Add No 1 - MAB Underground Utilities and Stormwater Improvements - 08-03-2020.pdf
PDF 31 MB Posted
- Attached to
- Combined Underground Utilities and Storm Water Improvements, Moore Air Base, Edinburg, Texas
- Solicitation number
- 12639522R0041
About this file
This solicitation seeks proposals for combined underground utilities and storm water improvements at Moore Air Base in Edinburg, Texas. The Department of Agriculture Animal and Plant Health Inspection Service Marketing and Regulatory Programs Business Services is soliciting bids to install new underground utilities including water, sewer and electrical lines as well as make storm water drainage improvements. Proposals are due by August 3, 2020 with award notices expected to be issued by September 2020. The solicitation includes attachments with project specifications, drawings and response requirements. Any references in the documents related to future or add alternate work shall be disregarded for this project.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
00 01 02.doc
Project Manual for
USDA-APHIS-PPQ
Moore Air Base Underground Utilities and Stormwater Improvements USDA Contract No: AG-6395-C-16-0119
Edinburg, Texas
8/3/2020
Texas Registration #136708 License Exp. Date: 09-30-2020 Texas Firm Registration No. F-174
Texas Registration #102678 License Exp Date: 12-31-2020 Texas Firm Registration No. F-174
Texas Registration #116530 License Exp. Date: 12-31-2020 Texas Firm Registration No. F-174
Addendum No. 1 ms1952 27100.28.00
ADDENDUM NO. 1
July 31, 2020
MOORE AIR BASE
UNDERGROUND UTILITIES AND STORMWATER IMPROVEMENTS
USDA CONTRACT NO: AG-6395-C-16-0119
EDINBURG, TEXAS
1. SECTION 31 23 00 – EXCAVATION AND FILL
Article "3.16 INITIAL PIPE TRENCH BACKFILL"
Change paragraph D. to read:
D. Compaction: 85% maximum density.
2. DRAWINGS
The following Drawings have been revised, as indicated by revision number, and are reissued herewith:
Drawing No. Title Rev. No.
GG02 INDEX SHEET 1
CU220 OVERALL SITE PLAN 1
CU226 SANITARY SEWER PLAN & PROFILE – SHEET 6 1
CU227 SANITARY SEWER PLAN & PROFILE – SHEET 7 1
CU228 SANITARY SEWER PLAN & PROFILE – SHEET 8 1
CU229 SANITARY SEWER PLAN & PROFILE – SHEET 9 1
CU230 SANITARY SEWER PLAN & PROFILE – SHEET 10 1
CU231 SANITARY SEWER PLAN & PROFILE – SHEET 11 1
CU233 UTILITY CORRIDOR SECTIONS 1
EP101 SITE ELECTRICAL PLAN – SHEET 1 1
EP106 SITE ELECTRICAL PLAN – SHEET 6 1
EP107 SITE ELECTRICAL PLAN – SHEET 7 1
EP108 SITE ELECTRICAL PLAN – SHEET 8 1
EP109 SITE ELECTRICAL PLAN – SHEET 9 1
EP110 SITE ELECTRICAL PLAN – SHEET 10 1
EU504 SITE ELECTRICAL DETAILS – SHEET 4 1
EO08 SITE ELECTRICAL – NEW ELECTRICAL MANHOLES 1
PC01 RAW WATER IRRIGATION PLAN – SHEET 1 1
PC02 RAW WATER IRRIGATION PLAN – SHEET 2 1
Revise the following Drawings as indicated. These Drawings are not being reissued at this time.
Drawing GG07 SWPPP AND REMOVALS KEY MAP
Add Note 1 to read: The government will remove water from ditches and boneyard items prior to construction.
Addendum No. 1 ms1952 27100.28.00
Drawings GG12 – GG13
Change alignment of proposed underground utilities along 5th Street to match Drawings CU228-CU230, Rev 1.
Drawings CU105 – CU106
Drawings CU204 – CU205
END OF ADDENDUM NO. 1
1) D. K. Mathias
2) J. Meyer
INDEX SHEET
GG02 1
AS NOTED
DK MATHIAS
GM REEVES
XXX, 2020
DK MATHIAS
J MEYER
1 ADDENDUM NO. 1 DKM DKM JM 7-31-2020
D
A
1 2
C A
D
R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN
SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
Texas Firm Registration No.: F-174
AT FULL SIZE
IN
cm0 1 2 3 4
6 7
USDA-APHIS-PPQ MOORE AIR BASE
27100.13
NOTE: THE SIZE, NUMBER AND LOCATION OF EXISTING
UTILITIES SHOWN ON THIS DRAWING ARE APPROXIMATE AND
ARE FOR GENERAL INFORMATION ONLY. UTILITY SERVICE
CONNECTIONS ARE NOT SHOWN ON THIS DRAWING.
CONTRACTOR FULLY RESPONSIBLE FOR OBTAINING EXACT
LOCATIONS OF EXISTING UTILITIES FROM UTILITY
COMPANIES. SOME EXISTING UTILITIES MAY NOT BE SHOWN.
DRAWING INDEX
136708
JASON JAMES MEYER
7-31-2020
A
1 2
C
AD
D D
3- R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com Texas Firm Registration No.: F-174
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
USDA-APHIS-PPQ MOORE AIR BASE
UNDERGROUND UTILITIES AND STORMWATER IMPROVEMENTS
EDINBURG, TEXAS
27100.13
GENERAL NOTESNORTH
1. FURNISH AND INSTALL NEW SANITARY SEWER TO REPLACE
EXISTING SANITARY SEWER ON NEW ALIGNMENT SHOWN.
2. CONTRACTOR SHALL FIELD CHECK AND VERIFY ALL
EXISTING UTILITY LOCATIONS, DIMENSIONS AND
ELEVATIONS IN THE FIELD PRIOR TO COMMENCEMENT OF
PROPOSED WORK.
3. LOCATE AND CONNECT ALL ACTIVE SANITARY SERVICES TO
NEW SEWER. APPROXIMATE LOCATION OF KNOWN SERVICE
TAPS ARE SHOWN AND MAY BE ACTIVE OR INACTIVE.
ADDITIONAL SERVICE TAPS MAY BE PRESENT. CONTRACTOR
IS RESPONSIBLE FOR IDENTIFYING AND REINSTATING ALL
ACTIVE SERVICE TAPS. AFTER BUILDING SERVICE IS
CONNECTED TO FUNCTIONING NEW SANITARY SEWER, PLUG
OPEN ENDS OF INACTIVE SERVICES AND ABANDON
REMAINING PIPING IN PLACE. VERIFY SEWER LINE IS NOT IN
USE PRIOR TO ABANDONMENT.
4. MAINTAIN EXISTING SANITARY SEWER AND WATER
DISTRIBUTION SYSTEM IN SUBSTANTIALLY CONTINUOUS
OPERATION DURING CONSTRUCTION, MAKING AND
REMOVING TEMPORARY CONNECTIONS AS NECESSARY IN
ACCORDANCE WITH SPECIFICATION SECTION 01 11 00.
5. ALL PIPES SHALL BE INSPECTED BY THE GOVERNMENT
REPRESENTATIVE PRIOR TO BACKFILLING.
6. TOP OF MANHOLES SHALL MATCH FINISHED TOP OF
PAVEMENT WHEN PRESENT.
7. SIDEWALK AND PAVEMENT REMOVAL SHALL BE IN
ACCORDANCE WITH SPECIFICATION SECTION 31 23 00,
PARAGRAPH 3.13. SAWCUT EXISTING PAVEMENT BY A
STRAIGHT EDGE WITH AN APPROPRIATE SAWCUT MACHINE.
ANY PAVEMENT DAMAGED OUTSIDE OF TRENCH SHALL BE
REPAIRED AT NO ADDITIONAL COST TO THE GOVERNMENT.
8. CONTRACTOR SHALL DOCUMENT EXISTING PAVEMENT
MATERIALS, CONFIGURATION AND CONSTRUCTION PRIOR
TO DEMOLITION OR REMOVALS. FOLLOWING
CONSTRUCTION, THE GRADES AND PAVEMENT SHALL BE
REPLACED SAME AS PRE-CONSTRUCTION. CONSTRUCTION
PRACTICES SHALL BE IN ACCORDANCE WITH SPECIFICATION
SECTIONS 32 11 23, 32 12 16, 32 13 13, 32 15 00, 32 16 23 AND
32 92 19, AS APPLICABLE. MILLING AND OVERLAY OF THE
ASPHALT SURFACE IN AREA OF 5TH STREET IS
ACCEPTABLE.
9. WHEEL STOPS SHALL BE REMOVED, REPAINTED, AND
REUSED AS NECESSARY. ANY DAMAGED WHEEL STOPS
SHALL BE REPLACED AT NO ADDITIONAL COST TO THE
GOVERNEMENT.
10. FURNISH AND APPLY PAVEMENT MARKING MATERIALS TO
MATCH PRE-CONSTRUCTION CONDITIONS. USE WHITE
READY-MIXED TRAFFIC PAINT, AASHTO M248, TYPE S.
