This document is an Amendment (No. 0003) for a federal contract opportunity for permanent repairs and sign installations across multiple locations in Puerto Rico. The project, designated PR ER DOT PRMNT RPR(16), involves five separate work schedules (A through E) covering signage repairs, guardrail repairs, and road shoulder/ditch reconditioning on various highway routes. Key modifications include revised standard drawings references, updated bid schedule quantities and pay item amounts, and changes to calendar days for project completion.

The contract allows the government flexibility in awarding schedules, with a potential total project duration of 1,210 calendar days if all schedules are awarded simultaneously. Schedules include signage repairs on specific routes (AC-802578, AC-812578, AC-819578, AC-820578, AC-823578, and AC-824578), guardrail repairs, and associated infrastructure work. The bid opening has been rescheduled to Thursday, December 4, 2025, at 2:00 p.m. EST, and bidders are required to submit a bid guarantee of not less than 20 percent of the bid price or $3 million, whichever is less.

View the file

Other files

File Type Posted
Results of Bid Opening - PR ER DOT PRMNT RPR(16).pdf PDF
Amendment 0002 - PR ER DOT PRMNT RPR(16).pdf PDF
Amendment 0001 - PR ER DOT PRMNT RPR(16).pdf PDF
VETS-4212 Form.pdf PDF
Plans - PR ER DOT PRMNT RPR(16) - 823578 - Part 1 of 2.pdf PDF
Categorical Exclusion Form (NEPA) Appendices - Part 2 of 8.pdf PDF
Section 106 Report - 823578 - Part 15 of 20.pdf PDF
Self Certification - 820578.pdf PDF
PRHTAs Standard Drawings.pdf PDF
ADV_Bidders Qualifications Form.doc DOC document
Asbestos and Lead Report-Certification - 819578 - Part 2 of 6.pdf PDF
Section 106 Report -824578 - Part 8 of 10.pdf PDF
Categorical Exclusion Form (NEPA) Appendices - Part 7 of 8.pdf PDF
ACM Report-Certification - 812578_PR-330.pdf PDF
Plans - PR ER DOT PRMNT RPR(16) - 820578 - Part 1 of 7.pdf PDF
Section 106 Report - 823578 - Part 20 of 20.pdf PDF
OGPe_State Approved_CE_AC-824578.pdf PDF
Categorical Exclusion Form (NEPA) Appendices - Part 8 of 8.pdf PDF
Asbestos and Lead Report-Certification - 820578.pdf PDF
Plans - PR ER DOT PRMNT RPR(16) - 819578 - Part 4 of 8.pdf PDF
Lead Report-Certification - 802578.pdf PDF
Plans - PR ER DOT PRMNT RPR(16) - 812578 - Part 1 of 2.pdf PDF
Section 106 Report - 823578 - Part 14 of 20.pdf PDF
Lead Report-Certification - 812578_PR-330.pdf PDF
Section 106 Report - 819578.pdf PDF
Self Certification - 802578.pdf PDF
Asbestos and Lead Report-Certification - 819578 - Part 1 of 6.pdf PDF
Section 106 Report - 823578 - Part 8 of 20.pdf PDF
Plans - PR ER DOT PRMNT RPR(16) - 819578 - Part 5 of 8.pdf PDF
Plans - PR ER DOT PRMNT RPR(16) - 819578 - Part 2 of 8.pdf PDF
ACM Report - 812578_PR-362.pdf PDF
Section 106 Report - 823578 - Part 12 of 20.pdf PDF
Section 106 Report -824578 - Part 5 of 10.pdf PDF
Plans - PR ER DOT PRMNT RPR(16) - 802578.pdf PDF
Plans - PR ER DOT PRMNT RPR(16) - 819578 - Part 8 of 8.pdf PDF
ACM Certification - 812578_PR-360.pdf PDF
Lead Report-Certification - 812578_PR-361.pdf PDF
PRHTAs Material Testing Schedule.pdf PDF
Asbestos and Lead Report-Certification - 819578 - Part 6 of 6.pdf PDF
Lead Report-Certification - 812578_PR-4409.pdf PDF
ACM Report - 812578_PR-360.pdf PDF
ACM Report-Certification - 812578_PR-446.pdf PDF
Lead Report-Certification - 812578_PR-447.pdf PDF
Section 106 Report - 823578 - Part 5 of 20.pdf PDF
Section 106 Report - 820578 - Part 2 of 3.pdf PDF
Categorical Exclusion Form (NEPA) Appendices - Part 5 of 8.pdf PDF
Section 106 Report - 823578 - Part 18 of 20.pdf PDF
Plans - PR ER DOT PRMNT RPR(16) - 824578 - Part 2 of 2.pdf PDF
ACM Report-Certification - 812578_PR-3362.pdf PDF
Plans - PR ER DOT PRMNT RPR(16) - 812578 - Part 2 of 2.pdf PDF
Show 40 more

Latest 50 of 133 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

693C7326B000001 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ASHBURN VA 20147

ATTN: Construction

693C73

SUITE E2-3-300

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

ASHBURN VA 20147

ATTN: Acquisitions

693C73

SUITE E2-3-300

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

See Block 1411/21/20250003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

10/16/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PR ER DOT PRMNT RPR(16)

The purpose of this Amendment is to:

1) Revise the Special Contract Requirements (J Pages) as follows:

a) Replace subsection 910-1.01 Scope to revise standard drawings reference.

b) See Special Contract Requirements (J Pages) Changes for details.

