Addendum_2_-_BID_No._IFB-26-001-HG.pdf
PDF 5 MB Posted
- Solicitation number
- IFB 26-001-HG
- Issued by
- Lake County, Florida
About this file
Addendum 2 to Invitation for Bid IFB-26-001-HG
This is Addendum 2 to the Invitation for Bid (IFB) issued by the City of Leesburg, Florida, for the U.S. Highway 27 Utility (Sewer/Water) Turnpike Relocation Project. The addendum, dated October 24, 2025, and issued by Procurement Manager Hosea Goodwyn, provides clarifications and modifications to the original bid documents in response to 27 Requests for Information (RFIs) submitted by interested bidders. The project involves the relocation of 1,000 linear feet of existing 12-inch water line and 8-inch sewer line, replacing them with 14-inch HDPE water line and 14-inch HDPE force main, including directional boring under the Florida Turnpike along U.S. Highway 27. The revised Itemized Price Schedule (Attachment C), dated October 22, 2025, establishes 18 pay items for the project, including mobilization/demobilization, maintenance of traffic, construction staking, density testing, pressure testing, erosion control, trench safety, pipe supply (12-inch C900 PVC and 14-inch HDPE), valves and fittings, air release valve vaults, connections to existing utilities, and grout fill operations. Bidders must acknowledge receipt of Addendum 2 on the Proposal Bid Form; submission of a bid constitutes acknowledgment of receipt.
Key clarifications include confirmation that there are no minority business enterprise requirements, no Davis-Bacon wage requirements (federal funding is not included), and no full-time Resident Project Representative staffing anticipated by the City. The contractor shall supply an English-speaking representative available on-site or by cell phone during all work hours, with part-time construction observation by the City. No accurate flow calculations are available at the project site. Grout fill material for abandoned piping shall comply with FDOT Standard Specification Section 121 "Flowable Fill," and all Air Release Valves (ARVs) shall be installed in accordance with City Standard Details S-13 and W-14. The contractor is responsible for selective clearing and grubbing (trees with stems larger than 4 inches must be cleared at least 8 feet from pipeline locations) and restoration of the southern driveway to equal or better condition. Performance and Payment Bonds are required at 110 percent of the contract amount with a 24-month maintenance period. The contractor shall supply minimum two vacuum trucks for force main cut-in operations and must obtain FDOT approval for all utility tie-in procedures. Three FDOT permits have been issued: 2024-H-853-00162 for potable water, 2024-H-853-00143 for sanitary force main, and 2024-H-853-00163 for natural gas, with work permitted until October 31, 2025. All work shall comply with FDOT Standard Specifications and Standard Plans, and the contractor must maintain trench safety per OSHA and Florida regulations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE: October 24, 2025 TO: All Interested Bidders and Other Interested Parties FROM: Hosea Goodwyn, Procurement Manager
The City makes the following changes, additions, deletions, information, and/or clarifications and now considers the addendum a part of the Invitation for Bid (IFB) Document. Bidders must acknowledge receipt of this addendum by indicating receipt in the space provided on the Proposal Bid Form. If the bidder has already submitted the Proposal Bid Form to the City’s Procurement Division, the Bidder should revise their electronic submission to include this addendum. In any case, the submission of a bid is an acknowledgment of receipt of the addendum. The City will construe all bids received as though the Bidder has received and acknowledged the addendum.
Below is the City’s reply to RFIs (Request for Information – a/k/a bid inquiries or questions) submitted by interested parties by the posted deadline to submit RFIs.
Q1. Measurement and Payment Spec (01025, page 12 and 13 of 381) lists (7) pay items. The pricing form to be submitted lists (19) pay items. Please forward revised spec section 01025 measurement and payment matching the pricing form.
A1. Refer to Items 5 & 6 in Section 1025-1.03A. Specifically 6.b: “where not otherwise specified, the basis for payment for various items of work shall be equivalent to the latest edition of Florida Department of Transportation (FDOT) Standard Specifications.”
Q2. Attachment C Itemized Price Schedule includes pay item 8, 9 and 28 related to 6" gas pipe.
Please confirm these items are not part of the force main and water project and provide revised itemized price schedule.
A2. See attached Revised Itemized Price Schedule dated October 22, 2025.
Q3. Does this project have any minority requirements?
A3. No.
Q4. Does this project require an engineer’s field office?
A4. No.
Q5. Does this project require an on-site superintendent?
A5. Contractor shall properly staff the job during productive work. Prime Contractor shall supply an English-speaking representative to be available onsite or by cell phone at all times workers and subcontractors are onsite to organize and direct work. Such representative shall be responsive to questions and concerns raised by the City of Leesburg throughout construction.
Bid No. IFB 26-001-HG
U.S. Highway 27 Utility (Sewer/Water) Turnpike Relocation Project
Addendum No. 2
City of Leesburg does not anticipate staffing this project with a full-time Resident Project Representative, instead relying on part-time construction observation.
Q6. Does this project have any Davis Bacon requirements?
A6. No. Federal funding is not included in this project.
Q7. Does the city know the current flow calculations?
A7. No accurate flow information is available in the vicinity of the project site.
Q8. Drawing C-100 shows abandoned water main and force main piping to be grouted in place.
Please provide spec on the grout material required.
A8. FDOT Standard Specification Section 121 “Flowable Fill”.
Q9. Detail S-13 on Drawing G-001 shows a doghouse manhole at the force main ARV locations.
Is this detail to be used for the water main ARV locations? Please provide spec on required doghouse manholes.
