ACS Reqts Building1448.pdf
PDF 42 KB Posted
- Attached to
- AD / Access Control System - Lenel Brand name
- Solicitation number
- FA282326Q0045
About this file
This document is a facility access and safety specifications guide for Building 1448. It provides detailed information about card reader locations for access control and kill switch placements throughout the facility.
The card readers are distributed across multiple functional areas including the Entry Vestibule (Room 101), Security Vestibule (Room 108), three Engineering Areas (Rooms 111, 113, and 115), a Conference Room (Room 117), two Laboratory spaces (Rooms 112A and 114A), Equipment Storage (Room 116), and a Corridor (Room 110). Specific doors and their corresponding access points are enumerated for each area. Kill switches are positioned at interior locations of various doors throughout the Engineering Areas, Conference Room, Labs, and other critical access points, including Door 111G (Room 111), Doors 111A/111B/111C (respective rooms), Door 117A (Room 117), Door 117C (Room 113), Door 113A (Room 113), Door 115E (Room 115), Doors 115A/115B/115C (respective rooms), Door 114F (Lab 2, Room 114A), Door 112F (Lab 1, Room 112A), and Door 112D (Room 112D). This specification document appears to be facility infrastructure documentation rather than a contract solicitation document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA282326Q00450001.pdf | ||
| SOW 7.8.2026.pdf | ||
| 1448 Diagram CCTV.pdf | ||
| Q and A FA282326Q0045.pdf | ||
| SOW.pdf | ||
| ACS Diagram.pdf | ||
| FA282326Q0045.pdf | ||
| SOW Access Control System.pdf | ||
| Redacted Brand name Document_Redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building 1448
CARD READERS
Entry Vestibule – ROOM 101
Door 102A into Room 101
Security Vestibule – ROOM 108
Door 108A into Room 108
Door 108B into Room 109
Door 108B into Room 108
Engineering Area 1 – ROOM 111
Doors 111A / 111B / 111C into Room’s 111A / 111B / 111C
Door 111E into IT Room 111E
Door 111G into Room 111
Engineering Area 2 – ROOM 113
Door 113A into Room 113
Conference Room – ROOM 117
Door 117A into Room 117
Door 117C into Room 113
Engineering Area 3 – ROOM 115
Doors 115A / 115B / 115C into Room’s 115A / 115B / 115C
Door 115E into Room 115
Lab 1 – ROOM 112A
Door 112F into Room 112A
Door 112C into Room 112C
Door 112D into Room 112D
Equipment Storage – ROOM 116
Door 116B into Room 116
Lab 2 – ROOM 114A
Door 114F into Room 114A
Door 114C into Room 114C
Door 114D into Room 114D
Corridor – ROOM 110
Door 109A to corridor Room 110
KILL SWITCHES
Door 111G interior of room 111
Doors 111A / 111B / 111C interior of respective rooms
Door 117A interior of room 117
Door 117C interior of room 113
Door 113A interior of room 113
Door 115E interior of room 115
Doors 115A / 115B / 115C interior of respective rooms
Door 114F interior of room 114A (Lab 2)
Door 112F interior of room 112A (Lab 1)