This is Addendum No. 2, dated June 6, 2022, issued by Andrews, Hammock & Powell, Inc. on behalf of the Dougherty County Board of Education in Albany, Georgia, for HVAC and plumbing upgrades at Alice Coachman Elementary School located at 1425 W Oakridge Drive. The addendum modifies the original specifications and drawings dated May 20, 2022, and must be acknowledged on the Bid Price Form to avoid bidder disqualification. A mandatory pre-bid meeting was scheduled for June 23, 2022, with staggered start times between 12:45 p.m. and 2:15 p.m. at 601 Flint Ave, Albany, Georgia. The addendum applies to six related bid packages (22-FAC-012 through 22-FAC-017) covering HVAC and plumbing upgrades at multiple elementary schools including Alice Coachman, International Studies, Lamar Reese, MLK Jr., Morningside, and West Town Elementary Schools.
The addendum contains three primary specification changes and three drawing revisions. Section 230514 modifications require contractors to provide one cylinder of R-410a refrigerant as a spare part and establish a transfer document for extra materials. Section 230900 requires the DDC system to monitor fault outputs from all bipolar ionization units with alarms sent to the owner's control system. Section 234100 mandates that particulate air filtration units be equipped with dry contact outputs for building automation system monitoring. Drawing revisions include updated Mechanical Demo Plans for Sectors A, B, and C/D/E, all revised as of June 6, 2022. The pre-bid sign-in sheet lists 23 attendees from various mechanical, electrical, and construction companies including Albany Air, Waters Mechanical, Newell Construction, Lang Mechanical, SafeAire, and others, with a mix of prime and non-prime contractors.
Text of this file
Alice Coachman Elementary School May 20, 2022
HVAC & Plumbing Upgrades
Dougherty County Board of Education
Albany, Georgia
Addendum No. 2- Page 1 of 2
ANDREWS, HAMMOCK & POWELL, INC. 250 CHARTER LANE, SUITE 100, MACON, GA 31210
ADDENDUM NUMBER: TWO DATED: June 6, 2022
To: All contract bidders of record.
This addendum forms a part of the Contract Documents and modifies the original Specifications and Drawings dated May 20, 2022, as noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Price Form; failure to do so may subject bidder to disqualification.
GENERAL INFORMATION
1. A copy of the Pre-Bid Sign-in Sheet is included with this addendum.
CHANGES TO SPECIFICATIONS
1. SECTION 230514 - CLOSEOUT DOCUMENT REQUIRMENTS FOR HVAC
A. On page 230514-6, paragraph 1.11.A, delete the table in its entirety and replace with the following:
TRANSFER OF EXTRA MATERIALS AND SPARE PARTS
Spec Section Total Quantity
Received
Owner's
Rep. Initials
Date
Received
ADDITIONAL REFRIGERANT
Provide one (1) cylinder of R-410a refrigerant.
"I certify that the above list of spare parts and materials have been turned over to the Owners
Representative."
Company:
Name:
Title:
Signature:
Date:
2. SECTION 230900 - INSTRUMENTATION AND CONTROL FOR HVAC
A. On page 230900-16, add the following as paragraph 3.12.O.3.:
“3. Bipolar Ionization Unit Monitoring: DDC system shall monitor fault output of all bipolar ionization units. All alarms shall be sent to the Owner's control system.”
Alice Coachman Elementary School May 20, 2022
HVAC & Plumbing Upgrades
Dougherty County Board of Education
Albany, Georgia
Addendum No. 2- Page 2 of 2
3. SECTION 234100 - PARTICULATE AIR FILTRATION AND BI-POLAR IONIZATION
UNITS
A. On page 234100-3, paragraph 2.3.A, add the following sentence before the last sentence of this paragraph.
“Unit shall be equipped with dry contact output capable of connection to BAS for monitoring a fault condition.”
CHANGES TO DRAWINGS
1. MD101 - MECHANICAL DEMO PLAN - SECTOR A
A. Delete Sheet MD101 in its entirety and replace with Sheet MD101, revised 06/06/2022, included herewith.
2. MD102 - MECHANICAL DEMO PLAN - SECTOR B
A. Delete Sheet MD102 in its entirety and replace with Sheet MD102, revised 06/06/2022, included herewith.
3. MD103 - MECHANICAL DEMO PLAN - SECTORS C, D & E
A. Delete Sheet MD103 in its entirety and replace with Sheet MD103, revised 06/06/2022, included herewith.
END OF ADDENDUM #2
Dougherty County School System - Facilities Services Department 1711 Schilling Avenue, Albany, Georgia 31705
Phone: (229) 431-1301 Fax: (229) 431-1252
Bid Number:
Bid Name:
Bid Date:
Bid Location:
NAME Prime COMPANY NAME PHONE EMAIL Tony Reese N/A DCSS Facilities 229-431-1301 treese@docoschools.org
Jake Andrews N/A Andrews, Hammock & Powell, Inc. 478-832-6372 jandrews@ahpengr.com
Jim Hughes N/A Andrews, Hammock & Powell, Inc. 478-832-6368 jhughes@ahpengr.com
Will Fox N/A Andrews, Hammock & Powell, Inc. 478-832-6383 wfox@ahpengr.com
Holden Parker N/A Andrews, Hammock & Powell, Inc. 478-832-6382 hparker@ahpengr.com
Bob Montgomery Yes Albany Air 229-894-0682 bmontgomery@albanyair.com
Rebecca Greer Yes Waters Mechanical 912-654-2829 rgreer@watersmechanical.net
Rick Newell Yes Newell Construction 229-347-3220 rick.newell@newellconstruction.com
Ashley Lang Yes Lang Mechanical 229-403-0645 clayton@langmechanical.org
Cole Sumner No ESS-Metro Power 229-206-0292 cole.sumner@metropower.com
Davy Youmans No Metro Power 229-357-1191 davy.youmans@metropower.com
Jayson Meyers Keith Lawson Company 850-879-3300 jayson@keithlawson.com construction@keithlawson.com
David Kolody No Metro Power Plumbing 229-439-5779 david.kolody@metropower.com
Clay Griffith Georgia Electric 229-869-6126 clay@geaelec.com
Bill Guin Yes SafeAire 229-343-5304 bguin@safeaire.com
Ricky Spence Yes SafeAire 229-343-5304 rspence@safeaire.com
Jason Griffin Johnson Electronics 229-869-9502 jason@jesystemsinc.com
601 Flint Ave, Albany Ga.
Mandatory Pre-Bid Sign-In Sheet 22-FAC-012, 22-FAC-013, 22-FAC-014, 22-FAC-015, 22-FAC-016, and 22-FAC-017 HVAC and Plumbing Upgrades at Alice Coachman, International Studies, Lamar Reese, MLK Jr., Morningside, and West Town Elementary Schools June 23, 2022 @ 12:45, 1:00, 1:15, 1:30, 1:45, 2:00, and 2:15 mailto:treese@docoschools.org mailto:jandrews@ahpengr.com mailto:jhughes@ahpengr.com mailto:wfox@ahpengr.com mailto:hparker@ahpengr.com mailto:bmontgomery@albanyair.com mailto:rgreer@watersmechanical.net mailto:rick.newell@newellconstruction.com mailto:clayton@langmechanical.org mailto:cole.sumner@metropower.com mailto:davy.youmans@metropower.com mailto:jayson@keithlawson.com mailto:jayson@keithlawson.com mailto:david.kolody@metropower.com mailto:clay@geaelec.com mailto:bguin@safeaire.com mailto:rspence@safeaire.com mailto:jason@jesystemsinc.com
Dougherty County School System - Facilities Services Department 1711 Schilling Avenue, Albany, Georgia 31705
Phone: (229) 431-1301 Fax: (229) 431-1252
Bid Number:
Bid Name:
Bid Date:
Bid Location:
NAME Prime COMPANY NAME PHONE EMAIL 601 Flint Ave, Albany Ga.
Mandatory Pre-Bid Sign-In Sheet 22-FAC-012, 22-FAC-013, 22-FAC-014, 22-FAC-015, 22-FAC-016, and 22-FAC-017 HVAC and Plumbing Upgrades at Alice Coachman, International Studies, Lamar Reese, MLK Jr., Morningside, and West Town Elementary Schools June 23, 2022 @ 12:45, 1:00, 1:15, 1:30, 1:45, 2:00, and 2:15
Mark Gordon No Gordon Electric Co. 229-436-9659 gordonr29@aol.com
Rod Carter No Flint River Construction 229-449-1343 flintrivercc@yahoo.com
Larry Griffin Yes LRA Constructors 229-349-2276 lgriffin@lraconstructors.com mailto:gordonr29@aol.com mailto:flintrivercc@yahoo.com mailto:lgriffin@lraconstructors.com
44 4 4
MD101
MD101
MD101
11 12
9 9
CORRIDOR
A114
OFFICE
A104
WORK ROOM
A119
COUNSELOR
A118
TEST
A122
A123
BOOK KEEPING
A124
PRINCIPAL
A108
RR
A107
RR
A106
RR
A105
RR
A115
ELEC
A110
CLINIC
A116
ART
A111
STOR.
A113
MEDIA
A127
LOBBY
CONF.
A136
A.V. STOR.
A135
MEDIA PRODUCTION
A134
MDF
A133
COMPUTER LAB
A131
MUSIC
A132
21 21
19 19
19 19
7 7
7 7
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
A
B
C D E
2021191
05/20/2022
GA DOE ID #: 0299
MD101
MECHANICAL DEMO PLAN -
SECTOR A
A L
IC
E C
O A
C H
M A
N E
L E
M E
N T
A R
Y S
C H
O O
L
H V
A C
P
L U
M B
IN
G
U P
G R
A D
E S
WBF/JA3
JA3
W
O A
K R
ID
G
E D
R A
L B
A N
Y G
A
NOTES: (THIS SHEET ONLY)
1 . REMOVE EXISTING INLINE EXHAUST FAN MOUNTED ABOVE
CEILING.
2 . REMOVE EXISTING FAN COIL UNIT AND ASSOCIATED DUCTWORK
UP TO LOCATION SHOWN. REMOVE EXISTING GPS BIPOLAR
IONIZATION UNIT AND STORE FOR REUSE IN NEW FAN COIL UNIT
SAME LOCATION.
3 . REMOVE EXISTING VVT BOX, SUPPORTS, ASSOCIATED
DUCTWORK, INSULATION, ETC. (TYPICAL)
4 . REMOVE EXISTING HEAT PUMP, ASSOCIATED PIPING, ETC.
5 . EXISTING DUCT PENETRATES FLOOR SLAB AT THIS APPROXIMATE
LOCATION. LEAVE EXISTING DUCTWORK TO APPROX. 8" ABOVE
SLAB. SEE NEW WORK PLAN FOR CONNECTION OF NEW DUCT.
6 . EXISTING DUCTWORK AND FIRE DAMPER TO REMAIN. CAP
DUCTWORK ON BOTH SIDES OF WALL AND SEAL AIR TIGHT.
PROVIDE ACCESS PANEL TO ALLOW ACCESS TO FIRE DAMPER.
7 . DUCTWORK CONTINUES ABOVE CEILING. SEE MECHANICAL DEMO
PLAN - SECTOR A
8 . EXISTING DIFFUSER MOUNTE BELOW MEZZANINE TO REMAIN. SEE
MECHNICAL DEMO MEZZANINE PLAN - ADMIN AREA FOR MORE
INFORMATION.
9 . EXISTING DUCTWORK TO REMAIN. CLEAN DUCTWORK IN
ACCORDANCE WITH DUCT CLEANING SPEC.
10 . REMOVE EXISTING OUTSIDE AIR DUCT UP TO LOCATION SHOWN.
CAP AND SEAL DUCT AIR AND WATER TIGHT.
11 . REMOVE EXISTING DUCTWORK, SUPPORTS, ETC. ROUTED BELOW
MEZZANINE.
12 . SEE MECHANICAL DEMO MEZZANINE PLAN - MEDIA AREA FOR
ITEMS REMOVED IN MEZZANINE AREA ABOVE.
13 . SEE MECHANICAL DEMO MEZZANINE PLAN - ADMIN AREA FOR
ITEMS REMOVED IN MEZZANINE AREA ABOVE.
14 . SEE MECHANICAL DEMO MEZZANINE PLAN - ART AREA FOR ITEMS
REMOVED IN MEZZANINE AREA ABOVE.
1/8" = 1'-0"1 MECHANICAL DEMO PLAN - SECTOR A
1/4" = 1'-0"3 MECHANICAL DEMO MEZZANINE PLAN - ADMIN AREA
1/4" = 1'-0"4 MECHANICAL DEMO MEZZANINE PLAN - MEDIA AREA
1/4" = 1'-0"2 MECHANICAL DEMO MEZZANINE PLAN - ART AREA
NOTES: (THIS SHEET ONLY)
15 . REMOVE EXISTING EXHAUST FAN MOUNTED BELOW MEZZANINE.
DUCTWORK TO REMAIN. SEE NEW WORK PLAN FOR INSTALLATION
OF NEW EXHAUST FAN.
16 . EXISTING INLINE EXHAUST FAN IN ATTIC TO REMAIN.
17 . REMOVE EXISTING ELECTRIC DUCT HEATER AT THIS
APPROXIMATE LOCATION. PATCH DUCT WHERE HEATER WAS
REMOVED.
18 . EXISTING PIPING CONTINUES TO ASSOCIATED AIR HANDLING UNIT.
FIELD VERIFY EXACT ROUTING. REMOVE ALL EXISTING PIPING.
SEE NEW WORK PLAN FOR ROUTING OF NEW PIPING IN SAME
LOCATION.
19 . REMOVE EXISTING PIPING IN CHASE. SEE NEW WORK PLAN FOR
ROUTING OF NEW PIPING IN EXISTING CHASE.
20 . EXISTING 44" X 16" RETURN DUCT IN CHASE AND ASSOCIATED
SIDEWALL RETURN GRILLE TO REMAIN. SEE NEW WORK PLAN FOR
CONNECTION OF NEW RETURN DUCT.
21 . REMOVE EXISTING OUTSIDE AIR DUCT. SEAL OPENING AIR TIGHT.
22 . EXISTING RELIEF OPENING AND FIRE DAMPER TO REMAIN.
GENERAL NOTE: OWNERSHIP OF ALL REMOVED EQUIPMENT NOT RETAINED BY
THE OWNER SHALL BECOME PROPERTY OF THE CONTRACTOR. COORDINATE
WITH OWNER FOR SALVAGE OF ANY EQUIPMENT TO BE RETAINED BY THE OWNER.
No. Description Date
1 ADDENDUM #2 06/06/22
10 10
STAGE
B116
DRY STORAGE
B104
FREEZER
B103
COOLER
B102
KITCHEN
B111
OFFICE
B108
TOILET
B106
CAN WASH
B105LOCKERS
B107
JAN
B110
SERVING
B112
GYM
B120
MECH.
B124
ELEC.
B126
STORAGE
B123
OFFICE
B122
STORAGE
B121
CORR.
B101
BOYS RR
B117
GIRLS RR
B118
CUSTODIAL
B119
CAFETORIUM
B115
DISH WASH
B114
13 13
MM
20 13
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
A
B
C D E
2021191
05/20/2022
GA DOE ID #: 0299
MD102
MECHANICAL DEMO PLAN -
SECTOR B
A L
IC
E C
O A
C H
M A
N E
L E
M E
N T
A R
Y S
C H
O O
L
H V
A C
P
L U
M B
IN
G
U P
G R
A D
E S
WBF/JA3
JA3
W
O A
K R
ID
G
E D
R A
L B
A N
Y G
A
NOTES: (THIS SHEET ONLY)
1 . COMPLETELY REMOVE EXISTING CEILING HEATER, DISCONNECT,
THERMOSTAT, ASSOCIATED WIRING, ETC. REPAIR ANY DAMAGED
CEILING GRID/TILE CAUSE BY DEMOLITION. PROVIDE NEW CEILING
TILE TO MATCH EXISTING TILE WHERE CEILING HEATER WAS
REMOVED.
2 . REMOVE EXISTING ROOF MOUNTED EXHAUST FAN. SEE NEW
WORK PLAN FOR INSTALLATION OF NEW EXHAUST FAN IN SAME
LOCATION.
3 . REMOVE EXISTING PAD MOUNTED PACKAGED HEAT PUMP,
ASSOCIATED DUCTWORK, AND DUCT COVER UP TO LOCATION
SHOWN. REMOVE EXISTING GPS BIPOLAR IONIZATION UNIT AND
STORE FOR REINSTALLATION IN NEW PACKAGED HEAT PUMP
SAME LOCATION.
4 . REMOVE EXISTING PACKAGED TERMINAL HEAT PUMP. SEE NEW
WORK PLAN FOR INSTALLATION OF NEW PTHP IN SAME LOCATION.
5 . REMOVE EXISTING INTAKE VENTILATOR ON ROOF. EXISTING ROOF
CURB TO REMAIN. CAP EXISTING CURB AND PROVIDE SUPPORTS
AS REQUIRED FOR INSTALLATION OF NEW DUCTLESS HEAT PUMP.
SEE NEW WORK PLAN FOR INSTALLATION OF NEW DUCTLESS
HEAT PUMP ON EXISTING CURB THIS LOCATION.
6 . REMOVE EXISTING FAN COIL UNIT MOUNTED ABOVE CEILING,
ASSOCIATED DUCTWORK, SUPPORTS, PIPING, GRILLES, ETC.
REMOVE EXISTING GPS BIPOLAR IONIZATION UNIT AND STORE
FOR REUSE IN NEW DUCTLESS FAN COIL UNIT SAME LOCATION.
EXISTING CONDENSATE PIPE TO REMAIN FOR REUSE, SEE NEW
WORK PLAN.
7 . REMOVE EXISTING HEAT PUMP MOUNTED ATOP EQUIPMENT
SUPPORT PLATFORM ON ROOF, AND ASSOCIATED PIPING.
EXISTING EQUIPMENT SUPPORT TO BE REUSED. SEE NEW WORK
PLAN FOR INSTALLATION OF NEW DUCTLESS HEAT PUMP.
8 . REMOVE EXISTING AIR HANDLING UNIT AND ASSOCIDATED PIPING
COMPLETELY. REMOVE DUCTWORK UP TO LOCATION SHOWN. SEE
SHEET M102 FOR NEW AIR HANDLING UNIT.
9 . COMPLETELY REMOVE EXISTING HEAT PUMP, ASSOCIATED
PIPING, ETC. SEE NEW WORK PLAN FOR INSTALLATION OF NEW
HEAT PUMP SAME LOCATION.
10 . REMOVE EXISTING CEILING HEATER. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW CEILING HEATER.
11 . EXISTING INLINE FAN MOUNTED IN ATTIC TO REMAIN.
12 . REMOVE EXISTING ROOF MOUNTED EXHAUST FAN. EXISTING
ROOF CURB TO REMAIN. CAP EXISTING CURB AND PROVIDE
SUPPORTS AS REQUIRED FOR INSTALLATION OF NEW DUCTLESS
HEAT PUMP. SEE NEW WORK PLAN FOR INSTALLATION OF NEW
DUCTLESS HEAT PUMP ATOP EXISTING CURB THIS LOCATION.
13 . EXISTING DUCTWORK TO REMAIN. CLEAN DUCTWORK IN
ACCORDANCE WITH DUCT CLEANING SPEC.
14 . EXISTING ROOF MOUNTED EXHAUST FAN, ASSOCIATED
DUCTWORK, SUPPORTS, ETC. SERVING DISHWASHER TO REMAIN.
15 . REMOVE EXISTING DOOR AIR CURTAIN. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW DOOR AIR CURTAIN SAME LOCATION.
16 . REMOVE EXISTING KITCHEN UPBLAST EXHAUST FAN ON ROOF.
SEE NEW WORK PLAN FOR INSTALLATION OF NEW FAN SAME
LOCATION.
17 . REMOVE EXISTING KITCHEN MAKE-UP AIR UNIT. SEE NEW WORK
PLAN FOR INSTALLATION OF NEW KITCHEN MAKE-UP AIR UNIT
SAME LOCATION.
18 . EXISTING LOUVER, ACTUATOR, SCREEN, ASSOCIATED DUCTWORK
AND GRILLES TO REMAIN.
19 . EXISTING MOTOR ACTUATOR TO REMAIN. MAINTAIN EXISTING
START/STOP SIGNAL FOR EXISTING LOUVER ACTUATOR MOTOR.
20 . CAP EXISTING OUTSIDE AIR DUCT AND SEAL AIR AND WATER
TIGHT.
1/8" = 1'-0"1 MECHANICAL DEMO PLAN - SECTOR B
GENERAL NOTE: OWNERSHIP OF ALL REMOVED EQUIPMENT NOT RETAINED BY
THE OWNER SHALL BECOME PROPERTY OF THE CONTRACTOR. COORDINATE
WITH OWNER FOR SALVAGE OF ANY EQUIPMENT TO BE RETAINED BY THE OWNER. 1
1 1
1 1
1 1
2 2 2
3 3 3 3
5 5 5
4TH GRADE CR
C102
4TH GRADE CR
C123
4TH GRADE CR
C122
5TH GRADE CR
C113
4TH GRADE CR
C104
4TH GRADE CR
C103
2ND GRADE CR
D102
2ND GRADE CR
D123
2ND GRADE CR
D122
2ND GRADE CR
D103
2ND GRADE CR
D104
EIP
D112
3RD GRADE CR
D111
3RD GRADE CR
D110
3RD GRADE CR
D109
3RD GRADE CR
D108
P.F.
D107
BOYS TOILET
D105
ELEC
D114
JAN
D106
VESTIBULE
D118
WORK ROOM
D119
BOOK STOR.
D120
IDF
D121
5TH GRADE CR
C109
5TH GRADE CR
C110
5TH GRADE CR
C111
5TH GRADE CR
C112
KINDERGARTEN CR
E102
KINDERGARTEN
CLASSROOM
E106
KINDERGARTEN
CLASSROOM
E131
KINDERGARTEN CR
E135
1ST GRADE CR
E121
1ST GRADE CR
E120
1ST GRADE CR
E111
MOID
E110
PID CR
E107
WORK ROOM
E128
JAN
E122
GIRLS TLT
E123
BOYS TLT
E124
VESTIBULE
E127
WOMEN
E125
MEN
E126
IDF
E130
ELEC
E129
BATHROOM
E108
KITCHEN/LAUND
E109
RECEPTION/WAITING
E116
BOOK STOR.
E117
GIRLS TLT
E118
BOYS TLT
E119
BOOK STOR.
E112
GIRLS TLT
E113
BOYS TLT
E114
RECEPTION/WAITING
E115
SPEECH CR
C108
RESOURCE CR
C107
JAN
C106
BOYS TOILET
C105
BOOK STOR.
C120
IDF
C121
WORK ROOM
C119
VESTIBULE
C118
WOMEN
C116
MEN
C117
ELEC
C114
MEN
D117
WOMEN
D116
BOYS TLT
E134
GIRLS TLT
E133
BOOK STOR.
E132
BOOK STOR.
E103
GIRLS TLT
E104
BOYS TLT
E105
CORRIDOR
E101
CORRIDOR
C101
GIRLS TOILET
C115
CORRIDOR
D101
GIRLS TOILET
D115
9 9
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
A
B
C D E
2021191
05/20/2022
GA DOE ID #: 0299
MD103
MECHANICAL DEMO PLAN -
SECTORS C, D & E
A L
IC
E C
O A
C H
M A
N E
L E
M E
N T
A R
Y S
C H
O O
L
H V
A C
P
L U
M B
IN
G
U P
G R
A D
E S
WBF/JA3
JA3
W
O A
K R
ID
G
E D
R A
L B
A N
Y G
A
NOTES: (THIS SHEET ONLY)
1 . REMOVE EXISTING WALL HUNG HEAT PUMP. REMOVE EXISTING
GPS BIPOLAR IONIZATION UNIT AND STORE FOR INSTALLATION IN
NEW WALL HUNG HEAT PUMP SAME LOCATION. SEE NEW WORK
PLAN.
2 . REMOVE EXISTING INLINE EXHAUST FAN MOUNTED ABOVE
CEILING. FIELD VERIFY EXACT LOCATION. REMOVE PORTION OF
DUCTWORK AS REQUIRED FOR INSTALLATION OF NEW EXHAUST
FAN IN SAME LOCATION. REPAIR / REPLACE ANY CEILING TILE OR
GRID DAMAGED DURING DEMOLITION.
3 . REMOVE EXISTING CEILING HEATER. FIELD VERIFY EXACT
LOCATION. CAREFULLY REMOVE CEILING TILE / GRID AS
REQUIRED FOR REMOVAL AND INSTALLATION OF NEW CEILING
HEATER IN SAME LOCATION. REPAIR / REPLACE CEILING TILE /
GRID DAMAGED DURING DEMOLITION.
4 . COMPLETELY REMOVE EXISTING DEHUMIDFIER IN BOOK STORAGE
ROOM.
5 . EXISTING PROPELLER FAN MOUNTED IN ATTIC TO REMAIN.
6 . REMOVE EXISTING WALL HUNG HEAT PUMP. EXISTING DUCTWORK
TO REMAIN. REMOVE EXISTING GPS BIPOLAR IONIZATION UNIT
AND STORE FOR REINSTALLATION IN NEW WALL HUNG HEAT PUMP
SAME LOCATION.
1/8" = 1'-0"1 MECHANICAL DEMO PLAN - SECTORS C, D, & ENOTES: (THIS SHEET ONLY)
7 . REMOVE EXISTING WALL HUNG HEAT PUMP. EXISTING DUCTWORK
AND SIDEWALL GRILLES TO REMAIN. CLEAN GRILLES TO REMOVE
DIRT AND DEBRIS IN ACCORDANCE WITH DUCT CLEAN
SPECIFICATION. SALVAGE EXISTING GPS BIPOLAR IONIZATION
UNIT FOR INSTALLATION IN NEW WALL HUNG HEAT PUMP SAME
LOCATION.
8 . EXISTING EXHAUST DUCTWORK & GRILLES TO REMAIN. CLEAN
FACE OF GRILLES TO REMOVE DIRT, DUST, & DEBRIS.
9 . REMOVE EXISTING PACKAGED TERMINAL HEAT PUMP. SEE NEW
WORK PLAN FOR INSTALLATION OF NEW PTHP IN SAME LOCATION.
GENERAL NOTE: OWNERSHIP OF ALL REMOVED EQUIPMENT NOT RETAINED BY
THE OWNER SHALL BECOME PROPERTY OF THE CONTRACTOR. COORDINATE
WITH OWNER FOR SALVAGE OF ANY EQUIPMENT TO BE RETAINED BY THE OWNER.
| 22-FAC-012_Addendum No. 2_06062022 |
| Pre-Bid Sign In Sheet_06022022 |
| Pre-Bid Sign-In |
| Mechanical Drawings |
| Sheets |
| MD101 - MECHANICAL DEMO PLAN - SECTOR A |
| MD102 - MECHANICAL DEMO PLAN - SECTOR B |
| MD103 - MECHANICAL DEMO PLAN - SECTORS C, D & E |
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 3 | — | |
| DRAWINGS | — | |
| Addendum 4 | — | |
| Addendum 1 | — | |
| Bid tab | — | |
| Bid Invitation | — | |
| Award Information | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .