Addendum 1.pdf

PDF 396 KB Posted

Attached to
Central Florida Rail Corridor (CFRC) Track Improvements - Multiple Locations
Solicitation number
RFP-10060
Issued by
Volusia County, Florida

About this file

This document is an addendum to a Request for Proposal (RFP) issued by the Florida Department of Transportation (FDOT) for the Central Florida Rail Corridor (CFRC) Track Improvements - Multiple Locations contract. The addendum modifies the original scope of services by specifying that the vendor shall install a total of eight (8) new insulated joints, four (4) on Mainline No 1 and four (4) on Mainline No 2, at locations to be determined by the CFRC Signal Team. The solicitation is for technical and price proposals, with a mandatory pre-proposal meeting scheduled for September 4, 2024, and proposals due no later than October 2, 2024, at 10:00 AM. The contract will be awarded to a vendor registered in the State of Florida's MyFloridaMarketplace system, and out-of-state companies must be authorized to do business in Florida.

The solicitation document is subject to change, and potential bidders are responsible for monitoring the Vendor Information Portal for any updates. The contract will be subject to a 1% MyFlorida Marketplace transaction fee, unless the transaction is exempt. The solicitation also includes compliance requirements with Title VI of the Civil Rights Act of 1964 and other nondiscrimination statutes and authorities.

View the file

Other files

File Type Posted
Addendum 1.pdf PDF
Agreement between Dept and Contractor.pdf PDF
Exhibit B - Method of Compensation.pdf PDF
Exhibit D.pdf PDF
Exhibit G - G101.00 Disp SunRail Material.pdf PDF
Exhibit M - CFRC Track Chart APRIL 2023.pdf PDF
Exhibit N - SunRail CMP-SMCP R3.pdf PDF
Exhibit E - Insurance Provisions.pdf PDF
Exhibit G - G101.00 Disp SunRail Material.pdf PDF
Exhibit H - CFRC GENERAL ORDER NO. 6 TTSI 2.pdf PDF
Exhibit L - CFRC TRACK AND SIGNAL CHART.pdf PDF
Agreement between Dept and Contractor.pdf PDF
Exhibit C - FTA Provisions.pdf PDF
Exhibit D.pdf PDF
Exhibit G - G101.00 Disp SunRail Material.pdf PDF
Exhibit I - CWR.pdf PDF
Exhibit N - SunRail CMP-SMCP R3.pdf PDF
Exhibit B - Method of Compensation.pdf PDF
Exhibit D.pdf PDF
Exhibit E - Insurance Provisions.pdf PDF
Exhibit K - MOW MOS Operating Rules.pdf PDF
Exhibit L - CFRC TRACK AND SIGNAL CHART.pdf PDF
Addendum 4 Complete.pdf PDF
Agreement between Dept and Contractor.pdf PDF
Exhibit A - Scope of Services.pdf PDF
Exhibit B - Method of Compensation.pdf PDF
Exhibit F - Fence Policy.pdf PDF
Exhibit H - CFRC GENERAL ORDER NO. 6 TTSI 2.pdf PDF
Exhibit L - CFRC TRACK AND SIGNAL CHART.pdf PDF
Exhibit M - CFRC Track Chart APRIL 2023.pdf PDF
Exhibit N - SunRail CMP-SMCP R3.pdf PDF
Q&A 2 Complete.pdf PDF
Addendum 1.pdf PDF
Addendum 5 Complete - Part 2.pdf PDF
Agreement between Dept and Contractor.pdf PDF
Exhibit K - MOW MOS Operating Rules.pdf PDF
DOT-RFP-25-5002-TIML RFP.pdf PDF
Exhibit E - Insurance Provisions.pdf PDF
Exhibit I - CWR.pdf PDF
Exhibit K - MOW MOS Operating Rules.pdf PDF
Exhibit L - CFRC TRACK AND SIGNAL CHART.pdf PDF
Exhibit O - CFRC MWIs.pdf PDF
Addendum 1.pdf PDF
Exhibit A - Scope of Services.pdf PDF
Exhibit C - FTA Provisions.pdf PDF
Exhibit D.pdf PDF
Exhibit F - Fence Policy.pdf PDF
Exhibit K - MOW MOS Operating Rules.pdf PDF
Q&A 1.pdf PDF
Addendum 2.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Transportation

RON DESANTIS

GOVERNOR

605 Suwannee Street

Tallahassee, FL 32399-0450

JARED W. PERDUE, P.E.

SECRETARY

Improve Safety, Enhance Mobility, Inspire Innovation www.fdot.gov

Addendum #1

ADVERTISEMENT NUMBER: DOT-RFP-25-5002-TIML

DESCRIPTION: Central Florida Rail Corridor (CFRC) Track Improvements – Multiple Locations

DATE: 8/27/2024

You are hereby notified that the above referenced Request for Proposal (RFP) is modified as noted below:

In Exhibit “A” Scope of Services, sheet 9 of 82 under Section 2.0 Services To Be Required, sentence 2.2, is replaced with the following:

“2.2 The Vendor shall install a total of eight (8) new insulated joints, four (4) on Mainline No 1 and four (4) on Mainline No 2, at locations to be specified by the CFRC Signal Team.”

TO ACKNOWLEDGE RECEIPT OF THIS NOTICE AND ALL CHANGES, PLEASE SIGN AND

RETURN BY E-MAIL AT D5.PROCUREMENTQUESTIONS@DOT.STATE.FL.US PRIOR TO

October 2, 2024, at 10:00AM.

Name of Company:

Authorized Signature: Date:

FAILURE TO FILE A PROTEST WITHIN THE TIME PRESCRIBED IN SECTION 120.57(3),

F.S. SHALL CONSTITUTE A WAIVER OF PROCEEDINGS UNDER CHAPTER 120, F.S.

File details come from the government source that posted it. Updated .