This document is Addendum #2 for Bid #B24-57, issued by the Morris County Division of Purchasing in New Jersey for the Replacement of the Wharton DPW Building on Worman Avenue. The addendum changes the bid opening date to April 9, 2024 at 11:00 AM and provides responses to several technical questions from potential bidders. The questions cover detailed specifications for the project, including HVAC controls (based on Daikin), diffuser and register schedules, fire alarm contractor information, and technical requirements for the pre-engineered metal building such as ground snow load (30 PSF), live load (20 PSF), and collateral load (7 PSF).
The addendum emphasizes compliance with New Jersey statutes, specifically N.J.S.A. 40A:11-18, which requires the use of American-manufactured products wherever possible. Additional clarifications include specifications on metal gauge requirements (minimum 22-gauge), electrical wiring details for various systems, and guidance on handling existing fuel dispensing branch circuits. Bidders are required to acknowledge the addendum and include the attached acknowledgment form with their sealed bid proposal. The project appears to involve a comprehensive replacement of an existing Department of Public Works facility, with detailed technical specifications to ensure precise construction requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
March 25, 2024
NOTICE OF ADDENDUM ISSUANCE #2 – #B24-57
Pursuant to N.J.S.A. 40A:11-1 et. sec., please be advised that Addendum Number 2 has been issued for:
REPLACEMENT OF THE WHARTON DPW BUILDING – WORMAN
AVENUE FACILITY
The date of Opening has been changed.
Sealed responses to the above bid are now scheduled to be received and opened by the Morris County Division of Purchasing on April 9, 2024 at 11:00 AM prevailing time.
This addendum is being issued to provide responses to questions submitted, details available for download at https://www.bidnetdirect.com/new-jersey
Addenda MUST be acknowledged in your proposal.
Please include the attached acknowledgement of addenda form with your sealed bid proposal, as it is a required document.
https://www.bidnetdirect.com/new-jersey
BID #B24-57
Replacement of the Wharton DPW Building – Worman Avenue Facility
Questions & Answers
Q. Who is the Basis of Design for the HVAC Controls?
A. The HVAC controls were based on Daikin.
Q. There was no schedule provided for the Grilled, Registers and Diffusers, please provide.
A. Please refer to the attached ‘Diffuser and Register Schedule.”
Q. Please provide this building FA vendor contact information.
A. The current fire alarm contractor is:
Fire and Security Technologies 217 Halls Mill Road Lebanon, NJ 08833
Q. Please provide the required ground snow load for the pre-engineered metal building.
A. The required ground snow load for the pre-engineered metal building is to be 30 PSF.
Q. Please provide the required live load for the pre-engineered metal building.
A. The required live load for the pre-engineered metal building is to be a minimum of 20 PSF.
Q. Please provide the required collateral load for the pre-engineered metal building.
A. The required collateral load for the pre-engineered metal building is to be 7 PSF.
Q. Please provide the importance factor/ risk category for the pre-engineered metal building.
A. Category 2.
Q. Please provide the site class/ soil type for the project.
A. Please refer to the Geo-technical investigation report.
Q. Does the Buy-American Act apply to this project? Or is Domestic Steel only required for this project?
A. Per N.J.S.A. 40A:11-18, titled, ‘American Goods and products to be used where possible:’ “Each local unit shall provide, in the specifications for all contracts for county or municipal work or for work which it will pay any part of the cost, or work which by contract or ordinance it will ultimately own and maintain, that only manufactured and farm products of the United States, wherever available, be used in such work.
Q. Specification section 133419, 2.08C and D, Liner:…0.040-inch. Soffit Panels:…0.040-inch metal is equivalent to approximately 20 gauge steel. The PEMB manufacturer does not supply 20-gauge steel materials for paneling or trims. Standard PEMB gauge metal materials are 26, 24, and 22-gauge. Please verify which gauge is required for both the interior liner panels and soffit panels based on these PEMB gauges.
A. The section above should be revised to read gauge. A minimum of 22-gauge is required.
Q. On the Plumbing drawings it shows a duplex sump pump system for the oil/water separator. There is no wiring shown on the electrical drawings for this sump pump system. Please provide a revised electrical drawing showing the feeder to the pump control panel and the pumps.