A9. Refer to Detail W-14 on Sheet G-002. Further details on the referenced manhole can be found on Detail S-1 and Section 5.23 of City of Leesburg Construction Standards. Link:
https://www.leesburgflorida.gov/my_city/departments/pnz/css.php
Q10. What is the cost for liquidated damages A10. See section 3.10, Time of Contract, within the solicitation document.
Q11. What qualifications are necessary to bid on this project, for example Underground Utility Contractor, Certified General Contractor...
A11. See section 6.5, Contractor Qualifications and Evaluation of Bidder, within the solicitation document.
Q12. Can bid quantities be added to the bid form, so all bidders are bidding apples to apples.
A12. See attached Revised Itemized Price Schedule dated October 22, 2025.
Q13. Drawing C-100 shows a 6" gas main to be grout filled and placed out of service. Please confirm this work is not a part of the sewer/water project.
A13. Yes, all work pertaining to the gas main is excluded from the water / sewer project.
Q14. Please provide a copy of the FDOT permit with all details included.
A14. The following FDOT permits were issued to the City of Leesburg:
2024-H-853-00162 Potable Water 2024-H-853-00143 Sanitary Force Main 2024-H-853-00163 Natural Gas
Q15. Will the City be updating the SOV as discussed in the Pre-Bid?
A15. See attached Revised Itemized Price Schedule dated October 22, 2025.
Q16. Who owns the driveway on the South side of US-27? If other than the City, has the City engaged with the property owner for access/coordination of work behind vehicle gate on/along
(See bid IFB-26-002-HG) the access road?
A16. All work is within the FDOT right-of-way, including the southern driveway is within FDOT right-of-way.
Q17. Are there any special work conditions? (work hour limits, sequencing, lane restrictions) A17. Refer to response to Q27 regarding sequencing. Refer to FDOT permits listed in response to Q14 regarding work hours and lane closure restrictions.
Q18. Are laydown or staging areas available within City-Owned parcels or must the Contractor secure them independently?
A18. Contractor shall supply staging areas.
Q19. Are there any environmentally sensitive areas (wetlands or tree zones) along the alignment requiring special protection?
A19. No wetlands within the area of work.
Q20. Will the engineer provide approved standard erosion control details or should the Contractor design and submit a site-specific plan?
A20. No erosion control plan has been provided.
Q21. The profile and plan views indicate the ARVs may be installed above ground, while the detail drawing shows an in-ground vault installation. Please confirm the intended installation method for the ARVs to ensure compliance with design intent.
A21. All ARV’s shall be installed in accordance with City Standard Details S-13 and W-14.
Q22. The pipe is routed through a driveway on an existing property that is currently listed for sale. Based on recent Google Earth imagery, it appears this site has been in a dilapidated condition for some time. Is the contractor required to repave these driveways on the for-sale parcel?
A22. Restore southern driveway to equal or better condition upon completion of construction.
Q23. Since there will be tree clearing needed on the west side of the project, will it be the responsibility of the gas contractor or water / sewer contractor? Additionally, can limits of clearing and a pay item for clearing be added?
A23. Selective clearing and grubbing shall be the responsibility of the water / sewer contractor.
Cost for such shall be included as ancillary cost to the linear footage price of the pipe or may be included as a component of the Mobilization / Demobilization line item. No stems larger than 4-inches shall remain closer than 8ft from the City’s pipelines.
Q24. Please verify Performance and Payment Bond amount and maintenance period required.
City specifications are conflicting with engineering specifications.
A24. Where conflict exists, the more conservative (in favor of the City) shall prevail: Payment & Performance Bond at 110% of contract amount, and maintenance period of 24-months.
Q25. Since there are significant cost differences between force main and water main material, can the force main and water main open cut pipe, fittings and valves pay items be segregated by type (i.e. FM valves or WM valves)?
A25. See attached Revised Itemized Price Schedule dated October 22, 2025.
Q26. The profile and plan views indicate the ARVs may be installed above ground, while the detail drawing shows an in-ground vault installation. Please confirm the intended installation method for the ARVs to ensure compliance with design intent.
A26. Refer to Q21.
Q27. Does the city have a Bypass plan for this project?
A27. The basis of design assumes Contractor will isolate the section of water and sewer mains in order to cut-in fittings needed to connect to the new mains, following their clearance for use by FDEP. It is anticipated that no customers will be out of service during the cut-in of the new water main due to separate feed sources. During force main cut-in, the contractor shall supply a minimum 2 vacuum trucks to draw sewage from the isolated force main and from upstream (southern) wet wells, hauling and decanting the liquid into City-owned manholes or wet wells downstream (north) of the project area. Contractor shall submit a detailed plan prior to each utility tie-in for City approval. City shall not unreasonably withhold approval for Contractor’s proposed method.
ACKNOWLEDGMENT - Addendum No. 2
Company Name
Signature of Officer
Type/Print Officer's Name & Title
NAME OF BIDDER: ________________________________________________________________________________
00300 - 4
IFB 26-001-HG ATTACHMENT C – REVISED ITEMIZED PRICE SCHEDULE
Dated: October 22, 2025
Item Description Quantity Unit Unit Price Amount
1 Mobilization/Demobilization 1 LS 2 Maintenance of Traffic 1 LS 3 Construction Staking/As Built 1 LS 4 Density Testing 1 LS 5 Pressure Test Force Main 1 LS
6 Pressure Test Water Main 1 LS 7 Erosion Control/Silt Fence 1 LS 8 Trench Safety & Temporary Shoring 1 LS
9 12” C900 PVC Pipe 980 LF 10 12” Gate Valves & Plug Valves, w/Box 5 EA 11 12” DIP Fittings (Water) 1 LS 12 12” DIP Fittings (Sewer) 1 LS 13 14” SDR-11 PE4710 HDPE Pipe 1,600 LF 14 2” Air Release Valve & Vault 4 EA 15 Connect to Existing Force Main 2 EA
16 Connect to Existing Water Main 2 EA
17 Grout Fill 8” or 12” Pipe 55 CY
18 Restoration – Bahia Sod 1,800 SY
Total:
Project Name:US-27 Utility (Sewer/Water) Relocation at Florida’s Turnpike
Rule 14-46.001 F.A.C.
