About this file

This solicitation seeks design-build services for combined underground utilities and storm water improvements at Moore Air Base in Edinburg, Texas. The scope of work includes replacing the existing gravity sanitary sewer system, installing a new raw water system for irrigation purposes, establishing new electrical and communication infrastructure including an underground conduit and duct system, installing a fiber optic cable between the elevated water tank and water treatment plant, and providing new electrical cabling and equipment per the attached Phase 2 drawings. Offerors must acknowledge receipt of Amendment 0002 replacing pages in the solicitation and drawings. The contracting agency is the USDA Animal and Plant Health Inspection Service. The solicitation number is 12639522R0041 and the response due date is not provided. Any references to future or Add Alternate 1B work in the final design documents shall be disregarded.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12639522R0041 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

APHIS-MN-126395

07/29/20220002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

USDA APHIS

250 MARQUETTE AVE

SUITE 410

MINNEAPOLIS MN 55401

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/30/2022

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Tax ID Number: Not Available

DUNS Number: Not Available

This amendment is written to:

- Replace pages 6 and 7 of the solicitation with the following pages below. Changes to those pages are marked by a left border.

- Replace drawings EO03, EO04, EO06, EO07, and EO09 of the Phase 2 Electrical Cabling and

Equipment drawing set with the following pages below. Verbiage in the text boxes is removed.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

JAMES G. ROLOFF

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

07/29/2022

Sol 12639522R0041, Combined Underground Utilities Improvements, MAB, TX, Amendment 2 replacement pages buildings to stabilize the slope and minimize vegetation growth.

Regrade ditches which are no longer required filled in with excess material from the excavation of the main ditch and graded to drain.

2. New gravity sanitary sewer system includes, but is not limited to, building service reconnections, abandonment, removal of existing sanitary sewer pipes and manholes, and site restoration.

3. New raw water system for irrigation purposes includes, but is not limited to, installation of the Government-furnished filter. Furnish and install pumps, hydropneumatics bladder tank and associated piping, instrumentation and electrical work; sunshade and concrete slab; raw water distribution piping and reinstatement of service connections.

4. New electrical and communication infrastructure includes, but is not limited to:

Underground conduit system to include duct spacers, marking tape, pull cords, and above grade utility markers.

Cast in place or pre-cast electrical manholes and communication handholes at locations shown.

Quazite or Electrimold Box Pad per drawings for pad mounted electrical primary switches based on S&C PME – 9 compartmental switch per drawings. Height to top of box pad will vary based on water level. Where flooding may occur, a concrete pad will be required with a box pad extension on top of pad.

Concrete pads for pad-mounted transformers.

Four-way direct buried sectionalizing cabinets based on Hubbell per drawings.

Manholes and grounding at manholes.

5. Installation of an OS2 single mode 12 strand fiber optic cable in new duct bank system from existing elevated water storage tank to existing water treatment plant. At each end location provide fiber optic industrial closet housing with integral closet connector panels populated with six duplex LC termination and pigtails for fusion splicing. See drawings for cable designation COS2-EWT/WTP requirement and routing.

Programming integration of elevated water storage tank fiber optic I/O into existing water treatment plant control panel and SCADA system for indication.

6. New Electrical Cabling and Equipment (Phase 2) for the Underground Electrical and

Communication Infrastructure above is included, per the signed and sealed Phase 2 Electrical Cabling and Equipment drawings and specifications include but is not limited to:

Furnishing and installing new electrical primary and secondary cabling; panelboards and meter enclosures.

Sol 12639522R0041, Combined Underground Utilities Improvements, MAB, TX, Amendment 2 replacement pages

Furnishing and installing new sectionalizing cabinets. (Count shall be verified, per design documents.)

Furnishing and installing new pad mounted switchgear. (Count shall be verified, per design documents.)

Furnishing and installing new transformers. (Count shall be verified, per documents.)

Furnishing and installing electrical secondary services for both existing buildings and newly planned buildings/structures.

