This file is an Addendum 1 to a state solicitation (Reference No. ARFQ 0211 GSD2400000058) that addresses vendor questions and responses regarding product specifications. The addendum was issued on June 8, 2012, to clarify requirements for window installations in a lobby area. The primary modification involves guidance on glass specifications for sliding counter windows, where the vendor questioned whether to specify insulated glass units (with longer lead time and higher cost) or 1/4" laminated glass (with shorter lead time and lower cost). Both options provide equivalent noise transparency. The agency confirmed that the 1/4" laminated glass is an acceptable substitute, allowing vendors to proceed with the more economical and faster option.

All vendors responding to this solicitation must acknowledge receipt of this addendum and all others issued for the solicitation by completing and submitting the included Addendum Acknowledgement Form with their bids. Failure to acknowledge addenda may result in bid disqualification. Vendors are instructed that only written information officially issued as an addendum is binding; verbal representations made during discussions with state personnel are not binding. All other provisions of the original solicitation and any previously issued addenda remain in full force and effect.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revised 6/8/2012

SOLICITATION NUMBER: [Insert RFQ, RFP No.] Addendum Number: [Insert Number]

The purpose of this addendum is to modify the solicitation identified as [insert RFQ, RFP No.] (“Solicitation”) to reflect the change(s) identified and described below.

Applicable Addendum Category:

[ ] Modify bid opening date and time

[ ] Modify specifications of product or service being sought

[ ] Attachment of vendor questions and responses

[ ] Attachment of pre-bid sign-in sheet

[ ] Correction of error

[ ] Other

Description of Modification to Solicitation:

Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.

Terms and Conditions:

1. All provisions of the Solicitation and other addenda not modified herein shall remain in full force and effect.

2. Vendor should acknowledge receipt of all addenda issued for this Solicitation by completing an Addendum Acknowledgment, a copy of which is included herewith.

Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.

ARFQ 0211 GSD2400000058

Addendum issued to publish and distribute the attached documentation to the vendor community.

1. To attach vendor questions and agency responses, per Attachment A;

No other changes.

ATTACHMENT A

Q1. While I was on site and discussing with the employees, they were concerned about noise transfer coming from the lobby and requested insulated glass units for the sliding counter windows. After discussion with the manufacturer I can get these sliding windows with insulated glass in them at a much longer lead time and higher price however the option with 1/4" laminated glass is a short lead time and a cheaper option. Both options offer roughly the same amount of noise transparency.

So my question is, am I to bid with the insulated units and longer lead time or am I to bid with the 1/4" glass and shorter lead time?

A1. If both options have about the same noise transparency, the laminated 1/4" glass is an acceptable substitute.

ADDENDUM ACKNOWLEDGEMENT FORM

SOLICITATION NO.:_____________

Instructions: Please acknowledge receipt of all addenda issued with this solicitation by completing this addendum acknowledgment form. Check the box next to each addendum received and sign below.

Failure to acknowledge addenda may result in bid disqualification.

Acknowledgment: I hereby acknowledge receipt of the following addenda and have made the necessary revisions to my proposal, plans and/or specification, etc.

Addendum Numbers Received:

(Check the box next to each addendum received)

[ ] Addendum No. 1 [ ] Addendum No. 6

[ ] Addendum No. 2 [ ] Addendum No. 7

[ ] Addendum No. 3 [ ] Addendum No. 8

[ ] Addendum No. 4 [ ] Addendum No. 9

[ ] Addendum No. 5 [ ] Addendum No. 10

I understand that failure to confirm the receipt of addenda may be cause for rejection of this bid. I further understand that any verbal representation made or assumed to be made during any oral discussion held between Vendor’s representatives and any state personnel is not binding. Only the information issued in writing and added to the specifications by an official addendum is binding.

Company

Authorized Signature

Date

NOTE: This addendum acknowledgement should be submitted with the bid to expedite document processing.

GSD2400000058

File details come from the government source that posted it. Updated .