This is Addendum No. 2, dated June 6, 2022, issued by Andrews, Hammock & Powell, Inc. on behalf of the Dougherty County Board of Education in Albany, Georgia, for HVAC and plumbing upgrades at Alice Coachman Elementary School located at 1425 W Oakridge Drive. The addendum modifies the original specifications and drawings dated May 20, 2022, and must be acknowledged on the Bid Price Form to avoid bidder disqualification. A mandatory pre-bid meeting was scheduled for June 23, 2022, with staggered start times between 12:45 p.m. and 2:15 p.m. at 601 Flint Ave, Albany, Georgia. The addendum applies to six related bid packages (22-FAC-012 through 22-FAC-017) covering HVAC and plumbing upgrades at multiple elementary schools including Alice Coachman, International Studies, Lamar Reese, MLK Jr., Morningside, and West Town Elementary Schools.

The addendum contains three primary specification changes and three drawing revisions. Section 230514 modifications require contractors to provide one cylinder of R-410a refrigerant as a spare part and establish a transfer document for extra materials. Section 230900 requires the DDC system to monitor fault outputs from all bipolar ionization units with alarms sent to the owner's control system. Section 234100 mandates that particulate air filtration units be equipped with dry contact outputs for building automation system monitoring. Drawing revisions include updated Mechanical Demo Plans for Sectors A, B, and C/D/E, all revised as of June 6, 2022. The pre-bid sign-in sheet lists 23 attendees from various mechanical, electrical, and construction companies including Albany Air, Waters Mechanical, Newell Construction, Lang Mechanical, SafeAire, and others, with a mix of prime and non-prime contractors.

Text of this file

Alice Coachman Elementary School May 20, 2022

HVAC & Plumbing Upgrades

Dougherty County Board of Education

Albany, Georgia

Addendum No. 2- Page 1 of 2

ANDREWS, HAMMOCK & POWELL, INC. 250 CHARTER LANE, SUITE 100, MACON, GA 31210

ADDENDUM NUMBER: TWO DATED: June 6, 2022

To: All contract bidders of record.

This addendum forms a part of the Contract Documents and modifies the original Specifications and Drawings dated May 20, 2022, as noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Price Form; failure to do so may subject bidder to disqualification.

GENERAL INFORMATION

1. A copy of the Pre-Bid Sign-in Sheet is included with this addendum.

CHANGES TO SPECIFICATIONS

1. SECTION 230514 - CLOSEOUT DOCUMENT REQUIRMENTS FOR HVAC

A. On page 230514-6, paragraph 1.11.A, delete the table in its entirety and replace with the following:

TRANSFER OF EXTRA MATERIALS AND SPARE PARTS

Spec Section Total Quantity

Received

Owner's

Rep. Initials

Date

Received

ADDITIONAL REFRIGERANT

Provide one (1) cylinder of R-410a refrigerant.

"I certify that the above list of spare parts and materials have been turned over to the Owners

Representative."

Company:

Name:

Title:

Signature:

Date:

2. SECTION 230900 - INSTRUMENTATION AND CONTROL FOR HVAC

A. On page 230900-16, add the following as paragraph 3.12.O.3.:

“3. Bipolar Ionization Unit Monitoring: DDC system shall monitor fault output of all bipolar ionization units. All alarms shall be sent to the Owner's control system.”

Alice Coachman Elementary School May 20, 2022

HVAC & Plumbing Upgrades

Dougherty County Board of Education

Albany, Georgia

Addendum No. 2- Page 2 of 2

3. SECTION 234100 - PARTICULATE AIR FILTRATION AND BI-POLAR IONIZATION

UNITS

A. On page 234100-3, paragraph 2.3.A, add the following sentence before the last sentence of this paragraph.

“Unit shall be equipped with dry contact output capable of connection to BAS for monitoring a fault condition.”