FLORIDA DEPARTMENT OF TRANSPORTATION December 14, 2016
UTILITY PERMIT
PERMIT NO:__________________________________
STATE ROAD INFORMATION
County: Section: State Road No: Beginning Mile Post: Ending Mile Post:
APPLICANT INFORMATION
The Utility Agency Owner (UAO) shall be identified in this Applicant Information Box. When the UAO is a City or County and desires to have the Utility Builder make a joint permit applicant, as prescribed in Section 2.1(4) of the 2017 Utility Accommodation Manual (UAM), the Utility Builder shall also be identified in this Applicant Information Box. A Utility Builder alone cannot apply for a utility permit without the City or County adding them as a joint applicant.
Utility Agency/Owner (UAO) Utility Builder (only applicable when the UAO is a City or County) Name: _____________________________________ Name: ______________________________________
Contact Person: _____________________________________ Contact Person: ______________________________________ Address: _____________________________________ Address: ______________________________________
City: _____________________________________ City: ______________________________________ State: _____ State: _____ Zip: _________ Zip: _________
Telephone: _____________________________________ Telephone: ______________________________________ Email: ____________________________________ Email: ______________________________________
WORK DESCRIPTION
The Applicant(s) requests permission from the Florida Department of Transportation (FDOT) to construct, operate, and maintain the utilities as described below and as depicted in the incorporated documentation.
Utility Work No: ___________________________
Additional sheets are attached and are incorporated into this permit Yes No For FDEP certification, the FDOT agency report is attached in accordance with UAM Section 2.4.1 (13) Yes No
TRAFFIC CONTROL (TCP)
The TCP will comply with the following 600 series index(es) ________________________________________________________________________ A TCP has been attached and incorporated into this permit application in compliance with UAM Section 2.4.2.
MOT Technician’s contact information (may be supplied at the two (2) business day notification to FDOT):
Name: ________________________________ Telephone ________________________ Email: _______________________________
COMMENCEMENT OF WORK
The UAO and/or Utility Builder shall commence actual construction in good faith within sixty (60) calendar days after approval of the permit application. If the beginning date is more than sixty (60) calendar days from the date of approval, the UAO and/or Utility Builder must review the permit with the FDOT Approving Engineer listed to make sure no changes have occurred to the transportation facility that would affect the permit’s continued approval. The UAO and/or Utility Builder shall make good faith efforts to expedite the work and complete the work within the calendar days indicated.
Anticipated Start Date: ___________________ Calendar days needed to completed: ________
Lake
35243594422325
Florida
SR 91
City of Leesburg Public Works
12/9/2025
0.161
550 S 14th St
611, 613, 600, 620
34748
Halff is pleased to submit this Proposal to the City of Leesburg for professional services related to the FPID 435786 3 Turnpike widening project and the City’s need to relocate existing utilities within this corridor. The project includes design of force main under the Turnpike west side us US27 and between the on and off ramps, approximately 600ft and approximately 100ft westerly of the proposed new bridge over US27.
2024-H-853-00143
11470040
City of Leesburg Public Works
Leesburg public.works@leesburgflorida.gov
0.392
Approved 2024-H-853-00143 Wilfredo Acevedo
4/23/2025 ah5816 Text Box FDOT Permit for Sewer Main
Florida Department of Transportation
UTILITY PERMIT
December 14, 2016
PERMIT NO:_________________________________
APPLICANT SIGNATURE
By the below signature(s) the UAO and/or Utility Builder agree(s) to construct, operate, and maintain the work as noted in the above Work Description, shown in plans and incorporated documents, in compliance with the UAM, all instructions noted in the FDOT Special Instructions Box, and special instructions incorporated into this permit. The UAO and/or Utility Builder declares, the location of all existing utilities that it owns or has an interest in, both aerial and underground, are accurately shown on the plans of the work areas. In accordance with UAM Section 2.8, the UAO and/or Utility Builder further declares that a letter of notification was delivered to the owners of other facilities within the work areas and that those listed below are the only facility owners known to be involved or potentially impacted by the proposed work.
Date Notified: Name of other facility owners (attach additional sheets if necessary).
Utility Agency/Owner Utility Builder (when applicable)
Signature: ____________________________ Date: ________________ Signature:___________________________ Date: _______________ Name (printed): _____________________________________________ Name (printed): __________________________________________ Title: ______________________________________________________ Title: ___________________________________________________
FDOT PROJECT INFORMATION
Pursuant to UAM Section 2.1(10), the utility work is within FDOT projects listed below and must have a Utility Work Schedule for each project approved prior to commencement of work within the FDOT project limits:
FDOT SPECIAL INSTRUCTIONS
In accordance with UAM Section 2.7, FDOT incorporates the below and attached special instructions into this permit.
Additional FDOT Special Instructions are attached and incorporated into this permit. Yes No
PERMIT APPROVAL
By signature below, FDOT gives permission to the UAO and /or Utility Builder to construct, operate, and maintain the utilities indicated in this Utility Permit in compliance with the UAM, all incorporated documents, and special instructions. Any changes to the approved work must be approved by the FDOT’s Approving Engineer and attached and incorporated into this permit in accordance with UAM Section 2.11.
