Addendum 1, Technical Questions ARFQ VNF 26-02.xlsx

XLSX spreadsheet 10 KB Posted

Attached to
Addendum 1, Flat Roof Replace and Gutter Clean
Solicitation number
ARFQ-0618-BVH2600000002-2
Issued by
Cabell County, West Virginia

About this file

This document is Addendum 1 containing technical questions for ARFQ VNF 26-02, a rubber roof replacement project. The addendum provides clarifications on various technical aspects of the roofing project, including site inspection opportunities, with interested bidders able to contact Amber Higginbotham or Steve Cain at 304-736-1027 to arrange a pre-bid roof inspection.

The addendum confirms several critical project details, including Davis-Bacon wage requirements due to federal funding, confirmation that no prior asbestos testing or core drilling has been completed, and specification of project requirements such as coping/termination bar implementation. The warranty expectations align with industry standards, with an anticipated 20-year manufacturer's material warranty and 5-year vendor labor warranty. Bidders are advised to submit warranty documents to the agency project manager at final inspection, and the project does not require a tapered roofing system.

View the file

Other files

File Type Posted
Final_ARFQ_0618_BVH2600000002_1_WV_ARFQ_FORM.PDF PDF
Provisions for Federally Funded Procurements (2).pdf PDF
Final_ARFQ_0618_BVH2600000002_2_WV_ARFQ_FORM.PDF PDF
Pricing Page-Flar Rubber Roof replace.xlsx XLSX spreadsheet
TCA (5).pdf PDF
Roof Replacement.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

TECHNICAL QUESTIONS ARFQ VNF 26*02-Rubbber Roof Replace
QUESTION #QUESTIONSPECIFICATION REFERENCEANSWER
1Are Davis-Bacon wages required? Box is not marked, but solicitation says Federal Funds to be used and in that document Davis-Bacon wages required.TCAYes, Davis-Bacon wages are required.
2Has there been an asbestos test and if so, what were the results?N/ANo, an asbestos test has not been completed.
3Has there been a core drill? If so, what materials are expected to exist and how many layers?N/ANo, a core drill has not been completed.
4Tapered system requested?N/ANo, a tapered systme is not being requested.
5Coping or termination bar requested?N/AYes, coping or termination bar is requested where applicable.
6What type/length of warranty is requested?10.4.2As per Spec 10.4.2 "The vendor shall submit any warranty documents to the Agency project manager at final inspection". Industry standard is 20 years for material (manufacturer's warranty) and 5 years for labor (vendor warranty).
7Can there be an inspection of the roof prior to bidding?N/AYes, an inspection of the roofs is allowable prior to bidding. Please call 304-736-1027 and ask for Amber Higginbotham or Steve Cain.