CHANGES TO DRAWINGS

1. MD101 - MECHANICAL DEMO PLAN - SECTOR A

A. Delete Sheet MD101 in its entirety and replace with Sheet MD101, revised 06/06/2022, included herewith.

2. MD102 - MECHANICAL DEMO PLAN - SECTOR B

A. Delete Sheet MD102 in its entirety and replace with Sheet MD102, revised 06/06/2022, included herewith.

3. MD103 - MECHANICAL DEMO PLAN - SECTORS C, D & E

A. Delete Sheet MD103 in its entirety and replace with Sheet MD103, revised 06/06/2022, included herewith.

END OF ADDENDUM #2

Dougherty County School System - Facilities Services Department 1711 Schilling Avenue, Albany, Georgia 31705

Phone: (229) 431-1301 Fax: (229) 431-1252

Bid Number:

Bid Name:

Bid Date:

Bid Location:

NAME Prime COMPANY NAME PHONE EMAIL Tony Reese N/A DCSS Facilities 229-431-1301 treese@docoschools.org

Jake Andrews N/A Andrews, Hammock & Powell, Inc. 478-832-6372 jandrews@ahpengr.com

Jim Hughes N/A Andrews, Hammock & Powell, Inc. 478-832-6368 jhughes@ahpengr.com

Will Fox N/A Andrews, Hammock & Powell, Inc. 478-832-6383 wfox@ahpengr.com

Holden Parker N/A Andrews, Hammock & Powell, Inc. 478-832-6382 hparker@ahpengr.com

Bob Montgomery Yes Albany Air 229-894-0682 bmontgomery@albanyair.com

Rebecca Greer Yes Waters Mechanical 912-654-2829 rgreer@watersmechanical.net

Rick Newell Yes Newell Construction 229-347-3220 rick.newell@newellconstruction.com

Ashley Lang Yes Lang Mechanical 229-403-0645 clayton@langmechanical.org

Cole Sumner No ESS-Metro Power 229-206-0292 cole.sumner@metropower.com

Davy Youmans No Metro Power 229-357-1191 davy.youmans@metropower.com

Jayson Meyers Keith Lawson Company 850-879-3300 jayson@keithlawson.com construction@keithlawson.com

David Kolody No Metro Power Plumbing 229-439-5779 david.kolody@metropower.com

Clay Griffith Georgia Electric 229-869-6126 clay@geaelec.com

Bill Guin Yes SafeAire 229-343-5304 bguin@safeaire.com

Ricky Spence Yes SafeAire 229-343-5304 rspence@safeaire.com

Jason Griffin Johnson Electronics 229-869-9502 jason@jesystemsinc.com

601 Flint Ave, Albany Ga.

Mandatory Pre-Bid Sign-In Sheet 22-FAC-012, 22-FAC-013, 22-FAC-014, 22-FAC-015, 22-FAC-016, and 22-FAC-017 HVAC and Plumbing Upgrades at Alice Coachman, International Studies, Lamar Reese, MLK Jr., Morningside, and West Town Elementary Schools June 23, 2022 @ 12:45, 1:00, 1:15, 1:30, 1:45, 2:00, and 2:15 mailto:treese@docoschools.org mailto:jandrews@ahpengr.com mailto:jhughes@ahpengr.com mailto:wfox@ahpengr.com mailto:hparker@ahpengr.com mailto:bmontgomery@albanyair.com mailto:rgreer@watersmechanical.net mailto:rick.newell@newellconstruction.com mailto:clayton@langmechanical.org mailto:cole.sumner@metropower.com mailto:davy.youmans@metropower.com mailto:jayson@keithlawson.com mailto:jayson@keithlawson.com mailto:david.kolody@metropower.com mailto:clay@geaelec.com mailto:bguin@safeaire.com mailto:rspence@safeaire.com mailto:jason@jesystemsinc.com

Dougherty County School System - Facilities Services Department 1711 Schilling Avenue, Albany, Georgia 31705

Phone: (229) 431-1301 Fax: (229) 431-1252

Bid Number:

Bid Name:

Bid Date:

Bid Location:

NAME Prime COMPANY NAME PHONE EMAIL 601 Flint Ave, Albany Ga.