Approving Engineer: _____________________________________________ Date: _______________ Name: _____________________________________________
Title:______________________________________________
Notification of Utility Work to be provided to: Telephone _____________________ or Email: _____________________________
An FDOT Representative is required to be present on the worksite prior to commencement of work. Yes No Rep. Name: _____________________________ Telephone _____________________ Email: _____________________________
4/23/2025
See Attachment A and Special Conditions
9/18/2024
(954) 934-1205 ext. ______ daniel.ekback@dot.state.fl.us
Wilfredo Acevedo
Wilfredo Acevedo (digital signature)
Joseph.Chinelly@dot.state.fl.us
JOHN FOLKER (digital signature)
JOHN FOLKER
4072643341
Joseph Chinelly
DEPUTY DIST MAINTENANCE ADMINISTRATOR
2024-H-853-00143
FDOT construction is proposed or underway. Refer to Financial Project Id: 435786- 3 widen 91 with a Letting date of 9-9-2025 This work is related to an approved Utility Work Schedule.
Approved 2024-H-853-00143 Wilfredo Acevedo
4/23/2025
Florida Department of Transportation
UTILITY PERMIT
December 14, 2016
PERMIT NO:_________________________________
CERTIFICATION
I, the undersigned UAO and/or Utility Builder, hereby CERTIFY that the utilities were constructed and inspected in compliance with the UAM all incorporated documents, and special instructions. Pursuant to UAM Section 2.11, all changes have been approved by the FDOT’s Approving Engineer and incorporated into this permit along with all other material certifications, test results, bore logs, approved plans changes, as-built plans or other required documentation.
I also CERTIFY that work began on ________________ and was completed on ________________ and that the area was left in as good or better condition than when the work began.
Utility Agency/Owner Utility Builder (when applicable)
Signature: ____________________________ Date _________________ Signature:___________________________ Date ________________ Name (printed): _____________________________________________ Name (printed): ____________________________________________ Title: ______________________________________________________ Title: ____________________________________________________
FINAL INSPECTION OF WORK
The work was inspected and found to be in non-compliance as noted below:
All issues of non-compliance listed above have been brought into compliance and/or FDOT has no outstanding issues that need to be addressed by the UAO and/or Utility Builder. However, this final inspection does not release the UAO and/or Utility Builder of their continuing responsibilities pursuant to Rule 14-46.001, the UAM, all incorporated documents, and special instructions.
FDOT Inspector: _____________________________________________ Date: _______________ Name: _____________________________________________
Title: ______________________________________________
2024-H-853-00143
Approved 2024-H-853-00143 continuation page
PERMIT NO.:
STATE ROAD INFORMATION:
NAME OF OTHER FACILITY OWNERS / DATE NOTIFIED:
FDOT PROJECT INFORMATION:
THE WORK WAS INSPECTED AND FOUND TO BE IN NON-COMPLIANCE AS NOTED BELOW:
Lake SR 91, Section: 11470040, Begin MP: 0.161, End MP: 0.392, Lake SR 91, Section: 11470000, Begin MP: 14.604, End MP: 15.035, Lake SR 91, Section: 11470041, Begin MP: 0.000, End MP: 0.052
FDOT construction is proposed or underway. Refer to Financial Project Id: 435786-3 widen 91 with a Letting date of 9-9- This work is related to an approved Utility Work Schedule.
2024-H-853-00143
Approved 2024-H-853-00143
Sewer
03 25 2025
Joe Bitar Turnpike Utility & Rail Administrator
Docusign Envelope ID: 66A1F07A-E2BC-4D9E-89D3-C23DB60E983E
03/28/2025 | 11:01 AM EDT
Approved 2024-H-853-00143
Docusign Envelope ID: 66A1F07A-E2BC-4D9E-89D3-C23DB60E983E
Approved 2024-H-853-00143
2024-H-853-00143
ATTACHMENT “A”
Permit #2024-H-853-00143 (TP-11-UT-187-24)
Project Description: SR-91 MP 289
City of Leesburg Sewer is relocating for SR-91 Construction Project 435786-3-52-01. See
UWS
The following apply:
1. The Applicant shall be responsible to make sure the Contractor abides by the latest FDOT Standard Specifications and Standard Plans.
2. The Applicant shall be contacted by the Florida’s Turnpike Enterprise contact person Joe Chinelly or his designee within five (5) working days from the date of the permit approval to schedule a pre-work meeting. At the pre-work meeting, the permit, attachment A, and special conditions will be discussed. Also, the Applicant shall provide emergency contact names and numbers along with a schedule for the proposed work.
3. This Permit Does NOT allow Lanes Closures.
This permit is until October 31, 2025. We are asking that the applicant submit an E-mail requesting an extension, 10 days prior to the completion date, if they want to keep the permit valid and open past the completion date.
cc: File
Approved 2024-H-853-00143
Special Conditions Permit #2024-H-853-00143 (TP-11-UT-187-24)
The following apply:
1. The Applicant shall be responsible for designating, and physically exposing as necessary, all Turnpike-owned underground facilities (electric, ITS, telephone, water, sewer, etc.)
2. The Applicant shall not be allowed to leave any vehicles, equipment or materials within the Turnpike clear zone during non-work periods. The overnight storage of any vehicles, equipment or materials within the Turnpike right-of-way shall be prohibited without prior approval by the Turnpike Permits Office.
3. While work is in progress, all vehicles shall be parked as far off the roadway as possible. All vehicles must be clearly marked with a company name and/or logo, and be equipped with working amber strobe lights. In addition, all workers shall wear ANSI approved apparel (safety vests) while on Turnpike property.
4. The Applicant's attention is directed to the fact that the Applicant will be required to pay tolls, as applicable to the general public.
5. The Applicant shall be responsible for maintaining trench safety in accordance with OSHA and State of Florida regulations.
6. The directional bore work within the SR-91 limited access right-of-way shall only be performed during the period starting on Monday at 8 am and ending on Friday of the same calendar week at 5 pm. The directional bore will not be scheduled to start later than Thursday at noon for any week not preceding a three-day holiday weekend, or later than Wednesday at noon for a week preceding a three-day holiday weekend. No crossing work shall be performed outside these hours or days, or on holidays that fall within these work periods.
7. The directional bore shall be performed as a continuous operation until the initial bore has been completed, stopping only for short periods for scheduled activities, such as adding bore rods. Each subsequent crossing, whether for back reaming or pipe pullback, shall also be performed as a continuous operation, with no extended work stoppages leaving the cutting head, back reamer or lead end of the pull back pipe within the SR-91 limited access right-of-way, except for unavoidable equipment breakdown or an unforeseen emergency situation.
Approved 2024-H-853-00143
8. The Applicant shall be responsible for the protection of all Turnpike facilities and structures within the area of this work, including, but not limited to existing drainage structures, concrete ditch protection, signs, delineators and fencing. Any damage to Turnpike facilities or structures shall be reported to the Permits office within 24 hours and repaired or replaced to the satisfaction of the Turnpike, and in compliance with current F.D.O.T. standards and specifications.
9. The Applicant shall restore any area of the Turnpike right-of-way disturbed by this work. This shall include, but not be limited to the grading of areas to original grade and placement of sod in all areas disturbed by this work. All work shall be in accordance with Standard Specifications for Road and Bridge Construction, as well as the FDOT Standard Plans.
10. The Applicant shall be required to obtain necessary permits from all other agencies having jurisdiction in the areas of this permitted work.
11. In case of extreme traffic or weather conditions, the Applicant may be required to remove their operation from the roadway and/or right-of-way, at the discretion of the Engineer or the Florida Highway Patrol, Troop "K", who has jurisdiction on this roadway.
12. The Applicant shall notify the Turnpike Permits Representative within two weeks of completion of this work. At that time, a final inspection will be scheduled prior to final acceptance of the work, with participation from the Turnpike, the Applicant, and the Contractor.
13. The Applicant shall submit the "Certification", found on the back of the Utility Permit authorizing this work, to the Turnpike Permits Office within 30 days from acceptance of the work by the Turnpike.
cc: File
Approved 2024-H-853-00143
S D
S D
M H
C
C
C
C
C
C C
P S
TOB
-1
88.8151
U
U
C
U
C
U
C
U
U
BACK FLOW
C
U
U
U
U
U
U
S A N
WATER
WATER
WATER
T E L
S D
S D
S A N
C
C C
P S M H
WATER
WATER
BACK FLOW
T E L
310+00 311+00 312+00 313+00 314+00 315+00 316+00 317+00 318+00 319+00 320+00 321+00 322+00 323+00 324+00 325+00
506+00 507+00 508+00 509+00 510+00 511+00 512+00 513+00 514+00 515+00 516+00 517+00 518+00 519+00 520+00 521+00
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
402+00 403+00 404+00
405+
6+
7+
8+
8+
0+
1+
2+
3+
4+
5+
6+
7+
8+
9+
0+
1+
0+
1+
2+
3+
4+
5+
6+
7+
8+
9+
CONNECT TO EXISTING
12" FORCE MAIN VIA
EXISTING PLUG VALVE
CONNECT TO EXISTING
12" WATER MAIN
PROPOSED 12"
WATER MAIN PROPOSED 6" GASPROPOSED 12"
FORCE MAIN
SB US 27
RA
M
P G
EXIST. LEESBURG
6" GAS
EXIST. LEESBURG 6"
GAS (TO BE PLACED
OUT OF SERVICE)
EXIST. LA
R/W LINE
EXIST. LEESBURG
12" WATER MAIN
EXIST. LEESBURG 8"
FORCE MAIN (TO BE
PLACED OUT OF SERVICE)
EXIST. LEESBURG 12"
WATER MAIN (TO BE
PLACED OUT OF SERVICE)
EXIST. LEESBURG
8" FORCE MAIN
℄ CONST. US 27 N
℄ CONST. RAMP G2
R A
M P
G
1 2 3 4 5 6 7 8
Sheet C-1
43829.015
DKB
CLM
CLM
JANUARY 2025
R E
V
IS
IO
N
D A
T E
JOB NO.:
CHECKED BY:
DRAWN BY:
DATE:
DESIGNED BY:
FILE NAME:
Le es bu rg
, F lo rid a
U til ity R el oc at io n
Pl an
V ie w
SCALE IN FEET
Scale: 1"=
50' 50 50 100
N o rt h
S in cl ai r A ve
C er tif ic at e o f
A ut h o ri za tio n
N um b er
: 3
Fa x:
.3
.8
O ff ic e:
.3
.8
Ta va re s, F lo ri d a
Basic Concept Leesburg Use
EXIST. R/W LINE
RANDALL J. COSLOW, PE
Registered Eng 72269
SB
S
R
CONNECT TO
EXISTING 6" GAS
TEMP. MSE WALL
TMSE6-4 TEMP. MSE WALL
TMSE6-2
MSE WALL RW6-2C
MSE WALL RW6-2A
SB
S
R
CONNECT TO EXISTING
12" FORCE MAIN
CONNECT TO EXISTING
6" GAS VIA HOT TAP
CONNECT TO EXISTING 12"
WATER MAIN VIA WET TAP
Approved 2024-H-853-00143
FLORIDA DEPARTMENT OF TRANSPORTATION December 14, 2016
UTILITY PERMIT
PERMIT NO:__________________________________
STATE ROAD INFORMATION
County: Section: State Road No: Beginning Mile Post: Ending Mile Post:
APPLICANT INFORMATION
The Utility Agency Owner (UAO) shall be identified in this Applicant Information Box. When the UAO is a City or County and desires to have the Utility Builder make a joint permit applicant, as prescribed in Section 2.1(4) of the 2017 Utility Accommodation Manual (UAM), the Utility Builder shall also be identified in this Applicant Information Box. A Utility Builder alone cannot apply for a utility permit without the City or County adding them as a joint applicant.