ENSURE PAVEMENT IS DRY AND FREE FROM DIRT, DUST,
OIL, CURING COMPOUND OR OTHER CONTAMINANTS THAT
MAY INTERFERE WITH PROPERLY BONDING TO THE
SURFACE.
OVERALL SITE PLAN -
SANITARY SEWER KEY PLAN
CU220 1
1"=250'
DK MATHIAS
GM REEVES
MAY 26, 2020
F ROUSE
L LEISCHNER
1 ADDENDUM NO. 1 DKM FR LL 7-31-2020
1 2
C
AD
D D
3- R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com Texas Firm Registration No.: F-174
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
USDA-APHIS-PPQ MOORE AIR BASE
UNDERGROUND UTILITIES AND STORMWATER IMPROVEMENTS
EDINBURG, TEXAS
27100.13
NOTE: THE SIZE, NUMBER AND LOCATION OF EXISTING
UTILITIES SHOWN ON THIS DRAWING ARE APPROXIMATE AND
ARE FOR GENERAL INFORMATION ONLY. UTILITY SERVICE
CONNECTIONS ARE NOT SHOWN ON THIS DRAWING.
CONTRACTOR FULLY RESPONSIBLE FOR OBTAINING EXACT
LOCATIONS OF EXISTING UTILITIES FROM UTILITY
COMPANIES. SOME EXISTING UTILITIES MAY NOT BE SHOWN.
FO
R
C O
N
TI
N U
A
TI
O N
S
EE
S H
EE
T
C U
NOTESNORTH
FO
R
C O
N
TI
N U
A
TI
O N
S
EE
S H
EE
T
C U
1. PROVIDE WATERTIGHT COVER IN ACCORDANCE WITH
SPECIFICATION SECTION 33 30 00, 2.06.C. MANHOLE RIM
ELEVATION SET 1' ABOVE PEAK 500 YEAR FLOOD ELEVATION OF
197.3'.
2. REPLACE EXISTING LIFT STATION AND FORCE MAIN WITH
GRAVITY SEWER SERVICE. DEACTIVATE AND REMOVE THE LIFT
STATION STRUCTURE, AND MECHANICAL AND ELECTRICAL
EQUIPMENT. ABANDON FORCE MAIN PER DETAILS ON CU200.
COORDINATE WITH THE GOVERNMENT ON SALVAGE OF
EQUIPMENT.
3. SEE DRAWINGS CU200 - CU205 FOR SANITARY ABANDONMENT
DETAILS.
SANITARY SEWER PLAN & PROFILE
SHEET 6
CU226 1
1"=20'
DK MATHIAS
GM REEVES
MAY 26, 2020
F ROUSE
L LEISCHNER
1 ADDENDUM NO. 1 DKM FR LL 7-31-2020
7-31-2020
1 2
C
AD
D D
3- R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com Texas Firm Registration No.: F-174
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
USDA-APHIS-PPQ MOORE AIR BASE
UNDERGROUND UTILITIES AND STORMWATER IMPROVEMENTS
EDINBURG, TEXAS
27100.13
NOTE: THE SIZE, NUMBER AND LOCATION OF EXISTING
UTILITIES SHOWN ON THIS DRAWING ARE APPROXIMATE AND
ARE FOR GENERAL INFORMATION ONLY. UTILITY SERVICE
CONNECTIONS ARE NOT SHOWN ON THIS DRAWING.
CONTRACTOR FULLY RESPONSIBLE FOR OBTAINING EXACT
LOCATIONS OF EXISTING UTILITIES FROM UTILITY
COMPANIES. SOME EXISTING UTILITIES MAY NOT BE SHOWN.
FO
R
C O
N
TI
N U
A
TI
O N
S
EE
S H
EE
T
C U
NOTESNORTH
FO
R
C O
N
TI
N U
A
TI
O N
S
EE
S H
EE
T
C U
1. CONNECT EXISTING SERVICE LINE TO NEW SANITARY SEWER.
2. REPLACE EXISTING LIFT STATION AND FORCE MAIN WITH
GRAVITY SEWER SERVICE. DEACTIVATE AND REMOVE THE LIFT
STATION STRUCTURE, AND MECHANICAL AND ELECTRICAL
EQUIPMENT. ABANDON FORCE MAIN PER DETAILS ON CU200.
COORDINATE WITH THE GOVERNMENT ON SALVAGE OF
EQUIPMENT.
3. SEE DRAWINGS CU200-CU205 FOR SANITARY SEWER
ABANDONMENTS.
SANITARY SEWER PLAN & PROFILE
SHEET 7
CU227 1
1"=20'
DK MATHIAS
GM REEVES
MAY 26, 2020
F ROUSE
L LEISCHNER
1 ADDENDUM NO. 1 DKM FR LL 7-31-2020
10" SAN
B-CU233
A-CU233
7-31-2020
1 2
C
AD
D D
3- R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com Texas Firm Registration No.: F-174
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
USDA-APHIS-PPQ MOORE AIR BASE
UNDERGROUND UTILITIES AND STORMWATER IMPROVEMENTS
EDINBURG, TEXAS
27100.13
NOTE: THE SIZE, NUMBER AND LOCATION OF EXISTING
UTILITIES SHOWN ON THIS DRAWING ARE APPROXIMATE AND
ARE FOR GENERAL INFORMATION ONLY. UTILITY SERVICE
CONNECTIONS ARE NOT SHOWN ON THIS DRAWING.
CONTRACTOR FULLY RESPONSIBLE FOR OBTAINING EXACT
LOCATIONS OF EXISTING UTILITIES FROM UTILITY
COMPANIES. SOME EXISTING UTILITIES MAY NOT BE SHOWN.
FO
R
C O
N
TI
N U
A
TI
O N
S
EE
S H
EE
T
C U
NOTESNORTH
FO
R
C O
N
TI
N U
A
TI
O N
S
EE
S H
EE
T
C U
1. CONNECT EXISTING FORCE MAIN TO NEW MANHOLE.
2. SEE DRAWINGS CU200-CU205 FOR SANITARY SEWER
ABANDONMENTS.
3. SEE DROP CONNECTION DETAIL ON DRAWING GG24.
4. SEPARATION BETWEEN SANITARY SEWER AND IRRIGATION
WATER MUST BE MINIMUM OF 4 FEET. WHEN SEPARATION IS
LESS THAN 9 FEET, FOLLOW PIPE MATERIAL REQUIREMENT IN
SPECIFICATION SECTION 33 30 00, PARAGRAPH 3.07.E.1.
SANITARY SEWER PLAN & PROFILE
SHEET 8
CU228 1
1"=20'
DK MATHIAS
GM REEVES
MAY 26, 2020
F ROUSE
L LEISCHNER
1 ADDENDUM NO. 1 DKM FR LL 7-31-2020
C-CU233
7-31-2020
1 2
C
AD
D D
3- R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com Texas Firm Registration No.: F-174
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
USDA-APHIS-PPQ MOORE AIR BASE
UNDERGROUND UTILITIES AND STORMWATER IMPROVEMENTS
EDINBURG, TEXAS
27100.13
NOTE: THE SIZE, NUMBER AND LOCATION OF EXISTING
UTILITIES SHOWN ON THIS DRAWING ARE APPROXIMATE AND
ARE FOR GENERAL INFORMATION ONLY. UTILITY SERVICE
CONNECTIONS ARE NOT SHOWN ON THIS DRAWING.
CONTRACTOR FULLY RESPONSIBLE FOR OBTAINING EXACT
LOCATIONS OF EXISTING UTILITIES FROM UTILITY
COMPANIES. SOME EXISTING UTILITIES MAY NOT BE SHOWN.
FO
R
C O
N
TI
N U
A
TI
O N
S
EE
S H
EE
T
C U
NOTES
NORTH
FO
R
C O
N
TI
N U
A
TI
O N
S
EE
S H
EE
T
C U
FOR CONTINUATION SEE SHEET CU231
1. CONNECT EXISTING SANITARY SEWER TO NEW MANHOLE.
2. SEE DRAWINGS CU200-CU205 FOR SANITARY SEWER
ABANDONMENTS.
3. SEE NOTE ON DRAWING EP109 ABOUT PROTECTING UTILITY
POLES.
4. SEPARATION BETWEEN SANITARY SEWER AND IRRIGATION
WATER MUST BE MINIMUM OF 4 FEET. WHEN SEPARATION IS
LESS THAN 9 FEET, FOLLOW PIPE MATERIAL REQUIREMENT IN
SPECIFICATION SECTION 33 30 00, PARAGRAPH 3.07.E.1.
SANITARY SEWER PLAN & PROFILE
SHEET 9
CU229 1
1"=20'
DK MATHIAS
GM REEVES
MAY 26, 2020
F ROUSE
L LEISCHNER
1 ADDENDUM NO. 1 DKM FR LL 7-31-2020
C-CU233
7-31-2020
1 2
C
AD
D D
3- R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com Texas Firm Registration No.: F-174
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
USDA-APHIS-PPQ MOORE AIR BASE
UNDERGROUND UTILITIES AND STORMWATER IMPROVEMENTS
EDINBURG, TEXAS
27100.13
NOTE: THE SIZE, NUMBER AND LOCATION OF EXISTING
UTILITIES SHOWN ON THIS DRAWING ARE APPROXIMATE AND
ARE FOR GENERAL INFORMATION ONLY. UTILITY SERVICE
CONNECTIONS ARE NOT SHOWN ON THIS DRAWING.
