Addendum 1.pdf

PDF 249 KB Posted

Attached to
John Deere Gator Snowplows and Winches w/Installation
Solicitation number
ARFQ 0211 GSD2700000027 2
Issued by
Kanawha County, West Virginia

About this file

This is an Addendum 1 document issued by the State of West Virginia for solicitation ARFQ GSD2700000027, which concerns John Deere Gator Snowplows and Winches with Installation. The addendum was revised on June 8, 2012, and again on August 24, 2023. The document addresses vendor technical questions and responses related to the specifications for the equipment being procured. Specifically, the addendum clarifies that permanently mounted winches may use either cable or rope, rather than being limited to rope only as originally specified. All other provisions of the original solicitation remain in full force and effect.

Vendors submitting bids for this solicitation are required to acknowledge receipt of all addenda by completing and submitting an Addendum Acknowledgment Form with their bid proposal. Failure to acknowledge receipt of addenda may result in bid disqualification. The acknowledgment form instructs bidders to check boxes corresponding to each addendum number received and sign the document, confirming that necessary revisions have been made to their proposals and specifications. Vendors are advised that only written information and official addenda are binding; verbal representations made during discussions with state personnel are not binding.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revised 6/8/2012

SOLICITATION NUMBER: [Insert RFQ, RFP No.] Addendum Number: [Insert Number]

The purpose of this addendum is to modify the solicitation identified as [insert RFQ, RFP No.] (“Solicitation”) to reflect the change(s) identified and described below.

Applicable Addendum Category:

[ ] Modify bid opening date and time

[ ] Modify specifications of product or service being sought

[ ] Attachment of vendor questions and responses

[ ] Attachment of pre-bid sign-in sheet

[ ] Correction of error

[ ] Other

Description of Modification to Solicitation:

Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.

Terms and Conditions:

1. All provisions of the Solicitation and other addenda not modified herein shall remain in full force and effect.

2. Vendor should acknowledge receipt of all addenda issued for this Solicitation by completing an Addendum Acknowledgment, a copy of which is included herewith.

Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.

ARFQ GSD2700000027 - John Deere Gator Snowplows and Winches w/Installation Vendor Technical Questions and Responses

Q1. Permanently mounted winches for that unit typically have cable rather than rope. Will you accept cable or rope rather than limiting the spec to rope?

A1. That will be acceptable.

Revised 8/24/2023

ADDENDUM ACKNOWLEDGEMENT FORM

SOLICITATION NO.:

Instructions: Please acknowledge receipt of all addenda issued with this solicitation by completing this addendum acknowledgment form. Check the box next to each addendum received and sign below. Failure to acknowledge addenda may result in bid disqualification.

Acknowledgment: I hereby acknowledge receipt of the following addenda and have made the necessary revisions to my proposal, plans and/or specification, etc.

Addendum Numbers Received:

(Check the box next to each addendum received)

[ ] Addendum No. 1 [ ] Addendum No. 6

[ ] Addendum No. 2 [ ] Addendum No. 7

[ ] Addendum No. 3 [ ] Addendum No. 8

[ ] Addendum No. 4 [ ] Addendum No. 9

[ ] Addendum No. 5 [ ] Addendum No. 10

I understand that failure to confirm the receipt of addenda may be cause for rejection of this bid.

I further understand that any verbal representation made or assumed to be made during any oral discussion held between Vendor’s representatives and any state personnel is not binding. Only the information issued in writing and added to the specifications by an official addendum is binding.

Company

Authorized Signature

Date

NOTE: This addendum acknowledgement should be submitted with the bid to expedite document processing.

Untitled

Text1: ARFQ GSD2700000027
Text2: 1
Check Box4: Off
Check Box5: Off
Check Box6: Yes
Check Box7: Off
Check Box8: Off
Check Box9: Off
Text3:

1. Attach vendor technical questions and answers.

Company_2:
Date:
Solicitation Number: ARFQ GSD2700000027
Check Box52: Off
Check Box53: Off
Check Box54: Off
Check Box55: Off
Check Box56: Off
Check Box57: Off
Check Box58: Off
Check Box59: Off
Check Box60: Off
Check Box61: Off

File details come from the government source that posted it. Updated .