Addendum No. 2 for IFB 2501301 is issued by the City of Leesburg for the Construction of Venetian Cove Marina Facility, providing clarifications and responses to 38 bidder questions. The addendum addresses various technical and procedural inquiries regarding the marina office building project, including specifics about electrical systems, door specifications, concrete work, interior finishes, and scope limitations. Key clarifications include confirming that dock utilities are not part of the office building scope, permitting fees will be reimbursed by the city, and certain elements like temporary marina office and restrooms should be priced as add-alternates.
The document reveals the city's preference for cost-effective solutions and flexibility in material selections, with approvals required from the architect/engineer for alternative products. Notable specifications include using smooth drywall finishes, SYP #1 Select or D & Better wood for exterior ceilings, solid plastic toilet partitions, and painting exposed steel members to match wall surfaces. The addendum emphasizes that landscaping will primarily involve returning the marina area to its pre-existing appearance, and confirms a 6-inch thickness for interior concrete slabs and exterior sidewalks. Bidders are instructed to reference the Leesburg Aquatic Center for exterior aesthetic guidance and are given latitude to propose solutions that meet the project's nautical vision while maintaining cost-effectiveness.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE: May 1, 2025 TO: All Interested Bidders and Other Interested Parties FROM: Hosea Goodwyn, Senior Buyer
The City makes the following changes, additions, deletions, information, and/or clarifications and now considers the addendum a part of the Invitation for Bid (IFB) Document. Bidders must acknowledge receipt of this addendum by indicating receipt in the space provided on the Proposal Bid Form. If the bidder has already submitted the Proposal Bid Form to the City’s Purchasing Division, the Bidder should sign and return this addendum in a sealed envelope or revise their electronic submission to include this addendum. The envelope should include the company name and address, the bid number, opening date and time, and "Addendum No: 2".
In any case, the submission of a bid is an acknowledgment of receipt of the addendum. The City will construe all bids received as though the Bidder has received and acknowledged the addendum.
Below is the City’s reply to RFIs (Request for Information – a/k/a bid inquiries or questions) submitted by interested parties by the posted deadline to submit RFIs.
Q1. Will a Pre-Bid meeting be scheduled?
A1. No.
Q2. Please confirm that no Electrical or Plumbing work related to the docks should be included in this pricing. (i.e. Domestic Water piping per P2.1, Electric conduit/wire/panels per E1.2 & 1.3) A2. Correct – dock scope is outside of building project.
Q3. Plumbing Note #2 on P1.1 says to connect to existing Sewer MH. Please provide more information on which manhole that we are to connect building sewer to.
A3. Existing manhole is approx. 18’ from existing building SE corner. Contractor to verify in field
Q4. Please confirm we are not to include cost for the Temp Marina Office & Restrooms per Note 2 on C1.2 A4. Contractors to provide temp office cost as add-alternate
Q5. Please confirm we are not responsible for the temp fiber & conduit to the temp office location per note on C1.2 A5. Contractors to provide temp office utility services cost as add-alternate
Q6. Please provide more information/details/specs for the new nautical flagpole per Note #11 on C1.1. Are we to include this in our price? Is this going to be direct burial or will it require
IFB 2501301
Construction of Venetian Cove Marina Facility
Addendum No. 2 concrete foundations?
A6. Contractor to propose flagpole to be approved by arch./eng.. “Nautical” is the vision, cost-effective methods (direct burial) should be prioritized as applicable
Q7. Please provide specifications for the interior wood doors. Will they be painted/stained in the field or will they be factory stained?
A7. Cost savings will likely be preferred, either method is acceptable.
Q8. Please provide a Door Hardware schedule A8. Page A7.0, Note 1 refers bidders to their manufacturer’s specs for hardware schedules.
Q9. Are we to include the Exterior Building Lettering and City Emblem? If so, please provide additional information on materials & construction of signage.
A9. Yes! City can provide previous sign vendor information.
Q10. Is any work to be included at the existing parking & drives along Ball Park Rd? Material Legend on Sheet C1.1 references Light & Heavy-Duty Asphalt Pavement with details for these items on sheet C1.3. Are we reconstructing the parking and drives according to these details?
A10. Parking and drives are not included in the scope of work.
Q11. Is there a Project Manual or Specification Book for the project?
A11. No documents are available apart from those already provided.
Q12. What material are the toilet partitions to be? Solid plastic, plastic laminate, other?
A12. Solid plastic is preferred over plastic laminate.
Q13. Please provide Toilet Accessories Schedule showing Manufacturer and Model # for the Toilet Accessories.
A13. Plumbing Schedule included on P0.1
Q14. Are we to include the new Fuel System complete per F0.1 & F1.0? If so, please provide manufacturer information for the desired new fuel dispenser & sump.
A14. Yes!
Q15. Are we to include restriping/wheel blocks at the parking stalls & drives?
A15. Parking items not necessary for bid. May be added as add-alternate.
Q16. What is the extent of work to be included at the existing concrete pathway to the docks?
Note on C1.1 states “Existing Sidewalk Slope to be Modified” but doesn’t provide any other information.
A16. The slopes are listed on C1.1. Existing concrete to be demolished and repoured.
Q17. What wood species/grade of material is desired for the 1x6 T&G exterior ceilings and soffits?
A17. SYP #1 Select or D & Better. Or other cost-beneficial species approved by arch./eng.
Q18. Please provide details/information on the fencing around the Condenser Unit per Legend # 22 on A1.7 A18. Fencing is intended to improve curb appeal. Please propose wood, vinyl, or other material for consistent look-and-feel as rest of project.
Q19. Architectural Wall Sections show 4” gravel below the concrete slab. Please confirm if this is really required. We do not typically see that requirement in this area.
A19. Refer to S-3.0 for structural requirements. 4” gravel section is not required.
Q20. Please advise if there is any Landscape or Irrigation work required for this project.
Drawings were not provided for these scopes.
A20. Landscaping includes lawn care to return marina area to pre-existing look-and-feel.
Q21. Legend # 23 on A4.1, as well as the Wall Sections reference an Epoxy Floor Coating however this is not shown on the finish plan. Please confirm Epoxy Floor Coatings are not required for this project.
A21. Confirmed; epoxy floor coating is not required.
Q22. Detail 9 & 10 on A4.5 reference a wood slat ceiling in contradiction to the 1x6 tongue & groove ceiling shown on the RCP. Please confirm which is correct. If using the wood slat system per A4.5, please provide manufacturer information for the system being proposed.
A22. 1x6 T&G ceiling is the correct detail.
Q23. What is the desired color for the exterior Aluminum Doors & Windows?
A23. Refer to A7.0 for windows and doors schedule.
Q24. Regarding Material Legends on A6.2 & A6.3 Items #01 & 02 show wood wall siding board and light natural wood. There is no further information in the plans for these items and no details for what should be included. Please advise.
A24. See sheet A1.6 for interior wall finish types.
Q25. Will permit fees need to be included in our price or will they be waived by the City? If we are include, can an allowance be established and included?
A25. Yes! City permit fees will be reimbursed.
Q26. Note 25 states to refer to Landscape Plans for trees to be saved, relocated or removed onsite. We did not see a Landscape Plan included in the Bid Docs. Please advise.
A26. Landscaping includes lawn care to return marina area to pre-existing look-and-feel.
Q27. Please provide details/information for the new decorative fence required at the existing Fuel Tank per Legend Note #06 on C1.1 A27. Fencing is intended to improve curb appeal. Please propose wood, vinyl, or other material for consistent look-and-feel as rest of project.
Q28. Please confirm that there is no insulation required at Wall Type W1 per Wall Sections and per detail 6 on A4.5.
A28. Section is complete; confirmed.
Q29. What finish/texture is required all the drywall walls & ceilings? Will it be smooth, knock down, orange peel, etc?
A29. Smooth finish is recommended.
Q30. Please confirm that there is no applied finish to the structural steel posts at the porches and to the cast-in-place concrete beams at the porches. Will these exposed members receive paint?
A30. The exposed steel members are to be painted to match the wall surface. Reference Leesburg Aquatic Center for exterior look-and-feel.
Q31. Door sizing for the Wood Door Type D3 7 D4 are not common, commercial door sizes.
Please advise if 3’-0” x 6’-8” doors will be acceptable A31. 3'-0" x 6'-8" doors are acceptable for Wood Door Types D3 and D4, provided they meet all clear opening dimensions for their specific locations.
Q32. Please confirm the 6” thickness of the interior concrete slab and exterior concrete sidewalks per S-1.0.
A32. Confirmed; 6”.
Q33. Will the Owner/Architect accept other tile manufacturers/products to be used for this project?
A33. Yes, as approved by arch./eng.
Q34. Is a specification book available?
A34. No documents are available apart from those already provided
Q35. On E1.1, The lighting drawing shows (2) B fixtures in the shop. Where are these fixtures switched from?
A35. The south wall where the desk connects to the wall.
Q36. On E1.2 and E1.3, the floating docks show a box with circuit numbers, who provides this box? Nothing on drawings show a description, ID # or Manufacturer #.
A36. Dock utilities are not a part of the office building scope and wet slip equipment will be provided by marina MEP contractors.
Q37. On E2.1 Note 1, no conduit size or wire size depicted for the panels. Also, primary feeders aren’t depicted.
A37. Dock utilities are not a part of the office building scope and wet slip equipment will be provided by marina MEP contractors.
Q38. On E1.1, its missing exit lights.
A38. Include exit lights in bid despite drawing error.