CONTRACTOR FULLY RESPONSIBLE FOR OBTAINING EXACT
LOCATIONS OF EXISTING UTILITIES FROM UTILITY
COMPANIES. SOME EXISTING UTILITIES MAY NOT BE SHOWN.
NOTES
NORTH
FOR CONTINUATION SEE SHEET CU229
1. SEE DROP CONNECTION DETAIL ON SHEET GG24.
2. APPROXIMATE LOCATION OF KNOWN SERVICE TAPS ARE
SHOWN ON DRAWINGS CU200 - CU205. ADDITIONAL TAPS
MAY BE PRESENT AND MAY BE ACTIVE OR INACTIVE.
CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING AND
REINSTATING ALL ACTIVE SERVICE TAPS.
3. REMOVE AND REPLACE EXISTING MANHOLE.
4. CONNECT EXISTING SERVICE CONNECTIONS TO NEW
MANHOLE.
5. SEE DRAWINGS CU201-CU205 FOR SANITARY SEWER
ABANDONMENT DETAILS.
6. SEPARATION BETWEEN SANITARY SEWER AND IRRIGATION
WATER MUST BE MINIMUM OF 4 FEET. WHEN SEPARATION IS
LESS THAN 9 FEET, FOLLOW PIPE MATERIAL REQUIREMENT
IN SPECIFICATION SECTION 33 30 00, PARAGRAPH 3.07.E.1.
SANITARY SEWER PLAN & PROFILE
SHEET 10
CU230 1
1"=20'
DK MATHIAS
GM REEVES
MAY 26, 2020
F ROUSE
L LEISCHNER
1 ADDENDUM NO. 1 DKM FR LL 7-31-2020
D-CU233
C-CU233
7-31-2020
1 2
C
AD
D D
3- R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com Texas Firm Registration No.: F-174
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
USDA-APHIS-PPQ MOORE AIR BASE
UNDERGROUND UTILITIES AND STORMWATER IMPROVEMENTS
EDINBURG, TEXAS
27100.13
NOTE: THE SIZE, NUMBER AND LOCATION OF EXISTING
UTILITIES SHOWN ON THIS DRAWING ARE APPROXIMATE AND
ARE FOR GENERAL INFORMATION ONLY. UTILITY SERVICE
CONNECTIONS ARE NOT SHOWN ON THIS DRAWING.
CONTRACTOR FULLY RESPONSIBLE FOR OBTAINING EXACT
LOCATIONS OF EXISTING UTILITIES FROM UTILITY
COMPANIES. SOME EXISTING UTILITIES MAY NOT BE SHOWN.
NOTES
FOR CONTINUATION SEE SHEET CU229
NORTH 1. APPROXIMATE LOCATION OF KNOWN SERVICE TAPS ARE
SHOWN ON DRAWINGS CU200 - CU205. ADDITIONAL TAPS
MAY BE PRESENT AND MAY BE ACTIVE OR INACTIVE.
CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING AND
REINSTATING ALL ACTIVE SERVICE TAPS.
2. REMOVE AND REPLACE EXISTING MANHOLE AS SHOWN.
3. CONNECT EXISTING SERVICE CONNECTIONS TO NEW
MANHOLE.
4. SEE DRAWINGS CU220-CU225 FOR SANITARY SEWER
ABANDONMENT DETAILS.
5. SEPARATION BETWEEN SANITARY SEWER AND IRRIGATION
WATER MUST BE MINIMUM OF 4 FEET. WHEN SEPARATION IS
LESS THAN 9 FEET, FOLLOW PIPE MATERIAL REQUIREMENT
IN SPECIFICATION SECTION 33 30 00, PARAGRAPH 3.07.E.1.
SANITARY SEWER PLAN & PROFILE
SHEET 11
CU231 1
1"=20'
DK MATHIAS
GM REEVES
MAY 26, 2020
F ROUSE
L LEISCHNER
1 ADDENDUM NO. 1 DKM FR LL 7-31-2020
FOR CONTINUATION SEE SHEET CU229
FOR CONTINUATION SEE SHEET CU232
5T H
S
TR
EE
T
7-31-2020
1 2
C
AD
D D
3- R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com Texas Firm Registration No.: F-174
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
USDA-APHIS-PPQ MOORE AIR BASE
UNDERGROUND UTILITIES AND STORMWATER IMPROVEMENTS
EDINBURG, TEXAS
27100.13
NOTE: THE SIZE, NUMBER AND LOCATION OF EXISTING
UTILITIES SHOWN ON THIS DRAWING ARE APPROXIMATE AND
ARE FOR GENERAL INFORMATION ONLY. UTILITY SERVICE
CONNECTIONS ARE NOT SHOWN ON THIS DRAWING.
CONTRACTOR FULLY RESPONSIBLE FOR OBTAINING EXACT
LOCATIONS OF EXISTING UTILITIES FROM UTILITY
COMPANIES. SOME EXISTING UTILITIES MAY NOT BE SHOWN.
UTILITY CORRIDOR SECTIONS
CU233 1
AS NOTED
DK MATHIAS
GM REEVES
MAY 26, 2020
F ROUSE
L LEISCHNER
1 ADDENDUM NO. 1 DKM FR LL 7-31-2020
NOTES
1. UTILITY CORRIDOR SECTIONS ARE INDICATED ON DRAWINGS
CU221 - CU232.
2. DEFLECT IRR-W PIPING AND ELECTRICAL/COMM CONDUIT
AROUND SANITARY SEWER MANHOLES TO MAINTAIN SAME
DISTANCES AS FROM SANITARY PIPING NOTED IN SECTIONS.
3. SEPARATION BETWEEN SANITARY SEWER AND IRRIGATION
WATER MUST BE MINIMUM OF 4 FEET. WHEN SEPARATION IS
LESS THAN 9 FEET, FOLLOW PIPE MATERIAL REQUIREMENT
IN SPECIFICATION SECTION 33 30 00, PARAGRAPH 3.07.E.1.
SECTION A-CU233
NO SCALE
SECTION B-CU233
NO SCALE
SECTION C-CU233
NO SCALE
SECTION D-CU233
NO SCALE
7-31-2020
14+00
MH 2
N: 16666137.76
E: 1040051.29
10" SAN
EX MH 1
N: 16665810.44
E: 1040170.99
O/E O/E
O/E O/E
O/E O/E
O/EO/E
O/EO/E
O/E
O/EO/E
O/EO/E
O/E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
M
M
M
SS
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
F
O
F
O
F
O
S
A
N
S
A
N
SAN
SAN SAN SAN SAN
SAN
SAN SAN SAN SAN
SAN SAN SAN SAN
SAN
SS
SS
C
O
T
T
T
T
T
T
M
M
M
SS
G
G
G
CO
G A
T E
G A
T E
EP2
EP2
FUTURE 40' CLASS 2 RISER AEP METER
POLE, CAP CONDUITS AS SHOWN AT THIS
LOCATION FOR EXTENSION IN FUTURE PHASE
OF CONSTRUCTION
NEW PAD FOR PME-9
PAD MOUNTED
SWITCHGEAR SW#1
4 WAY SECTIONALIZER SC#1
NEW PAD FOR
150KVA TRANSFORMER
208/120V 3Ø, 4W TGH
EP2 MVSC1/2
EP2
EP2
STUB A 2-4" CONDUIT
10' FROM PAD, CAP
AND MARK MVSW1/4
TO REMAIN
EP2 MVSW1/3
N 16665966.81
E 1040233.31
N 16665979.78
E 1040158.98
N 16665995.72
E 1040172.19
PROPOSED SANITARY
SEWER (TYP)
GRAVEL DRIVE WILL BE
PAVED WITH STORMWATER
IMPROVEMENTS
M
V
S
C
M
V
S
C
MVSW1/2
OCC#1
CHH#1
N 16665991.00
E 1040163.59
N 16665971.03
E 1040234.90
N 16666008.05
E 1040141.55
C
P
CP1
CP1
M
O
O
R
E
R
I V
E
E
P
N 16665963.73
E 1040247.29
E
P
D
A
1 2
C A
R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN
SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
Texas Firm Registration No.: F-174
AT FULL SIZE
IN
cm0 1 2 3 4
6 7
USDA-APHIS-PPQ MOORE AIR BASE
ARE FOR GENERAL INFORMATION ONLY. UTILITY SERVICE
CONNECTIONS ARE NOT SHOWN ON THIS DRAWING.
CONTRACTOR FULLY RESPONSIBLE FOR OBTAINING EXACT
LOCATIONS OF EXISTING UTILITIES FROM UTILITY
COMPANIES. SOME EXISTING UTILITIES MAY NOT BE SHOWN.
