This document is a facility access and safety specifications guide for Building 1448. It provides detailed information about card reader locations for access control and kill switch placements throughout the facility.

The card readers are distributed across multiple functional areas including the Entry Vestibule (Room 101), Security Vestibule (Room 108), three Engineering Areas (Rooms 111, 113, and 115), a Conference Room (Room 117), two Laboratory spaces (Rooms 112A and 114A), Equipment Storage (Room 116), and a Corridor (Room 110). Specific doors and their corresponding access points are enumerated for each area. Kill switches are positioned at interior locations of various doors throughout the Engineering Areas, Conference Room, Labs, and other critical access points, including Door 111G (Room 111), Doors 111A/111B/111C (respective rooms), Door 117A (Room 117), Door 117C (Room 113), Door 113A (Room 113), Door 115E (Room 115), Doors 115A/115B/115C (respective rooms), Door 114F (Lab 2, Room 114A), Door 112F (Lab 1, Room 112A), and Door 112D (Room 112D). This specification document appears to be facility infrastructure documentation rather than a contract solicitation document.

View the file

Other files

File Type Posted
FA282326Q00450001.pdf PDF
SOW 7.8.2026.pdf PDF
1448 Diagram CCTV.pdf PDF
Q and A FA282326Q0045.pdf PDF
SOW.pdf PDF
ACS Diagram.pdf PDF
FA282326Q0045.pdf PDF
SOW Access Control System.pdf PDF
Redacted Brand name Document_Redacted.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building 1448

CARD READERS

Entry Vestibule – ROOM 101

Door 102A into Room 101

Security Vestibule – ROOM 108

Door 108A into Room 108

Door 108B into Room 109

Door 108B into Room 108

Engineering Area 1 – ROOM 111

Doors 111A / 111B / 111C into Room’s 111A / 111B / 111C

Door 111E into IT Room 111E

Door 111G into Room 111

Engineering Area 2 – ROOM 113

Door 113A into Room 113

Conference Room – ROOM 117

Door 117A into Room 117

Door 117C into Room 113

Engineering Area 3 – ROOM 115

Doors 115A / 115B / 115C into Room’s 115A / 115B / 115C

Door 115E into Room 115

Lab 1 – ROOM 112A

Door 112F into Room 112A

Door 112C into Room 112C

Door 112D into Room 112D

Equipment Storage – ROOM 116

Door 116B into Room 116

Lab 2 – ROOM 114A

Door 114F into Room 114A

Door 114C into Room 114C

Door 114D into Room 114D

Corridor – ROOM 110

Door 109A to corridor Room 110

KILL SWITCHES

Door 111G interior of room 111

Doors 111A / 111B / 111C interior of respective rooms

Door 117A interior of room 117

Door 117C interior of room 113

Door 113A interior of room 113

Door 115E interior of room 115

Doors 115A / 115B / 115C interior of respective rooms

Door 114F interior of room 114A (Lab 2)

Door 112F interior of room 112A (Lab 1)

File details come from the government source that posted it. Updated .