Overhead cable feeding the elevated water tank shall be removed. The water tank shall be provided with a new underground feed in a new duct bank and a new transformer.

Furnishing and installing fiber, cabling and equipment for the newly added communication loop.

Demolition to include existing overhead secondary service conductors, riser conduit with cabling, weather head, grounding cables and grounding rods per the design documents, which shall be coordinated with the base.

All coordination efforts related to project phasing, service disconnection and outages must be scheduled with the base and base electricians. It is anticipated that the underground system will be energized in phases and sectionalizing cabinets and switches shall have certain sections isolated during installation with lockout/tagout procedures in place.

Any and all references within the final design drawings and specifications related to future work and/or Add Alternate 1B work shall be disregarded under this project.

Project Contacts:

APHIS Contracting Officer (CO) Jim Roloff

USDA, APHIS, MRPBS, AAMD

250 Marquette Avenue, Suite 410 Minneapolis, MN 55401-2329 Tel. No.: (612) 590-7603 Email: James.G.Roloff@usda.gov

APHIS Engineering Project Managers (EPMs) Fikru Taye, P.E.

USDA, APHIS, ASD, ESB

4700 River Road, Unit 115 (3A-03-41) Riverdale, MD 20737 – 1238 Tel. No.: (301) 851-2641 E-mail: Fikru.Taye@aphis.usda.gov

Toni Mitchell

USDA, APHIS, AAMD, ESB

4700 River Road, Unit 115 mailto:James.G.Roloff@usda.gov mailto:Fikru.Taye@aphis.usda.gov

S E GSEGR CODE CABLE NUMBER FROM Equipment VIA TO CABLE TYPE NEUTRAL GROUND CONDUIT SIZE (3) NOTES COMMENTS

MV MVSC5/2 SC#5 SECTIONALIZING CABINET POSITION #2 PRIMARY ELECTRICAL DUCTBANK (LOOP B) SW#6, COMPART #1 3 - 1/C #4/0, 15KV, EPR 133% INSULATION 4 INCH, 4 INCH SPARE

MV MVSC5/3 SC#5 SECTIONALIZING CABINET POSITION #3 PRIMARY ELECTRICAL DUCTBANK (LOOP B) SPARE 4 INCH, 4 INCH SPARE STUB OUT AND CAP

MV MVSC5/4 SC#5 SECTIONALIZING CABINET POSITION #4 PRIMARY ELECTRICAL DUCTBANK (LOOP B) SPARE 4 INCH, 4 INCH SPARE STUB OUT AND CAP

MV MVSW6/2 SW#6 S&C PME-9 SWITCH, COMPART #2 PRIMARY ELECTRICAL DUCTBANK (LOOP B) SC#6, POSITION #1 3 - 1/C #4/0, 15KV, EPR 133% INSULATION 4 INCH, 4 INCH SPARE

MV MVSW6/3 SW#6 S&C PME-9 SWITCH, COMPART #3 PRIMARY ELECTRICAL DUCTBANK (LOOP B) TRANSFORMER 75KVA/ 6409,6410/8505-8509 3 - 1/C #4/0, 15KV, EPR 133% INSULATION 4 INCH, 4 INCH SPARE

MV MVSW6/4 SW#6 S&C PME-9 SWITCH, COMPART #4 PRIMARY ELECTRICAL DUCTBANK (LOOP B) TRANSFORMER 500KVA/ 6403, 7508-7511 3 - 1/C #4/0, 15KV, EPR 133% INSULATION 4 INCH, 4 INCH SPARE

MV MVSC6/2 SC#6 SECTIONALIZING CABINET POSITION #2 PRIMARY ELECTRICAL DUCTBANK (LOOP B) SW#9, COMPART #1 3 - 1/C #4/0, 15KV, EPR 133% INSULATION 4 INCH, 4 INCH SPARE

MV MVSC6/3 SC#6 SECTIONALIZING CABINET POSITION #3 PRIMARY ELECTRICAL DUCTBANK (LOOP B) SW#7, COMPART #1 3 - 1/C #4/0, 15KV, EPR 133% INSULATION 4 INCH, 4 INCH SPARE

MV MVSC6/4 SC#6 SECTIONALIZING CABINET POSITION #4 PRIMARY ELECTRICAL DUCTBANK (LOOP B) SPARE 4 INCH, 4 INCH SPARE STUB OUT AND CAP

MV MVSW7/2 SW#7 S&C PME-9 SWITCH, COMPART #2 PRIMARY ELECTRICAL DUCTBANK (LOOP B) TRANSFORMER 150KVA/ 6411,6412/6413 3 - 1/C #4/0, 15KV, EPR 133% INSULATION 4 INCH, 4 INCH SPARE

MV MVSW7/3 SW#7 S&C PME-9 SWITCH, COMPART #3 PRIMARY ELECTRICAL DUCTBANK (LOOP B) TRANSFORMER 500KVA/ 6418 3 - 1/C #4/0, 15KV, EPR 133% INSULATION 4 INCH, 4 INCH SPARE

MV MVSW7/4 SW#7 S&C PME-9 SWITCH, COMPART #4 PRIMARY ELECTRICAL DUCTBANK (LOOP B) TRANSFORMER 150KVA/ 6414 3 - 1/C #4/0, 15KV, EPR 133% INSULATION 4 INCH, 4 INCH SPARE

MV MVSW9/2 SW#9 S&C PME-9 SWITCH, COMPART #2 PRIMARY ELECTRICAL DUCTBANK (LOOP B) SC#7, POSITION #1 3 - 1/C #4/0, 15KV, EPR 133% INSULATION 4 INCH, 4 INCH SPARE

MV MVSW9/3 SW#9 S&C PME-9 SWITCH, COMPART #3 PRIMARY ELECTRICAL DUCTBANK (LOOP B) TRANSFORMER 500KVA/ 6420 3 - 1/C #4/0, 15KV, EPR 133% INSULATION 4 INCH, 4 INCH SPARE

MV MVSW9/4 SW#9 S&C PME-9 SWITCH, COMPART #4 PRIMARY ELECTRICAL DUCTBANK (LOOP B) TRANSFORMER 75KVA/ 6407 3 - 1/C #4/0, 15KV, EPR 133% INSULATION 4 INCH, 4 INCH SPARE

MV MVSC7/2 SC#7 SECTIONALIZING CABINET POSITION #2 PRIMARY ELECTRICAL DUCTBANK (LOOP B) SW#11, COMPART #2 3 - 1/C #4/0, 15KV, EPR 133% INSULATION 4 INCH, 4 INCH SPARE

MV MVSC7/3 SC#7 SECTIONALIZING CABINET POSITION #3 PRIMARY ELECTRICAL DUCTBANK (LOOP B) SW#10, COMPART #1 3 - 1/C #4/0, 15KV, EPR 133% INSULATION 4 INCH, 4 INCH SPARE

MV MVSC7/4 SC#7 SECTIONALIZING CABINET POSITION #4 PRIMARY ELECTRICAL DUCTBANK (LOOP B) SPARE 4 INCH, 4 INCH SPARE STUB OUT AND CAP

MV MVSW10/2 SW#10 S&C PME-9 SWITCH, COMPART #2 PRIMARY ELECTRICAL DUCTBANK (LOOP B) SC#8, POSITION #1 3 - 1/C #4/0, 15KV, EPR 133% INSULATION 4 INCH, 4 INCH SPARE

MV MVSW10/3 SW#10 S&C PME-9 SWITCH, COMPART #3 PRIMARY ELECTRICAL DUCTBANK (LOOP B) TRANSFORMER 75KVA/ WTP 3 - 1/C #4/0, 15KV, EPR 133% INSULATION 4 INCH, 4 INCH SPARE

MV MVSW10/4 SW#10 S&C PME-9 SWITCH, COMPART #4 PRIMARY ELECTRICAL DUCTBANK (LOOP B) TRANSFORMER 225KVA/ 6417 3 - 1/C #4/0, 15KV, EPR 133% INSULATION 4 INCH, 4 INCH SPARE

