Addendum 1.pdf

PDF 396 KB Posted

Attached to
Central Florida Rail Corridor (CFRC) Track Improvements - Multiple Locations
Solicitation number
RFP-10060
Issued by
Volusia County, Florida

About this file

This document is Addendum #1 for a Request for Proposal (RFP) issued by the Florida Department of Transportation (FDOT) for the Central Florida Rail Corridor (CFRC) Track Improvements - Multiple Locations project. The addendum updates the scope of services, which now requires the vendor to install a total of eight (8) new insulated joints, four (4) on Mainline No 1 and four (4) on Mainline No 2, at locations specified by the CFRC Signal Team. The RFP is due on October 2, 2024, at 10:00 AM, and a mandatory pre-proposal meeting will be held on September 4, 2024, at 10:00 AM at the FDOT District 5 Headquarters in DeLand, Florida. The contract will be awarded to the successful bidder, and the document provides details on the requirements for out-of-state businesses and licensing.

The document also outlines the MFMP Transaction Fee, which will be applicable to any payments made to the vendor(s) resulting from the contract. Additionally, the document emphasizes compliance with nondiscrimination statutes and authorities, including Title VI of the Civil Rights Act of 1964 and related federal regulations.

View the file

Other files

File Type Posted
Exhibit A - Scope of Services.pdf PDF
Exhibit C - FTA Provisions.pdf PDF
Exhibit F - Fence Policy.pdf PDF
Exhibit J - GCOR.pdf PDF
Addendum 2.pdf PDF
DOT-RFP-25-5002-TIML RFP.pdf PDF
Exhibit I - CWR.pdf PDF
Exhibit J - GCOR.pdf PDF
Exhibit M - CFRC Track Chart APRIL 2023.pdf PDF
Exhibit O - CFRC MWIs.pdf PDF
Addendum 1.pdf PDF
Exhibit K - MOW MOS Operating Rules.pdf PDF
Addendum 1.pdf PDF
Agreement between Dept and Contractor.pdf PDF
Exhibit H - CFRC GENERAL ORDER NO. 6 TTSI 2.pdf PDF
Exhibit M - CFRC Track Chart APRIL 2023.pdf PDF
Q&A 2 Complete.pdf PDF
Q&A 3.pdf PDF
Addendum 5 Complete - Part 2.pdf PDF
Exhibit C - FTA Provisions.pdf PDF
Exhibit E - Insurance Provisions.pdf PDF
Exhibit I - CWR.pdf PDF
Exhibit J - GCOR.pdf PDF
Exhibit K - MOW MOS Operating Rules.pdf PDF
Q&A 1.pdf PDF
Q&A 3.pdf PDF
Q&A 4 TIML Final.pdf PDF
Addendum 5 Complete - Part 1.pdf PDF
Addendum 6.pdf PDF
DOT-RFP-25-5002-TIML RFP.pdf PDF
Exhibit D.pdf PDF
Exhibit E - Insurance Provisions.pdf PDF
Exhibit F - Fence Policy.pdf PDF
Addendum 1.pdf PDF
Agreement between Dept and Contractor.pdf PDF
Exhibit B - Method of Compensation.pdf PDF
Exhibit D.pdf PDF
Exhibit G - G101.00 Disp SunRail Material.pdf PDF
Exhibit M - CFRC Track Chart APRIL 2023.pdf PDF
Exhibit N - SunRail CMP-SMCP R3.pdf PDF
Exhibit E - Insurance Provisions.pdf PDF
Exhibit G - G101.00 Disp SunRail Material.pdf PDF
Exhibit H - CFRC GENERAL ORDER NO. 6 TTSI 2.pdf PDF
Exhibit L - CFRC TRACK AND SIGNAL CHART.pdf PDF
Agreement between Dept and Contractor.pdf PDF
Exhibit C - FTA Provisions.pdf PDF
Exhibit D.pdf PDF
Exhibit G - G101.00 Disp SunRail Material.pdf PDF
Exhibit I - CWR.pdf PDF
Exhibit N - SunRail CMP-SMCP R3.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Transportation

RON DESANTIS

GOVERNOR

605 Suwannee Street

Tallahassee, FL 32399-0450

JARED W. PERDUE, P.E.

SECRETARY

Improve Safety, Enhance Mobility, Inspire Innovation www.fdot.gov

Addendum #1

ADVERTISEMENT NUMBER: DOT-RFP-25-5002-TIML

DESCRIPTION: Central Florida Rail Corridor (CFRC) Track Improvements – Multiple Locations

DATE: 8/27/2024

You are hereby notified that the above referenced Request for Proposal (RFP) is modified as noted below:

In Exhibit “A” Scope of Services, sheet 9 of 82 under Section 2.0 Services To Be Required, sentence 2.2, is replaced with the following:

“2.2 The Vendor shall install a total of eight (8) new insulated joints, four (4) on Mainline No 1 and four (4) on Mainline No 2, at locations to be specified by the CFRC Signal Team.”

TO ACKNOWLEDGE RECEIPT OF THIS NOTICE AND ALL CHANGES, PLEASE SIGN AND

RETURN BY E-MAIL AT D5.PROCUREMENTQUESTIONS@DOT.STATE.FL.US PRIOR TO

October 2, 2024, at 10:00AM.

Name of Company:

Authorized Signature: Date:

FAILURE TO FILE A PROTEST WITHIN THE TIME PRESCRIBED IN SECTION 120.57(3),

F.S. SHALL CONSTITUTE A WAIVER OF PROCEEDINGS UNDER CHAPTER 120, F.S.

File details come from the government source that posted it. Updated .