Addendum 1, Technical Questions ARFQ VNF 26-02.xlsx

XLSX spreadsheet 10 KB Posted

Attached to
Addendum 1, Flat Roof Replace and Gutter Clean
Solicitation number
ARFQ 0618 BVH2600000002 2
Issued by
Cabell County, West Virginia

About this file

This is Addendum 1 to a Technical Questions document for ARFQ VNF 26-02, a rubber roof replacement project. The solicitation addresses key technical clarifications regarding project specifications and requirements. Prior to bidding, potential vendors are permitted to inspect the roofs by contacting Amber Higginbotham or Steve Cain at 304-736-1027. The project does not require a tapered roofing system or core drilling, and no asbestos testing has been completed to date. Coping or termination bars are requested where applicable per specification 10.4.2.

Davis-Bacon wages are required for this project despite the checkbox not being marked in the original solicitation, as federal funds will be used. Warranty requirements follow industry standards, with manufacturers expected to provide 20 years of material warranty and vendors to provide 5 years of labor warranty, with documentation to be submitted to the Agency project manager at final inspection. Vendors should note that no pre-bid asbestos or core drill testing has been conducted, requiring bidders to account for potential unknown roof conditions in their proposals.

View the file

Other files

File Type Posted
Pricing Page-Flar Rubber Roof replace.xlsx XLSX spreadsheet
Roof Replacement.docx DOCX document
TCA (5).pdf PDF
Final_ARFQ_0618_BVH2600000002_2_WV_ARFQ_FORM.PDF PDF
Final_ARFQ_0618_BVH2600000002_1_WV_ARFQ_FORM.PDF PDF
Provisions for Federally Funded Procurements (2).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

TECHNICAL QUESTIONS ARFQ VNF 26*02-Rubbber Roof Replace
QUESTION #QUESTIONSPECIFICATION REFERENCEANSWER
1Are Davis-Bacon wages required? Box is not marked, but solicitation says Federal Funds to be used and in that document Davis-Bacon wages required.TCAYes, Davis-Bacon wages are required.
2Has there been an asbestos test and if so, what were the results?N/ANo, an asbestos test has not been completed.
3Has there been a core drill? If so, what materials are expected to exist and how many layers?N/ANo, a core drill has not been completed.
4Tapered system requested?N/ANo, a tapered systme is not being requested.
5Coping or termination bar requested?N/AYes, coping or termination bar is requested where applicable.
6What type/length of warranty is requested?10.4.2As per Spec 10.4.2 "The vendor shall submit any warranty documents to the Agency project manager at final inspection". Industry standard is 20 years for material (manufacturer's warranty) and 5 years for labor (vendor warranty).
7Can there be an inspection of the roof prior to bidding?N/AYes, an inspection of the roofs is allowable prior to bidding. Please call 304-736-1027 and ask for Amber Higginbotham or Steve Cain.

File details come from the government source that posted it. Updated .