ACI-RCDMS_Section B_Schedule of Prices_DRAFT.xlsx

XLSX spreadsheet 134 KB Posted

Attached to
Draft RFP for Advanced Contracting Initiative – Regional Contracts for Debris Management Services
Solicitation number
W912EK26RA0001-DRAFT-RFP
Issued by

About this file

This file is a Draft Schedule of Prices for the Advanced Contracting Initiative - Regional Contracts for Debris Management Services (ACI-RCDMS) issued by the U.S. Army Corps of Engineers Rock Island District. The document outlines a comprehensive debris removal scenario for the Northwestern Division, specifically addressing a catastrophic flood event in the lower Willamette and Columbia Rivers region involving Portland and surrounding counties. The scenario anticipates managing approximately 3.1 million cubic yards of vegetative debris, 1.6 million cubic yards of mixed construction and demolition waste, and various other debris types, with an expected completion time of 240 days.

The pricing schedule includes multiple Contract Line Item Numbers (CLINs) covering planning, training, mobilization, specialized crew support, and debris removal across urban and non-urban sectors. Key pricing components include rates for operations managers, environmental compliance, safety managers, debris separation, emergency road clearance, hazardous material handling, and debris hauling at various distances. The document emphasizes that proposed rates must be binding across the entire region, Service Contract Act wage rates apply, and commercial landfill disposal fees are not included in the pricing. Offerors are required to provide unit prices for all CLINs, including those with zero quantities, with the government intending to evaluate price reasonableness before making contract awards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NWD

IMPORTANT: Rates proposed by the offeror in the Schedule of Prices shall be binding across the entire region and not just in the scenario locality. Service Contract Act (SCA) Wage Rates apply. See https://sam.gov/wage-determinations for applicable Wage Determinations. Offerors should do their due diligence when determining the binding rate for each CLIN based on their understanding of the wage rates and other costs of performance across the region being proposed.

Scenario:

The scenario location for the Northwestern Division (NWD) is a multi-county impact zone along the lower Willamette and Columbia Rivers, including areas in Portland, Milwaukie, and Clackamas and Multnomah counties. A rare sequence of late-December weather events occurs: heavy mountain snowfall is followed by an unusually warm, moisture-laden atmospheric river event ("Pineapple Express"), resulting in several days of intense rainfall and rapid snowmelt throughout the Willamette Valley. Reservoirs in the Upper Willamette are already near their design capacity when a second round of storms overwhelms the flood control systems. A non-federal levee system suffers a major breach after extended high water erodes and overtops key sections. Simultaneous surcharging in the city’s stormwater infrastructure exacerbates urban flooding. Deep inundation spreads into residential neighborhoods, industrial facilities, and critical city corridors.

Approximately 3.1 million cubic yards of vegetative debris, 1.6 million cubic yards of mixed C&D, and significant quantities of white goods, titled property, commercial equipment, utility-line debris, sediment, and other waste streams are expected across the affected sectors. Floodwaters mobilize significant debris from industrial yards, warehouses, riverside commercial properties, and residential structures, depositing debris fields along major roadways, public rights-of-way, riverbanks, drainage channels, and urban neighborhoods. Extensive sediment deposition, culvert blockage, downed trees, damaged docks, floating structures, and debris accumulation along the Willamette and Columbia Rivers contribute to complex removal requirements. FEMA has authorized ROW debris removal for impacted residential and commercial properties along the river.

Infrastructure disruption is significant. Portions of the affected area experience outages or impairment of power, potable water systems, wastewater collection, stormwater conveyance, and transportation access for 20–40 days. Recovery operations are constrained by washed-out road segments, damaged bridges, inundated industrial zones, and debris-filled waterways.

The anticipated time for completion will be approximately two-hundred and forty (240) days for all debris removal, reduction and disposal for the affected sectors. Contractor shall provide all management and field-level personnel necessary to successfully complete the mission within the period of performance. Commercial landfill disposal fees shall not be included in the prices below. Offerors shall provide their methods for locating, maintaining, operating, and coordinating the use of Temporary Debris Staging and Reduction (TDSR) and other staging and processing sites, in accordance with their operational approach, environmental best practices, and regulatory requirements.

The scenario locality and information concerning a likely emergency event is provided for information purposes only. The quantities in each CLIN, which will be used for the purpose of determining the total evaluated price, are based on the Government’s assessment of the likely quantities required to respond to the most likely emergency event in this region.