Mandatory Pre-Bid Sign-In Sheet 22-FAC-012, 22-FAC-013, 22-FAC-014, 22-FAC-015, 22-FAC-016, and 22-FAC-017 HVAC and Plumbing Upgrades at Alice Coachman, International Studies, Lamar Reese, MLK Jr., Morningside, and West Town Elementary Schools June 23, 2022 @ 12:45, 1:00, 1:15, 1:30, 1:45, 2:00, and 2:15

Mark Gordon No Gordon Electric Co. 229-436-9659 gordonr29@aol.com

Rod Carter No Flint River Construction 229-449-1343 flintrivercc@yahoo.com

Larry Griffin Yes LRA Constructors 229-349-2276 lgriffin@lraconstructors.com mailto:gordonr29@aol.com mailto:flintrivercc@yahoo.com mailto:lgriffin@lraconstructors.com

44 4 4

MD101

MD101

MD101

11 12

9 9

CORRIDOR

A114

OFFICE

A104

WORK ROOM

A119

COUNSELOR

A118

TEST

A122

MAIL

A123

BOOK KEEPING

A124

PRINCIPAL

A108

RR

A107

RR

A106

RR

A105

RR

A115

ELEC

A110

CLINIC

A116

ART

A111

STOR.

A113

MEDIA

A127

LOBBY

CONF.

A136

A.V. STOR.

A135

MEDIA PRODUCTION

A134

MDF

A133

COMPUTER LAB

A131

MUSIC

A132

21 21

19 19

19 19

7 7

7 7

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TITLE:

SUBJECT TO GENERAL

COPYRIGHT LAWS ©

REVISIONS

A

B

C D E

2021191

05/20/2022

GA DOE ID #: 0299

MD101

MECHANICAL DEMO PLAN -

SECTOR A

A L

IC

E C

O A

C H

M A

N E

L E

M E

N T

A R

Y S

C H

O O

L

H V

A C

P

L U

M B

IN

G

U P

G R

A D

E S

WBF/JA3

JA3

W

O A

K R

ID

G

E D

R A

L B

A N

Y G

A

NOTES: (THIS SHEET ONLY)

1 . REMOVE EXISTING INLINE EXHAUST FAN MOUNTED ABOVE

CEILING.

2 . REMOVE EXISTING FAN COIL UNIT AND ASSOCIATED DUCTWORK

UP TO LOCATION SHOWN. REMOVE EXISTING GPS BIPOLAR

IONIZATION UNIT AND STORE FOR REUSE IN NEW FAN COIL UNIT

SAME LOCATION.

3 . REMOVE EXISTING VVT BOX, SUPPORTS, ASSOCIATED

DUCTWORK, INSULATION, ETC. (TYPICAL)

4 . REMOVE EXISTING HEAT PUMP, ASSOCIATED PIPING, ETC.

5 . EXISTING DUCT PENETRATES FLOOR SLAB AT THIS APPROXIMATE

LOCATION. LEAVE EXISTING DUCTWORK TO APPROX. 8" ABOVE

SLAB. SEE NEW WORK PLAN FOR CONNECTION OF NEW DUCT.

6 . EXISTING DUCTWORK AND FIRE DAMPER TO REMAIN. CAP

DUCTWORK ON BOTH SIDES OF WALL AND SEAL AIR TIGHT.

PROVIDE ACCESS PANEL TO ALLOW ACCESS TO FIRE DAMPER.

7 . DUCTWORK CONTINUES ABOVE CEILING. SEE MECHANICAL DEMO

PLAN - SECTOR A

8 . EXISTING DIFFUSER MOUNTE BELOW MEZZANINE TO REMAIN. SEE

MECHNICAL DEMO MEZZANINE PLAN - ADMIN AREA FOR MORE

INFORMATION.

9 . EXISTING DUCTWORK TO REMAIN. CLEAN DUCTWORK IN

ACCORDANCE WITH DUCT CLEANING SPEC.

10 . REMOVE EXISTING OUTSIDE AIR DUCT UP TO LOCATION SHOWN.

CAP AND SEAL DUCT AIR AND WATER TIGHT.

11 . REMOVE EXISTING DUCTWORK, SUPPORTS, ETC. ROUTED BELOW

MEZZANINE.

