets of glass with ½” air space in between and low E coating on #2 surface, tempered.
2. Locations: Exterior Aluminum Storefront or Hollow Metal glazing systems, directly adjacent to door assemblies and below 18 inches above finished floor. (required to be tempered glass per code). Refer to Drawings.
3. Minimum Visible Light Transmittance: 53%
4. Solar Heat Gain Coefficient: ≤0.45
5. Product: Pilkington, Solar-E or approved equal.
B. Type G2– 1” Insulated, Low E Glass
1. Description: Two ¼” sheets of glass with ½” air space in between and low E coating on #2 surface, annealed.
2. Locations: Exterior Aluminum Storefront or Hollow Metal glazing systems and Glazed curtain wall system. Refer to Drawings.
3. Minimum Visible Light Transmittance: 53%
4. Solar Heat Gain Coefficient: ≤0.45
5. Product: Pilkington, Solar-E or approved equal.
C. Type G3 – Clear Flat, Tempered Glass:
1. Description: ¼ inch thick, clear, annealed or tempered as required by Code.
2. Locations: Shall be used in all interior sidelight assemblies in hollow metal and aluminum frames.
23.18 08 8000 - 7
Shall be used in other locations as defined on the Drawings.
D. Type G4 – Clear Flat Glass:
1. Description: ¼ inch thick, clear glass.
2. Locations: For use in interior glazing. Refer to Drawings.
E. Type G5 – 1” Insulated, Low E, Tempered Glass:
1. Description: Two ¼” sheets of glass with ½” air space in between and low E coating on #2 surface, tempered.
2. Locations: Exterior Aluminum Storefront or Hollow Metal glazing systems, directly adjacent to door assemblies and below 18 inches above finished floor. (required to be tempered glass per code). Refer to Drawings.
3. Color: Pilkington Supergrey
4. Product: Pilkington, Solar-E or approved equal.
F. Type G6– 1” Insulated, Low E Glass
1. Description: Two ¼” sheets of glass with ½” air space in between and low E coating on #2 surface, annealed.
2. Locations: Exterior Aluminum Storefront or Hollow Metal glazing systems and Glazed curtain wall system. Refer to Drawings.
3. Color: Pilkington Supergrey
4. Product: Pilkington, Solar-E or approved equal.
END OF SECTION
Richard L. Leza's Learning Center
1'- 0"
6'- 0"
3'- 0"
12'-1"
15'-3"
1/2" TEMPERED CLEAR
GLASS SLIDING DOORS.
1'-3 3/4" 1"
9 1 /2"
2 1 /2"
5'- 9 1
/2" 2 1
/2"
12" LAMINATED GLASS W/
ADHESIVE STYLE LETTERING
EQ. EQ. EQ. EQ.
PROVIDE DISPLAY CASE
LOCKS AT EA. DOOR.
SHELF
SHELF
TERRAZZO BASE.
TERRAZZO TOP.
P.LAM SIDES AND
BACK.
AD1.0
STEP INTEGRATED
WITH DISPLAY BASE.
1'- 8"
6"
6" 14'-2" 7"
1/2" TEMPERED GLASS,
PROVIDE FIXED BOTTOM
RAIL.
CONT. SEALANT.
PRE-CAST TERRAZZO TOP
TO MATCH STAIR CASE.
3/4" PLY WD. SUBSTRATE.
PRE-CAST TERRAZZO EDGE
AT TOP CONDITION.
P.LAM EDGE AT SIDE RAIL
CONDITION.
1/2" TEMPERED CLEAR
SLIDING GLASS DOORS AND
TOP/BOTTOM RIAL SYSTEM.
1/2" TEMPERED CLEAR
GLASS SHELVES.
PLYWD. BACK AND SIDES
WITH P.LAM. FINISH.
PRE-CAST TERRAZZO BASE
TO MATCH STAIR CASE.
PRE-CAST TERRAZZO
FRONT OVER 3/4" PLYWD.
3/4" PLWD W/ P.LAM FINISH AT
BACK WALL. PROVIDE FINISHED
BACK AND SIDES.
1'- 0"
6'- 0"
3'- 0"
3"1/2"
9 1 /2"
2 1 /2"
5'- 9 1
/2" 2 1
/2"
2'-3"
1'- 0"
1"
1"
1x BLOCKING.
1'-11 1/2"
TERRAZZO STEP ON SAME
PLAIN AS TOP OF CASE.
Project no: 23.18 Date:
Studio D Architects
509 S. Main Studio d Las Cruces, NM 88001 505.521.3757 www.studio-d.biz
Thomas & Brown New Facility
REVISED/ADDED DRAWING
New Mexico State University Las Cruces, NM
Reference Drawing:
Scale:
Field Change #
AD1.0
1DISPLAY CASE ELEVATION
3/8" = 1'-0"
2DISPLAY CASE SECTION
1" = 1'-0"
Project no: 23.18 Date:
Studio D Architects
509 S. Main Studio d Las Cruces, NM 88001 505.521.3757 www.studio-d.biz
Thomas & Brown New Facility
REVISED/ADDED DRAWING
New Mexico State University Las Cruces, NM
Reference Drawing:
Scale:
Field Change #
AD1.1
1ANTENNA LOCATIONS
NTS
EXISTING RADIO ANTENNA TO BE
REMOVED AND SALVAGED TO
OWNER; COORDINATE WITH NMSU.
EXISTING IRRIGATION ANTENNA TO
BE REMOVED AND SALVAGED TO
OWNER; COORDINATE WITH NMSU.
NMSU Thomas & Brown : New Facility
CONSTRUCTION DOCUMENTS
date 10.15.24
ARCHITECT
STUDIO D ARHCITECTS
PO BOX 1467
FAIRACRES, NM 88033
P 575.521.3757 F
CONTACT:
JASON CLARK
PROJECT TEAM
OWNER
NEW MEXICO STATE UNIVERSITY
P.O. BOX 30001
LAS CRUCES, NM 88003
P F
CONTACT:
ROBERT ESTRADA,
ASSISTANT DIRECTOR
DATE OF ADVERTISEMENT - October 30, 2024
PROJECT
LOCATION
VICINITY MAP
COVER SHEET
G001 CONSTRUCTION & STAGING AREA
SITE AND BUILDING INFORMATION (EXIST.)
AD100 FLOOR PLAN DEMOLITION
AD101 FLOOR PLAN DEMOLITION
AD300 EXTERIOR ELEVATIONS DEMOLITION
AS301 EXTERIOR ELEVATIONS DEMOLITION
AD400 BUILDING SECTIONS DEMOLITION
AD401 BUILDING SECTIONS DEMOLITION
AD500 RCP AND ROOF DEMOLITION
S001 STRUCTURAL FOUNDATION
S200 FOUNDATION DEMOLITION PLAN
PD001 PLUMBING EXIST. SITE
PD002 PLUMBING DEMOLITION
DEMOLITION
AS001 DEMOLITION SITE PLAN
MS100 MECHANICAL DEMOLITION SITE PLAN
MS101 MECHANICAL SITE PLAN (COPY)
PDS101 PLUMBING DEMOLITION SITE PLAN
ES100 ELECTRICAL SITE DEMOLITION PLAN
TS100 TECHNOLOGY SITE DEMOLITION PLAN
TS101 TECHNOLOGY SITE PLAN (COPY)
CIVIL
AS100 DIMENSION SITE PLAN
AS101 SITE DETAILS
C-1 SITE PLAN (CIVIL)
C-2 GRADING PLAN
C-3 UTILITY PLAN
C-3.1 UTILITY DETAILS
LANDSCAPE
LS101 LANDSCAPE PLAN
LS102 IRRIGATION PLAN
LS103 LANDSCAPE DETAILS
STRUCTURAL
S100 STRUCTURAL NOTES
S101 STRUCTURAL DETAILS
S102 STRUCTURAL DIAGRAMS
S201 FOUNDATION PLAN
S300 2ND FLOOR FRAMING PLAN
S301 3RD FLOOR FRAMING PLAN
S302 PRE-ENG. LT. GA. TRUSS PLAN
S303 HIGH ROOF FRAMING PLAN
S400 TYPICAL FOUNDATION DETAILS
S410 FOUNDATION DETAILS
S500 TYPICAL FRAMING DETAILS
S501 TYPICAL FRAMING DETAILS
S510 FLOOR FRAMING DETAILS
S511 FLOOR FRAMING DETAILS
S600 ROOF FRAMING DETAILS
S601 ROOF FRAMING DETAILS
S602 ROOF FRAMING DETAILS
S700 STAIR PLANS
S701 STAIR PLANS
S710 STAIR DETAILS
S711 CASTELLATED BEAM ELEV.