SITE DISTRIBUTION
ELECTRICAL & COMM
PLAN NOTES:
N
O
R
T
H
F O
R
C
O N
T I N
U A
T I O
N
S
S
H E
T
P
1. DRAWINGS SHEETS EP101 - EP118 ARE FOR THE INSTALLATION OF
NEW UNDERGROUND ELECTRICAL PRIMARY AND COMMUNICATION
CONDUITS AS SHOWN ON SHEET EG004, ELECTRICAL MANHOLES,
PAD MOUNTED SWITCH BOX PAD, OR CONCRETE PAD PER DETAILS,
4 POSITION SECTIONALIZING CABINETS, CONCRETE PADS FOR PAD
MOUNTED TRANSFORMERS WHERE REQUIRED, COMMUNICATION
HANDHOLES, AND OPTICAL COMMUNICATION CABINETS WITHOUT
CABLING OR PATCH PANELS. COS2-EWT/WTP FIBER OPTIC CABLE IS
INSTALLED AS PART OF THIS CONTRACT. SEE DWG EO09.
2. DETAILS FOR BOX PADS, CONCRETE PADS, SECTIONALIZERS,
MANHOLES, HANDHOLES, AND OPTICAL CABINETS ARE SHOWN
ON DRAWINGS EU501-EU506.
3. COORDINATE THE EP DRAWINGS WITH THE CU SERIES OF DRAWINGS
TO HAVE A COORDINATED INSTALLATION WITH A COMMON
TRENCHING FOR THE MAJORITY OF THE PROJECT WITH THE NEW
SEWER INSTALLATION WHERE ROUTING IS PARALLEL AND AS SHOWN
IN DETAILS ON DRAWING CU233.
SITE DISTRIBUTION
LEGEND:
PME-9 PAD MOUNTED 15KV SWITCH BASED
ON S&C PME-9.
4 WAY
SECTIONALIZER
4 WAY 600 AMP 15KV SECTIONALIZING
CABINET WITH LOAD BREAK ELBOWS.
EP2 2 - 4" HDPE DIRECT BURIED CONDUITS.
1 - FUTURE 3/C #4/0 15KV EPR CABLE
BY OTHERS 1 - SPARE
EP4 4 - 4" HDPE DIRECT BURIED CONDUITS. (2)
FUTURE 3 - 1/C #4/0 15KV EPR CABLES
BY OTHERS 1 - SPARE
SITE ELECTRICAL PLAN
SHEET 1
EP101 1
1" = 20'
DL MORITZ
BK GROTHE
MAY 26, 2020
MJ HILL
E LEAF
1 ADDENDUM NO. 1 BWD DLM EL 7-31-2020
EMH ELECTRICAL MANHOLE
CP1 1 - 4" HDPE WITH 4-1 1/4" INNER DUCTS
CP4 4 - 4" HDPE WITH 4-1 1/4" INNER DUCTS
OCC OPTICAL CONNECTION CABINET
CHH COMMUNICATION HANDHOLE
EOSF0 EXISTING SINGLE-MODE FIBER OPTIC
CABLE
EOMF0 EXISTING MULTI-MODE FIBER OPTIC CABLE
MVSW# MEDIUM VOLTAGE SWITCH CIRCUIT
MVSC# MEDIUM VOLTAGE SECTIONALIZING
CABINET CIRCUIT
ACSR ALUMINUM CLAD STEEL REINFORCED
7-31-2020
116530
ERNEST E. LEAF
10" SAN
10" SAN
GRAVEL
A S
P H
A L
T
DITCH TO BE REGRADED DURING
STORMWATER PROJECT
EP4
EP2
EXISTING 500KVA PAD MOUNT
TRANSFORMER
480/277V 3Ø, 4W TO BE SWITCHED TO
NEW SERVICE IN FUTURE
EP4
EP4
EP4
EP2
EP2
EP2
N 16667927.20
E 1038868.97
N 16667777.26
E 1038754.20
PROPOSED SANITARY
SEWER (TYP)
MVSC4/2
MVSW3/4 MVSC3/2
CHH#7
BM
-E2
M
W W
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
E
E
E
E
T
T
T
N 16668146.96
E 1038714.42
MH 9
N: 16667886.43
E: 1038904.46
MH 10
N: 16668211.08
E: 1038670.76
CP1
CP4
CP4
CP4
BUILDING ACCESS MUST BE
MAINTAINED AT ALL TIMES
R
D
S
T R
E E
T
33+00
34+00
35+00
36+00
EMH#7
EMH#6
OCC#5
N 16667884.01
E 1038902.36
T
T
T
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
BM
-E2
LS
S A
N
S A
N S
A N
S A
N
S A
N
SAN
SAN
CO
CO
CO
FO DEPTH:1.21'
FL: 194.31'
DEPTH:2.83'
W DEPTH: 1.75'
FM DEPTH:3.92'
W DEPTH: 3.33'
35+00
36+00
37+00
38+00
39+00
NOTE 2
CP1 DIRECTIONAL BORED IN
PARALLEL WITH EXISTING
FIBER ROUTE SHOWN
BORE A NEW 4" HDPE WITH
INNERDUCTS AS SHOWN ON
DWG EU506 AND DIRECTIONAL BORE
TO 4'-0" BELOW BOTTOM
ELEVATION OF PROPOSED
DITCH AS SHOWN ON DWG CU108
C P
C P
NOTE 3
NOTE 5
EXISTING ELECTRICAL PRIMARY RISER POLE TO BE RELOCATED
NOTE 4
N 16667975.13
E 1038932.58
D
A
1 2
C A
R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN
SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
Texas Firm Registration No.: F-174
AT FULL SIZE
IN
cm0 1 2 3 4
6 7
USDA-APHIS-PPQ MOORE AIR BASE
ARE FOR GENERAL INFORMATION ONLY. UTILITY SERVICE
CONNECTIONS ARE NOT SHOWN ON THIS DRAWING.
CONTRACTOR FULLY RESPONSIBLE FOR OBTAINING EXACT
LOCATIONS OF EXISTING UTILITIES FROM UTILITY
COMPANIES. SOME EXISTING UTILITIES MAY NOT BE SHOWN.
F O
R
C
O N
T I N
U A
T I O
N
S
E
N
O
R
T
H
F O
R
C
O N
T I N
U A
T I O
N
S
E
SHEET 6
EP106 1
1" = 20'
DL MORITZ
BK GROTHE
MAY 26, 2020
MJ HILL
E LEAF
1 ADDENDUM NO. 1 BWD DLM EL 7-31-2020
FOR CONTINUATION SEE SHEET EP107B
NOTES:
1. SEE DRAWING EP101 FOR NOTES AND LEGEND.
2. EXISTING ABOVE GRADE FIBER OPTIC PULLBOX. COORDINATE WITH
DWG CU107 GRADING REQUIREMENT. PROVIDE A NEW 12 STRAND
SINGLE MODE FIBER IN CP1 ROUTE SHOWN FROM PULLBOX TO BLDG
6205. REPLACE EXISTING PATCH PANEL IN BLDG 6205 TO MATCH
EXISTING WITH THE SAME CONNECTOR TYPE AND PATCH PANEL
SHALL HAVE PIGTAILS PRETERMINATED TO REPLACE EXISTING
FIBER, IN ABOVE GRADE PULLBOX FUSION SPLICE THE NEW CABLE
AND COORDINATE WITH STEVEN KIRPES/MAB IT SPECIALIST, AT
BASE.
3. COORDINATE INCOMING FIBER SERVICE TO BLDG. 6205 TO GET NEW
FIBER INTO BUILDING WITH GOVERNMENT. REUSE EXISTING ROUTE
IF POSSIBLE. COORDINATE OUTAGE WITH GOVERNMENT.
4. CONTRACTOR TO COORDINATE OUTAGE TO BUILDING 6205 AND
RELOCATE EXISTING ELECTRICAL PRIMARY RISER POLE TO THIS
NEW LOCATION. EXCAVATE TO EXPOSE EXISTING UNDERGROUND
CABLE AND REROUTE TO FUSED CUTOUTS ON RELOCATED RISER
POLE. PROVIDE NEW CABLE TERMINATIONS TO MATCH EXISTING.
PROVIDE TEMPORARY DOWN GUY WITH FIBERGLASS STRAIN
INSULATOR IN LINE OF PULLING TENSION IF REQUIRED AND PLACE
GUY GUARD AT ABOVE GRADE THIMBLE HEAD.
5. EXTEND EXISTING ACSR CONDUCTORING FROM EXISTING RISER
POLE TO NEW RELOCATED POLE LOCATION SHOWN. CONTRACTOR
TO VERIFY ACSR SIZE IN FIELD AND DO COMPRESSION SLEEVE
CONNECTIONS TO EXISTING ACSR CONDUCTOR.