12 . SEE MECHANICAL DEMO MEZZANINE PLAN - MEDIA AREA FOR

ITEMS REMOVED IN MEZZANINE AREA ABOVE.

13 . SEE MECHANICAL DEMO MEZZANINE PLAN - ADMIN AREA FOR

ITEMS REMOVED IN MEZZANINE AREA ABOVE.

14 . SEE MECHANICAL DEMO MEZZANINE PLAN - ART AREA FOR ITEMS

REMOVED IN MEZZANINE AREA ABOVE.

1/8" = 1'-0"1 MECHANICAL DEMO PLAN - SECTOR A

1/4" = 1'-0"3 MECHANICAL DEMO MEZZANINE PLAN - ADMIN AREA

1/4" = 1'-0"4 MECHANICAL DEMO MEZZANINE PLAN - MEDIA AREA

1/4" = 1'-0"2 MECHANICAL DEMO MEZZANINE PLAN - ART AREA

NOTES: (THIS SHEET ONLY)

15 . REMOVE EXISTING EXHAUST FAN MOUNTED BELOW MEZZANINE.

DUCTWORK TO REMAIN. SEE NEW WORK PLAN FOR INSTALLATION

OF NEW EXHAUST FAN.

16 . EXISTING INLINE EXHAUST FAN IN ATTIC TO REMAIN.

17 . REMOVE EXISTING ELECTRIC DUCT HEATER AT THIS

APPROXIMATE LOCATION. PATCH DUCT WHERE HEATER WAS

REMOVED.

18 . EXISTING PIPING CONTINUES TO ASSOCIATED AIR HANDLING UNIT.

FIELD VERIFY EXACT ROUTING. REMOVE ALL EXISTING PIPING.

SEE NEW WORK PLAN FOR ROUTING OF NEW PIPING IN SAME

LOCATION.

19 . REMOVE EXISTING PIPING IN CHASE. SEE NEW WORK PLAN FOR

ROUTING OF NEW PIPING IN EXISTING CHASE.

20 . EXISTING 44" X 16" RETURN DUCT IN CHASE AND ASSOCIATED

SIDEWALL RETURN GRILLE TO REMAIN. SEE NEW WORK PLAN FOR

CONNECTION OF NEW RETURN DUCT.

21 . REMOVE EXISTING OUTSIDE AIR DUCT. SEAL OPENING AIR TIGHT.

22 . EXISTING RELIEF OPENING AND FIRE DAMPER TO REMAIN.

GENERAL NOTE: OWNERSHIP OF ALL REMOVED EQUIPMENT NOT RETAINED BY

THE OWNER SHALL BECOME PROPERTY OF THE CONTRACTOR. COORDINATE

WITH OWNER FOR SALVAGE OF ANY EQUIPMENT TO BE RETAINED BY THE OWNER.

No. Description Date

1 ADDENDUM #2 06/06/22

10 10

STAGE

B116

DRY STORAGE

B104

FREEZER

B103

COOLER

B102

KITCHEN

B111

OFFICE

B108

TOILET

B106

CAN WASH

B105LOCKERS

B107

JAN

B110

SERVING

B112

GYM

B120

MECH.

B124

ELEC.

B126

STORAGE

B123

OFFICE

B122

STORAGE

B121

CORR.

B101

BOYS RR

B117

GIRLS RR

B118

CUSTODIAL

B119

CAFETORIUM

B115

DISH WASH

B114

13 13

MM

20 13

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TITLE:

SUBJECT TO GENERAL

COPYRIGHT LAWS ©

REVISIONS

A

B

C D E

2021191

05/20/2022

GA DOE ID #: 0299

MD102

MECHANICAL DEMO PLAN -

SECTOR B

A L

IC

E C

O A

C H

M A

N E

L E

M E

N T

A R

Y S

C H

O O

L

H V

A C

P

L U

M B

IN

G

U P

G R

A D

E S

WBF/JA3

JA3

W

O A

K R

ID

G

E D

R A

L B

A N

Y G

A

NOTES: (THIS SHEET ONLY)

1 . COMPLETELY REMOVE EXISTING CEILING HEATER, DISCONNECT,

THERMOSTAT, ASSOCIATED WIRING, ETC. REPAIR ANY DAMAGED

CEILING GRID/TILE CAUSE BY DEMOLITION. PROVIDE NEW CEILING

TILE TO MATCH EXISTING TILE WHERE CEILING HEATER WAS

REMOVED.

