This Addendum 1 modifies the original procurement for a 40-Ton RTU (Rooftop Unit) for West Virginia. The addendum presents clarifications and modifications to the initial solicitation requirements, including adjustments to specifications, delivery timelines, and technical requirements for the heating, ventilation, and air conditioning (HVAC) equipment. The document addresses questions submitted by potential bidders during the pre-bid period and provides official responses from the issuing agency to ensure all participants have consistent information regarding the equipment specifications, installation requirements, and performance standards expected for the 40-ton unit.

The addendum reinforces pricing and evaluation criteria while clarifying any ambiguities in the original bid documents. It may include modifications to delivery schedules, warranty requirements, or technical specifications that impact the overall cost and feasibility of proposals. This amendment is a standard procurement practice in state and local contracting designed to promote fair competition by providing all bidders with identical, updated information before final bid submission.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revised 6/8/2012

SOLICITATION NUMBER: [Insert RFQ, RFP No.] Addendum Number: [Insert Number]

The purpose of this addendum is to modify the solicitation identified as [insert RFQ, RFP No.] (“Solicitation”) to reflect the change(s) identified and described below.

Applicable Addendum Category:

[ ] Modify bid opening date and time

[ ] Modify specifications of product or service being sought

[ ] Attachment of vendor questions and responses

[ ] Attachment of pre-bid sign-in sheet

[ ] Correction of error

[ ] Other

Description of Modification to Solicitation:

Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.

Terms and Conditions:

1. All provisions of the Solicitation and other addenda not modified herein shall remain in full force and effect.

2. Vendor should acknowledge receipt of all addenda issued for this Solicitation by completing an Addendum Acknowledgment, a copy of which is included herewith.

Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.

ARFQ GSD2700000028 – 40-Ton RTU Unit Vendor Technical Questions and Responses

Q1. With regards to ARFQ-0211-GSD2700000028-1 the spec states that the RTU must be delivered within two weeks of award. That will not be possible, we have found that the minimum delivery time for an RTU is 8-10 weeks with recent experience. Would the state consider allowing an appropriate amount of time for delivery?

A1. The Agency does not plan on changing the delivery mandate at this time.

Q2. Would an offer with a 10-week lead time, or something similar to that, still be considered?

A2. Yes, a 10-week lead time will be acceptable.

Q3. Could you please clarify whether the solicitation is requesting pricing for the unit only, or whether the scope includes the complete change-out of the existing unit, including the associated work necessary for installation?

A3. This is for unit only. No installation.

Revised 8/24/2023

ADDENDUM ACKNOWLEDGEMENT FORM

SOLICITATION NO.:

Instructions: Please acknowledge receipt of all addenda issued with this solicitation by completing this addendum acknowledgment form. Check the box next to each addendum received and sign below. Failure to acknowledge addenda may result in bid disqualification.

Acknowledgment: I hereby acknowledge receipt of the following addenda and have made the necessary revisions to my proposal, plans and/or specification, etc.

Addendum Numbers Received:

(Check the box next to each addendum received)

[ ] Addendum No. 1 [ ] Addendum No. 6

[ ] Addendum No. 2 [ ] Addendum No. 7

[ ] Addendum No. 3 [ ] Addendum No. 8

[ ] Addendum No. 4 [ ] Addendum No. 9

[ ] Addendum No. 5 [ ] Addendum No. 10

I understand that failure to confirm the receipt of addenda may be cause for rejection of this bid.

I further understand that any verbal representation made or assumed to be made during any oral discussion held between Vendor’s representatives and any state personnel is not binding. Only the information issued in writing and added to the specifications by an official addendum is binding.

Company

Authorized Signature

Date

NOTE: This addendum acknowledgement should be submitted with the bid to expedite document processing.

Untitled

Text1: ARFQ GSD2700000028
Text2: 1
Check Box4: Off
Check Box5: Off
Check Box6: Yes
Check Box7: Off
Check Box8: Off
Check Box9: Off
Text3:

1. Attach vendor technical questions and answers.

Company_2:
Date:
Solicitation Number: ARFQ GSD2700000028
Check Box52: Off
Check Box53: Off
Check Box54: Off
Check Box55: Off
Check Box56: Off
Check Box57: Off
Check Box58: Off
Check Box59: Off
Check Box60: Off
Check Box61: Off

File details come from the government source that posted it. Updated .