This is Addendum No. 2 to Invitation to Bid (RFB-58-19) issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, dated September 10, 2018. The addendum pertains to a chiller pre-purchase for the DOCJT Law Enforcement Training Center in Richmond, Kentucky. The addendum contains five binding modifications to the original bid specifications and requirements that bidders must incorporate into their proposals. These modifications address technical specifications including service task documentation requirements, physical dimensions, harmonic distortion standards, evaporator configuration, and chiller room layout connection specifications. All changes outlined in the addendum become binding upon the contract to be issued in response to this invitation to bid.

The key technical revisions include clarification that service task information, frequency, downtime estimates, and technician hours shall be submitted as preliminary manufacturer's data but are for informational purposes only and not included in the purchase price or life-cycle cost calculations. The maximum chiller height specification is revised to 6'-10" without disassembly. Harmonic distortion requirements are modified to require input filtering based on manufacturer analysis to comply with IEEE 519 recommendations rather than the original IEEE-54-2014 standard. The evaporator configuration is changed from a 3-pass to a 2-pass design, and condenser and evaporator water connections are repositioned to opposite sides with specified outlet configurations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-58-19

FOR: Chiller Pre-Purchase - DOCJT Law Enforcement Training Center Richmond, Kentucky

DATE: September 10, 2018

ADDENDUM NO. Two (2)

BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING

UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.

Item 1: Section 15700 – Chiller Specifications; Page 3, Lines 19-22:

Service Task(s), Frequency/Milestone; Estimated Downtime for task(s) and Estimated technician hours for task(s) shall be submitted with preliminary manufacturer’s data as described in Section 01050 – Special

Conditions, Pages 6-8. Costs for such task(s) are for the owner’s information and are not part of the purchase price nor the life-cycle calculations. Do not add this information to the Form of Proposal

Item 2: Section 15700 – Chiller Specifications; Page 6, Line 31:

Maximum height of chiller (without disassembly) is 6’-10”.

Item 3: Section 15700 – Chiller Specifications; Page 16, Lines 1-3:

Replace: “The AFD shall not produce more than 10% notching and 3% total harmonic current distortion, measured at the input lugs, per IEEE-54-2014.”

With: “Based on the manufacturer's harmonic analysis study and report, provide input filtering, as required, to limit total demand (harmonic current) distortion and total harmonic voltage demand at the defined point of common coupling to meet IEEE 519 recommendations.”

CONTINUED

Invitation to Bid No. RFB-58-19 For: Chiller Pre-Purchase - DOCJT Law Enforcement Training Center Richmond, Kentucky

Kristi Sharp, CPPB, Statewide Procurement Analyst II Division of Engineering and Contract Administration

Addendum 2

9/10/18

Item 4: Section 15700 – Chiller Specifications; Page 18, Line 18:

Change evaporator from 3-pass to 2-pass.

Item 5: Chiller Room Layout Drawing:

Connection for condenser water shall be on the opposite side evaporator connections

Connection for evaporator may be out of the end of the bundle

Connection for condenser may be out the side of the water box.

END OF ADDENDUM