2 . REMOVE EXISTING ROOF MOUNTED EXHAUST FAN. SEE NEW

WORK PLAN FOR INSTALLATION OF NEW EXHAUST FAN IN SAME

LOCATION.

3 . REMOVE EXISTING PAD MOUNTED PACKAGED HEAT PUMP,

ASSOCIATED DUCTWORK, AND DUCT COVER UP TO LOCATION

SHOWN. REMOVE EXISTING GPS BIPOLAR IONIZATION UNIT AND

STORE FOR REINSTALLATION IN NEW PACKAGED HEAT PUMP

SAME LOCATION.

4 . REMOVE EXISTING PACKAGED TERMINAL HEAT PUMP. SEE NEW

WORK PLAN FOR INSTALLATION OF NEW PTHP IN SAME LOCATION.

5 . REMOVE EXISTING INTAKE VENTILATOR ON ROOF. EXISTING ROOF

CURB TO REMAIN. CAP EXISTING CURB AND PROVIDE SUPPORTS

AS REQUIRED FOR INSTALLATION OF NEW DUCTLESS HEAT PUMP.

SEE NEW WORK PLAN FOR INSTALLATION OF NEW DUCTLESS

HEAT PUMP ON EXISTING CURB THIS LOCATION.

6 . REMOVE EXISTING FAN COIL UNIT MOUNTED ABOVE CEILING,

ASSOCIATED DUCTWORK, SUPPORTS, PIPING, GRILLES, ETC.

REMOVE EXISTING GPS BIPOLAR IONIZATION UNIT AND STORE

FOR REUSE IN NEW DUCTLESS FAN COIL UNIT SAME LOCATION.

EXISTING CONDENSATE PIPE TO REMAIN FOR REUSE, SEE NEW

WORK PLAN.

7 . REMOVE EXISTING HEAT PUMP MOUNTED ATOP EQUIPMENT

SUPPORT PLATFORM ON ROOF, AND ASSOCIATED PIPING.

EXISTING EQUIPMENT SUPPORT TO BE REUSED. SEE NEW WORK

PLAN FOR INSTALLATION OF NEW DUCTLESS HEAT PUMP.

8 . REMOVE EXISTING AIR HANDLING UNIT AND ASSOCIDATED PIPING

COMPLETELY. REMOVE DUCTWORK UP TO LOCATION SHOWN. SEE

SHEET M102 FOR NEW AIR HANDLING UNIT.

9 . COMPLETELY REMOVE EXISTING HEAT PUMP, ASSOCIATED

PIPING, ETC. SEE NEW WORK PLAN FOR INSTALLATION OF NEW

HEAT PUMP SAME LOCATION.

10 . REMOVE EXISTING CEILING HEATER. SEE NEW WORK PLAN FOR

INSTALLATION OF NEW CEILING HEATER.

11 . EXISTING INLINE FAN MOUNTED IN ATTIC TO REMAIN.

12 . REMOVE EXISTING ROOF MOUNTED EXHAUST FAN. EXISTING

ROOF CURB TO REMAIN. CAP EXISTING CURB AND PROVIDE

SUPPORTS AS REQUIRED FOR INSTALLATION OF NEW DUCTLESS

HEAT PUMP. SEE NEW WORK PLAN FOR INSTALLATION OF NEW

DUCTLESS HEAT PUMP ATOP EXISTING CURB THIS LOCATION.

13 . EXISTING DUCTWORK TO REMAIN. CLEAN DUCTWORK IN

ACCORDANCE WITH DUCT CLEANING SPEC.

14 . EXISTING ROOF MOUNTED EXHAUST FAN, ASSOCIATED

DUCTWORK, SUPPORTS, ETC. SERVING DISHWASHER TO REMAIN.

15 . REMOVE EXISTING DOOR AIR CURTAIN. SEE NEW WORK PLAN FOR

INSTALLATION OF NEW DOOR AIR CURTAIN SAME LOCATION.

16 . REMOVE EXISTING KITCHEN UPBLAST EXHAUST FAN ON ROOF.

SEE NEW WORK PLAN FOR INSTALLATION OF NEW FAN SAME

LOCATION.

17 . REMOVE EXISTING KITCHEN MAKE-UP AIR UNIT. SEE NEW WORK

PLAN FOR INSTALLATION OF NEW KITCHEN MAKE-UP AIR UNIT

SAME LOCATION.

18 . EXISTING LOUVER, ACTUATOR, SCREEN, ASSOCIATED DUCTWORK

AND GRILLES TO REMAIN.

19 . EXISTING MOTOR ACTUATOR TO REMAIN. MAINTAIN EXISTING

START/STOP SIGNAL FOR EXISTING LOUVER ACTUATOR MOTOR.

20 . CAP EXISTING OUTSIDE AIR DUCT AND SEAL AIR AND WATER

TIGHT.

1/8" = 1'-0"1 MECHANICAL DEMO PLAN - SECTOR B

GENERAL NOTE: OWNERSHIP OF ALL REMOVED EQUIPMENT NOT RETAINED BY

THE OWNER SHALL BECOME PROPERTY OF THE CONTRACTOR. COORDINATE

WITH OWNER FOR SALVAGE OF ANY EQUIPMENT TO BE RETAINED BY THE OWNER. 1

1 1

1 1

1 1

2 2 2

3 3 3 3

5 5 5

4TH GRADE CR

C102

4TH GRADE CR

C123

4TH GRADE CR

C122

5TH GRADE CR

C113

4TH GRADE CR

C104

4TH GRADE CR

C103

2ND GRADE CR

D102

2ND GRADE CR

D123

2ND GRADE CR

D122

2ND GRADE CR

D103

2ND GRADE CR

D104

EIP

D112

3RD GRADE CR

D111

3RD GRADE CR

D110

3RD GRADE CR

D109

3RD GRADE CR

D108

P.F.

D107

BOYS TOILET

D105

ELEC

D114

JAN

D106

VESTIBULE

D118

WORK ROOM

D119

BOOK STOR.

D120

IDF

D121

5TH GRADE CR

C109

5TH GRADE CR

C110

5TH GRADE CR

C111

5TH GRADE CR

C112

KINDERGARTEN CR

E102

KINDERGARTEN

CLASSROOM

E106

KINDERGARTEN

CLASSROOM

E131

KINDERGARTEN CR

E135

1ST GRADE CR

E121

1ST GRADE CR

E120

1ST GRADE CR

E111

MOID

E110

PID CR

E107

WORK ROOM

E128

JAN

E122

GIRLS TLT

E123

BOYS TLT

E124

VESTIBULE

E127

WOMEN

E125

MEN

E126

IDF

E130

ELEC

E129

BATHROOM

E108

KITCHEN/LAUND

E109

RECEPTION/WAITING

E116

BOOK STOR.

E117

GIRLS TLT

E118

BOYS TLT

E119

BOOK STOR.

E112

GIRLS TLT

E113

BOYS TLT

E114

RECEPTION/WAITING

E115

SPEECH CR

C108

RESOURCE CR

C107

JAN

C106

BOYS TOILET

C105

BOOK STOR.

C120

IDF

C121

WORK ROOM

C119

VESTIBULE

C118

WOMEN

C116

MEN

C117

ELEC

C114

MEN

D117

WOMEN

D116

BOYS TLT

E134

GIRLS TLT

E133

BOOK STOR.

E132

BOOK STOR.