A. Please see the below images from the drawings:
Q. What is the wiring method for these under floor pumps? Is it considered explosion proof Class 1, Division 2?
A. If speaking about fuel pumps, please see the below image from the drawings:
Q. There are unit heaters shown on the mechanical and plumbing drawings that are not shown on the electrical drawings. Please provide revised electrical drawings.
A. Please see the below image from the drawings:
Q. There is a gas water heater and circulator pump shown on the plumbing drawings that is not shown on the electrical drawings. Please provide revised electrical drawings.
A. Please see the below image from the drawings:
Q. On drawing E-003 it shows us to interrupt and extend the existing fuel dispensing branch circuits to panel PP-FUEL. Please provide a detail of how many conduits there are that require extending.
Please provide us with a detail of how to interrupt these conduits.
Are these branch circuits Class 1 Div 2 explosion proof?
A. The contractor will need to field confirm the total of conduits. It is all underground. Please also see the image from the drawings below:
DIFFUSER AND REGISTER SCHEDULE
NECK SIZE (AT CFM LISTED) REMARKS
<100 <150 <200 <250 <300 <350 <425 <450 <500 <650
A SCD 24" x 24" STEEL, FULL FACE, THREE CONE DIFFUSER 6" 6" 8" 8" 10" 10" 10" 12" 12" 14" 1,2,3,4,5,6
WITH REMOVABLE INNER CONE ASSEMBLY.
B 530 STEEL, CEILING RETURN REGISTER WITH 3/4" BLADE SPACING, 10x10 10x10 10x10 12x12 12x12 12x12 10x22 10x22 10x22 22x22 FIXED 45° DEFLECTION AND BARS PARALLEL TO THE LONG DIMENSION. 6" 8" 8" 10" 10" 10" 12" 12" 14" 16"
C SDGE NECK SIZE EXTRUDED ALUMINUM SPIRAL DUCT DOUBLE DEFLECTION SUPPLY
PLUS 2" REGISTER WITH OPPOSED BLADE DAMPER, 3/4" BLADE SPACING AND FRONT BARS
PARALLEL TO THE SHORT DIMENSION. INSTALL AT 35 DEG DOWNWARD ANGLE
NOTES:
1. MODEL SELECTION IS BASED ON PRICE.
2. TABLE INDICATES SIZES FOR NOISE CRITERION RATING <NC 20 IN GENERAL AREAS, SEE DRAWINGS FOR SIZES FOR NOISE CRITERION RATING<NC15 IN ACOUSTICALLY SENSITIVE AREAS.
3. BAKED ENAMEL FINISH, COLOR TO BE SELECTED BY ARCHITECT.
4. DIFFUSERS SHALL BE 4-WAY BLOW UNLESS OTHERWISE INDICATED ON PLANS.
5. MOUNTING FRAME TYPE SHALL BE COORDINATED WITH CEILING AND/OR WALL CONSTRUCTION TYPE.
6. DIFFUSER NECK SIZE INDICATED REFERS TO NOMINAL DUCT SIZE, NOT FACE SIZE, AND SHALL VARY WITH CFM AS SCHEDULED, FOR REGISTERS/GRILLES, PROVIDE INTERNALLY LINED PLENUM BOX WITH ROUND CONNECTION(S) WHERE ROUND DUCT IS INDICATED.
NECK SIZE IS SHOWN ON PLANS 1,2,3,4,5
1,2,3,4,5,6 24" x 24"
OR
12" x 24"
UNIT
ID MODEL FACE SIZE DESCRIPTION
COUNTY OF MORRIS
ACKNOWLEDGMENT OF RECEIPT OF ADDENDA
The undersigned Bidder hereby acknowledges receipt of the following Addenda:
ADDENDUM
NUMBER
DATE ACKNOWLEDGE RECEIPT
(Initial)
Bidder MUST __________________ ______________ ___________________ acknowledge EACH addenda __________________ ______________ ___________________ by number, date, and initial __________________ ______________ ___________________ acknowledgment
By:
(Signature of Authorized Representative)
Name:
(Print or Type)
Title:
Date:
THIS FORM IS REQUIRED
Acknowledged for:
(Name of Bidder)
| Addendum #2 B25-57 March 25, 2024.pdf |
| questions & answers B24-57 |
| Diffuser and Register Schedule |
| revised addenda ack form |
| ACKNOWLEDGE RECEIPT |
| DATE |
| (Signature of Authorized Representative) |
File details come from the government source that posted it. Updated .