ARCHITECTURAL
A100 DIMENSION FLOOR PLAN 1ST FLOOR
A101 DIMENSION FLOOR PLAN 2ND FLOOR
A102 DIMENSION FLOOR PLAN 3RD FLOOR
A103 ENLARGED PLANS & PLAN DETAILS
A104 ENLARGED PLAN DETAILS
A105 FLOOR FINISHES 1ST FLOOR
A106 FLOOR FINISHES PLANS
A200 SCHEDULES
A201 WINDOW FRAME TYPES
A202 DOOR FRAME TYPES, DOOR TYPES
A203 HEAD AND JAMB DETAILS
A300 EXTERIOR ELEVATIONS
A301 EXTERIOR ELEVATIONS
A400 BUILDING SECTIONS
A401 BUILDING SECTIONS
A402 BUILDING SECTIONS
A403 WALL SECTIONS
A404 WALL SECTIONS
A405 WALL SECTIONS
A406 WALL SECTIONS
A407 WALL SECTIONS
A408 WALL SECTIONS
A409 WALL SECTIONS
A410 WALL SECTIONS
A411 WALL SECTIONS
A412 STAIR SECTIONS
A413 STAIR SECTIONS
A500 REFLECTED CEILING PLAN 1ST FLOOR
A501 REFLECTED CEILING PLAN 2ND FLOOR
A502 REFLECTED CEILING PLAN 3RD FLOOR
A600 ROOF PLAN
A700 INTERIOR ELEVATIONS
A701 INTERIOR ELEVATIONS
A702 MILLWORK SECTIONS
A800 ADA DETAILS
A801 ADA DETAILS
MECHANICAL
M-001 MECHANICAL LEGEND
MS101 MECHANICAL SITE PLAN
MH101 HVAC 1ST FLOOR PLAN
MH102 HVAC 2ND FLOOR PLAN
MH103 HVAC 3RD FLOOR PLAN
MH131 MECHANICAL ROOF PLAN
MP101 MECHANICAL PLUMBING 1ST FLOOR
MP102 MECHANICAL PLUMBING 2ND FLOOR
MP103 MECHANICAL PLUMBING 3RD FLOOR
M-401 ENLARGED MECHANICAL PLAN
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-503 MECHANICAL DETAILS
M-504 MECHANICAL DETAILS
M-601 MECHANICAL DIAGRAMS
M-701 MECHANICAL SCHEDULES
M-702 MECHANICAL SCHEDULES
MI001 MECHANICAL CONTROLS LEGEND
MI601 MECHANICAL CONTROLS DIAGRAMS
MI602 MECHANICAL CONTROLS DIAGRAMS
MI603 MECHANICAL CONTROLS DIAGRAMS
FIRE PROTECTION
FX001 FIRE PROTECTION LEGEND
FX101 FIRE PROTECTION 1ST FLOOR PLAN
FX102 FIRE PROTECTION 2ND FLOOR PLAN
FX103 FIRE PROTECTION 3RD FLOOR PLAN
FX501 FIRE PROTECTION DETAILS
FX601 FIRE PROTECTION DIAGRAMS
PLUMBING
P-001 PLUMBING LEGEND
PS101 PLUMBING SITE PLAN
PL101 WASTE & VENT 1ST FLOOR PLAN
PL102 WASTE & VENT 2ND FLOOR PLAN
PL103 WASTE & VENT 3RD FLOOR PLAN
PL131 PLUMBING ROOF PLAN
PP101 PRESSURE PIPING 1ST FLOOR PLAN
PP102 PRESSURE PIPING 2ND FLOOR PLAN
PP103 PRESSURE PIPING 3RD FLOOR PLAN
P-401 ENLARGED PLUMBING PLANS
P-402 ENLARGED PLUMBING PLANS
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
P-701 PLUMBING SPECIFICATIONS & SCHED.
P-702 PLUMBING CALCULATIONS
ELECTRICAL
E-001 ELECTRICAL LEGEND
ES101 ELECTRICAL SITE PLAN
EL101 LIGHTING 1ST FLOOR PLAN
EL102 LIGHTING 2ND FLOOR PLAN
EL103 LIGHTING 3RD FLOOR PLAN
EP101 POWER 1ST FLOOR PLAN
EP102 POWER 2ND FLOOR PLAN
EP103 POWER 3RD FLOOR PLAN
FA101 FIRE ALARM 1ST FLOOR
FA102 FIRE ALARM 2ND FLOOR
FA103 FIRE ALARM 3RD FLOOR
E-401 ENLARGED ELECTRICAL PLAN
E-501 ELECTRICAL DETAILS
E-601 ELECTRICAL DIAGRAMS
E-602 GROUNDING DIAGRAMS
E-603 LIGHTING DETAILS & SEQUENCE OF OP.
E-701 ELECTRICAL SCHEDULES
E-702 ELECTRICAL PANEL SCHED.
E-703 ELECTRICAL PANEL SCHED.
E-704 ELECTRICAL PANEL SCHED.
TECHNOLOGY
T001 TECHNOLOGY LEGEND
TS101 TECHNOLOGY SITE PLAN
T-101 TECHNOLOGY SYSTEMS 1ST FLOOR PLAN
T-102 TECHNOLOGY SYSTEMS 2ND FLOOR PLAN
T-103 TECHNOLOGY SYSTEMS 3RD FLOOR PLAN
T-401 ENLARGED TECHNOLOGY PLANS
T-500 VAULT DETAILS
T-501 TECHNOLOGY DETAILS
T-502 TECHNOLOGY DETAILS
T-503 SECURITY DETAILS
T-504 AUDIO VISUAL
T-601 TECHNOLOGY DIAGRAMS
project no. 23.18
MECHANICAL, ELECTRICAL &
PLUMBING
BRIDGERS & PAXTON
4600-C MONTGOMERY BLVD. NE
ALBUQUERQUE, NM 87109
P 505.883.4111 F
CONTACT:
ILIR MESITI, PE, LEED AP, CGD
SCOTT RUSH, RCDD
STRUCTURAL
STUBBS ENGINEERING, INC.