MV MVSW11/3 SW#11 S&C PME-9 SWITCH, COMPART #3 PRIMARY ELECTRICAL DUCTBANK (LOOP B) TRANSFORMER 1500KVA/ MEX FRUIT FLY (OTHERS) 3 - 1/C #4/0, 15KV, EPR 133% INSULATION 4 INCH, 4 INCH SPARE

MV MVSW11/4 SW#11 S&C PME-9 SWITCH, COMPART #4 PRIMARY ELECTRICAL DUCTBANK (LOOP B) SPARE 4 INCH, 4 INCH SPARE STUB OUT AND CAP

MV MVSC8/2 SC#8 SECTIONALIZING CABINET POSITION #2 PRIMARY ELECTRICAL DUCTBANK (LOOP B) EXISTING O/E TO CATTLE TICK 3 - 1/C #4/0, 15KV, EPR 133% INSULATION 4 INCH, 4 INCH SPARE STUB OUT AND CAP

MV MVSC8/3 SC#8 SECTIONALIZING CABINET POSITION #3 PRIMARY ELECTRICAL DUCTBANK (LOOP B) SPARE 4 INCH, 4 INCH SPARE STUB OUT AND CAP

MV MVSC8/4 SC#8 SECTIONALIZING CABINET POSITION #4 PRIMARY ELECTRICAL DUCTBANK (LOOP B) SPARE 4 INCH, 4 INCH SPARE

MV MVSC10/4 SC#10 SECTIONALIZING CABINET POSITION #4 PRIMARY ELECTRICAL DUCTBANK (LOOP B) TRANSFORMER 25KVA/T6410 1 - 1/C#4/0, 15KV, EPR 133% INSULATION 4 INCH, 4 INCH SPARE

MV MVSC10/3 SC#10 SECTIONALIZING CABINET POSITION #3 PRIMARY ELECTRICAL DUCTBANK (LOOP B) TRANSFORMER 25KVA/T6411 3 - 1/C#4/0, 15KV, EPR 133% INSULATION 4 INCH, 4 INCH SPARE

SITE ELECTRICAL PRIMARY CABLE SCHEDULE

D

A

1 2

C

AD

D D

3- R

C

B

3 4 5

F

E

G

D

6 7 8 9

REV.

10 11

CHECKED

DESIGNED

APPROVED

APPROVED

DATE

DRAWN SCALE:

NO.

A

DATENO. REVISIONS APVDCHKDDSGN

B

C

E

F

G

C STANLEY CONSULTANTS

225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com Texas Firm Registration No.: F-174

USDA-APHIS-PPQ MOORE AIR BASE

PHASE 2 ELECTRICAL CABLING AND EQUIPMENT DESIGN

EDINBURG, TEXAS

27100.26

MAY 09, 2022

DL MORITZ

EE LEAF

06-22-2022

SITE ELECTRICAL PRIMARY

CABLE SCHEDULE - SHEET 2

EO03 1

AS NOTED

DL MORITZ

BW DEEN

NM BROWN

1 REMOVED TCT AND TARS NAL NAL EEL 06-22-2022

12639522R0041, Amendment 0002 hugo Highlight

SEGR CODE CABLE NUMBER FROM Equipment VIA TO CABLE TYPE NEUTRAL GROUND CONDUIT SIZE (3) NOTES COMMENTS

LV LVTGH TGH TRANSFORMER #TGH SECONDARY ELECT UNDERGROUND SERVICE SWITCHBOARD #1SWBD (2) - 3 - #300KCMIL, 600V (2) - #300KCMIL (2) - #2 AWG (2) - 3 INCH

LV LVT6021 T6021 TRANSFORMER #T6021 SECONDARY ELECT UNDERGROUND SERVICE SWITCHBOARD #1SWBD (1) - 2 - #1AWG, 600V (1) - #1AWG (1) - #6 AWG (1) - 1 1/2 INCH

