Addendum 1 18283.pdf
PDF 26 KB Posted
- Solicitation number
- RFQ-171-190000000458-4
- Issued by
- Bay County, Michigan
About this file
This is Addendum No. 1 issued by the Michigan Department of Technology, Management and Budget (DTMB) for the Former Salzburg Cleaners Remediation project located at 1906 South Erie Street in Bay City, Michigan. The addendum, dated June 7, 2019, addresses bidder questions regarding contract specifications for a 90-day remediation project overseen by the Department of Environment, Great Lakes, and Energy (EGLE). The bid opening date is set for June 12, 2019, with no extension to the bid timeline.
The addendum provides clarifications on several key contract requirements, including the contractor's responsibility for executing an access agreement with the City of Bay City, documentation requirements for payment, and disposal specifications for concrete, asphalt, and groundwater. Specifically, bidders are instructed to assume all concrete and HMA pavement will be disposed of at a licensed Type II Disposal Facility, and that 20% of certain lump sum payments will be withheld until all project documentation is submitted to the professional. The addendum maintains the original pay item structures and does not allow for splitting of certain line items as requested by potential bidders.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (R 1/15)
STATE OF MICHIGAN Date Issued: June 7, 2019 Department of Technology, Management and Budget Funding Code: 1581 State Facilities Administration File No: 761/18283.SAR 3111 W. St. Joseph Street Department: EGLE Lansing, Michigan 48917 Project Name: Former Salzburg
Cleaners
Bid Opening Date: June 12, 2019
ADDENDUM NO. 1
TO: All Bidders
SUBJECT: Former Salzburg Cleaners Remediation 1906 South Erie Street, Bay City, Michigan 48706
INTENT: This Addendum is issued to:
Item 1 – Provide response to the following questions received
Q: Under Section 00200 part 2.3, the specifications indicate that it is the contractor’s responsibility to execute an access agreement with the City of Bay City. The bid documents also state that the contractor is to execute the access agreement after the award of the contract which may cause delays to the 90-day completion schedule. As the contractor does not represent the owner, wouldn’t the customer be best served if this was completed by the Professional?
R: The Contractor shall be responsible for executing the access agreement with the City of Bay City.
Q: Under Section 01025, pay items 2.3 “Asbestos Abatement” and 2.4 “Removal and Disposal of Hazardous and Miscellaneous Regulated Waste and Building Demolition, Removal and Disposal Including All Contents” indicate that 20% of the lump sum is to be withheld until “all project documentation has been provided to the Professional.” Can you please elaborate on what specific documentation is required under each pay item? Is this a new State of Michigan requirement? On a project with a completion period of 90 days, why is the contractor expected to participate in financing portions of the work for an extended period of time?
R: All documentation required for payment is provided under Section 01300 “Submittals” of the bid specifications.
Q: Under Section 01025, pay items 2.5 “Removal and Disposal of Concrete Slabs, Foundations, and Sidewalks” and 2.6 “Sawcut, Removal, and Disposal of HMA Pavement”, there is an option to either have the material recycled or sent to a Type II landfill based on impaction levels. The price to recycle the material is considerably less than to send it to the landfill. Can you tell us which portion of the concrete and asphalt is impacted so that we can accurately price their disposal? Also, can this item be split into two pay items – one for recycled material and one for disposal at the type II landfill?
R: Assume all concrete and HMA pavement to be disposed of at a licensed Type II Disposal Facility.
Q: Due to the quick turnaround on this project, will there be an extension to the bid date?
R: No
Q: Under Section 01025, pay items 2.8 “Management and Disposal of Non- Hazardous Impacted Groundwater”, there is only one pay item for the management of the dewatering system and disposal of the water. These two categories can vary in pricing dramatically based upon the actual amount of groundwater at the project location. Can this pay item be separated into two pay items? Management of the dewatering system and disposal of impacted groundwater.
R: Pay item 2.8 “Management and Disposal of Non-Hazardous Impacted Groundwater” shall remain unchanged.
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the bidder in the space provided in the Bid Summary Form submitted with the bidder's bid for submission of a valid bid. The changes and information shall become part of the contract documents. (Authority: 1984 PA 431)