2) Revise the Solicitation Bid Schedule to:

a) Replace the Bid Schedule to revise pay item quantity and pay item amount.

b) Revise the calendar days for Schedules B and C.

c) See B-Pages Changes for details.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 25

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

693C7326B000001/0003

3) Revise the SF 1442 to:

a) Replace the calendar days for Schedules B and

C.

b) See SF 1442 Changes for details.

4) Provide a summary of responses to questions/clarifications asked by potential bidders.

5) Reschedule the Bid Opening date to Thursday, December 4, 2025, at 2:00 p.m. EST.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Amendment No. 0003

Info Page 1 of 1

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Project PR ER DOT PRMNT RPR(16)

Sign and Safety Repairs - West Region

Solicitation: 693C73-26-B-000001

The purpose of this Amendment is to:

1) Revise the Special Contract Requirements (J Pages) as follows:

a) Replace subsection 910-1.01 Scope to revise standard drawings reference.

b) See Special Contract Requirements (J Pages) Changes for details.

2) Revise the Solicitation Bid Schedule to:

a) Replace the Bid Schedule to revise pay item quantity and pay item amount.

b) Revise the calendar days for Schedules B and C.

c) See B-Pages Changes for details.

3) Revise the SF 1442 to:

a) Replace the calendar days for Schedules B and C.

b) See SF 1442 Changes for details.

4) Provide a summary of responses to questions/clarifications asked by potential bidders.

5) Reschedule the Bid Opening date to Thursday, December 4, 2025, at 2:00 p.m. EST.

SCR changes 1 of 1

Special Contract Requirement (J Pages) Changes

1. Delete Subsection 910-1.01 paragraph and substitute the following:

This work shall consist of the reconstruction to existing transition modules, and construction of new transition modules (cast-in-place or precast) at bridges and/or concrete barriers in accordance with these specifications and in conformity with the lines, grades, types, details and locations shown on the plans, standard drawings MB-23 to MB-28 or established by CO.

B Pages Changes Page 1 of 1

B-Pages Changes

1) Delete Bid Schedule Instructions Pages 1-3 and substitute with amended Bid Schedule

Instructions Pages 1-3. Delete Bid Schedule and Bid Summary Pages B-1 through B-7 and substitute with amended Bid Schedule and Bid Summary Pages B-1 through B-7. Changes are as follows:

a) Revised the pay item amount for the following Schedule B, C, and D pay item:

1) Pay item 21201-1000 Reconditioning of Shoulders and Ditches.

b) Revised the pay item quantity for the following Schedule C pay item:

1) Pay item 21201-1000 Reconditioning of Shoulders and Ditches.

c) Revised the calendar days for Maximum Time Allowed for Each Schedule of Work if

Awarded Separately for the following Schedules:

1) If Schedule B (Government Option 1) is exercised after the award of the original contract, the performance period to complete all Schedule B work will be 725 calendar days and will start on the effective date of Schedule B’s Notice to Proceed.

2) If Schedule C (Government Option 2) is exercised after the award of the original contract, the performance period to complete all Schedule C work will be 485 calendar days and will start on the effective date of Schedule C’s Notice to Proceed.

BID SCHEDULE INSTRUCTIONS

PROJECT: PR ER DOT PRMNT RPR(16)

BIDDERS PLEASE NOTE: Before preparing the bid, carefully read the Instructions to

Bidders. While preparing the bid, comply with the following:

COMPLETING THE BID SCHEDULE

Complete the Bid Schedule(s) by handwriting in ink or typing. Specify a Unit Bid Price, in figures with cents to only two decimal places, for each pay item in the Unit Bid Price column for which a quantity is given. Do not enter or tender a Unit Bid Price for any pay item for which no estimated quantity appears in the Bid Schedule. Determine the products of the respective unit prices and quantities, and show them, in figures, in the Amount Bid column. If a Unit Bid Price and Amount Bid have been inserted by the Government for a pay item, do not change the Unit

Bid Price and Amount Bid for the pay item. Determine the Bid Total for each specific individual

Schedule of Work by adding the amounts of the listed items and show in the block provided for that individual Schedule of Work. In case of multiplication errors, the Amount Bid for the item will be based on the Unit Bid Price.

To be eligible for award, bidders must submit prices for each pay item.

Review Subsection 109.05 of the Special Contract Requirements (SCR) regarding scope of payment for direct and indirect payment work.

Fill in the Bid Total(s) for each individual Schedule of Work as directed on the Bid Summary page. Fill in the Evaluation Total Price of Project in the space provided on the Bid Summary page.

The amount in Block 17 of the SF 1442 should be completed as follows:

Schedule A - $ .

Schedule B - $ .

Schedule C - $ .

Schedule D - $ .

Schedule E - $ .

SCHEDULES OF WORK

The Bid Schedule is comprised of the following separate schedules and options of work:

Schedule A (Base Contract) - Pages B-1 through B-2

Schedule B (Government Option 1) - Page B-3

Schedule C (Government Option 2) - Page B-4

Schedule D (Government Option 3) - Page B-5

Schedule E (Government Option 4) - Page B-6

Amendment 0003

The Government will award the project as a Base Contract (Schedule A) with the option to award Schedule B (Government Option 1), Schedule C (Government Option 2), Schedule D

(Government Option 3), and Schedule E (Government Option 4); see FAR Clauses 52.217-4 and 52.217-5.