LV LVT6017 T6017 TRANSFORMER #T6017 SECONDARY ELECT UNDERGROUND SERVICE SWITCHBOARD #1SWBD (2) - 3 - #300KCMIL, 600V (2) - #300KCMIL (2) - #2 AWG (2) - 3 INCH

LV LVT6101 T6101 TRANSFORMER #T6101 SECONDARY ELECT UNDERGROUND SERVICE SWITCHBOARD #1SWBD (2) - 3 - #300KCMIL, 600V (2) - #300KCMIL (2) - #2 AWG (2) - 3 INCH

LV LVT6205 T6205 TRANSFORMER #T6205 SECONDARY ELECT UNDERGROUND SERVICE SWITCHBOARD #1SWBD (2) - 3 - #500KCMIL, 600V (2) - #500KCMIL (2) - #1/0 AWG (2) - 4 INCH EXISTING SECONDARY, NO CHANGE

LV LVTEWT TEWT TRANSFORMER #TEWT SECONDARY ELECT UNDERGROUND SERVICE SWITCHBOARD #1SWBD (1) - 2 - #1AWG, 600V (1) - #1AWG (1) - #6 AWG (1) - 1 1/2 INCH

LV LVT6415 T6415 TRANSFORMER #T6415 SECONDARY ELECT UNDERGROUND SERVICE SWITCHBOARD #1SWBD (3) - 3 - #500KCMIL, 600V (3) - #500KCMIL (3) - #1/0 AWG (3) - 4 INCH

LV LVT6403 T6403 TRANSFORMER #T6403 SECONDARY ELECT UNDERGROUND SERVICE SWITCHBOARD #1SWBD (5) - 3 - #500KCMIL, 600V (5) - #500KCMIL (5) - #1/0 AWG (5) - 4 INCH EXISTING SECONDARY, NO CHANGE

LV LVT6409 T6409 TRANSFORMER #T6409 SECONDARY ELECT UNDERGROUND SERVICE SWITCHBOARD #1SWBD (2) - 2 - 3/0, 600V (2) - 1-3/0, 600V (1) - #3 AWG (2) - 2 INCH

LV LVT6411 T6411 TRANSFORMER #T6411 SECONDARY ELECT UNDERGROUND SERVICE SWITCHBOARD #1SWBD (2) - 3 - #300KCMIL, 600V (2) - #300KCMIL (2) - #2 AWG (2) - 3 INCH EXISTING SECONDARY, NO CHANGE

LV LVT6414 T6414 TRANSFORMER #T6414 SECONDARY ELECT UNDERGROUND SERVICE SWITCHBOARD #1SWBD (6) - 3 - #500KCMIL, 600V (6) - #500KCMIL (6) - #1/0 AWG (6) - 4 INCH EXISTING SECONDARY, NO CHANGE

LV LVT6418 T6418 TRANSFORMER #T6418 SECONDARY ELECT UNDERGROUND SERVICE SWITCHBOARD #1SWBD (5) - 3 - #500KCMIL, 600V (5) - #500KCMIL (5) - #1/0 AWG (5) - 4 INCH EXISTING SECONDARY, NO CHANGE

LV LVT6407 T6407 TRANSFORMER #T6407 SECONDARY ELECT UNDERGROUND SERVICE SWITCHBOARD #1SWBD (1) - 3 - #300KCMIL, 600V (1) - #300KCMIL (1) - #2 AWG (1) - 3 INCH

LV LVT6420 T6420 TRANSFORMER #T6420 SECONDARY ELECT UNDERGROUND SERVICE SWITCHBOARD #1SWBD (5) - 3 - #500KCMIL, 600V (5) - #500KCMIL (5) - #1/0 AWG (5) - 4 INCH

LV LVT3207 T3207 TRANSFORMER #T3207 SECONDARY ELECT UNDERGROUND SERVICE SWITCHBOARD #1SWBD (1) - 3 - #300KCMIL, 600V (1) - #300KCMIL (1) - #2 AWG (1) - 3 INCH EXISTING SECONDARY, NO CHANGE

LV LVT6417 T6417 TRANSFORMER #T6417 SECONDARY ELECT UNDERGROUND SERVICE SWITCHBOARD #1SWBD (3) - 3 - #300KCMIL, 600V (3) - #300KCMIL (3) - #2 AWG (3) - 3 INCH EXISTING SECONDARY, NO CHANGE

LV LVT6430 T6430 TRANSFORMER #T6430 SECONDARY ELECT UNDERGROUND SERVICE SWITCHBOARD #1SWBD (4) - 3 - #500KCMIL, 600V (4) - #500KCMIL (4) - #1/0 AWG (4) - 4 INCH EXISTING SECONDARY, NO CHANGE

LV LVTMF TMF TRANSFORMER #TMF SECONDARY ELECT UNDERGROUND SERVICE SERVICE DISCONNECT

BY OTHERS

SITE ELECTRICAL SECONDARY CABLE SCHEDULE

D

A

1 2

C

AD

D D

3- R

C

B

3 4 5

F

E

G

D

6 7 8 9

REV.

10 11

CHECKED

DESIGNED

APPROVED

APPROVED

DATE

DRAWN SCALE:

NO.

A

DATENO. REVISIONS APVDCHKDDSGN

B

C

E

F

G

C STANLEY CONSULTANTS

225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com Texas Firm Registration No.: F-174

USDA-APHIS-PPQ MOORE AIR BASE

PHASE 2 ELECTRICAL CABLING AND EQUIPMENT DESIGN

EDINBURG, TEXAS

27100.26

MAY 09, 2022

DL MORITZ

EE LEAF

06-22-2022

SITE ELECTRICAL SECONDARY

CABLE SCHEDULE

EO04 1

AS NOTED

DL MORITZ

BW DEEN

NM BROWN

1 REMOVED TCT AND TARS NAL BAL EEL 06-22-2022

12639522R0041, Amendment 0002

Equipment Designator LOCATION KVA PHASE VOLTAGE PRIMARY VOLTAGE SECONDARY COMMENTS

TGH GUARD HOUSE AND LIFT STATION SERVICE 1 - 150KVA PAD MTD. 3 12.5KV 208Y/120V, 3 PHASE, 4 WIRE SERVICE FROM NEW UNDERGROUND SERVICE

T6021 WAREHOUSE, BLDG.6021 1 - 25KVA PAD MTD. 1 12.5KV 120/240, 1 PHASE, 3 WIRE SERVICE FROM NEW UNDERGROUND SERVICE

T6017 CITRUS GREENING, BLDG. 6017, 6015 HAZ MAT 1 - 150KVA PAD MTD. 3 12.5KV 208Y/120V, 3 PHASE, 4 WIRE SERVICE FROM NEW UNDERGROUND SERVICE

T6101 FMS MOTOR POOL, BLDG. 6101, 6102 1 - 150KVA PAD MTD. 3 12.5KV 208Y/120V, 3 PHASE, 4 WIRE SERVICE FROM NEW UNDERGROUND SERVICE

T6205 AIRCRAFT HANGER, BLDG. 6203, 6205 1 - 500KVA PAD MTD. 3 12.5KV 480Y/277V, 3 PHASE, 4 WIRE RESERVICED FROM NEW UNDERGROUND SERVICE

TEWT ELEVATED WATER TOWER 1 - 25KVA PAD MTD. 1 12.5KV 120/240, 1 PHASE, 3 WIRE SERVICE FROM NEW UNDERGROUND SERVICE

T6415 FMS WORK SHOP AND TOOL CRIB, BLDG. 6415, 6416 1 - 300KVA PAD MTD. 3 12.5KV 208Y/120V, 3 PHASE, 4 WIRE SERVICE FROM NEW UNDERGROUND SERVICE

