ACM Report - 812578_PR-362.pdf
PDF 2 MB Posted
- Attached to
- Sign and Safety Repairs - West Region
- Solicitation number
- 693C73-26-B-000001
About this file
This is an Asbestos Containing Building Materials (ACBM) Inspection Report prepared by Zimmetry Environmental Management Corp. for the Puerto Rico Highway & Transportation Authority. The report documents an inspection conducted on March 27, 2019, of metal guardrails located on PR-362 from Km 2.39 to Km 3.96 in San Germán, Puerto Rico, as part of Hurricane María Efforts for Guardrails & Sign Rehabilitation.
The inspection, performed by a state-certified inspector, aimed to identify materials containing asbestos fibers above allowable levels and ensure compliance with local, state, and federal regulations. The evaluation found no asbestos-containing materials at the inspected sites. The report includes location plans, photographs of the inspected guardrail segments, and an aerial view of the project area. The inspection covered three specific locations: Km 2.39, Km 2.77 (where no guardrail was present), and Km 3.96, with photographic documentation provided for each site.
View the file
Other files
Show 40 more
Latest 50 of 133 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS CONTAINING BUILDING MATERIALS INSPECTION
REPORT
FOR
PUERTO RICO HIGHWAY & TRANSPORTATION AUTHORITY
SAMPLING CONDUCTED AT PROJECT:
HURRICANE MARÍA EFFORTS FOR GUARDRAILS & SIGN
REHABILITATION
UNIT 1: MARICAO, SAN GERMÁN & SAN SEBASTIÁN, PR
AC-812578
PR-362 SAN GERMÁN, PR
GUARDRAILS INSPECTED FROM KM 2.39 TO KM 3.96
ZEM-19057
APRIL, 2019
PREPARED BY:
ZIMMETRY ENVIRONMENTAL MANAGEMENT CORP.
PO BOX 3545 BAYAMÓN, PR 00958
PHONE: 787.995.0005
WWW.ZIMMETRY.COM
INFO@ZIMMETRY.COM
Asbestos Containing Materials Inspection
Guard Rails on PR-362
TABLE OF CONTENT
SECTION 1: Executive Summary
1.1 Introduction
1.2 Summary of Property Evaluation
SECTION 2: ASBESTOS CONTAINING BUILDING MATERIALS INSPECTION REPORT
2.1 Overview of the Evaluation
2.2 Conditions and Limitations
2.3 Environmental Assessment Report Certification
SECTION 3: APPENDICES
Appendix A: Certifications, Licenses, and Accreditations
Appendix B: Location Plan
Appendix C: Project Photographs
Appendix D: Aerial Location View
Guard Rails on PR-362
SECTION 1: EXECUTIVE SUMMARY
1.1 INTRODUCTION
Zimmetry Environmental Management Corp. was contracted by EBP Design Group Consulting Engineers, P.S.C. to perform an Asbestos Containing Building Materials (ACBM) inspection. The survey was conducted on March 27, 2019 at the metal guard rails located at PR-362 from Km 2.39 to Km 3.96 in San German, Puerto Rico as part of Hurricane María Efforts for Guardrails & Sign Rehabilitation for Unit 1: Maricao, San Germán & San Sebastián - AC-812578 project. The asbestos containing building materials sampling was performed to identify materials that contain asbestos fibers above allowable levels and to assist with the compliance of local, state and federal regulations.
1.2 SUMMARY OF PROPERTY EVALUATION
The project consisted in the evaluation of the areas of the aforementioned project. The evaluation found that no asbestos containing materials were identified during the inspection through the site.
Guardrail Inspected:
Km 2.39 Km 2.77 No guard rail present at this site Km 3.96
Guard Rails on PR-362
SECTION 2: ASBESTOS CONTAINING MATERIALS SURVEY REPORT
2.1 OVERVIEW OF THE EVALUATION
This asbestos containing materials (ACM) survey is an inspection to identify the location of any ACM that exist within. Throughout the inspection no asbestos containing materials were identified at the road.
The inspection was conducted by Puerto Rico EQB and United States Environmental Protection Agency (USEPA) accredited Inspectors qualified by experience, education and training in the recognition of potential ACM and approved bulk sampling techniques. Some areas may not have been directly accessible due to the physical hazards encountered within.
In these areas assumptions based on findings in other areas were made whenever possible.
These assumptions are duly noted as such in this report.
The inspection was performed in accordance with Environmental Protection Agency recommended procedures found in EPA-450/2-78-014 (Parts I and II), EPA 560/5-85-024, and 40 CFR 763. These procedures call for the visual inspection of the building for suspect friable material and collection and analysis of representative samples of suspect material.
2.2 CONDITIONS AND LIMITATIONS—DISCLAIMER
Zimmetry Environmental Management Corp. has performed this asbestos containing building materials inspection in a thorough and professional manner consistent with commonly accepted industry standards. The Preparer cannot guarantee and does not warrant that this evaluation has identified all adverse environmental factors and/or conditions affecting this property on the date of the evaluation.
The results reported and conclusions reached by the Preparer are solely for the benefit of the Owner and occupants. The results and opinions in this report, based solely on the conditions found at the property on the date of the evaluation, are valid only on that date. The Preparer assumes no obligation to advise the client of any changes in any real or potential asbestos hazards at this structure beyond the date of the property evaluation.
The Asbestos Containing Building Materials inspection was performed to ready accessible components and surfaces. If suspected components that could contain asbestos are encountered they shall be managed as containing asbestos until the appropriate laboratory analysis is performed.
Guard Rails on PR-362
2.3 ENVIRONMENTAL ASSESSMENT REPORT CERTIFICATION
Zimmetry Environmental Management Corp. has performed this asbestos containing building materials inspection in a thorough and professional manner consistent with commonly accepted industry standards. The inspection was conducted on March 27, 2019 by Joanne Negrón, state-certified inspector ASB-1118-0741-SI, qualified by experience, education and training in the recognition of asbestos containing materials and approved sampling techniques.
Joanne Negron, MSEM Environmental Building Inspector
Guard Rails on PR-362
SECTION 3: APPENDICES
Appendix A: Certifications, Licenses, and Accreditations
Appendix B: Location Plan
Appendix C: Photograph
Appendix D: Aerial Location View
Guard Rails on PR-362
APPENDIX A: CERTIFICATIONS, LICENSES, AND
ACCREDITATIONS
Guard Rails on PR-362
APPENDIX B: LOCATION PLAN
Joanne Oval
Guard Rails on PR-362
Photographic documentation is for reference purposes and doesn't necessarily include all the materials containing asbestos.
APPENDIX C: PROJECT PHOTOGRAPHS
PR-362 Km. 2.39
PR-362 Km. 2.77 No guard rail present at this site
PR-362 Km. 3.96
Guard Rails on PR-362
APPENDIX D: AERIAL LOCATION VIEW
| Cover |
| TOC ACM |
| ACM Inspection |
| APPENDIX B |
| PR-362 GR1 |
| PR-362 GR3 |
| Appendix C Photo1 |
| APPENDIX D Aerial |
File details come from the government source that posted it. Updated .