The purpose of dividing the project into multiple schedules and options is to provide the

Government with maximum flexibility in completing the project in a timely and cost-effective manner. This approach enables the efficient use of programmed funds and accommodates the potential need for additional funding or permit approvals required for the optional work. If complete funding is available and all required permits are in place at the time of award of

Schedule A (Base Contract), the Government may award Schedule B (Government Option

1), Schedule C (Government Option 2), Schedule D (Government Option 3), and Schedule

E (Government Option 4) at that time.

If additional funding or permitting is required for the award of Schedules B, C, D, and E

(Government Options 1, 2, 3, and 4), and is received after the award of Schedule A (Base

Contract), the Government has the right to exercise Schedules B, C, D, and E (Government

Options 1, 2, 3, and 4) at the unit prices bid according to the following schedule:

Schedule B (Government Option 1): No later than the contract completion date for

Schedule A (Base Contract).

Schedule C (Government Option 2): No later than the contract completion date for

Schedule A (Base Contract).

Schedule D (Government Option 3): Within 365 calendar days from the Notice to Proceed of Schedule A (Base Contract).

Schedule E (Government Option 4): No later than the contract completion date for

Schedule A (Base Contract).

COMPLETION OF WORK

The Government has estimated the number of calendar days necessary to complete all contract work from the effective date of the Notice to Proceed to contract completion for the various contract award scenarios. The maximum number of calendar days allowed (i.e., the contact performance period) is shown in Block 11 of the SF-1442 and described below.

If the Government awards the contract as Schedules A + B + C + D + E, the performance period to complete all contract work will be 1210 calendar days.

If the Government awards the contract as Schedule A only, the performance period to complete all Schedule A work will be 515 calendar days and will start on the effective date of

Schedule A’s Notice to Proceed.

If Schedule B (Government Option 1) is exercised after the award of the original contract, the performance period to complete all Schedule B work will be 725 calendar days and will start on the effective date of Schedule B’s Notice to Proceed.

If Schedule C (Government Option 2) is exercised after the award of the original contract, the performance period to complete all Schedule B work will be 485 calendar days and will start on the effective date of Schedule C’s Notice to Proceed.

If Schedule D (Government Option 3) is exercised after the award of the original contract, the performance period to complete all Schedule B work will be 235 calendar days and will start on the effective date of Schedule D’s Notice to Proceed.

If Schedule E (Government Option 4) is exercised after the award of the original contract, the performance period to complete all Schedule E work will be 125 calendar days and will start on the effective date of Schedule E’s Notice to Proceed.

In developing a construction schedule to determine the number of calendar days, the Government considered and included the work limitations shown in Sections 108 and 156 of the Special

Contract Requirements (SCR). Specific work limitations may be (but are not limited to):

National legal holidays, weekends, rush hours, night work, specified no work periods, work or traffic control phasing, etc. The Government also considered those work items that are weather sensitive and when those work items will be performed. The Government also considered time required for preparing material and drawing submittals, and the allowable Government review times for those submittals (Subsection 104.03 of the SCR).

BASIS FOR AWARD

The contract will be awarded to the responsive, responsible bidder with the lowest Evaluation

Total Price of Project, which is defined as:

Schedule A (Base Contract) Bid Total +

Schedule B (Government Option 1) Bid Total +

Schedule C (Government Option 2) Bid Total +

Schedule D (Government Option 3) Bid Total +

Schedule E (Government Option 4) Bid Total +

B I D S C H E D U L E Schedule A

Project No: PR ER DOT PRMNT RPR(16)

Item No. Quantity Unit Unit Price Amount

15001-0000 Line A0020 ALL LPSM $

15001-1000 Line A0040 ALL LPSM $

15100-1000 Line A0060 ALL LPSM $

15102-0000 Line A0080 1 CTSM $ 680,000.00$

15401-0000

Line A0100 ALL LPSM $

15501-0000 Line A0120 ALL LPSM $

20100-0000 Line A0140 2 CUERDA $ $

61101-0000 Line A0160 35 MO $ $

61310-1000

Line A0180 22,700 SQFT $ $

61310-2000 Line A0200 5,300 SQFT $ $

61310-3000 Line A0220 11,600 SQFT $ $

61310-4000 Line A0240 11,000 SQFT $ $

61310-5000 Line A0260 1,500 SQFT $ $

61310-6000 Line A0280 45 SQFT $ $

61310-7000 Line A0300 750 SQFT $ $

61310-8000 Line A0320 620 SQFT $ $

61311-2000 Line A0340 2,500 SQFT $ $

61312-4000 Line A0360 410 SQFT $ $

62100-1000 Line A0380 660 Each $ $

62100-2000 Line A0400 2,880 Each $ $

Construction Survey and Staking

Field Assessment

Mobilization

Reimbursement for Municipal Tax Payments

Contractor Testing

Construction Schedule

Kilometer Marker

Hectometer Marker

Traffic Sign Assembly, Code E

Traffic Sign Assembly, Code F

Traffic Sign Assembly, Code G

Clearing and Grubbing

Field Office

Traffic Sign Assembly, Code A

Traffic Sign Assembly, Code B

Traffic Sign Assembly, Code C

Traffic Sign Assembly, Code D

Traffic Sign Assembly, Code H

Traffic Sign Assembly, Code R

Traffic Sign Assembly, Code I

Submitted by: __________________________

Name: Signage Repairs on AC-802578, AC-812578, AC-

819578, AC-820578, AC-823578, & AC-824578

Schedule Total: _________________________

B-1

Amendment No.

Schedule A

Project No: PR ER DOT PRMNT RPR(16)

Item No. Quantity Unit Unit Price Amount

Name: Signage Repairs on AC-802578, AC-812578, AC-

819578, AC-820578, AC-823578, & AC-824578

62101-1000 Line A0420 100 Each $ $

63800-1000 Line A0440 ALL LPSM $

66100-1000 Line A0460 45 Each $ $

91300-5000 Line A0480 5,925 Each $ $

91300-6000 Line A0500 570 Each $ $

93501-0000 Line A0520 55 Each $ $

Object Markers

Removal of Existing Traffic Signs (Breakaway)

Locate Utility, Test Pit

Maintenance of Traffic

Project Funding Sign

Removal of Existing Traffic Signs (Ground Mounted)

B-2

Amendment

Option B

Project No: PR ER DOT PRMNT RPR(16)

Item No. Quantity Unit Unit Price Amount

15001-0000 Line B0020 ALL LPSM $

15001-1000 Line B0040 ALL LPSM $

15100-1000 Line B0060 ALL LPSM $

15102-0000 Line B0080 1 CTSM $ 435,000.00$

15401-0000

Line B0100 ALL LPSM $

15401-1000 Line B0120 ALL LPSM $

15501-0000 Line B0140 ALL LPSM $

20100-0000 Line B0160 1 CUERDA $ $

21201-1000

Line B0180 1 CTSM $ $

60600-1000 Line B0200 14,700 M $ $

60600-4000 Line B0220 14,500 M $ $

60600-5000 Line B0240 53 Each $ $

60604-3100 Line B0260 3 Each $ $

61101-0000 Line B0280 18 MO $ $

63800-1000 Line B0300 ALL LPSM $

91001-5100 Line B0320 3 Each $ $

93101-1000 Line B0340 1,900 M $ $

93501-0000 Line B0360 28 Each $ $

Construction Survey and Staking

Field Assessment

Mobilization

Reimbursement for Municipal Tax Payments

Contractor Testing

Cultural Resource Protection and Monitoring

Thrie-Beam Transition, Type II

Field Office

Maintenance of Traffic

Construction Schedule

Clearing and Grubbing

Reconditioning of Shoulders and Ditches

W-Beam Guardrail, Single Face

Removal, Storage and Delivery of Existing Guardrail

New Crashworthy End Terminal Type II, TL-2

New Transition Module (Less than 45mph)

Removal and Disposal of Lead Based Paint (Painted Guardrail)

Locate Utility, Test Pit

Submitted by: __________________________

Name: Guardrail Repairs on AC-812578, AC-820578 & AC- 824578

Schedule Total: _________________________

B-3

Amendment No.

30,000.00

Option C

Project No: PR ER DOT PRMNT RPR(16)

Item No. Quantity Unit Unit Price Amount

15001-0000 Line C0020 ALL LPSM $

15001-1000 Line C0040 ALL LPSM $

15100-1000 Line C0060 ALL LPSM $

15102-0000 Line C0080 1 CTSM $ 195,000.00$

15401-0000

Line C0100 ALL LPSM $

15401-1000 Line C0120 ALL LPSM $

15501-0000 Line C0140 ALL LPSM $

20100-0000 Line C0160 1 CUERDA $ $

21201-1000

Line C0180 1 CTSM $ $

60600-1000 Line C0200 8,760 M $ $

60600-4000 Line C0220 8,700 M $ $

60600-5000 Line C0240 15 Each $ $

61101-0000 Line C0260 12 MO $ $

63800-1000 Line C0280 ALL LPSM $

93101-1000 Line C0300 80 M $ $

93501-0000 Line C0320 19 Each $ $

Construction Survey and Staking

Field Assessment

Mobilization

Reimbursement for Municipal Tax Payments

Contractor Testing

Cultural Resource Protection and Monitoring

Field Office

Maintenance of Traffic

Removal and Disposal of Lead Based Paint (Painted Guardrail)

Construction Schedule

Clearing and Grubbing

Reconditioning of Shoulders and Ditches

W-Beam Guardrail, Single Face

Removal, Storage and Delivery of Existing Guardrail

New Crashworthy End Terminal Type II, TL-2

Locate Utility, Test Pit

Submitted by: __________________________

Name: Guardrail Repairs on AC-802578 and AC-823578

Schedule Total: _________________________

B-4

Amendment No.

Option D

Project No: PR ER DOT PRMNT RPR(16)

Item No. Quantity Unit Unit Price Amount

15001-0000 Line D0020 ALL LPSM $

15001-1000 Line D0040 ALL LPSM $

15100-1000 Line D0060 ALL LPSM $

15102-0000 Line D0080 1 CTSM $ 120,000.00$

15401-0000

Line D0100 ALL LPSM $

15401-1000 Line D0120 ALL LPSM $

15501-0000 Line D0140 ALL LPSM $

20100-0000 Line D0160 1 CUERDA $ $

21201-1000

Line D0180 1 CTSM $ $

60600-1000 Line D0200 2,400 M $ $

60600-4000 Line D0220 1,880 M $ $

60600-5000 Line D0240 28 Each $ $

60604-3100 Line D0260 2 Each $ $

61101-0000 Line D0280 6 MO $ $

63800-1000 Line D0300 ALL LPSM $

66100-1000 Line D0320 8 Each $ $

91001-5100 Line D0340 2 Each $ $

93101-1000 Line D0360 460 M $ $

93501-0000 Line D0380 10 Each $ $

Name: Guardrail Repairs on AC-819578 Schedule Total: _________________________

Submitted by: __________________________

Project Funding Sign

New Transition Module (Less than 45mph)

Removal and Disposal of Lead Based Paint (Painted Guardrail)

Construction Survey and Staking

Field Assessment

Mobilization

Reimbursement for Municipal Tax Payments

Contractor Testing

Cultural Resource Protection and Monitoring

Locate Utility, Test Pit

Thrie-Beam Transition, Type II

Field Office

Maintenance of Traffic

Construction Schedule

Clearing and Grubbing

Reconditioning of Shoulders and Ditches

W-Beam Guardrail, Single Face

Removal, Storage and Delivery of Existing Guardrail

New Crashworthy End Terminal Type II, TL-2

B-5

Amendment No.

Option E

Project No: PR ER DOT PRMNT RPR(16)

Item No. Quantity Unit Unit Price Amount

15001-1000 Line E0020 ALL LPSM $

15100-1000 Line E0040 ALL LPSM $

61310-1000 Line E0060 20 SQFT $ $

Name: Signage Repairs on AC-823578 Schedule Total: _________________________

Submitted by: __________________________

Field Assessment

Mobilization

Traffic Sign Assembly, Code A

B-6

Amendment

B-7

BID SUMMARY

Project PR ER DOT PRMNT RPR(16)

(1) Schedule A (Base Contract) Bid Total (from Page B-1) = (1) $____________________

(2) Schedule B (Government Option 1) Bid Total (from Page B-3) = (2) $____________________

(3) Schedule C (Government Option 2) Bid Total (from Page B-4) = (3) $____________________

(4) Schedule D (Government Option 3) Bid Total (from Page B-5) = (4) $____________________

(5) Schedule E (Government Option 4) Bid Total (from Page B-6) = (5) $____________________

Total Price of Project (for evaluation purposes only)

EVALUATION TOTAL PRICE OF PROJECT = (1) + (2) + (3) + (4) + (5) $____________________

Maximum Time Allowed for the Contract if All Schedules are Awarded at the Same Time

If the Government awards the contract as Schedules A + B + C + D + E, the performance period to complete all contract work will be 1210 calendar days.

Maximum Time Allowed for Each Schedule of Work if Awarded Separately:

If the Government awards the contract as Schedule A only, the performance period to complete all

Schedule A work will be 515 calendar days and will start on the effective date of Schedule A’s Notice to

Proceed.

If Schedule B (Government Option 1) is exercised after the award of the original contract, the performance period to complete all Schedule B work will be 725 calendar days and will start on the effective date of Schedule B’s Notice to Proceed.

If Schedule C (Government Option 2) is exercised after the award of the original contract, the performance period to complete all Schedule C work will be 485 calendar days and will start on the effective date of Schedule C’s Notice to Proceed.

If Schedule D (Government Option 3) is exercised after the award of the original contract, the performance period to complete all Schedule D work will be 235 calendar days and will start on the effective date of Schedule D’s Notice to Proceed.

If Schedule E (Government Option 4) is exercised after the award of the original contract, the performance period to complete all Schedule E work will be 125 calendar days and will start on the effective date of Schedule E’s Notice to Proceed.

SF 1442 Changes Page 1 of 1

SF 1442 Changes

1) Delete *Block 11 on Page 5 of the SF 1442 to revise the calendar days for Schedules B and

C, and substitute with the following:

Maximum Time Allowed for the Contract if All Schedules are Awarded at the Same Time:

If the Government awards the contract as Schedules A, B, C, D, and E, the performance period to complete all contract work will be 1210 calendar days.

Maximum Time Allowed for Each Schedule of Work if Awarded Separately:

If the Government awards the contract as Schedule A only, the performance period to complete all Schedule A work will be 515 calendar days and will start on the effective date of Schedule A’s Notice to Proceed.

If Schedule B (Government Option 1) is exercised after the award of the original contract, the performance period to complete all Schedule B work will be 725 calendar days and will start on the effective date of Schedule B’s Notice to Proceed.

If Schedule C (Government Option 2) is exercised after the award of the original contract, the performance period to complete all Schedule C work will be 485 calendar days and will start on the effective date of Schedule C’s Notice to Proceed.

If Schedule D (Government Option 3) is exercised after the award of the original contract, the performance period to complete all Schedule D work will be 235 calendar days and will start on the effective date of Schedule D’s Notice to Proceed.

If Schedule E (Government Option 4) is exercised after the award of the original contract, the performance period to complete all Schedule E work will be 125 calendar days and will start on the effective date of Schedule E’s Notice to Proceed.

Schedule D (Government Option 3) cannot be executed until all permits have been received.

See Completion of Work section of the B-Pages – Bid Schedule Instructions for further information. The completion time for the contract is not to exceed the maximum time above. Work restrictions can be found in SCR Sections 108 and 156.

Notice to Proceed will be issued within 30 days following receipt of acceptable performance and payment bonds. (Actual Notice to Proceed date will be 10 days from issuance or the date specified in the Notice.)

Questions/Clarifications

Bidders can send written questions or inquiries for clarification to: eflhd.contracts@dot.gov.

Questions can be submitted at any time, but questions submitted within 10 days of the bid opening may not be answered in time for the bidder to properly incorporate the responses into their solicitation.

The following questions and issues were asked via email. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised, and some questions may not be included. The

Government’s direct response to the sender may also have been updated below for better clarity.

1) Addendum and Sign Installation Methods. In the referenced Addendum, a table was included listing different payment methods for the installation of various sign types. The

PRTH 2020 specification does not fully cover signs with three or more GTS posts, which have a variation. Should we apply the (STS) Small Traffic Sign with U-Channel specification as indicated? This question is also based on the field conditions, since in many of the roads where the signs will be installed—mostly tertiary roads connecting to secondary roads—it may not be possible to meet the GMTS foundation dimensions and suggested concrete base widths.

Response: The pay items A to R from the table in Amendment 1 are not specific to

“Ground Mounted Traffic Signs” (GMTS) standard drawings. Several sign configurations and sizes require the use of “Small Traffic Signs” (STS) standard drawings.

The PRHTA Standard Drawings GMTS-03 and GMTS-04 covers signs from 6’ x 4’ up to 16’ x 16’ with one or two structural steel posts. Smaller signs between 4 square feet and 36 square feet may be installed according to PRHTA Standard Drawings STS-13 and STS-13A, with one and up to four steel flanged channel posts or square steel posts.

For route marker signs, each configuration of route marker size and number of markers is covered by one specific standard drawing, either by the “Ground Mounted

Traffic Signs” (GMTS) or the “Small Traffic Signs” (STS). Refer to the PRHTA

Standard Drawings STS-22A to STS-22C and GMTS-10 to GMTS-14 and the amended list of pay item codes descriptions developed by PRHTA for traffic sign assembly for additional information.

The contractor is required to coordinate with the CO on any noted difference in the plans before proceeding with the proposed work in accordance with FAR 52.236-21.

Payment will be made for the actual quantities of work performed and accepted, or for material furnished, according to the contract. The scheduled quantities may be increased, decreased, or deleted.

mailto:eflhd.contracts@dot.gov

2) Minimum Wage During the Project. Will the minimum wage of $17.25 per hour remain in effect for the entire duration of the project, or should we expect an increase according to the prevailing wage specifications over the coming years?

Response: The Davis-Bacon wage determination included in the contract at the time of award will apply for the life of the contract. Updates will only occur if an option is exercised after the time of award, or if there is a modification that impacts construction.

3) Schedule B – New Transition Module. Schedule B appears to be the only one that includes a New Transition Module under 45 miles to be combined with the Thrie-Beam Transition, Type II. If other Schedules include similar conditions (e.g., connections to bridges or existing embankments), how should the new connection be handled? The existing transition modules differ by approximately 1–2 inches from the current specification.

Response: Pay items 60604-3100 Thrie-Beam Transition, Type II, and 91001-5100 New

Transition Module (Less than 45mph) are part of Schedules B and D. Refer to the

PRHTA Standard Drawings and the SCR Subsection 910-1.01 for additional information.

The pay item 15001-1000 Field Assessment is included on each schedule. Refer to SCR

Subsection 150.05(k)(1) Traffic Sign Field Assessment for additional information.

The Contractors are required to coordinate with the CO on any noted difference in the plans before proceeding with the proposed work in accordance with FAR 52.236-21.

Payment will be made for the actual quantities of work performed and accepted, or for

4) Project Office Location. Can the same office location be maintained throughout the entire duration of the project?

Response: The exact office location can be maintained throughout the entire duration of the project. Obtain approval from the CO before delivery of a mobile field office or any rental agreements are signed. Refer to SCR Subsection 611.02 for additional information.

5) Bid Bond. Please confirm that is for 20% of the bid.

Response: A bid guarantee in the amount of not less than 20 percent of the bid price or

$3 million, whichever is less, is required with this bid. If the bidder fails to provide the required bid guarantee, such failure may require rejection of the bid. Reference FAR

Provision 52.228-1, Bid Guarantee.

6) Checklist for bid. Point 12. Invoicing for payments – Please provide information of where we can find the document or what type of document is.

Response: See Solicitation page G-10, 1252.232-70 Electronic Submission of Payment

Requests, for more information.

7) Cultural compliance. We suggest an allowance for this item.

Response: The pay item 15401-1000, Cultural Resource Protection and Monitoring, can be found in the Bid Schedule (Schedules B, C, and D). Refer to the B pages and SCRs

Section 154 for additional information.

Contractors are required to coordinate with the CO on any noted difference in the plans before proceeding with the proposed work in accordance with FAR 52.236-21.

Payment will be made for the actual quantities of work performed and accepted, or for

8) We are currently reviewing this project involving guardrails and ground-mounted signs located in Puerto Rico. Our company is FDOT-certified in roadway signing, bollards, handrails, and pedestrian bridges.

Could you please clarify whether our existing FDOT certification qualifies us to bid on this project or future DOT projects in Puerto Rico, or if a separate certification/registration is required by the Puerto Rico contracting authority? If a local certification is necessary, kindly advise on the requirements and process to obtain it.

Response: State licensing requirements are not applicable for this contract.

9) Pay Item Code F Post Type. We request clarification regarding the required post type for

Pay Item Code F – “Ground Mounted Route Markers with or without auxiliary plates – 4 markers – 24"x24" or 36"x24"”, as defined in Amendment No. 0001.

According to PRHTA Standard Specification 613-3.04(g)(1), “signs with an area equal to or greater than twenty-one (21) square feet shall be mounted on breakaway posts according to

GMTS Standard Drawings.” However, Standard Drawing STS-22B (Sheet 22B of 25) shows a four-marker assembly using 24"x24" panels (total area 16 sq. ft.) mounted on four U-channel posts (3 lb/ft). If the same assembly uses 36"x24" panels, the total area becomes 24

sq. ft., exceeding the 21 sq. ft. threshold referenced in Section 613-3.04(g)(1).

Nevertheless, Pay Item F assemblies correspond to the PRHTA/GMTS “Route Marker” series (GMTS-10 through GMTS-14), which utilize U-channel posts rather than GMTS breakaway post structures.

We therefore request written confirmation that, under Pay Item F, the four-marker assembly using 36"x24" panels shall continue to utilize 3 lb/ft U-channel posts as shown in Standard

Drawing STS-22B**, and that the GMTS breakaway post requirement does not apply to this configuration.

Response: For clarification, the Pay Item Codes Descriptions from C through N have been revised.

PAY

ITEM

CODE:

DESCRIPTION:

A Ground Mounted Signs with area (A) less than twenty-one square feet

(A< 21 sqft) and width (W) equal or less than thirty inches (W≤30"). The total area includes auxiliary plates.

B Ground Mounted Signs with area less than twenty-one square feet (A<

21sqft) and width greater than thirty inches (W>30"). The total area includes auxiliary plates.

C Ground Mounted Route Markers with or without auxiliary plates - 1 marker - 24"x24" or 36"x24". (STS-22A)

D Ground Mounted Route Markers with or without auxiliary plates - 2 markers - 24"x24" or 36"x24". (STS-22A)

E Ground Mounted Route Markers with or without auxiliary plates - 3 markers - 24"x24". (STS-22B)

F Ground Mounted Route Markers with or without auxiliary plates - 4 markers - 24"x24". (STS-22B)

G Ground Mounted Route Markers with or without auxiliary plates - 1 marker - 36"x36". (STS-22C)

H Ground Mounted Route Markers with or without auxiliary plates - 2 markers - 36"x36". (STS-22C)

PAY

ITEM

CODE:

DESCRIPTION:

I Ground Mounted Route Markers with or without auxiliary plates - 3 markers - 36"x36" or 36"x24". (GMTS-10)

J Ground Mounted Route Markers with or without auxiliary plates - 4 markers - 36"x36" or 36"x24". (GMTS-11)

K Ground Mounted Route Markers with or without auxiliary plates - 1 marker - 48"x48" or 48”x36”. (GMTS-12)

L Ground Mounted Route Markers with or without auxiliary plates - 2 markers - 48"x48" or 48”x36”. (GMTS-12).

M Ground Mounted Route Markers with or without auxiliary plates - 3 markers - 48"x48" or 48”x36”. (GMTS-13)

N Ground Mounted Route Markers with or without auxiliary plates - 4 markers - 48"x48" or 48”x36”. (GMTS-14)

O Ground Mounted EXIT Gore Signs - None, One and Two Digits-0, 1 and

2 Digits.

P Ground Mounted EXIT Gore Signs - Three Digits-3 Digits.

Q Ground Mounted EXIT Gore Signs - Four Digits-4 Digits.

R Ground Mounted Signs with area (A) equal or more than twenty-one square feet (A ≥ 21 sq. ft.). The total area includes auxiliary plates.

S Bridge Mounted.

T Installation in existing Ground Mounted Structure A<21 sq. ft. The total area includes auxiliary plates.

U Installation in existing Ground Mounted Structure A≥21 sq. ft. The total area includes auxiliary plates.

V Overhead Signs - New Structure type I-A.

W Overhead Signs - New Structure type I-B.

X Overhead Signs - New Structure type I-C.

Y Overhead Signs - New Structure type I-D.

Z Overhead Signs - New Structure type II-A.

AA Overhead Signs - New Structure type II-B.

BB Overhead Signs - New Structure type III-A.

CC Overhead Signs - New Structure type III-B.

DD Overhead Signs - New Structure type III-C.

EE Overhead Signs - New Structure type III-D.

FF Overhead Signs - New Structure type III-E.

GG Overhead Sign - Installation in existing overhead structure - sign area A

≤ 144 sq. ft.

HH Overhead Sign - Installation in existing overhead structure - sign area A

> 144 sq. ft.

Contractors are required to coordinate with the CO on any noted difference in the plans before proceeding with the proposed work in accordance with FAR 52.236-21.

Payment will be made for the actual quantities of work performed and accepted, or for

10) CTSM Pay Item (Specification 212 – Reconditioning of Shoulders and Ditches). We note that the Specification 212 – Reconditioning of Shoulders and Ditches (Unit: CTSM) pay item appears without an estimated amount in the bid schedule.

Since CTSM (Contingent Sum) items are paid based on actual costs as authorized by the

Contracting Officer, we respectfully request the Government’s estimated contingent sum to be entered in the bid proposal schedule to ensure a complete and responsive bid submission that complies with Section 102.02 “Bidding requirements and conditions”.

Response: The pay item 21201-1000 Reconditioning of Shoulders and Ditches was revised to reflect the amount through this amendment. Refer to the amended B pages for additional information.

Contractors are required to coordinate with the CO on any noted difference in the plans before proceeding with the proposed work in accordance with FAR 52.236-21.

Payment will be made for the actual quantities of work performed and accepted, or for

11) Bid Bond Original Signature and Seal Requirement. In preparation for electronic bid submission via email, we request confirmation regarding the bid bond (SF-24) and Power of

Attorney requirements.

Please confirm whether these documents must bear wet-ink/original signatures and embossed corporate seals, or if scanned electronic copies of duly executed documents (with visible seals and signatures) are acceptable for compliance under the solicitation’s “electronic submission” provisions and checklist instructions.

Response: Scanned documents will be accepted via email only at

EFLHD.Contracts@dot.gov. Please make sure all signatures and seals are clearly visible before submitting your solicitation.

12) Clarification on Time Allowed for Schedule B (Independent Award). The time allocation of 85 calendar days for Schedule B, when awarded independently, appears to contain a computational error. We respectfully request confirmation of the correct number of calendar days intended for Schedule B when awarded independently.

Response: The calendar days have been revised. Please see the Bid Schedule Changes and SF 1442 Changes provided in this amendment completion for additional

13) Clarification on Overall Time Computation for Separate versus Combined Schedules.

We also believe there may be an error in the computation of contract time when schedules are awarded separately. The sum of the independent durations (515 + 85 + 250 + 235 + 125 =

1,210 days) is identical to the duration listed for “All Work,” and all computations appear to begin at the Notice to Proceed.

We request clarification on the intended logic and correct computation of contract time for independent schedules versus the combined award.

Response: The calendar days have been revised. Please see the Bid Schedule Changes and SF 1442 Changes provided in this amendment completion for additional

14) Specification 606 identifies the installation of MB and MC terminals as a subsidiary obligation under W-Beam Guardrail, Single Face. To ensure fair competition and accurate pricing for the Government, we respectfully recommend creating separate pay items for:

• W-Beam Guardrail Single Face (per linear meter), and

• MB/MC End Terminals (per each).

Response: We understand the current condition may have changed since the plans were prepared. However, the pay item 15001-1000 Field Assessment is included on each schedule. The Contractor shall identify and propose any design and/or quantity changes for approval by the CO. Refer to SCR Subsection 150.05(k)(1) Traffic Sign

Field Assessment for additional information.

For Pay Item 60600-1000 W-Beam Guardrail, Single Face, the contractor shall consider in their price proposal the appropriate type of MB/MC End Terminals required in

Specification 606 and the PRHTA’s Standard Drawings.

Please submit your bid based on the current advertised documents. Payment will be made for the actual quantities of work performed and accepted or material furnished according to the contract. Refer to the amended B pages and SCRs Sections 606 for additional information.

Contractors are required to coordinate with the CO any noted difference in the plans before proceeding with the proposed work in accordance with FAR 52.236-21. Payment will be made for the actual quantities of work performed and accepted or material furnished according to the contract. The scheduled quantities may be increased, decreased, or deleted.

15) Request for Separate Pay Item – Slope Break Condition Deep Posts (MB-09). We also observed numerous locations requiring slope break condition steel deep posts per Drawing

MB-09. These posts are currently considered a subsidiary obligation under the W-Beam

Guardrail item. Given the significant variability and the substantial additional materials and labor associated with this condition, we strongly recommend establishing a separate linear-meter pay item for guardrail requiring deep posts.

Response: For Pay Item 60600-1000 W-Beam Guardrail, Single Face, the contractor shall consider in their price proposal the appropriate type of posts required in accordance with Specification 606 and the PRHTA’s Standard Drawings.

Please submit your bid based on the current advertised documents. Payment will be made for the actual quantities of work performed and accepted or material furnished according to the contract. Refer to the amended B pages and SCRs Sections 606 for additional information.

Contractors are required to coordinate with the CO any noted difference in the plans before proceeding with the proposed work in accordance with FAR 52.236-21. Payment will be made for the actual quantities of work performed and accepted or material

16) Request for Separate Pay Item – Post Protection for Hazardous Objects (MB-08).

Similarly, several locations require post protection for guardrail adjacent to hazardous objects

(MB-08). This condition also represents a material and labor increase that varies widely across project locations. We respectfully request that this item also be separated into its own linear-meter pay item to ensure competitive, consistent, and fair pricing.

Response: For Pay Item 60600-1000 W-Beam Guardrail, Single Face, the contractor shall consider in their price proposal the appropriate type of post protection required in accordance with Specification 606 and the PRHTA’s Standard Drawings.

Please submit your bid based on the current advertised documents. Payment will be made for the actual quantities of work performed and accepted or material furnished according to the contract. Refer to the amended B pages and SCRs Sections 606 for additional information.

Contractors are required to coordinate with the CO any noted difference in the plans before proceeding with the proposed work in accordance with FAR 52.236-21. Payment will be made for the actual quantities of work performed and accepted or material

17) We are hereby, respectfully requesting more time to turn in our proposal for the above-referenced project. We are in need of additional time to prepare a responsible, thorough bid package better.

Response: The Bid Opening date has been rescheduled to Thursday, December 4, 2025, at 2:00 p.m. EST.

B-Pages - Amendment 0003.pdf
Bid Schedule - Amendment 3.pdf
BID SCHEDULE INSTRUCTIONS
COMPLETING THE BID SCHEDULE
To be eligible for award, bidders must submit prices for each pay item.
SCHEDULES OF WORK
COMPLETION OF WORK
B_Schedule A.pdf
Listing
B_Schedule B.pdf
Listing
B_Schedule D.pdf
Listing
B_Schedule E.pdf
Listing
B-Pages_Amendment 3.pdf
BID SCHEDULE INSTRUCTIONS
COMPLETING THE BID SCHEDULE
To be eligible for award, bidders must submit prices for each pay item.
SCHEDULES OF WORK
COMPLETION OF WORK

File details come from the government source that posted it. Updated .