T6403 QUARANTINE AND GREENHOUSES BLDGS. 6403, 7508-7511 1 - 500KVA PAD MTD. 3 12.5KV 208Y/120V, 3 PHASE, 4 WIRE RESERVICED FROM NEW UNDERGROUND SERVICE

T6409 BLDGS. 6409,6410, 8505-8509 1 - 75KVA PAD MTD. 1 7.6KV 120/240V, 1 PHASE, 3 WIRE SERVICE FROM NEW UNDERGROUND SERVICE

T6411 BUILDINGS 6411, 6412, 6413 1 - 150KVA PAD MTD. 3 12.5KV 208Y/120V, 3 PHASE, 4 WIRE RESERVICED FROM NEW UNDERGROUND SERVICE

T6414 BIO CONTROL, BLDG. 6414 1 - 1,500KVA PAD MTD. 3 12.5KV 480Y/277V, 3 PHASE, 4 WIRE RESERVICED FROM NEW UNDERGROUND SERVICE

T6418 EXISTING MEX FLY REARING, BLDG.6418 1 - 500KVA PAD MTD. 3 12.5KV 208Y/120V, 3 PHASE, 4 WIRE RESERVICED FROM NEW UNDERGROUND SERVICE

T6407 FMS OFFICE, BLDG. 6407 1 - 75KVA PAD MTD. 3 12.5KV 208Y/120V, 3 PHASE, 4 WIRE SERVICE FROM NEW UNDERGROUND SERVICE

T6420 WAREHOUSE, BLDG. 6420 1 - 500KVA PAD MTD. 3 12.5KV 208Y/120V, 3 PHASE, 4 WIRE SERVICE FROM NEW UNDERGROUND SERVICE

T3207 WATER TREATMENT PLANT, BLDG.3207 1 - 75KVA PAD MTD. 3 12.5KV 208Y/120V, 3 PHASE, 4 WIRE RESERVICED FROM NEW UNDERGROUND SERVICE

T6417 BIO CONTROL AND TRAILER,BLDG.6417 1 -225KVA PAD MTD. 3 12.5KV 208Y/120V, 3 PHASE, 4 WIRE RESERVICED FROM NEW UNDERGROUND SERVICE

T6430 AEO WAREHOUSE, BLDG.6430 1 - 1,000KVA PAD MTD. 3 12.5KV 480Y/277V, 3 PHASE, 4 WIRE RESERVICED FROM NEW UNDERGROUND SERVICE

TMF MEXICAN FRUIT FLY REARING FUTURE BY OTHERS 3 12.5KV ???? CONNECTION TO COMPARTMENT 3, SW#11 BY OTHERS

NEW TRANSFORMER REQUIREMENTS

D

A

1 2

C

AD

D D

3- R

C

B

3 4 5

F

E

G

D

6 7 8 9

REV.

10 11

CHECKED

DESIGNED

APPROVED

APPROVED

DATE

DRAWN SCALE:

NO.

A

DATENO. REVISIONS APVDCHKDDSGN

B

C

E

F

G

C STANLEY CONSULTANTS

225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com Texas Firm Registration No.: F-174

USDA-APHIS-PPQ MOORE AIR BASE

PHASE 2 ELECTRICAL CABLING AND EQUIPMENT DESIGN

EDINBURG, TEXAS

27100.26

MAY 09, 2022

DL MORITZ

EE LEAF

06-22-2022

SITE ELECTRICAL

NEW TRANSFORMER REQUIREMENTS

EO06 1

AS NOTED

DL MORITZ

BW DEEN

NM BROWN

1 REMOVED TCT AND TARS NAL NAL EEL 06-22-2022

12639522R0041, Amendment 0002

D

A

1 2

C

AD

D D

3- R

C

B

3 4 5

F

E

G

D

6 7 8 9

REV.

10 11

CHECKED

DESIGNED

APPROVED

APPROVED

DATE

DRAWN SCALE:

NO.

A

DATENO. REVISIONS APVDCHKDDSGN

B

C

E

F

G

C STANLEY CONSULTANTS

225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com Texas Firm Registration No.: F-174

USDA-APHIS-PPQ MOORE AIR BASE

PHASE 2 ELECTRICAL CABLING AND EQUIPMENT DESIGN

EDINBURG, TEXAS

27100.26

MAY 09, 2022

DL MORITZ

EE LEAF

06-22-2022

SITE ELECTRICAL

SECTIONALIZING CABINETS AND

PAD MOUNTED SWITCHES

EO07 1

AS NOTED

DL MORITZ

BW DEEN

NM BROWN

1 REMOVED TCT AND TARS NAL NAL EEL 06-22-2022

PROVIDE CABINETS WITH

BOX EXTENSIONS.

Equipment Designator

LOCATION POSITIONS VOLTAGE RATING AMPERE COMMENTS NOTES NOTES

SC#1 INCOMING FROM UTILITY RISER POLE AT ENTRANCE 4 15KV 600A POSITION 1 -IN/ POSITION 2-OUT/ POSITION 3-OPEN/ POSITION 4-OPEN BASIS OF DESIGN HUBBELL FIBERGLASS 78" X 32" WITH INTEGRAL GROUND SLEEVE FOR 30 " BURIAL DEPTH. PROVIDE TAMPED 12" WASHED ROCK BASE.

SC#2 WAREHOUSE 6021 SERVICE 4 15KV 600A POSITION 1 -IN/ POSITION 2-OUT/ POSITION 3-6021/ POSITION 4-OPEN "

SC#3 FIELD LOCATED 4 15KV 600A POSITION 1 -IN/ POSITION 2-OUT/ POSITION 3-OPEN/ POSITION 4-OPEN "

SC#4 FMS MOTOR POOL 4 15KV 600A POSITION 1 -IN/ POSITION 2-OUT/ POSITION 3-6101/ POSITION 4-OPEN "

SC#5 FIELD LOCATED 4 15KV 600A POSITION 1 -IN/ POSITION 2-OUT/ POSITION 3-OPEN/ POSITION 4-OPEN "

SC#6 FIELD LOCATED 4 15KV 600A POSITION 1 -IN/ POSITION 2-OUT/ POSITION 3-SW#7/ POSITION 4-OPEN "

SC#7 FIELD LOCATED 4 15KV 600A POSITION 1 -IN/ POSITION 2-OUT/ POSITION 3-SW#10/ POSITION 4-OPEN "

SC#8 FMS WORK SHOP AND TOOL CRIB 4 15KV 600A POSITION 1 -IN/ POSITION 2-ALT.B/ POSITION 3-OPEN/ POSITION 4-OPEN "

SC@10 T6410/T6411 SERVICE 4 15KV 600A POSITION 1 -IN/ POSITION 2-ALT.B/ POSITION 3-OPEN/ POSITION 4-OPEN "

NEW SECTIONALIZING CABINETS

12639522R0041, Amendment 0002

A

1 2

C A

R

C

B

3 4 5

F

E

G

D

6 7 8 9

REV.

10 11

CHECKED

DESIGNED

APPROVED

APPROVED

DATE

DRAWN

SCALE:

NO.

A

DATENO. REVISIONS APVDCHKDDSGN

B

C

E

F

G

C STANLEY CONSULTANTS

225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com

Texas Firm Registration No.: F-174

USDA-APHIS-PPQ MOORE AIR BASE

PHASE 2 ELECTRICAL CABLING AND EQUIPMENT DESIGN

EDINBURG, TEXAS

27100.26

MAY 09, 2022

DL MORITZ

EE LEAF

05-09-2022

116530

ERNEST E. LEAF

SITE ELECTRICAL

COMMUNICATION CONDUIT AND

CABLE SCHEDULE - SHEET 1

EO09 0

AS NOTED

DL MORITZ

BW DEEN

NM BROWN

12639522R0041, Amendment 0002

2022-07-29T11:11:58-0500
JAMES ROLOFF

File details come from the government source that posted it. Updated .