7-31-2020
116530
1 2
C
AD
D D
3- R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com Texas Firm Registration No.: F-174
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
USDA-APHIS-PPQ MOORE AIR BASE
UNDERGROUND UTILITIES AND STORMWATER IMPROVEMENTS
EDINBURG, TEXAS
27100.13
NOTE: THE SIZE, NUMBER AND LOCATION OF EXISTING
UTILITIES SHOWN ON THIS DRAWING ARE APPROXIMATE AND
ARE FOR GENERAL INFORMATION ONLY. UTILITY SERVICE
CONNECTIONS ARE NOT SHOWN ON THIS DRAWING.
CONTRACTOR FULLY RESPONSIBLE FOR OBTAINING EXACT
LOCATIONS OF EXISTING UTILITIES FROM UTILITY
COMPANIES. SOME EXISTING UTILITIES MAY NOT BE SHOWN.
FO
R
C O
N
TI
N U
A
TI
O N
S
EE
S H
EE
T
EP
NORTH
FO
R
C O
N
TI
N U
A
TI
O N
S
EE
S H
EE
T
EP
SITE ELECTRICAL PLAN
SHEET 7
EP107 1
1" = 20'
DL MORITZ
BK GROTHE
MAY 26, 2020
MJ HILL
E LEAF
1 ADDENDUM NO. 1 BWD DLM EL 7-31-2020
FOR CONTINUATION SEE SHEET EP107B (NOTE 2)
NOTES:
1. SEE DRAWING EP101 FOR NOTES AND LEGEND.
2. CONTINUATION OF FIBER OPTIC, CROSSES OVER MISSION DRIVE.
BORE EP2 & CP1 UNDER MISSION DRIVE.
8" SAN
S
A N
8" SAN
T
O/E
O/E
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G G
G
G
G
G
M
G
G
G
G
G
G
G
GGGGGGG
G
G
W
W
WW
W
W
W W
W
W W
W
W
ARTHROPOD
QUARANTINE
F O
F O
F O
F O
F O
F O
FO
F O
F O
F O
F O
F O
F O
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
F O
FO
FO
FO
C
O
C
O
C
O
C
O
O/E
O/E
64+00
65+00
66+00
67+00
68+00
PROPOSED IRR-W
(TYP)
46+00
47+00
48+00
49+00
T
W W
W
W
W W
O/E
O/E
M
W
W
WW
W
W
W
S A
N
S A
N
S A
N
SAN
SAN
M
CO
CO
CO
CO
LIFT STATION
ASPHALT
E P
EP2
EP2
EP2
E P
N 16668640.90
E 1038273.25
N 16668712.57
E 1038020.66
5TH STREET
MVSW6/2
M V
S W
MVSW5/2
MVSC5/3
MVSC5/4
CHH#10
CHH#11
N 16668642.90
E 1038291.98
N 16668776.27
E 1038179.63
E O
M F
E O
M F
EOMF0
EOMF0
C P
CP1
CP1
EOMF0
CP1
5TH STREET
NEW PAD FOR PME-9 SW#5
PROPOSED SANITARY
SEWER (TYP)
T
H
S
T R
E E
T
EXISTING FIBER
PULLBOX LOCATION
TO BE VERIFIED
BY CONTRACTOR
WITH GOVT
EXISTING 500KVA PAD MOUNTED
TRANSFORMER 208/120V 3Ø, 4W TO BE
SWITCHED TO NEW SERVICE IN THE
FUTURE. CAP CONDUITS FOR FUTURE
EXTENSION T6403
N 16668734.87
E 1038085.85
4 WAY SECTIONALIZER
SC#5
EP2 MVSC5/2
NEW PAD FOR
150 KVA TRANSFORMER 208/120V
3Ø, 4W T6409
N 16668920.07
E 1038053.25
CHH#12 TO BE CAST IN PLACE,
SEE DWG EU504, EO10
ES ALLOW FOR 40' OF GND (4")C
FROM PAD, CAP AND MARK
EXISTING DISCONNECT RACK WILL
BE REFED FROM NEW PAD MOUNT
TRANSFORMER IN FUTURE
EXISTING FIBER PULLBOX
LOCATION TO BE VERIFIED BY
CONTRACTOR WITH GOVT
N 16668910.98
E 1038059.66
3-EOMF0
FROM BLDG 6414
EOMF0
EP2
MVSW5/4
EP2MVSC4/2
MVSW5/3
EP2
NEW PAD FOR PME-9 SW#6
MVSW6/3
SEE NOTE 2
N 16668932.73
E 1038033.83
D
A
1 2
C A
R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN
SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
Texas Firm Registration No.: F-174
AT FULL SIZE
IN
cm0 1 2 3 4
6 7
USDA-APHIS-PPQ MOORE AIR BASE
ARE FOR GENERAL INFORMATION ONLY. UTILITY SERVICE
CONNECTIONS ARE NOT SHOWN ON THIS DRAWING.
CONTRACTOR FULLY RESPONSIBLE FOR OBTAINING EXACT
LOCATIONS OF EXISTING UTILITIES FROM UTILITY
COMPANIES. SOME EXISTING UTILITIES MAY NOT BE SHOWN.
F O
R
C
O N
T I N
U A
T I O
N
S
E
N
O
R
T
H
F O
R
C
O N
T I N
U A
T I O
N
S
E
SHEET 8
EP108 1
1" = 20'
DL MORITZ
BK GROTHE
MAY 26, 2020
MJ HILL
E LEAF
1 ADDENDUM NO. 1 BWD DLM EL 7-31-2020
FOR CONTINUATION SEE SHEET EP111
NOTES:
1. SEE DRAWING EP101 FOR NOTES AND LEGEND.
2. TO BE HAND EXCAVATED AND INTERCEPT EXISTING
COMMUNICATION CABLES/DUCTS AND NEW CP1 DUCT.
7-31-2020
116530
O /E
O /E
O/E
O/E
O/E
O/E
O/E
O/E O/E
O/E O
/E
O /E
O /E
O /E
O /E
O /E
O /E
O/EO/EO/E
O/E
O/E
O/E
O/E
O/E
O/E
O E
O E
O E
O E
O E
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
GGGG
G
G
M
M
G
G
G
G
G
G
G
G
G
G
G
G
G
G
SS
W
W
W
W
W
W
W
FMS WAREHOUSE
01 & 02
FMS
ADMINISTRATION
PROPOSED
APPROX 5,000SQ FT
F
O
F
O
F O
F O
F O
FO
FO
FO
FO
FO
FO
FO
FO
FO
F O
F O
F O
F O
F O
F O
F O
F O
F O
F O
F O
F O
F O
F O
F O
FO
FO
FO
FO
FO
FO
F O
F O
F O
F O
C
O
C
O
C
O
C
O
C
O
C
O
T
T
T
T
68+00
69+00 70+00
71+00
71+56
PROPOSED
IRR-W (TYP)
S A
N
SAN
SAN
W
W
W
W
W
W
M
M
W
SAN
SAN
SAN
SAN
SAN
G
G
G
G
G G
G
G
G
S
A
N
SAN
S
A N
G
G G
FO DEPTH: 1.67'
DEPTH: 2.17'
FO DEPTH: 2.17'
FO DEPTH: 1.83'
DEPTH: 1.83'
FO DEPTH: 2.33'
ASPHALT
MH 13P2
FROM BLDG 6430
N 16669041.35
E 1037782.21
N 16669213.13
E 1037827.61
N 16669200.93
E 1037836.33
N 16669039.48
E 1037777.95
N 16669219.88
E 1037822.74
N 16669085.01
E 1037940.04
N 16669218.90
E 1037840.86
N 16669090.22
E 1037933.89
N 16669081.78
E 1037942.45
N 16669228.33
E 1037836.96
N 16669193.73
E 1037841.53
E P
EP2
ES ALLOW FOR 10'
(2) (4")C FROM PAD,
CAP AND MARK
NEW PAD FOR TRANSFORMER 500 KVA
208/120V 3Ø, 4W FOR T6420
NEW PAD FOR TRANSFORMER 75 KVA
208/120V 3Ø, 4W FOR T6407
EP2
EP2
NEW PAD FOR PME-9 SW#8
T
H
S
T R
E E
T
T
H
S
T R
E E
T
5TH STREET
MVSW5/2
MVSW8/2
M V
S C
MVSW9/4
MVSW9/3
MVSW9/2
MVSW8/4
OCC#8
CHH#13
CHH#14
4 WAY SECTIONALIZER
SC#6
CP1
CP1
CP1
CP1
PROVIDE EP2 3' FROM PAD AND CAP FOR FUTURE
EXTENSION TO EXISTING WAREHOUSE 6430 PAD
MOUNTED 1000KVA TRANSFORMER 480/277V 3Ø, 4W
T6430, MVSW8/3
PROPOSED SANITARY
SEWER (TYP)
EP2
MVSW6/2
EOMF0
EOMF0
E O
M F
NEW PAD FOR
PME-9 SW#9
E O
M F
E P
E
O
S
F
E O
M F
EXISTING FIBER
HANDHOLE LOCATION
TO BE VERIFIED BY
CONTRACTOR WITH GOVT
E O
M F
EP2 MVSC6/2
ES ALLOW FOR 10'
(4")C FROM PAD, CAP
AND MARK
EOMF0
C P
NOTE 2
D
A
1 2
C A
R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN
SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
Texas Firm Registration No.: F-174
AT FULL SIZE
IN
cm0 1 2 3 4
6 7
USDA-APHIS-PPQ MOORE AIR BASE
ARE FOR GENERAL INFORMATION ONLY. UTILITY SERVICE
CONNECTIONS ARE NOT SHOWN ON THIS DRAWING.
CONTRACTOR FULLY RESPONSIBLE FOR OBTAINING EXACT
LOCATIONS OF EXISTING UTILITIES FROM UTILITY
COMPANIES. SOME EXISTING UTILITIES MAY NOT BE SHOWN.
F O
R
C
O N
T I N
U A
T I O
N
S
E
N
O
R
T
H
F O
R
C
O N
T I N
U A
T I O
N
S
E
FOR CONTINUATION SEE SHEET EP111
SHEET 9
EP109 1
1" = 20'
DL MORITZ
BK GROTHE
MAY 26, 2020
MJ HILL
E LEAF
1 ADDENDUM NO. 1 BWD DLM EL 7-31-2020
FOR CONTINUATION SEE SHEET EP109A
NOTES:
1. SEE DRAWING EP101 FOR NOTES AND LEGEND.
2. PROVIDE TEMPORARY DOWN GUYS AS REQUIRED WHERE NEW CP1
AND EP2 UGE CONDUITS ARE ROUTED IN CLOSE PROXIMITY TO OHE
POLES TO BE REMOVED AFTER BACKFILL IS COMPLETED AND
COMPACTED. REMOVE SIDEWALK AND REPLACE AS REQUIRED TO
GET ADEQUATE SETBACK FROM OHE POLES.
7-31-2020
116530
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O
E
O
E
O
E
O
E
S A
N
E
X
I
S
T
I
N
G
W
A
T
E
R
L
I
N
E
O E
O E
W
O/E O/E
O/E O/E
O/E O/E
O/E O/E
O/E O/E
O/E O/E
O E
O E
G
G
G
G
G
G
G
G
G
G
M
G
G
G
G
G
G
S S
S S
S S
S S
S S
S S
W
W
F O
F O
F O
F O
F O
F O
F O
F O
F O
F O
F O
F O
F O
F O
B M
E
W
T
T
T
T
T
WTP
AD
EXISTING INLET TO BE
PLUGGED DURING
STORMWATER PROJECT
WATER GROUND
STORAGE TANK
ASPHALT
EX MH 18
EX MH 20
BACKWASH VALVE
AND CLEAN OUT
CLEAN OUT
8" CROSSING DITCH
FL APPROX 210.22
NOTE 1
NOTE 6
N 16669547.71
E 1037605.16
N 16669608.32
E 1037881.63
N 16669536.63
E 1037715.05
N 16669546.85
E 1037610.00
N 16669503.75
E 1037719.58
N 16669569.78
E 1037847.71
N 16669516.03
E 1037763.11
E
S D
S D
52+00
53+00
N 16669508.71
E 1037888.89
N 16669512.46
E 1037893.80
N 16669557.48
E 1037596.58
S A
N S
A N
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
S A
N
S A
N
S A
N
S A
N
S A
N
S A
N
S A
N
S A
N
T
T
T
S D
S D
S A
N S
A N
S A
N
S A
N S
A N
T
E
W
W
E
X
I
S
T
I
N
G
W
A
T
E
R
L
I
N
E
T
W
M
W
W
F O
F O
F O
F O
F O
F O
F O
F O
F O
F O
F O
F O
F O
F O
LS
NEW PAD
FOR PME-9
SW#11
E
P
E P
EP2
EP2
EP2
NEW PAD FOR
PME-9 SW#10
PROPOSED SANITARY
SEWER (TYP)
8TH STREET
T
H
S
T R
E E
T
NEW IRRIGATION
SYSTEM EQUIPMENT
FOR ELECTRICAL
WORK, SEE PE DWGS
M V
S C
MVSC8/4
MVSC8/3
MVSW10/2
MVSW10/3
M
V
S
W
OCC#10
MVSW11/4
OCC#9
CHH#16
SEE DWG PE06 FOR
COMMUNICATION
BUILDING CONNECTION
M V
S C
MVSC7/3
C P
C P
E P
C P
COS2-EWT/WTP
FIBER FROM EWT
8TH STREET
MVSC7/4
CHH#15
PROVIDE EP2 TO LOCATION SHOWN
AND CAP FOR FUTURE EXTENSION
TO EXISTING 75KVA PAD MOUNT
TRANSFORMER 208/120V 3Ø, 4W
T3207
TO MEXICAN FRUIT FLY REARING FACILITY
TRANSFORMER BY OTHERS, PROVIDE EP2
CONDUITS FROM COMPARTMENT 3 OF
SW#11 10' IN DIRECTION SHOWN, CAP
CONDUITS, AND PLACE MARKER FOR
EXTENSION BY OTHERS.
M I S
S I O
N
D
R I V
E
E P
M V
S W
PROPOSED
IRR-W (TYP)
4 WAY SECTIONALIZER SC#7
4 WAY SECTIONALIZER
SC#8
PROVIDE EP2 TO LOCATION
SHOWN AND CAP FOR FUTURE
EXTENSION TO EXISTING 225KVA
PAD MOUNT TRANSFORMER
208/120V 3Ø, 4W T6417
CP1
ALTERNATE 1B BEGINS AT 4
WAY SECTIONALIZER SC#8
AND EXTENDS TO CATTLE TICK
FACILITY
SPARE EP2 CONDUITS 10' FROM
PME-9 AND CAPPED AND MARKED
N 16669444.86
E 1037684.69
N 16669441.28
E 1037686.89
N 16669444.20
E 1037678.72
D
A
1 2
C A
R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN
SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
Texas Firm Registration No.: F-174
AT FULL SIZE
IN
cm0 1 2 3 4
6 7
USDA-APHIS-PPQ MOORE AIR BASE
ARE FOR GENERAL INFORMATION ONLY. UTILITY SERVICE
CONNECTIONS ARE NOT SHOWN ON THIS DRAWING.
CONTRACTOR FULLY RESPONSIBLE FOR OBTAINING EXACT
LOCATIONS OF EXISTING UTILITIES FROM UTILITY
COMPANIES. SOME EXISTING UTILITIES MAY NOT BE SHOWN.
N
O
R
T
H
FOR CONTINUATION SEE SHEET EP109
FOR CONTINUATION SEE SHEET EP112
SHEET 10
EP110 1
1" = 20'
DL MORITZ
BK GROTHE
MAY 26, 2020
MJ HILL
E LEAF
1 ADDENDUM NO. 1 BWD DLM EL 7-31-2020
F O
R
C
O N
T I N
U A
T I O
N
S
E
A
NOTES:
1. SEE DRAWING EP101 FOR NOTES AND LEGEND.
7-31-2020
116530
1 2
C A
R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN
SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
Texas Firm Registration No.: F-174
AT FULL SIZE
IN
cm0 1 2 3 4
6 7
USDA-APHIS-PPQ MOORE AIR BASE
SITE ELECTRICAL DETAILS
SHEET 4
EU504 1
AS NOTED
DL MORITZ
BK GROTHE
MAY 26, 2020
MJ HILL
E LEAF
1 ADDENDUM NO. 1 BWD DLM EL 7-31-2020
"d"
4" DEEP ANCHOR POCKET
IN BASE SLAB AND TOP
SLAB-FILL WITH GROUT
AFTER ANCHOR IS IN PLACE
SIZE AND LOCATE TO FIT
ANCHOR MEMBERS
6"Ø GROUT HOLE IN
TOP SLAB CENTERED
ON ANCHOR POCKET
PLAN-SECTION
ALL AROUND
M
A X
REINFORCING NOT
SHOWN FOR CLARITY
EL "H"
SUMP
KEYWAY-BOTTOM
& 2 SIDES
DUCT BANK
METALLIC TO NON-METALLIC
COUPLING (TYP)
CONDUIT (TYP)
INSIDE FACE
MANHOLE WALL
EL "H"
WATERSTOP (TYP)
"c" OR "c1"
(TYP ALL
AROUND)
ANCHOR
ANCHOR
DOWELS-MATCH VERT
WALL REINF (TYP)
"g"
(TYP ALL
AROUND)
SLOPE TO
SUMP (TYP)
ANCHOR
#4@12
2 ADDL BARS
EACH FACE
SAME SIZE AS
WALL REINF (TYP)
T
Y P
WATERSTOP (TYP)
"c" OR "c1"
ANCHOR
"g"
"f"
#5@12
DOWELS-MATCH VERT
WALL REINF (TYP)
EL "H"
"b"
"a"
"c2" OR "c3"
M
X
Y P
ACCESS OPENINGS; FRAME & LID-
NEENAH R-6662-RP WITH TYPE T
HINGES & TYPE G LIFT HANDLE
ADDL REINF BARS TOP
& BOT EA SIDE OF
OPENING & #5 X 4'-6"
@ EA CORNER
MATCH BOT SLAB
REINF SIZE & SPACING
ROUGHEN JOINT (TYP)
d
O
F
GROUND ROD
LADDER (LOCATE W/ TOP
SLAB ACCESS OPENING)
10" SQUARE SUMP-
LOCATE TO BEST SUIT
SPECIFIC MANHOLE
3'-0" SQUARE ACCESS OPENING
IN TOP SLAB-LOCATE TO BEST
SUIT SPECIFIC MANHOLE
1 ADDL BAR
EACH FACE-
SAME SIZE AS
WALL REINF (TYP)
(CLR TYP)
(FOR ORIENTATION AND LOCATION SEE PLANS)
#4@12
KEYED BLOCKOUT
ADDL #5 X 4'-2"
EACH CORNER @
BLOCKOUT (TYP)
BENTONITE SEAL
ALL AROUND (TYP)
#4@12
ADDL #4 X 3'-4"
EACH CORNER @
BLOCKOUT (TYP)
BENTONITE SEAL
ALL AROUND (TYP)
KEYED BLOCKOUT FOR PIPE,
CONDUIT OR DUCT BANK-SIZE
AND LOCATE TO SUIT SYSTEM
PROVIDED AND MANHOLE
ORIENTATION-FILL WITH
NON-SHRINK GROUT AFTER
SYSTEM INSTALLED
GROUT
BENTONITE SEAL
ALL AROUND
(TYP)
BENTONITE
SEAL ALL
AROUND
BENTONITE SEAL
ALL AROUND (TYP)
BELLED END (TYP)
GROUND WIRE
OR CABLE
TWO EXTRA "a" BARS EACH SIDE;
L = POCKET OR OPENING DIMENSION
PLUS 4'-6". ALSO ONE EXTRA "a" BAR
DIAGONALLY AT EACH CORNER OF POCKET
OR OPENING; L=80 BAR DIAMETER
KEYED BLOCKOUT FOR PIPE, CONDUIT OR DUCT
BANK-SIZE AND LOCATE TO SUIT SYSTEM
PROVIDED AND MANHOLE ORIENTATION-FILL WITH
NON-SHRINK GROUT AFTER SYSTEM INSTALLED
"b"
NOTE:
METAL CONDUIT SHALL NOT BE USED
WHERE EACH PHASE OF 3 PHASE SYSTEM
IS IN SEPARATE CONDUIT.
BELLED END MAY BE BUSHING IF DESIRED
TO RUN INTERIOR WIRE IN CONDUIT.
1/2" EXP ANCHOR (TYP)
3/8" X 4" LADDER
SUPPORT BRACKETS
EACH SIDE @ 8'-0" (MAX)
3/4"Ø RUNGS (TYP)
BAR 2" X 5/8"
BAR3/4 X 1/4
2-3/8"Ø WELDED
STUD ANCHORS
EACH FACE
OF SUMP
1/4" FLOOR PLATE SUMP
COVER WITH 3/4"Ø HOLES
@ 4" SPACING EACH WAY;
FABRICATE AND STIFFEN
PLATE TO FIT EQUIPMENT
L2X2X1/4
"c1"
"B"
SPLICE LAP
(TYP)
A c
"D"
(TYP)
2" d
C
E
F
"f" TOP
#4@12 BOTTOM
#4@12 TOP
"a" BOTTOM
"G"
M A
X I M
U M
J
T
Y P
M A
X I M
U M
J
"G"
"f" TOP
#5@12 BOTTOM
#4@12 TOP
"a" BOTTOM
E
F
C e
I F
F
V A
R I E
S
3'-0" SQ
ACCESS
MANHOLE
7"
"D"
B L O
C K
O U
T
1/81/4"
1 1/4"
2"
10'-0"
NON-METALLIC CONDUIT
METALLIC CONDUIT
(SEE NOTE)
MATCH TOP SLAB
REINF SIZE & SPACING
TWO EXTRA "a" BARS EACH SIDE;
L = POCKET OR OPENING DIMENSION
PLUS 4'-6". ALSO ONE EXTRA "a" BAR
DIAGONALLY AT EACH CORNER
OF POCKET OR OPENING;
L=80 BAR DIAMETER
C
L R
C
L R
C
L R
C
L R
C
L R
C
L R
C
L R
C
L R
ELEVATION
INSIDE
OUTSIDE
FINISHED
GRADE
1'-0"
M
A X
F
PRECAST CONC COLLAR
SCHEDULE OF DIMENSIONS AND REINFORCING
DIMENSIONS REINFORCING
A B C D E F G H J K L a b c c1 c2 c3 d d1 e e1 f g
PLAN DIMENSIONS SMALLER THAN 8'-0"
BASIS OF DESIGN:
AT-REST LATERAL PRESSURE: 90 pcf
ROOF LL: HS20 WHEEL LOAD
EARTHQUAKE: SDC B
BACKFILL PLACED FULL HEIGHT BEFORE TOP SLAB POURED
MINIMUM SAFE ALLOWABLE SOIL BEARING CAPACITY: 2,500 psf
CONCRETE STRENGTH, fc: 4,500 psi
REINFORCING STEEL STRENGTH, fy: 60,000 psi
1. MAXIMUM EXTERIOR WATER LEVEL WITHOUT BACKFILL IN PLACE AND
NO TOP SLAB IN PLACE: 3' ABOVE TOP OF BASE SLAB.
2. MAXIMUM EXTERIOR WATER LEVEL WITH BACKFILL IN PLACE (NO TOP
SLAB): "J" ABOVE TOP OF BASE SLAB.
3. MAXIMUM EXTERIOR WATER LEVEL WITH BACKFILL AND TOP SLAB IN
PLACE: "J" PLUS "0.2E" ABOVE TOP OF BASE SLAB.
4. IF EXTERIOR WATER LEVEL EXCEEDS MAXIMUMS GIVEN ABOVE,
FLOOD THE STRUCTURE OR ADD WEIGHT TO STRUCTURE ADEQUATE
TO PREVENT UPLIFT.
5. PULLING IRON: "CHANCE 8120" OR EQUAL. LOCATE ON CENTERLINE OF
DUCT BANK IN WALL OPPOSITE DUCT BANK PENETRATION. IF
LOCATION CONFLICTS WITH OTHER DUCT BANK OR CONTRACTOR'S
OPERATIONS, ADJUST LOCATION TO SUIT SPECIFIC MANHOLE OR
VAULT.
6. BENTONITE SEAL: "WATERSTOP RX" OR "JOINT STRIP" BY AMERICAN
COLLOID COMPANY OR EQUAL.
7. WATERSTOP: 3/16" X 5" PVC WATERSTOP; BENTONITE SEAL MAY BE
SUBSTITUTED FOR WATERSTOP.
8. DETAILS SHOWN ARE TYPICAL REQUIREMENTS. CONTRACTOR SHALL
ORIENT DETAILS TO SUIT EACH MANHOLE OR VAULT ARRANGEMENT
AND ADD DETAILS SPECIFIED OR SHOWN AT SPECIFIC LOCATIONS.
9. DO NOT PERMIT TRAFFIC OVER TOP OF SLAB UNTIL CONCRETE IS AT
LEAST 14 DAYS OLD (7 DAYS WHEN HIGH-EARLY STRENGTH CEMENT
OR COMPARABLE ACCELERATOR IS USED.) TIME IS BASED UPON
CONCRETE TEMPERATURE ABOVE 50° F; INCREASE TIME IF
TEMPERATURE OF CONCRETE FALLS BELOW 50° F.
10. USE ANCHOR POCKETS ONLY WHERE REQUIRED; USUALLY AS
ANCHORAGE FOR STEAM AND HOT WATER PIPE MANHOLES. IT IS
INTENDED THAT VERTICAL STEEL PIPE(S) OR TUBE COLUMN(S) BE
PLACED TO USE AS THE PIPE ANCHOR.
11. DUCT BANK AND PULLING IRON DETAILS REQUIRED ONLY FOR
ELECTRICAL.
12. PROVIDE SOIL RETENTION SYSTEM AS REQUIRED TO PROTECT
EXISTING FACILITIES DURING CONSTRUCTION.
GENERAL NOTES:
NO SCALE
MANHOLES WITH PLAN DIMENSIONS SMALLER THAN 8'-0"
B B
SCALE:
A
SECTION
SCALE:
B
SECTION
SCALE:
C
DETAIL
NO SCALE
ACCESS OPENING DETAIL
C
NO SCALE
KEYED BLOCKOUT IN WALL DETAIL
NO SCALE
DUCT BANK TO MANHOLE WALL DETAIL
7'-0" 7'-0" 7'-6" 8" 8" 10" 8"
- 8'-0" #5@8 #5@8 #4@12 #4@12 #5@8
- - - - - #4@8
4'-0" 4'-0" 4'-0" 8" 8" 10" 0"
- 3'-0" #4@9 #4@9 #4@12 #4@12 #4@9
- - #4@8
#3@9 #3@9
INFORMATION SHOWN FOR CAST IN PLACE,
COMMUNICATION HANDHOLE LOCATION,
SEE DWG EP108 AND EMH#6 ON DWG EP106.
A
A
7-31-2020
116530
ERNEST E. LEAF
1 2
C A
R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN
SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
Texas Firm Registration No.: F-174
USDA-APHIS-PPQ MOORE AIR BASE
SITE ELECTRICAL
NEW ELECTRICAL MANHOLES
EO08 1
AS NOTED
DL MORITZ
BW DEEN
MAY 26, 2020
E LEAF
1 ADDENDUM NO. 1 BWD DLM EL 7-31-2020
7-31-2020
116530
1 2
C
AD
D D
3- R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com Texas Firm Registration No.: F-174
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
USDA-APHIS-PPQ MOORE AIR BASE
UNDERGROUND UTILITIES AND STORMWATER IMPROVEMENTS
EDINBURG, TEXAS
27100.13
NOTE: THE SIZE, NUMBER AND LOCATION OF EXISTING
UTILITIES SHOWN ON THIS DRAWING ARE APPROXIMATE AND
ARE FOR GENERAL INFORMATION ONLY. UTILITY SERVICE
CONNECTIONS ARE NOT SHOWN ON THIS DRAWING.
CONTRACTOR FULLY RESPONSIBLE FOR OBTAINING EXACT
LOCATIONS OF EXISTING UTILITIES FROM UTILITY
COMPANIES. SOME EXISTING UTILITIES MAY NOT BE SHOWN.
RAW WATER IRRIGATION PLAN
SHEET 1
PC01 1
1"=10'
AM ROMERO
GM REEVES
MAY 26, 2020
DK MATHIAS
L LEISCHNER
1 ADDENDUM NO. 1 DKM FR LL 7-31-2020
NOTES
NORTH
1. ALL PIPES SHALL BE INSPECTED BY THE GOVERNMENT
REPRESENTATIVE PRIOR TO BACKFILLING.
2. RESTORE SURFACES TO PRE-CONSTRUCTION CONDITION IN
ACCORDANCE WITH SPECIFICATION SECTIONS 32 11 23, 32
12 16, 32 13 13, 32 16 23 AND 32 92 19, AS APPLICABLE.
3. SUNSHADE NOT SHOWN FOR CLARITY. SEE DRAWING PS03.
4. CONNECT RAW WATERLINE TO EXISTING 16" INFLUENT LINE.
EXISTING LINE TO BE FIELD LOCATED BY CONTRACTOR.
5. PROVIDE 2-2" POWER CONDUITS FROM THE NEW RAW
WATER IRRIGATION CONTROL PANEL TO EXISTING PANEL A
IN THE WTP. SEAL AND CAP ONE CONDUIT (SPARE) FOR
FUTURE USE. PROVIDE 2-1-1/2" CONTROLS CONDUITS FROM
THE NEW RAW WATER IRRIGATION CONTROL PANEL TO WTP
OFFICE ROOM 104. SEAL AND CAP ONE CONDUIT (SPARE)
FOR FUTURE USE. SEE DRAWING PE02 AND PE06.
6. 2-2" AND 2-1-1/2" CONDUITS TO TURN UP ABOVE GROUND TO
ENTER WATER TREATMENT PLANT. PLACE "LB" CONDUIT
BODY AT BUILDING AND SEAL CONDUITS INTO BUILDING.
CONTINUE 2" CONDUITS TO EXISTING PANEL A IN MECH
ROOM 106. SEAL AND CAP ONE CONDUIT (SPARE) FOR
FUTURE USE CONTINUE 1-1/2" CONDUITS ABOVE CEILING TO
OFFICE NEAR MTU PANEL. SEE DRAWING PE02 AND PE06.
7. CONNECT 4" BW DISCHARGE PIPE TO EXISTING CATCH
BASIN.
8. INTERIOR AND EXTERIOR PIPING ASSOCIATED WITH THE
WTP IS NOT SHOWN.
9. MINIMUM DEPTH OF COVER SHALL BE 4'0" FOR IRRIGATION
LINES.
10. SEE SPECIFICATION SECTION 33 11 00 FOR SEPARATION
REQUIREMENTS.
11. SEPARATION BETWEEN SANITARY SEWER AND IRRIGATION
WATER MUST BE MINIMUM OF 4 FEET. WHEN SEPARATION IS
LESS THAN 9 FEET, FOLLOW PIPE MATERIAL REQUIREMENT
IN SPECIFICATION SECTION 33 30 00, PARAGRAPH 3.07.E.1.
FOR CONTINUATION SEE SHEET PC02
7-31-2020
1 2
C
AD
D D
3- R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com Texas Firm Registration No.: F-174
0 1 2 3
AT FULL SIZE
IN
cm0 1 2 3 4 5 6 7 8
USDA-APHIS-PPQ MOORE AIR BASE
UNDERGROUND UTILITIES AND STORMWATER IMPROVEMENTS
EDINBURG, TEXAS
27100.13
NOTE: THE SIZE, NUMBER AND LOCATION OF EXISTING
UTILITIES SHOWN ON THIS DRAWING ARE APPROXIMATE AND
ARE FOR GENERAL INFORMATION ONLY. UTILITY SERVICE
CONNECTIONS ARE NOT SHOWN ON THIS DRAWING.
CONTRACTOR FULLY RESPONSIBLE FOR OBTAINING EXACT
LOCATIONS OF EXISTING UTILITIES FROM UTILITY
COMPANIES. SOME EXISTING UTILITIES MAY NOT BE SHOWN.
GENERAL NOTESNORTH
FO
R
C O
N
TI
N U
A
TI
O N
S
EE
S H
EE
T
PC
1. ALL PIPES SHALL BE INSPECTED BY THE GOVERNMENT
REPRESENTATIVE PRIOR TO BACKFILLING.
2. RESTORE SURFACES TO PRE-CONSTRUCTION CONDITION IN
ACCORDANCE WITH SPECIFICATION SECTIONS 32 11 23, 32 12 16,
32 13 13, 32 15 00, 32 16 23 AND 32 92 19, AS APPLICABLE.
RAW WATER IRRIGATION PLAN
SHEET 2
PC02 1
1"=40'
AM ROMERO
GM REEVES
MAY 26, 2020
DK MATHIAS
L LEISCHNER
ADDENDUM NO. 1 DKM FR LL 7-31-2020
NOTES
1. INSTALL 1' PIECE OF PIPE BETWEEN MAINLINE VALVE AND END
CAP, END CAP SHALL BE THREADED PVC.
2. DISCONNECT EXISTING SHADEHOUSE WATERING SYSTEM FROM
POTABLE WATER LINE. PLUG POTABLE WATER LINE. CONNECT
NEW RAW WATER IRRIGATION LINE TO EXISTING SHADEHOUSE
WATERING SYSTEM.
3. SEPARATE GREENHOUSE HOSE BIB PIPING FROM WATER WALL
PIPING. KEEP WATER WALL PIPING CONNECTED TO THE
POTABLE WATER SYSTEM. CONNECT NEW RAW WATER
IRRIGATION LINE TO HOSE BIB PIPING. EXISTING BACKFLOW
PREVENTOR SHALL REMAIN CONNECTED TO THE POTABLE
WATER SYSTEM.
4. CONNECT NEW LINE TO EXISTING LAWN SPRINKLER LINE ON
UPSTREAM END OF EXISTING BACKFLOW PREVENTOR. PLUG
EXISTING PIPE IN PLACE. CUT AND PLUG OPEN END OF
ABANDONED PIPING BY FILLING END OF PIPE WITH CONCRETE.
5. PLUG ABANDONED PIPE BY COMPLETELY FILLING THE END OF
THE PIPE WITH CONCRETE. FORCE CONCRETE INTO THE END
OF THE PIPE FOR A DISTANCE OF 18 INCHES, OR ONE-HALF THE
PIPE DIAMETER, WHICHEVER IS GREATER. PRIOR TO FILLING,
PLACE A BULKHEAD IN THE PIPE USING EXPANDABLE FOAM.
PLACE CONCRETE AFTER FOAM IS CURED.
6. MINIMUM DEPTH OF COVER SHALL BE 4'-0" FOR IRRIGATION
LINES.
7. SEE SPECIFICATION SECTION 33 1 00 FOR SEPARATION
REQUIREMENTS.
8. MARK ALL RAW IRRIGATION WATER LEAD CONNECTION POINTS
WITH A 3' METAL #5 REBAR. PROVIDE 2 WITNESS
MEASUREMENTS FOR EACH CONNECTION POINT IN THE
PROJECT RECORD DRAWINGS.
9. SEPARATION BETWEEN SANITARY SEWER AND IRRIGATION
WATER MUST BE MINIMUM OF 4 FEET. WHEN SEPARATION IS
LESS THAN 9 FEET, FOLLOW PIPE MATERIAL REQUIREMENT IN
SPECIFICATION SECTION 33 30 00, PARAGRAPH 3.07.E.1.
7-31-2020
File details come from the government source that posted it. Updated .