E103

GIRLS TLT

E104

BOYS TLT

E105

CORRIDOR

E101

CORRIDOR

C101

GIRLS TOILET

C115

CORRIDOR

D101

GIRLS TOILET

D115

9 9

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TITLE:

SUBJECT TO GENERAL

COPYRIGHT LAWS ©

REVISIONS

A

B

C D E

2021191

05/20/2022

GA DOE ID #: 0299

MD103

MECHANICAL DEMO PLAN -

SECTORS C, D & E

A L

IC

E C

O A

C H

M A

N E

L E

M E

N T

A R

Y S

C H

O O

L

H V

A C

P

L U

M B

IN

G

U P

G R

A D

E S

WBF/JA3

JA3

W

O A

K R

ID

G

E D

R A

L B

A N

Y G

A

NOTES: (THIS SHEET ONLY)

1 . REMOVE EXISTING WALL HUNG HEAT PUMP. REMOVE EXISTING

GPS BIPOLAR IONIZATION UNIT AND STORE FOR INSTALLATION IN

NEW WALL HUNG HEAT PUMP SAME LOCATION. SEE NEW WORK

PLAN.

2 . REMOVE EXISTING INLINE EXHAUST FAN MOUNTED ABOVE

CEILING. FIELD VERIFY EXACT LOCATION. REMOVE PORTION OF

DUCTWORK AS REQUIRED FOR INSTALLATION OF NEW EXHAUST

FAN IN SAME LOCATION. REPAIR / REPLACE ANY CEILING TILE OR

GRID DAMAGED DURING DEMOLITION.

3 . REMOVE EXISTING CEILING HEATER. FIELD VERIFY EXACT

LOCATION. CAREFULLY REMOVE CEILING TILE / GRID AS

REQUIRED FOR REMOVAL AND INSTALLATION OF NEW CEILING

HEATER IN SAME LOCATION. REPAIR / REPLACE CEILING TILE /

GRID DAMAGED DURING DEMOLITION.

4 . COMPLETELY REMOVE EXISTING DEHUMIDFIER IN BOOK STORAGE

ROOM.

5 . EXISTING PROPELLER FAN MOUNTED IN ATTIC TO REMAIN.

6 . REMOVE EXISTING WALL HUNG HEAT PUMP. EXISTING DUCTWORK

TO REMAIN. REMOVE EXISTING GPS BIPOLAR IONIZATION UNIT

AND STORE FOR REINSTALLATION IN NEW WALL HUNG HEAT PUMP

SAME LOCATION.

1/8" = 1'-0"1 MECHANICAL DEMO PLAN - SECTORS C, D, & ENOTES: (THIS SHEET ONLY)

7 . REMOVE EXISTING WALL HUNG HEAT PUMP. EXISTING DUCTWORK

AND SIDEWALL GRILLES TO REMAIN. CLEAN GRILLES TO REMOVE

DIRT AND DEBRIS IN ACCORDANCE WITH DUCT CLEAN

SPECIFICATION. SALVAGE EXISTING GPS BIPOLAR IONIZATION

UNIT FOR INSTALLATION IN NEW WALL HUNG HEAT PUMP SAME

LOCATION.

8 . EXISTING EXHAUST DUCTWORK & GRILLES TO REMAIN. CLEAN

FACE OF GRILLES TO REMOVE DIRT, DUST, & DEBRIS.

9 . REMOVE EXISTING PACKAGED TERMINAL HEAT PUMP. SEE NEW

WORK PLAN FOR INSTALLATION OF NEW PTHP IN SAME LOCATION.

GENERAL NOTE: OWNERSHIP OF ALL REMOVED EQUIPMENT NOT RETAINED BY

THE OWNER SHALL BECOME PROPERTY OF THE CONTRACTOR. COORDINATE

WITH OWNER FOR SALVAGE OF ANY EQUIPMENT TO BE RETAINED BY THE OWNER.

22-FAC-012_Addendum No. 2_06062022
Pre-Bid Sign In Sheet_06022022
Pre-Bid Sign-In
Mechanical Drawings
Sheets
MD101 - MECHANICAL DEMO PLAN - SECTOR A
MD102 - MECHANICAL DEMO PLAN - SECTOR B
MD103 - MECHANICAL DEMO PLAN - SECTORS C, D & E

Other files

File Type Posted
Addendum 3 —
DRAWINGS —
Addendum 4 —
Addendum 1 —
Bid tab —
Bid Invitation —
Award Information —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .