About this file

This is Addendum No. 1 issued by the California Department of Parks and Recreation for RFQ #C15E0055 regarding Site Characterization and Remediation Services for Hazardous Materials at Malakoff Diggins State Historic Park. The addendum, issued April 6, 2016, revises the mandatory pre-proposal walk-through date from Tuesday, April 12, 2016 to Monday, April 18, 2016. Statements of Qualifications (SOQs) are due April 25, 2016. The mandatory site visit will begin at Empire Mine State Historic Park at 10:00 a.m., where attendees will meet to caravan to Malakoff Diggins State Historic Park in North Bloomfield.

The addendum emphasizes strict attendance requirements for the mandatory pre-proposal walk-through, stating that no SOQs will be considered from Prime Contractors who do not attend. Attendees must sign in within five minutes of the scheduled start time, with no exceptions for late arrivals. The walk-through represents the only opportunity for contractors to view the site with park personnel.

View the file

Other files

File Type Posted
RFQ_C15E0055.pdf PDF
Mandatory_Pre-Proposal_Walk-through_Sign-in_Sheet.pdf PDF
Addendum_3_C15E0055.pdf PDF
Addendum_2_C15E0055.pdf PDF
Attachment_A_Reports_Volume_3.pdf PDF
Attachment_A_Reports_Volume_4.pdf PDF
Addendum_4_C15E0055.pdf PDF
Attachment_A_Reports_Volume_2.pdf PDF
Attachment_A_Reports_Volume_1.pdf PDF
Addendum_5_C15E0055.pdf PDF
Attachments_B_through_D.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

State of California • Natural Resources Agency Edmund G. Brown Jr., Governor

DEPARTMENT OF PARKS AND RECREATION Lisa Ann L. Mangat, Director One Capitol Mall, Suite 410 Sacramento, California 95814

ADDENDUM No. 1

Issue Date: April 6, 2016

REQUEST FOR QUALIFICATIONS

BID NUMBER: C15E0055

MALAKOFF DIGGINS STATE HISTORIC PARK

SITE CHARACTERIZATION AND REMEDIATION SERVICES FOR HAZARDOUS

MATERIALS THROUGHOUT THE PARK SITE PROJECT

Statement of Qualifications (SOQs) Due Date: April 25, 2016

This addendum corrects/revises the Request for Qualifications (RFQ) for Site Characterization And Remediation Services For Hazardous Materials. The changes in this addendum shall be included in the Statement of Qualifications submitted in response to this RFQ. All conditions not affected by this addendum shall remain unchanged.

1. REVISE Section 1.4 Mandatory pre-proposal walk-through, item 1.4.1, page 7 of 16, as follows:

1.4.1. A Mandatory pre-proposal walk-through is scheduled for Tuesday, April 12, 2016 Monday, April 18th at MALAKOFF DIGGINS STATE HISTORIC PARK, however, due to its remote location, all attendees will first meet at 10:00 a.m. at EMPIRE MINE STATE HISTORIC PARK, 10791 East Empire Street, Grass Valley, CA 95945 and will caravan from there to MALAKOFF DIGGINS STATE HISTORIC PARK, located in the historic town of North Bloomfield, 23579 North Bloomfield Rd., Nevada City, California.

Attendance at the job showing is MANDATORY and will be the only opportunity made available for Contractors to view the site with park personnel. No SOQ will be considered from a Prime Contractor that did not attend the mandatory pre-proposal walkthrough. Due to wristwatch variance, attendees will be allowed to sign in up to five (5) minutes past the scheduled job showing start time. Those attendees arriving five (5) minutes past the scheduled job showing start time will not be allowed to sign in. Contractor’s failure to sign in for any reason will be considered non-attendance for the mandatory pre-proposal walk-through.

END OF ADDENDUM #1

ADDENDUM No. 1

File details come from the government source that posted it. Updated .