277 E. AMADOR AVE., STE. 200
LAS CRUCES, NM 88001
P 575.993.5228 F
CONTACT:
MICHAEL STUBBS
LANDSCAPE ARCHITECT
MITCHELL ASSOCIATES, LLC
P.O. BOX 1241
CEDAR CREST, NM 87008
P 505.639.9583 F
CONTACT:
DANNY MITCHELL
DRAWING INDEX
PROJECT DATA
SYMBOLS / REFERENCE TAGS
MAX. HEIGHT / STORIES
NO. OF EXITS
ALLOWABLE AREA
CONSTRUCTION TYPE
BUILDING OCCUPANCY
EXTERIOR WALL FIRE
MIN. CORRIDOR WIDTH
PUBLIC OCCUPANT LOAD
ITEM
RESISTANCE
EXIT WIDTH
PROVIDEDCODE REQUIREMENT
N/A
635x0.15 = 95.25" / 2 = 47.63 MIN.
75 FT. / 4 STORIES
B (HIGHER EDUCATION) / A3
69"
N/A
TYPE II - B
B (HIGHER EDUCATION) / A3
OCCUPANCY LOAD
TYPE II - B
69,000 S.F./ PER FLOOR 1ST FLOOR = 17,037
(RATIO OF 1/150 S.F.) : (1/20 IN A-3)
3 MIN. REQUIRED 7
48 FT. / 3 STORY
635x0.15 = 95.25" 216"
PLUMBING FIXTURE REQUIREMENTS
NEW MEXICO STATE UNIVERSITY (NMSU)
SITE REQUIREMENTS
ZONING :
1305 Frenger St.
Las Cruces, New Mexico
BUILDING OR WALL SECTION ELEVATION REFERENCE
WINDOW I.D.
DOOR I.D.
CONTROL POINT ELEVATION
NEW EXISTING
0'-0"
DETAIL REFERENCE
SHEET
DETAIL
A100
0'-0"
A100
SHEET
DETAIL
NORTH
ELEVATION
SHEET
A700
REGULATING CODES
INTERNATIONAL BUILDING CODE
UNIFORM MECHANICAL CODE
NEW MEXICO MECHANICAL CODE
UNIFORM PLUMBING CODE
NEW MEXICO PLUMBING CODE
INTERNATIONAL FIRE CODE
NATIONAL ELECTRIC CODE
NEW MEXICO ELECTRICAL CODE
AMERICAN NATIONAL STANDARDS INSTITUTE A117
NEW MEXICO COMMERCIAL BUILDING CODE
REVISION DATE
Project no:
Date:
Sheet:
La st
S av ed B y:
A
N D ec
3,
- 2 :1
1p m
La yo ut N am e:
L ay ou t1
D at e:
D ec
3,
- 2 :1
2p m
U se r:A N
D ra w in g Fi le : K
:\2
Pr oj ec ts \2
N M
SU
T ho m as a nd B ro w n Bu ild in g R ep la ce m en t\D
W G
\S he et s\
-C ov er .d w g
Studio D Architects
P.O. Box 1467 Fairacres, NM 88033
PH 575.521.3757
www.studio-d.biz
FAX 575.521.3880
Building Replacement
NMSU
Thomas & Brown New Facility
1305 Frenger St.
Las Cruces, NM 88001
23.18 October 2024
2ND FLOOR = 13,345
3RD FLOOR = 1,404
TOTAL = 31,786
OCCUPANCY LOAD
STUDENT COMMONS
USE
1,950 1/15 130
AREA S.F. LOAD FACTOR # OCCUPANTS
WORK ROOM/PRINTING 311 1/150 2
CONFERENCE 562 1/15 37
CONTROL LAB 1 765 1/20 16+1
TOTAL OCCUPANTS 342
KITCHEN/LOCKER 352 1/300 1
1ST FLOOR PLAN
2ND FLOOR PLAN
JANITOR
USE
25 1/300 1
AREA S.F. LOAD FACTOR # OCCUPANTS
ELECTRICAL 133 1/300 1
ROOFTOP FLEX SPACE 1,234 1/150 8
TOTAL OCCUPANTS 11
EQUIPMENT STOR. 183 1/300 1
3RD FLOOR PLAN
CONTROL LAB 2 765 1/20 16+1
CLASSROOM 1 1,516 1/20 48+1
CLASSROOM 2 1,516 1/20 48+1
MULTI-USE LAB 678 1/20 16+1
MULTI-USE STORAGE 96 1/300 1
OPTICS LAB 764 1/20 16+1
OPTICS STORAGE 96 1/300 1
ECE 184 1/150 1
LOADING 278 1/300 1
ELECTRICAL 147 1/300 1
FIRE 166 1/300 1
CAPSTONE 1
USE
219 1/150 1
AREA S.F. LOAD FACTOR # OCCUPANTS
CAPSTONE 2 219 1/150 1
CAPSTONE 4 233 1/150 2
CAPSTONE 5 231 1/150 2
TOTAL OCCUPANTS 144
CAPSTONE 3 269 1/150 2
OFFICE 1 120 1/150 1
OFFICE 2 120 1/150 1
OFFICE 3 120 1/150 1
OFFICE 4 120 1/150 1
OFFICE 5 110 1/150 1
OFFICE 6 112 1/150 1
OFFICE 7 120 1/150 1
OFFICE 8 120 1/150 1
OFFICE 9 120 1/150 1
OFFICE 10 120 1/150 1
EMAG LAB 915 1/20 16+1
ALL SITE CONDITIONS ARE EXISTING TO REMAIN. THE PROJECT WILL CONSIST OF
DEMOLISHING THE EXISTING THOMAS AND BROWN BUILDING AND REPLACING IT WITH
A NEW STRUCTURE WITHIN THE EXISTING BUILDING SITE. REFER TO NEW WORK SITE
PLAN FOR NEW BUILDING SEPARATION FROM EXISTING ADJACENT BUILDINGS.
EMAG STORAGE 120 1/300 1
ELECTRICAL 105 1/300 1
FIRE/MECH 192 1/300 1
GRAD OFFICE 1,168 1/150 8
CLASSROOM STOR. 201 1/300 1
CLASSROOM 1,259 1/20 48+1
EEC OFFICE 1,103 1/150 7
JANITOR 75 1/300 1
IT ROOM 97 1/300 1
STUDENT COMMONS 414 1/15 27
WAITING 179 1/15 12
**BUILDING TO BE PROVIDED WITH A SPRINKLER SYSTEM TO MEET THE 2021 IBC AND
NFPA 13 CODE REQUIREMENTS**
*ACCESSORY SPACES NOT COUNTED TOWARDS OCCUPANCY LOAD
MIN. STAIR WIDTH 159x0.3 = 47.7" MIN. 52"
497 OCCUPANTS
WATER CLOSETS LAVATORIES
MALE
FEMALE
REQUIRED PROVIDED REQUIRED
URINALS
PROVIDED
248.5 MEN & 248.5 WOMEN
DRINKING 5 6
FOUNTAINS
SERVICE 1 3
SINK
PROVIDED
SINGLE-USE - 3 - 30
CIVIL
A&E ENGINEERING
1800 E. LOHMAN AVE.
LAS CRUCES, NM 88001
P 575.649.0254 F
CONTACT:
ADRIAN RENTERIA, PE
ADDITIVE ALTERNATES
A. ADDITIVE ALTERNATE NO. 1:
1. DRONE ENCLOSURE (TO INCLUDE)
a. DRONE STEEL STRUCTURE AND ENCLOSURE NETTING
b. ADDITIONAL ROOF STRUCTURE REQUIRED FOR DRONE ENCLOSURE
B. ADDITIVE ALTERNATE NO. 2:
1. VINYL FLOORING IN LIEU OF SEALED CONCRETE AT LAB CLASSROOMS
C. ADDITIVE ALTERNATE NO. 3:
1. STEEL TUBE TRELLIS AT 3RD STORY ROOF FLEX SPACE.
a. INCLUDE STEEL TRELLIS STRUCTURE.
b. INCLUDE PRIME, PAINT AND FLASHINGS
D. ADDITIVE ALTERNATE NO. 4:
1. ADDITIONAL CONCRETE REPLACEMENT
a. REMOVE AND REPLACE CONCRETE WALKWAY AT NORTH SIDE OF
BUILDING, SEE SITE AND CIVIL.
b. REMOVE AND REPLACE CONCRETE DRIVE AT SOUTH SIDE OF BUILDING
(FRENGER ST.), SEE SITE AND CIVIL.
E. ADDITIVE ALTERNATE NO. 5:
1. LCD VIDEO DISPLAY WALL; REFER TO ELECTRICAL AND TECHNOLOGY
DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
**NON-SEPARATED USE/OCCUPANCY AS PER SECTION 508.3**
1 ADDENDUM 02 12.04.24
AutoCAD SHX Text
NO. 3813
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text H
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text W
AutoCAD SHX Text
JASON B. CLARK
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text F
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text X
AutoCAD SHX Text T
AutoCAD SHX Text 10.15.24
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
M
BF
SSSSSSSS
M
BF
elec vault
M
M
M
CO
REVISION DATE
Project no:
Date:
Sheet:
La st
S av ed B y:
a dr ia nr D ec
2,
- 1 :4
0p m
La yo ut N am e:
C -1
D at e:
D ec
2,
- 1 :4
6p m
U se r:a dr ia nr
D ra w in g Fi le : N
:\A &E
E ng in ee rin g\
Pr oj ec ts
\S tu di o
D -T ho m as
B ro w n
N ew
F ac ilit y\
D W
G S\
AE
T
H O
M
AS
A N
D B
R O
W N
.d w g Studio D
Building Replacement
1305 Frenger St.
Las Cruces, NM 88001
23.18 March 2024
10'
SCALE: 1" = 10'
0 20'
1. NEW CONCRETE RETAINING WALL
2. NEW 5" CONCRETE DRIVE PAD
3. NEW SINGLE TRASH ENCLOSURE
4. NEW 4" THICK CONCRETE SIDEWALK
5. NEW CONCRETE HANDICAP RAMP. SEE GRADING PLAN
FOR SLOPE
6. NEW CONCRETE STAIRS
7. NEW 5X5 CONCRETE LANDING
8. NEW 6" STAND UP CURB
9. NEW 2-INCH WATER METER BACKFLOW AMES (MODEL
LF200B-A) BACKFLOW PREVENTOR. COORDINATE
CLEARANCES WITH VAULT AND NMSU WATER UTILITY
DEPARTMENT.
10. NEW 12" WIDE CURB CUT TO ALLOW FLOWLINE
DRAINAGE
11. NEW VAULT ACCESS. SEE ARCHITECTURAL SITE
PLAN/DETAIL SHEETS.
12. CAP EXISTING CONCRETE VAULT. SEE ARCHITECTURAL
SITE PLAN/DETAIL SHEETS.
13. TAP NEW 6" WATERLINE INTO EXISTING 6" WATERLINE
USING TAPPING TEE WITH TAPPING GATE VALVE
FOLLOWING CLC DESIGN STANDARDS. VERIFY
LOCATION, DEPTH, MATERIAL AND SIZE OF EXISTING
WATERLINE BEFORE PLACEMENT OF WATER METER
AND ENCLOSURE. USE 6" 90 BEND, 4"X6" REDUCER,
6"X2" TEE TO CONNECT TO 4" FIRE LINE AND 2"
DOMESTIC SERVICE LINE.
14. NEW CONCRETE GUTTER PAN
15. EXISTING CONCRETE DRIVE PAD TO BE REMOVED AND
REPLACED WITH NEW 5" CONCRETE DRIVE PAD TO BE
PART OF ADDITIVE ALTERNATE #4
16. EXISTING CONCRETE SIDEWALK TO BE REMOVED AND
REPLACED TO BE A PART OF ADDITIVE ALTERNATE #4
17. NEW DOUBLE HEATED ENCLOSURE WITH 4" FIRELINE
AND 2" DOMESTIC WATERLINE. SEE PLUMBING SHEET
FOR CONNECTION DETAILS
18. NEW 4" DIAMETER FIRE PROTECTION DOUBLE CHECK
VALVE WITH (2) ISOLATION VALVES
19. NEW 1.5-INCH WATER METER BACKFLOW AMES (MODEL
LF200B-A) BACKFLOW PREVENTOR. COORDINATE
CLEARANCES WITH VAULT AND NMSU WATER UTILITY
DEPARTMENT.
SITE PLAN
PROJECT LOCATION
VICINITY PLAN
SW
EET AVEN
U E
SO
U
TH
ESPIN
A STR
EET
SOUTH HORSESHOE STREET
A
C
2X2-INCH KEYWAY
#4 BARS AT 8-INCHES O.C. EACH WAY
#4 BARS AT 8-INCHES O.C. EACH WAY
2" CHAMFER
B
4,000 PSI CONCRETE WALL
F
CONCRETE RETAINING WALL DETAIL
BoW ELEVATION
D
E
POLYURETHANE SEALANT
NOTE:
PROVIDE JOINT EVERY 50-FEET
2"
ToW ELEVATION
SEE ARCHITECTURAL PLANS FOR HANDRAIL/GUARDRAIL CONNECTION
RETAINING WALL SCHEDULE
A B C D E
2'-0" 3'-0" 4'-0" 5'-0"
1.00' 1.00' 1.00' 1.00'
2.50' 3.50' 5.00' 6.00'
1.50' 2.17' 3.33' 4.00'
0.33' 0.67' 1.00' 1.33'
F 0.67' 0.67' 0.67' 0.67'
12" SUBGRADE PREPARATION
COMPACTED TO 95% MOD. PROCTOR
VARIES
4"
BACKER ROD
POLYURETHANE SEALANT
4" THICK CONCRETE SIDEWALK
W/ 6X6 WWF
12" SUBGRADE PREPARATION
COMPACTED TO 95% MOD. PROCTOR
BACKER ROD
POLYURETHANE SEALANT
4"
1 2" 1 2"
TYPICAL CONCRETE DRIVE SECTION
NOT TO SCALE
5" REINFORCED SLAB
WITH #4 BAR AT 12"
O.C. EACH WAY
12" SELECT FILL
POLYURETHANE SEALANT
NOTE:
PROVIDE JOINT EVERY 10-FEET
2"
EARTH SIDE
EXPOSED SIDE
CONCRETE STAIRS DETAIL
0.50'
1.00'
TYPICAL
0.
TY
PI
C
AL
4,000 PSI CONCRETE WALL
#4 BARS AT 12-INCHES O.C. EACH WAY
1.00'
1.00'
12" SUBGRADE PREPARATION
COMPACTED TO 95% MOD. PROCTOR
6"
12"X6" HEADER CURB
6"
6"
TYPICAL STAND UP CONCRETE
EXISTING/NEW CONCRETE
NEW CONCRETE SIDEWALK
EXISTING PAVING
GRAVEL
BASE
2'-0"
1'-0" 1'-0"
6" 7"
CONCRETE
SUB-BASE
SITE PLAN
C-1
SW
EE
T
AV
EN
U
E
6'-0" 1.50' 6.50' 4.50' 1.33' 0.67'
N
EW
6.
' O
F G
U
TT
ER
P
AN
C
U R
B
E . L
OH
MA
N
AV
EN
UE
LA
S
CR
UC
ES
, N
M
PH
ON
E:
(5
) 6
-0
3" DIAMETER WEEP HOLES
@10'-0" ON CENTER
18" SQ. CONTINUOUS GRAVEL
DRAIN WITH PERVIOUS
GEOTEXTILE FILTER FABRIC
SIKALASTIC HLM 5000 GC
WATER PROOFING MEMBRANE
OAE
7'-0" 1.50' 7.00' 4.50' 1.83' 0.67' 8'-0" 1.50' 7.50' 5.00' 1.83' 0.67'
12/02/24
AN
Typewritten Text
ADDENDUM 02 12.04.24
AN
Polygon
0.
1:12 SLOPE
1:20 SLOPE
1:12 SLOPE
1:12 SLOPE
2.
1:12 SLOPE
1:12 SLOPE
10%
10%
2%
2%
0.50%
SSSSSSSS
CO
REVISION DATE
Project no:
Date:
Sheet:
La st
S av ed B y:
a dr ia nr D ec
2,
- 1 :4
0p m
La yo ut N am e:
C -2
D at e:
D ec
2,
- 1 :4
6p m
U se r:a dr ia nr
D ra w in g Fi le : N
:\A &E
E ng in ee rin g\
Pr oj ec ts
\S tu di o
D -T ho m as
B ro w n
N ew
F ac ilit y\
D W
G S\
AE
T
H O
M
AS
A N
D B
R O
W N
.d w g Studio D
Building Replacement
1305 Frenger St.
Las Cruces, NM 88001
23.18 March 2024
10'
SCALE: 1" = 10'
0 20'GRADING PLAN
TOP OF PAVEMENT
TOP OF SIDEWALK
TOP OF CURB
FINISHED GRADE
FLOW LINE OF SWALE
SLOPE
BUILDING DRAINAGE FLOW
92.32 ToS
92.75 ToC
93.00 ToP
93.00 FL
93.00 FG
2.0%
ASPHALT
CONCRETE SIDEWALK
1. ALL FILL MATERIAL SHALL BE COMPACTED TO 95% OF ASTM D1557.
2. CONTRACTOR SHALL MATCH GRADE AT PROPERTY LINE.
3. CONTRACTOR SHOULD FIELD LOCATE EXISTING UTILITIES BEFORE BEGINNING
EARTHWORK
4. ALL CONSTRUCTION SHALL CONFORM TO I.B.C., I.P.C. AND N.E.C. AS NOTED HEREIN.
5. CONTRACTOR SHALL SLOPE PAVED AREA AS SHOWN TO DRAIN.
6. ALL CONCRETE SHALL BE 4,000 P.S.I. MINIMUM.
7. THE CONTRACTOR IS RESPONSIBLE FOR JOB SITE SAFETY AND COMPLIANCE WITH
OSHA REGULATIONS.
8. SHOULD CONFLICTING INFORMATION OR INTERFERENCE PROBLEMS APPEAR IN THE
CONSTRUCTION DRAWINGS, THE CONTRACTOR SHALL BRING THAT INFORMATION TO
THE ATTENTION OF THE DESIGN ENGINEER IMMEDIATELY AND PRIOR TO
INSTALLATION, FAILURE TO DO SO SHALL NOT BE BASIS FOR EXTRA PAYMENT.
9. GRADING SHALL MATCH GRADE AT PROPERTY LINE. ALL SLOPES TO DAYLIGHT AT A
4:1 SLOPE..
10. NM ONE CALL PROCEDURES SHALL BE FOLLOWED BEFORE GRADING WORK BEGINS.
11. RE-SEED DISTURBED AREAS WITH NATURAL DESERT SPECIES.
12. ALL FILL AND CUT MATERIAL SHALL COMPLY WITH GEOTECHNICAL REPORT
PREPARED. IF NO REPORT WAS COMPLETED THE CONTRACTOR MUST HIRE A
GEOTECHNICAL ENGINEER TO CONDUCT ON-SITE INVESTIGATION TO PROVIDE
EARTHWORK PROCESS.
13. CONCRETE WORK FOR ADDITIVE ALTERNATE MUST MATCH EXISTING ELEVATION. TOP OF CONCRETE 92.32 ToCo
LEGEND
GENERAL NOTES
GRADING PLAN
C-2
SW
EE
T
AV
EN
U
E
E . L
OH
MA
N
AV
EN
UE
LA
S
CR
UC
ES
, N
M
PH
ON
E:
(5
) 6
-0
CONCRETE WORK UNDER
ADDITIVE ALTERNATE #3
12/02/24
AN
Typewritten Text
ADDENDUM 02 12.04.24
SSSS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SSSSSSSSSSSSSSSSSSSSSSSSSSSS
GASGASGASGAS
SSSS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SSSSSSSSSSSSSSSSSSSSSSSSSSSS
GASGASGASGAS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
M
M
S S S S
SSSSSSSS
S
S
M
S S
S S
S S S
CO
REVISION DATE
Project no:
Date:
Sheet:
La st
S av ed B y:
a dr ia nr D ec
2,
- 1 :4
0p m
La yo ut N am e:
C -3
D at e:
D ec
2,
- 1 :4
6p m
U se r:a dr ia nr
D ra w in g Fi le : N
:\A &E
E ng in ee rin g\
Pr oj ec ts
\S tu di o
D -T ho m as
B ro w n
N ew
F ac ilit y\
D W
G S\
AE
T
H O
M
AS
A N
D B
R O
W N
.d w g Studio D
Building Replacement
1305 Frenger St.
Las Cruces, NM 88001
23.18 March 2024
10'
SCALE: 1" = 10'
0 20'UTILITY PLAN
UTILITY PLAN
C-3
GODDARD HALL 18
E . L
OH
MA
N
AV
EN
UE
LA
S
CR
UC
ES
, N
M
PH
ON
E:
(5
) 6
-0
1. EXISTING SEWER MANHOLE
2. EXISTING 8-INCH DIAMETER CLAY SEWER LINE. VERIFY LOCATION
AND DEPTH
3. NEW 6-INCH SEWER SERVICE LINE.
4. CONNECT NEW 6-INCH PVC SEWER SERVICE TO EXISTING SEWER
SERVICE LINE. VERIFY LOCATION AND DEPTH OF EXISTING SEWER
LINE BEFORE INSTALLATION AND ORDERING OF NEW SEWER LINE
AND SEWER MANHOLE.
5. NEW SEWER MANHOLE CONNECT TO NEW 6-INCH PVC SEWER AND
EXISTING 8-INCH SEWER LINE. VERIFY LOCATION, DEPTH AND
MATERIAL OF EXISTING SEWER LINE BEFORE ORDERING NEW
MANHOLE.
6. EXISTING 6-INCH SEWER SERVICE LINE TO BE ABANDONED.
LOCATE AND CAP LINE AT THE CONNECTION POINT AT SEWER MAIN
LINE.
3 3
EX. MH
RIM:3902.82
INV. OUT:3899.03
EX. MH
RIM:3901.83
INV. IN:3889.45
NEW MH
RIM:3902.00
INV. OUT:3895.65 (PROJECTED)
1. SEWER LINE RE-ROUTING OF GODDARD HALL MUST BE COMPLETED
BEFORE DEMOLISHING BEGINS ON THE EXISTING THOMAS AND
BROWN BUILDING.
12/02/24
AN
ADDENDUM 02 12.04.24
REVISION DATE
Project no:
Date:
Sheet:
La st
S av ed B y:
a dr ia nr D ec
2,
- 1 :4
0p m
La yo ut N am e:
C -3
.1
D at e:
D ec
2,
- 1 :4
7p m
U se r:a dr ia nr
D ra w in g Fi le : N
:\A &E
E ng in ee rin g\
Pr oj ec ts
\S tu di o
D -T ho m as
B ro w n
N ew
F ac ilit y\
D W
G S\
AE
T
H O
M
AS
A N
D B
R O
W N
.d w g Studio D
Building Replacement
1305 Frenger St.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .