Addendum 1 to ITB 11658 Thompsons Mills Tailrace Support Column Replacement Project.docx
DOCX document 101 KB Posted
- Solicitation number
- S-63400-00013206
- Issued by
- Linn County, Oregon
About this file
Addendum 1 to Invitation to Bid (ITB) 11658, issued by the Oregon Parks and Recreation Department (OPRD), modifies the solicitation for the Thompson's Mills State Heritage Site Tailrace Support Column Replacement Project. The addendum provides clarifications and responses to bidder questions regarding site access, water management, public access during construction, archaeological considerations, and historic preservation qualifications. Key modifications include replacing the original Form A-1 with an updated version that emphasizes historic preservation contractor qualifications, with bidders required to demonstrate experience on at least three National Register of Historic Places projects completed within the last ten years. The procurement maintains the original bid closing date and time, with prospective bidders having until April 10, 2025, to submit written questions about the addendum.
The addendum highlights specific project constraints, including no heavy equipment access on the east side of the mill race, limited vehicle access, and the requirement for ground protection mats if soil compaction occurs. Contractors must prepare a work plan addressing staging areas, concrete delivery, and safety measures, with the understanding that the mill will remain partially accessible to the public. The project involves hand excavation in an archaeological site, with OPRD representative oversight. An concurrent electrical project will be occurring simultaneously, potentially impacting on-site electricity availability. Bidders are encouraged to leverage various historic preservation resources and certification programs to meet the specialized qualification requirements, with OPRD retaining discretion in evaluating alternative qualifications and experience.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 2 to ITB 11658 Thompsons Mills Tailrace Support Column Replacement Project~1.docx | DOCX document | |
| ITB 11658 Thompsons Mills Tailrace Support Column Replacement.docx | DOCX document | |
| BID TAB~4.docx | DOCX document | |
| Intent to Award~15.docx | DOCX document | |
| S-10700-00010885 SP Notice~1.docx | DOCX document | |
| Pre-bid sign-in.docx | DOCX document | |
| Attachment C Plans and Drawings~3.pdf | ||
| Attachment B Technical Sprcifications.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM #1
OregonBuys # S-63400-00013206
ITB # 11658
Thompson’s Mills State Heritage Site Tailrace Support Column Replacement Project
This Addendum 1 modifies the Invitation to Bid (“ITB”) document(s) for work only to the extent indicated herein. All other areas not specifically mentioned or affected by this Addendum 1 shall remain in full force. This Addendum 1 shall be added as a part of the original ITB document(s) and shall become part of the work required.
ADDENDUM
1. FORM A-1 — BIDDER INFORMATION AND CERTIFICATIONS FORM; SPECIAL QUALIFICATIONS: COVER SHEET AND HISTORIC PRESERVATION CONTRACTOR QUALIFYING WORK EXPERIENCE REFERENCE FORM is DELETED in it’s entirety and REPLACED with the attached FORM A-1 — BIDDER INFORMATION AND CERTIFICATIONS FORM; SPECIAL QUALIFICATIONS: COVER SHEET AND HISTORIC PRESERVATION CONTRACTOR / QUALIFIED INDIVIDUAL QUALIFYING WORK EXPERIENCE REFERENCE FORM – Addendum 1.
All references to the ITB CLOSING DATE AND TIME REMAIN UNCHANGED.
Addendum prepared by:
Melody Waight Sr. Contracts Specialist melody.waight@oprd.oregon.gov
Prospective Bidders have until 5:00 PM on April 10, 2025 to submit written questions regarding this Addendum.
1.
2.
3.
4.
5.
6.
1.
2.
3.
4.
5.
6.
This Addendum constitutes a MATERIAL change to the solicitation document. Its receipt by the Offeror shall be acknowledged per Section A of the ITB.
End of Addendum 1
CLARIFICATIONS AND RESPONSE(S) TO QUESTIONS
The following provides OPRD’s answers to questions received from potential Bidders. The information provided below is for clarification purposes only and does NOT constitute a change to the solicitation documents or requirements.
1. QUESTION: What is going to happen with the water running through the mill race, and the river levels?
OPRD RESPONSE: It is assumed that the water at the mill head-gates will be turned off, or diverted away from the work area into the turbine channel. The water in the Calapooia River is subject to storm runoff and may fluctuate. The lowest levels of the calendar year are in August, but this project must be completed before that time. The assumption is that the water level will allow work to proceed.
2. QUESTION: What is the allowable access to the East side of the Mill Race?
OPRD RESPONSE: No heavy equipment is allowed on the East side of the mill race. A Dually pickup truck (Gross weight not to exceed 12,500 lbs) is generally acceptable for transport of tools and equipment through a gate on Boston-Mills Road, however even that may cause disturbance or compaction of soils. Ground protection mats may be required if compaction is observed from vehicle traffic. It is expected that concrete will be delivered via a line pump based on the West side of the mill race. Actual work plan, staging areas, clean-out area, etc. is provided by contractor and approved by Owner.
3. QUESTION: Will the mill be open to the public during work?
OPRD RESPONSE: Assume that the public will still have access to some interior areas of the mill, except for areas directly over the work area. The wing over the mill race can be closed from visitor access with coordination between contractor and Owner. Assume the public will have access to general areas of the grounds on the West side of the mill race during the project, and safety measures are by contractor. See specifications.
4. QUESTION: The areas along the retaining wall is to be dug by hand, but what if anything needs to be done with the spoils? What about Archaeology?
OPRD RESPONSE: The area is a known archaeological site but monitoring of hand-digging is not required. Owner representative will be on site during this work in the event of any inadvertent discovery. Spoils are to be managed by contractor, and assumed to use as backfill after concrete wall is poured. The assumption by Owner is that no work stoppage will occur for Archaeology.
5. QUESTION: Historic qualifications seem difficult to meet. What can we do to make sure we are considered a responsive bidder?
OPRD RESPONSE: If Bidder or Bidder’s firm doesn’t have the qualifications asked for in the ITB, or in the specifications, Bidder is able to contract with or hire personnel that meet those requirements. There is an extensive list of resources here: https://www.achp.gov/initiatives/traditional-trades-training/programs-resources, or https://ptn.org/, or https://www.apti.org/, or https://www.npi.org/ as well as more international resources in heritage conservation, materials conservation, heritage preservation, and more.
See Addenda item 1.
Also refer to ITB Attachment B, Technical Specifications for details on historic preservation experience requirements.
6. QUESTION: Is anything else happening at the mill during the time of this project?
OPRD RESPONSE: Yes. There is an electrical project occurring that involves mostly interior work away from the mill race. However, electricity may not be available at certain times and the contractor may need to provide their own source of electricity.
SPECIAL QUALIFICATIONS: COVER SHEET AND HISTORIC PRESERVATION CONTRACTOR / QUALIFIED INDIVIDUAL QUALIFYING WORK EXPERIENCE REFERENCE FORM – Addendum 1 Select One:
A qualified individual shall meet the professional qualifications for any position described in The Secretary of the Interior’s Professional Qualifications for Archaeology and Historic Preservation as posted in the Federal Register, Volume 48, No. 190, Thursday, September 29, 1983. Also acceptable are the proposed revisions to The Secretary of the Interior’s Historic Preservation Professional Qualification Standards as written in the Federal Register, Volume 62, No. 119, Friday, June 20, 1997. In addition to Archaeologist and Historic Architect, these apply to anyone considered a professional Architectural Historian, Historic Engineer, Historic Landscape Architect, Historic Preservationist, Historic Preservation Planner, or Historian.
In some circumstances other certifications or experience may qualify an individual under the Special Historic Qualifications requirement. There exists numerous Historic Trades certification programs, National Park Service Historic Preservation Trades Centers, Traditional Trades Advancement Programs, and Academic programs focused on Historic Preservation Technical Trades, where the equivalent duration of involvement or experience may meet the standard. This determination is made by the Owner. Submit qualifications criteria with Reference Forms.
Name/Title of Qualified Individual
Name of Offeror’s Company
Mailing Address
Offeror’s Point Of Contact
Telephone Fax
(Name of Firm) accepts all the terms and conditions contained in the Historic Preservation Contractor Qualification Submittal.
CERTIFICATION:
I, ___________________________, certify that I am (title)__________________________ of the company herein listed and that the statements made in this document are true and accurate. I certify that, if awarded a Contract, the Qualified Individual listed in this form shall perform, or oversee performance of, all historic preservation work required under the resulting Contract. I understand that if I fail to provide all the required information in the submittal, or if after attempting to contact the persons whose names I provide, OPRD is still unable, having made reasonable effort, to verify the information furnished in my submittal, my bid may be rejected as nonresponsive at the sole discretion of OPRD.
Signature of authorized representative Date
Typed name of authorized representative
REFERENCE 1
Name of Historic Preservation Contractor (Offeror):
Name of Historic Preservation Qualified Individual (for Project References):
Qualified Individual’s Company Name (for Project References, if different than Offeror):
Offeror must provide verifiable references for projects on which Offeror/Qualified Individual has successfully completed, within the last ten (10) years, historic preservation work on a minimum of three (3) historic buildings listed on the National Register of Historic Places.
Historic Building Name:
Street Address:
City/State:
Total Contract Price at Completion:
($ 50,000. Minimum Value) Project satisfies Contractor’s/Qualified Individual’s required Special Historic Qualifications? (Yes/No)
(Must be “Yes” to qualify) Project is listed on the National Register of Historic Places.
(Yes/No) (Must be “Yes” to qualify)
National Register No.:
A copy of the Scope of Work for the above referenced project, or contract special provisions detailing this portion of the work is attached (Yes/No) (Detailed Scope of work is required.)
Owner for Above Project:
Owner Contact Name:
Owner Telephone Number:
(Must provide Owner Contact Name and Telephone Number.)
Award Date:
(Month/Year) Date Above Project Was Accepted by Owner:
(Must be no earlier than March 2015)
REFERENCE 2
Name of Historic Preservation Contractor (Offeror):
Name of Historic Preservation Qualified Individual (for Project References):
Offeror must provide verifiable references for projects on which Offeror/Qualified Individual has successfully completed, within the last ten (10) years, historic preservation work on a minimum of three (3) historic buildings listed on the National Register of Historic Places.
Historic Building Name:
Total Contract Price at Completion:
Project satisfies Contractor’s/Qualified Individual’s required Special Historic Qualifications? (Yes/No)
(Must be “Yes” to qualify) Project is listed on the National Register of Historic Places.
(Yes/No) (Must be “Yes” to qualify)
National Register No.:
A copy of the Scope of Work for the above referenced project, or contract special provisions detailing this portion of the work is attached
Owner for Above Project:
Award Date:
Date Above Project Was Accepted by Owner:
REFERENCE 3
Name of Historic Preservation Contractor (Offeror):
Name of Historic Preservation Qualified Individual (for Project References):
Offeror must provide verifiable references for projects on which Offeror/Qualified Individual has successfully completed, within the last ten (10) years, historic preservation work on a minimum of three (3) historic buildings listed on the National Register of Historic Places.
Historic Building Name:
Total Contract Price at Completion:
Project satisfies Contractor’s/Qualified Individual’s required Special Historic Qualifications? (Yes/No)
(Must be “Yes” to qualify) Project is listed on the National Register of Historic Places.
(Yes/No) (Must be “Yes” to qualify)
National Register No.:
A copy of the Scope of Work for the above referenced project, or contract special provisions detailing this portion of the work is attached
Owner for Above Project:
Award Date:
Date Above Project Was Accepted by Owner:
Addendum #1 ITB #11658 OregonBuys #S-63400-00013206 Thompson’s Mills State Heritage Site, Tailrace Support Column Replacement Project image1.jpeg