ADDENDUM 001 INDEX 603-21-201 Replace 6 floor-North Patient Room Doors.pdf

PDF 166 KB Posted

Attached to
Z2DA--36C249-23-AP-0088 - 603-21-201 - Replace 6-N Patient Room Doors
Solicitation number
36C24923B0016
Issued by

About this file

This addendum modifies the construction documents for project number 603-21-201 to replace patient room doors in the sixth floor intensive care unit at a Department of Veterans Affairs medical center. The changes include replacing and adding drawings, inserting new specifications for firestopping and fire protection, modifying payment terms, and adding infection control requirements due to the limited space in the ICU corridors. Protective measures are outlined for working in and traversing between patient rooms, including the use of room A663 as a temporary anteroom. Corresponding solicitation number 36C24923B0016 seeks bids to provide all labor, materials, equipment, and supervision necessary to complete the door replacements and install new access control features in accordance with the revised specifications and drawings, including meeting infection control protocols at level 4 and properly phasing the work.

View the file

Other files

File Type Posted
36C24923B0016 0005.docx DOCX document
Attachment 1 - 1999 Door Project Image.jpg JPG image
36C24923B0016 0004.docx DOCX document
Attachment 5 - ADDENDUM 001 603-21-201 Replace 6-North Patient Room Doors 078400 FIRESTOPPING.pdf PDF
36C24923B0016 0003.docx DOCX document
Attachment 2 - ADDENDUM 001 603-21-201 Replace 6-North Patient Room Doors A654 DOOR FRAME.pdf PDF
Attachment 4 - ADDENDUM 001 603-21-201 Replace 6-North Patient Room Doors ICRA.pdf PDF
Attachment 3 - ADDENDUM 001 603-21-201 Replace 6-North Patient Room Doors SOC-8_6th Floor.pdf PDF
Attachment 1 - RFI Questions - 603-21-201 - Replace 6N Patient Room Doors VA.pdf PDF
36C24923B0016 0002.docx DOCX document
36C24923B0016 0001.docx DOCX document
Price Schedule-36C24923B0016.xlsx XLSX spreadsheet
Drawing_A102-A654 FR_603-21-201 Replace 6-North Patient Room Doors.pdf PDF
Bidder Declaration-36C24923B0016.docx DOCX document
RFI_Form-36C24923B0016.pdf PDF
CalcofSelfPerformedWork-36C24923B0016.xlsx XLSX spreadsheet
ContractorEMR_Certification.docx DOCX document
SPEC_078400_Firestopping-603-21-201 Replace 6-North Patient Room Doors.pdf PDF
Drawings 603-21-201 6N Patient Room Doors CD.pdf PDF
Original Specs 603-21-201 6N Patient Room Doors VA.pdf PDF
IFB-36C24923B0016-Replace 6N Patient Room Doors.pdf PDF
WAGE-RATES.docx DOCX document
DRAWING_SOC-8- Replace 6-North Patient Room Doors-603-21-201.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project 603-21-201 Replace 6th Floor -North Patient Room Doors

DRAWING & SPECIFICATIONS ADDENDUM

The Government adds the following to the original construction documents submitted by the Architect Engineering Firm RDC / John Poe Architects dated on or around June 2021.

I. DRAWINGS:

a. SECTION 00 01 15, LIST OF DRAWING SHEETS INDEX IS AMENDED AS FOLLOWS:

i. Replace Drawing No. A202, Title Plans & Details with A101

1. A101 references room A-654

2. A101 references room A-663, for anteroom.

ii. Add the following Drawing No. & Title:

1. SOC-8, Fire Protection Plan (not the title on the drawing)

2. A102, A654 Door Detail

II. SPECIFICATION 00 01 15

a. Add SPECIFICATION 07 84 00 FIRESTOPPING to the Table of Contents

III. SPECIFICATION 01 32 16.15 -5

a. Replace bolded italicized part of 1.8 Payment to Contractor, A. Monthly, the contractor shall submit an application and certificate for payment using VA Form 10-6001a and certificate for payment documents G702 & G703… With or the AIA application and certificate for payment documents G702 & G703…

IV. SPECIFICATION 01 35 26-17

a. Add under paragraph 4. a. 6) the following:

a) Due to limited area in the ICU corridors, there may not be enough space for an anteroom during a door’s replacement, therefore additional ICRA measures shall be used for this project.

i) Don clean PPE, clothing, head, and shoe covers when traversing through the 6th floor ICU, both to and from the construction area.

ii) PPE stored in the work area needs to be stored in a clean sealed container to prevent contamination.

iii) Room A663 may be used as an anteroom for work in room A662. Contractor is responsible for protecting finishes from damage and keeping surfaces dust free in Room A663.

V. SPECIFICATION 07 84 00

a. Insert after SECTION NO. 02 41 00 and before SECTION NO. 08 14 00.