This is Addendum 2 to Request for Bids 14083-0-2025-BG issued by the City of Madison Water Utility for the 2025 Reservoir Painting project. The addendum, dated December 11, 2025, modifies and clarifies specifications for the comprehensive painting and restoration of two municipal water storage reservoirs: Reservoir 20 (4.2-million-gallon steel ground-level standpipe) and Reservoir 225 (500,000-gallon spheroid elevated tank). Key specification changes include restricting contractor working days to Monday through Saturday unless written approval from the Engineer is obtained, with no work permitted on holidays without written authorization. The surface preparation requirements have been revised to specify high-pressure washing of the interior dry stem and base cone at a minimum of 2,000 psi, with platforms to be abrasive blasted on both sides. Additionally, the addendum confirms that safety climb systems and brackets must comply with DBI/SALA LAD-SAF systems as specified in Section 05 50 00. Sealed electronic bids were due December 17, 2025, at 2:00 PM CST, with work anticipated to begin in spring 2026 and completion targeted for October 30, 2026.

Bidders were required to acknowledge receipt of all addenda on Form B, with failure to do so potentially resulting in disqualification. The project includes three cash allowances totaling $35,000: $20,000 for exterior cathodic protection equipment, $5,000 for interior wet pit filling repairs, and $10,000 for structural engineering evaluation. Contractors must maintain Commercial General Liability insurance of at least $1,000,000 per occurrence, Workers' Compensation insurance, and Professional Liability insurance of $1,000,000. The project is funded through the City of Madison's water utility budget and will be awarded to the lowest responsible, responsive bidder meeting all prequalification and specification requirements. Contractors employing 15 or more employees with aggregate annual business of $50,000 or more must file an approved Affirmative Action Plan within 30 days of the contract effective date. Daily work hours are restricted to 7:00 AM to 7:00 PM, with liquidated damages assessed for exceeding milestone outage durations. The project is subject to Wisconsin Department of Natural Resources Construction Permit requirements, OSHA compliance, and comprehensive environmental regulations including lead abatement and waste disposal protocols.

View the file

Other files

File Type Posted
RFB-Form D - Cost Proposal Excel (1).xlsx XLSX spreadsheet
RFB 14083 Award Recommendation.pdf PDF
Form D - Cost Proposal - Revised 12.09.2025.xlsx XLSX spreadsheet
Bid Summary.xlsx XLSX spreadsheet
RFB 14083.pdf PDF
Addendum 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

www.madisonwater.org - 119 East Olin Avenue, Madison, WI 53713-1431 - TEL 608.266.4651 - FAX 608.266.4426

ADDENDUM 2 12/11/2025

REQUEST FOR BIDS – 2025 RESERVOIR PAINTING: RFB # 14083-0-2025-BG Page 1 of 2

December 11, 2025

NOTICE OF ADDENDUM

ADDENDUM 2

RFB# 14083-0-2025-BG 2025

Reservoir Painting Madison WI

Munis Project No: 15851

Revise and amend the contract document(s) for the above project as stated in this addendum, otherwise, the original document shall remain in effect.

Changes to SPECIFICATIONS:

1. Revision to Section 01 11 00-2 1.04 (CONSTRUCTION REQUIREMENTS)

a. INSERT the following under 1.04 (B):

“Contractor shall limit working days to Monday-Saturday unless approved by the Engineer in writing. No work shall be allowed on holidays unless approved by the Engineer.”

2. Revision to Section 09 67 17-12 3.02 C (SURFACE PREPARATION)

a. Under Section 3.02 C.1 – It is the intent for the platforms to be abrasive blasted on both sides. REPLACE Section 09 67 17-12 C.1. with the following:

“High-pressure wash the interior dry stem and base cone with a minimum 2,000 psi.”

Clarification to SPECIFICATIONS:

3. Confirmation / verification of the intended cable support for the pedestal tank has been requested.

a. Safety climb systems, including brackets, shall be DBI/SALA LAD-SAF systems as specified in Section 05 50 00.

www.madisonwater.org - 119 East Olin Avenue, Madison, WI 53713-1431 - TEL 608.266.4651 - FAX 608.266.4426

ADDENDUM 2 12/11/2025

REQUEST FOR BIDS – 2025 RESERVOIR PAINTING: RFB # 14083-0-2025-BG Page 2 of 2

Bidders must acknowledge the receipt of any addenda on Form B. Failure to retrieve addenda and include their provisions may result in disqualification.

If you are unable to download plan revisions associated with the addendum, please contact the City of Madison Purchasing Services office at (608) 243-0529 to receive the material by another route.

12/11/2025

Pete Holmgren, PE Chief Engineer – Madison Water Utility