Utility Agency/Owner (UAO) Utility Builder (only applicable when the UAO is a City or County) Name: _____________________________________ Name: ______________________________________
Contact Person: _____________________________________ Contact Person: ______________________________________ Address: _____________________________________ Address: ______________________________________
City: _____________________________________ City: ______________________________________ State: _____ State: _____ Zip: _________ Zip: _________
Telephone: _____________________________________ Telephone: ______________________________________ Email: ____________________________________ Email: ______________________________________
WORK DESCRIPTION
The Applicant(s) requests permission from the Florida Department of Transportation (FDOT) to construct, operate, and maintain the utilities as described below and as depicted in the incorporated documentation.
Utility Work No: ___________________________
Additional sheets are attached and are incorporated into this permit Yes No For FDEP certification, the FDOT agency report is attached in accordance with UAM Section 2.4.1 (13) Yes No
TRAFFIC CONTROL (TCP)
The TCP will comply with the following 600 series index(es) ________________________________________________________________________ A TCP has been attached and incorporated into this permit application in compliance with UAM Section 2.4.2.
MOT Technician’s contact information (may be supplied at the two (2) business day notification to FDOT):
Name: ________________________________ Telephone ________________________ Email: _______________________________
COMMENCEMENT OF WORK
The UAO and/or Utility Builder shall commence actual construction in good faith within sixty (60) calendar days after approval of the permit application. If the beginning date is more than sixty (60) calendar days from the date of approval, the UAO and/or Utility Builder must review the permit with the FDOT Approving Engineer listed to make sure no changes have occurred to the transportation facility that would affect the permit’s continued approval. The UAO and/or Utility Builder shall make good faith efforts to expedite the work and complete the work within the calendar days indicated.
Anticipated Start Date: ___________________ Calendar days needed to completed: ________
Lake
35243594422325
Florida
SR 91
City of Leesburg Public Works
12/9/2025
0.161
550 S 14th St
611, 613, 600, 620
34748
Halff is pleased to submit this Proposal to the City of Leesburg for professional services related to the FPID 435786 3 Turnpike widening project and the City’s need to relocate existing utilities within this corridor. The project includes design of new water main under the Turnpike west side us US27 and between the on and off ramps, approximately 600ft and approximately 100ft westerly of the proposed new bridge over US27.
2024-H-853-00162
11470040
City of Leesburg Public Works
Leesburg public.works@leesburgflorida.gov
0.376
Approved 2024-H-853-00162 Wilfredo Acevedo
4/23/2025 ah5816 Text Box FDOT Permit for Water Main
Florida Department of Transportation
UTILITY PERMIT
December 14, 2016
PERMIT NO:_________________________________
APPLICANT SIGNATURE
By the below signature(s) the UAO and/or Utility Builder agree(s) to construct, operate, and maintain the work as noted in the above Work Description, shown in plans and incorporated documents, in compliance with the UAM, all instructions noted in the FDOT Special Instructions Box, and special instructions incorporated into this permit. The UAO and/or Utility Builder declares, the location of all existing utilities that it owns or has an interest in, both aerial and underground, are accurately shown on the plans of the work areas. In accordance with UAM Section 2.8, the UAO and/or Utility Builder further declares that a letter of notification was delivered to the owners of other facilities within the work areas and that those listed below are the only facility owners known to be involved or potentially impacted by the proposed work.
Date Notified: Name of other facility owners (attach additional sheets if necessary).
Utility Agency/Owner Utility Builder (when applicable)
Signature: ____________________________ Date: ________________ Signature:___________________________ Date: _______________ Name (printed): _____________________________________________ Name (printed): __________________________________________ Title: ______________________________________________________ Title: ___________________________________________________
FDOT PROJECT INFORMATION
Pursuant to UAM Section 2.1(10), the utility work is within FDOT projects listed below and must have a Utility Work Schedule for each project approved prior to commencement of work within the FDOT project limits:
FDOT SPECIAL INSTRUCTIONS
In accordance with UAM Section 2.7, FDOT incorporates the below and attached special instructions into this permit.
Additional FDOT Special Instructions are attached and incorporated into this permit. Yes No
PERMIT APPROVAL
By signature below, FDOT gives permission to the UAO and /or Utility Builder to construct, operate, and maintain the utilities indicated in this Utility Permit in compliance with the UAM, all incorporated documents, and special instructions. Any changes to the approved work must be approved by the FDOT’s Approving Engineer and attached and incorporated into this permit in accordance with UAM Section 2.11.
Approving Engineer: _____________________________________________ Date: _______________ Name: _____________________________________________
Title:______________________________________________
Notification of Utility Work to be provided to: Telephone _____________________ or Email: _____________________________
An FDOT Representative is required to be present on the worksite prior to commencement of work. Yes No Rep. Name: _____________________________ Telephone _____________________ Email: _____________________________
4/23/2025
See Attachment A and Special Conditions
10/21/2024
(954) 934-1205 ext. ______ daniel.ekback@dot.state.fl.us
Wilfredo Acevedo
Wilfredo Acevedo (digital signature)
Joseph.Chinelly@dot.state.fl.us
JOHN FOLKER (digital signature)
JOHN FOLKER
4072643341
Joseph Chinelly
DEPUTY DIST MAINTENANCE ADMINISTRATOR
2024-H-853-00162
FDOT construction is proposed or underway. Refer to Financial Project Id: 435786- 3 widen 91 with a Letting date of 9-9-2025 This work is related to an approved Utility Work Schedule.
Approved 2024-H-853-00162
Florida Department of Transportation
UTILITY PERMIT
December 14, 2016
PERMIT NO:_________________________________
CERTIFICATION
I, the undersigned UAO and/or Utility Builder, hereby CERTIFY that the utilities were constructed and inspected in compliance with the UAM all incorporated documents, and special instructions. Pursuant to UAM Section 2.11, all changes have been approved by the FDOT’s Approving Engineer and incorporated into this permit along with all other material certifications, test results, bore logs, approved plans changes, as-built plans or other required documentation.
I also CERTIFY that work began on ________________ and was completed on ________________ and that the area was left in as good or better condition than when the work began.
Utility Agency/Owner Utility Builder (when applicable)
Signature: ____________________________ Date _________________ Signature:___________________________ Date ________________ Name (printed): _____________________________________________ Name (printed): ____________________________________________ Title: ______________________________________________________ Title: ____________________________________________________
FINAL INSPECTION OF WORK
The work was inspected and found to be in non-compliance as noted below:
All issues of non-compliance listed above have been brought into compliance and/or FDOT has no outstanding issues that need to be addressed by the UAO and/or Utility Builder. However, this final inspection does not release the UAO and/or Utility Builder of their continuing responsibilities pursuant to Rule 14-46.001, the UAM, all incorporated documents, and special instructions.
FDOT Inspector: _____________________________________________ Date: _______________ Name: _____________________________________________
Title: ______________________________________________
2024-H-853-00162
Approved 2024-H-853-00162 continuation page
PERMIT NO.:
STATE ROAD INFORMATION:
NAME OF OTHER FACILITY OWNERS / DATE NOTIFIED:
FDOT PROJECT INFORMATION:
THE WORK WAS INSPECTED AND FOUND TO BE IN NON-COMPLIANCE AS NOTED BELOW:
Lake SR 91, Section: 11470040, Begin MP: 0.161, End MP: 0.376, Lake SR 91, Section: 11470000, Begin MP: 14.604, End MP: 15.035, Lake SR 91, Section: 11470041, Begin MP: 0.000, End MP: 0.052
FDOT construction is proposed or underway. Refer to Financial Project Id: 435786-3 widen 91 with a Letting date of 9-9- This work is related to an approved Utility Work Schedule.
2024-H-853-00162
Approved 2024-H-853-00162
ATTACHMENT “A”
Permit #2024-H-853-00162 (TP-11-UT-210-24)
Project Description: SR-91 MP 289
City of Leesburg Water is relocating for SR-91 Construction Project 435786-3-52-01. See
UWS
The following apply:
1. The Applicant shall be responsible to make sure the Contractor abides by the latest FDOT Standard Specifications and Standard Plans.
2. The Applicant shall be contacted by the Florida’s Turnpike Enterprise contact person Joe Chinelly or his designee within five (5) working days from the date of the permit approval to schedule a pre-work meeting. At the pre-work meeting, the permit, attachment A, and special conditions will be discussed. Also, the Applicant shall provide emergency contact names and numbers along with a schedule for the proposed work.
3. This Permit Does NOT allow Lanes Closures.
This permit is until October 31, 2025. We are asking that the applicant submit an E-mail requesting an extension, 10 days prior to the completion date, if they want to keep the permit valid and open past the completion date.
cc: File
Approved 2024-H-853-00162
Special Conditions Permit #2024-H-853-00162 (TP-11-UT-210-24)
The following apply:
1. The Applicant shall be responsible for designating, and physically exposing as necessary, all Turnpike-owned underground facilities (electric, ITS, telephone, water, sewer, etc.)
2. The Applicant shall not be allowed to leave any vehicles, equipment or materials within the Turnpike clear zone during non-work periods. The overnight storage of any vehicles, equipment or materials within the Turnpike right-of-way shall be prohibited without prior approval by the Turnpike Permits Office.
3. While work is in progress, all vehicles shall be parked as far off the roadway as possible. All vehicles must be clearly marked with a company name and/or logo, and be equipped with working amber strobe lights. In addition, all workers shall wear ANSI approved apparel (safety vests) while on Turnpike property.
4. The Applicant's attention is directed to the fact that the Applicant will be required to pay tolls, as applicable to the general public.
5. The Applicant shall be responsible for maintaining trench safety in accordance with OSHA and State of Florida regulations.
6. The directional bore work within the SR-91 limited access right-of-way shall only be performed during the period starting on Monday at 8 am and ending on Friday of the same calendar week at 5 pm. The directional bore will not be scheduled to start later than Thursday at noon for any week not preceding a three-day holiday weekend, or later than Wednesday at noon for a week preceding a three-day holiday weekend. No crossing work shall be performed outside these hours or days, or on holidays that fall within these work periods.
7. The directional bore shall be performed as a continuous operation until the initial bore has been completed, stopping only for short periods for scheduled activities, such as adding bore rods. Each subsequent crossing, whether for back reaming or pipe pullback, shall also be performed as a continuous operation, with no extended work stoppages leaving the cutting head, back reamer or lead end of the pull back pipe within the SR-91 limited access right-of-way, except for unavoidable equipment breakdown or an unforeseen emergency situation.
Approved 2024-H-853-00162
8. The Applicant shall be responsible for the protection of all Turnpike facilities and structures within the area of this work, including, but not limited to existing drainage structures, concrete ditch protection, signs, delineators and fencing. Any damage to Turnpike facilities or structures shall be reported to the Permits office within 24 hours and repaired or replaced to the satisfaction of the Turnpike, and in compliance with current F.D.O.T. standards and specifications.
9. The Applicant shall restore any area of the Turnpike right-of-way disturbed by this work. This shall include, but not be limited to the grading of areas to original grade and placement of sod in all areas disturbed by this work. All work shall be in accordance with Standard Specifications for Road and Bridge Construction, as well as the FDOT Standard Plans.
10. The Applicant shall be required to obtain necessary permits from all other agencies having jurisdiction in the areas of this permitted work.
11. In case of extreme traffic or weather conditions, the Applicant may be required to remove their operation from the roadway and/or right-of-way, at the discretion of the Engineer or the Florida Highway Patrol, Troop "K", who has jurisdiction on this roadway.
12. The Applicant shall notify the Turnpike Permits Representative within two weeks of completion of this work. At that time, a final inspection will be scheduled prior to final acceptance of the work, with participation from the Turnpike, the Applicant, and the Contractor.
13. The Applicant shall submit the "Certification", found on the back of the Utility Permit authorizing this work, to the Turnpike Permits Office within 30 days from acceptance of the work by the Turnpike.
cc: File
Approved 2024-H-853-00162
Water
03 25 2025
Joe Bitar Turnpike Utility & Rail Administrator
Docusign Envelope ID: 66A1F07A-E2BC-4D9E-89D3-C23DB60E983E
03/28/2025 | 11:01 AM EDT
Approved 2024-H-853-00162
2024-H-853-00162
2024-H-853-00162
2024-H-853-00162
S D
S D
M H
C
C
C
C
C
C C
P S
TOB
-1
88.8151
U
U
C
U
C
U
C
U
U
BACK FLOW
C
U
U
U
U
U
U
S A N
WATER
WATER
WATER
T E L
S D
S D
S A N
C
C C
P S M H
WATER
WATER
BACK FLOW
T E L
310+00 311+00 312+00 313+00 314+00 315+00 316+00 317+00 318+00 319+00 320+00 321+00 322+00 323+00 324+00 325+00
506+00 507+00 508+00 509+00 510+00 511+00 512+00 513+00 514+00 515+00 516+00 517+00 518+00 519+00 520+00 521+00
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
402+00 403+00 404+00
405+
6+
7+
8+
8+
0+
1+
2+
3+
4+
5+
6+
7+
8+
9+
0+
1+
0+
1+
2+
3+
4+
5+
6+
7+
8+
9+
CONNECT TO EXISTING
12" FORCE MAIN VIA
EXISTING PLUG VALVE
CONNECT TO EXISTING
12" WATER MAIN
PROPOSED 12"
WATER MAIN PROPOSED 6" GASPROPOSED 12"
FORCE MAIN
SB US 27
RA
M
P G
EXIST. LEESBURG
6" GAS
EXIST. LEESBURG 6"
GAS (TO BE PLACED
OUT OF SERVICE)
EXIST. LA
R/W LINE
EXIST. LEESBURG
12" WATER MAIN
EXIST. LEESBURG 8"
FORCE MAIN (TO BE
PLACED OUT OF SERVICE)
EXIST. LEESBURG 12"
WATER MAIN (TO BE
PLACED OUT OF SERVICE)
EXIST. LEESBURG
8" FORCE MAIN
℄ CONST. US 27 N
℄ CONST. RAMP G2
R A
M P
G
1 2 3 4 5 6 7 8
Sheet C-1
43829.015
DKB
CLM
CLM
JANUARY 2025
R E
V
IS
IO
N
D A
T E
JOB NO.:
CHECKED BY:
DRAWN BY:
DATE:
DESIGNED BY:
FILE NAME:
Le es bu rg
, F lo rid a
U til ity R el oc at io n
Pl an
V ie w
SCALE IN FEET
Scale: 1"=
50' 50 50 100
N o rt h
S in cl ai r A ve
C er tif ic at e o f
A ut h o ri za tio n
N um b er
: 3
Fa x:
.3
.8
O ff ic e:
.3
.8
Ta va re s, F lo ri d a
Basic Concept Leesburg Use
EXIST. R/W LINE
RANDALL J. COSLOW, PE
Registered Eng 72269
SB
S
R
CONNECT TO
EXISTING 6" GAS
TEMP. MSE WALL
TMSE6-4 TEMP. MSE WALL
TMSE6-2
MSE WALL RW6-2C
MSE WALL RW6-2A
SB
S
R
CONNECT TO EXISTING
12" FORCE MAIN
CONNECT TO EXISTING
6" GAS VIA HOT TAP
CONNECT TO EXISTING 12"
WATER MAIN VIA WET TAP
Approved 2024-H-853-00162
| Approved Utility Permit Package Gas.pdf |
| 11ut211-24 Att A |
| 11ut211-24 Special Conditions |
| Sheets and Views |
| RGB Full Sheet |
| Approved Utility Permit Package Sewer.pdf |
| 11ut187-24 Att A |
| 11ut187-24 Special Conditions |
| Sheets and Views |
| RGB Full Sheet |
| Approved Utility Permit Package Water.pdf |
| 11ut210-24 Att A |
| 11ut210-24 Special Conditions |
| Sheets and Views |
| RGB Full Sheet |