The Government intends to multiply the estimated quantities in the Schedule of Prices by the rates proposed by each offeror for each CLIN for the base period and each option year. The Government will then apply the escalation rates and add all prices for each year, base and options, to arrive at the total evaluated price for each region.

Several regions have a Schedule of Prices that include CLINs with zero quantities. The Government has determined that the work called for in these CLINs is not likely to be needed to respond to the most likely emergency event in this region. To ensure that the total evaluated price for each region fairly reflects the price to respond to the most likely event in each region, the Government has included zero quantities for these CLINs.

To be considered for award, Offerors must propose unit prices for all CLINs, including those with zero quantities. The Government intends to evaluate the reasonableness of the offerors' proposed rates for each CLIN and the reasonableness of the offerors' total evaluated price prior to making contract awards in each region. Offerors are cautioned that unreasonably high price proposals may be rejected.

SubCLIN #QUANTITYUNITUNIT PRICEEXTENDED AMOUNT
CLIN 0001 Planning and Pre-Execution
0001AAOperations Manager84Hour
0001ABOperations Planner84Hour
0001ACEnvironmental Compliance Manager84Hour
0001ADSafety & Health Manager84Hour
0001AEQC Manager84Hour
0001AFAerial Assessment CrewTBNCrew Day
CLIN 0002 Training and Preparedness
0002AAManagement Team Training and Exercise0EA
CLIN 0003 Mobilization, Demobilization, and Data Management
CLIN 0003A Mobilization/Demobilization
0003AAMobilization, Demobilization, PermitsTBNJobTBNTBN
CLIN 0003B Automated Debris Management System
0003BAValidate and Certify ADMS0EA
0003BBAutomated Debris Management Sys (ADMS) up to 1,000,000 CY1,000,000CY
0003BCAutomated Debris Management Sys (ADMS) over 1,000,000 CY8,850,000CY
0003BDAutomated Debris Management Sys (ADMS) up to 100,000 TN100,000TN
0003BEAutomated Debris Management Sys (ADMS) over 100,000 TN330,000TN
CLIN 0004 Specialized Crew Support
0004AADebris Separation Crew1080Crew Day
0004ABEmergency Road Clearance Crew20Crew Day
0004ACEmergency Search and Rescue Support Crew0Crew Day
0004ADHousehold Hazardous Material (HHM) Separation Crew (Parcel)0Crew Day
0004AEHHM Removal & Hauling Crew720Crew Day
0004AFHazardous & Toxic Waste (HTW) Crew30Crew Day
0004AGRegulated Materials Abatement Crew0Crew Day
0004AHLeaners and Hangers Crew180Crew Day
0004AIWaterway Barge Operation Crew0Crew Day
0004AJShoreline Waterway Operation Crew60Crew Day
0004AKTribal/Cultural/Biological/Archaeological MonitorsTBNCrew DayTBNTBN
CLIN 0005 Debris Loading / Hauling
CLIN 0005A Vegetative Debris Removal from Parcels and Hauling to Debris Management or Final Disposal Sites
0005AAUrban Sector Hauling Distance 0-15 miles0CY
0005ABUrban Sector Hauling Distance 16-30 miles0CY
0005ACUrban Sector Hauling Distance 31-60 miles0CY
0005ADNon Urban Sector Hauling, Distance 0-15 miles0CY
0005AENon Urban Sector Hauling, Distance 16-30 miles0CY
0005AFNon Urban Sector Hauling, Distance 31-60 miles0CY
CLIN 0005B Vegetative Debris Removal from Public Roads, Streets and ROWs and Hauling to Debris Management or Final Disposal Sites
0005BAUrban Sector Hauling Distance 0-15 miles1,550,000CY
0005BBUrban Sector Hauling Distance 16-30 miles375,000CY
0005BCUrban Sector Hauling Distance 31-60 miles250,000CY
0005BDNon Urban Sector Hauling, Distance 0-15 miles460,000CY
0005BENon Urban Sector Hauling, Distance 16-30 miles310,000CY
0005BFNon Urban Sector Hauling, Distance 31-60 miles155,000CY
CLIN 0005C Stump Removal and Hauling to Debris Management Site
0005CA<24" Diameter measured at 24" above the ground5800EA
0005CB24-36" Diameter measured at 24" above the ground1500EA
0005CC36-48" Diameter measured at 24" above the ground300EA
0005CDOver 48" Diameter measured at 24" above the ground80EA
CLIN 0005D Hazardous Tree Removal (HTR) from Parcels
0005DA12" or less diameter measured 4.5' feet above the ground0EA
0005DB13" to 24" diameter measured 4.5' feet above the ground0EA
0005DC25" to 36" diameter measured 4.5' feet above the ground0EA
0005DD37" to 48" diameter measured 4.5' above the ground0EA
0005DE49" and larger diameter measured 4.5 feet above the ground0EA
CLIN 0005E Hazardous Tree Removal (HTR) from Public Roads, Streets, and ROWs
0005EA12" or less diameter measured 4.5' feet above the ground2500EA
0005EB13" to 24" diameter measured 4.5' feet above the ground2100EA
0005EC25" to 36" diameter measured 4.5' feet above the ground1100EA
0005ED37" to 48" diameter measured 4.5' above the ground300EA
0005EE49" and larger diameter measured 4.5 feet above the ground60EA
CLIN 0005F Reduced Vegetative Debris (Mulch) Removal from TDSR
0005FAHauling Distance 0-30 miles575,000CY
0005FBHauling Distance 31-60 miles165,000CY
0005FCHauling Distance 61-120 miles80,000CY
CLIN 0005G Reduced Vegetative Debris (Incinerated) Removal from TDSR
0005GAFrom Urban Sector Site Hauling Distance 0-15 miles0CY
0005GBFrom Urban Sector Site Hauling Distance 16-30 miles0CY
0005GCFrom Urban Sector Site Hauling Distance 31-60 miles0CY
0005GDFrom Non Urban Sector Site Hauling Distance 0- 15 miles0CY
0005GEFrom Non Urban Sector Site Hauling Distance 16-30 miles0CY
0005GFFrom Non Urban Sector Site Hauling Distance 31-60 miles0CY
CLIN 0005H Construction & Demolition (C&D) Debris Removal from Public Roads, Streets and ROWs
0005HAUrban Sector Hauling Distance 0-15 miles800,000CY
0005HBUrban Sector Hauling Distance 16-30 miles192,000CY
0005HCUrban Sector Hauling Distance 31-60 miles128,000CY
0005HDNon Urban Sector Hauling Distance 0-15 miles240,000CY
0005HENon Urban Sector Hauling Distance 16-30 miles160,000CY
0005HFNon Urban Sector Hauling Distance 31-60 miles80,000CY
CLIN 0005J Construction & Demolition (C&D) Non-Fire Debris Removal from Private and/or Commercial Property
0005JAUrban Sector Hauling Distance 0-15 miles0TN
0005JBUrban Sector Hauling Distance 16-30 miles0TN
0005JCUrban Sector Hauling Distance 31-60 miles0TN
0005JDNon Urban Sector Hauling Distance 0-15 miles0TN
0005JENon Urban Sector Hauling Distance 16-30 miles0TN
0005JFNon Urban Sector Hauling Distance 31-60 miles0TN
CLIN 0005K Construction & Demolition (C&D) Fire Debris Removal from Private and/or Commercial Property
0005KAUrban Sector Hauling Distance 0-15 miles0TN
0005KBUrban Sector Hauling Distance 16-30 miles0TN
0005KCUrban Sector Hauling Distance 31-60 miles0TN
0005KDNon Urban Sector Hauling Distance 0-15 miles0TN
0005KENon Urban Sector Hauling Distance 16-30 miles0TN
0005KFNon Urban Sector Hauling Distance 31-60 miles0TN
CLIN 0005L Compacted C&D Removal from TDSR to Final Disposal Site
0005LAHauling Distance 0-15 miles300,000TN
0005LBHauling Distance 16-30 miles75,000TN
0005LCHauling Distance 31-60 miles25,000TN
CLIN 0005M White Goods Debris Removal (Freon Containing)
0005MAUrban Sector Hauling Distance 0-15 miles2800EA
0005MBUrban Sector Hauling Distance 16-30 miles300EA
0005MCUrban Sector Hauling Distance 31-60 miles15EA
0005MDNon Urban Sector Hauling Distance 0-15 miles700EA
0005MENon Urban Sector Hauling Distance 16-30 miles100EA
0005MFNon Urban Sector Hauling Distance 31-60 miles50EA
CLIN 0005N White Goods Debris Removal (Non-Freon Containing)
0005NAUrban Sector Hauling Distance 0-15 miles4500EA
0005NBUrban Sector Hauling Distance 16-30 miles500EA
0005NCUrban Sector Hauling Distance 31-60 miles25EA
0005NDNon Urban Sector Hauling Distance 0-15 miles1500EA
0005NENon Urban Sector Hauling Distance 16-30 miles250EA
0005NFNon Urban Sector Hauling Distance 31-60 miles125EA
CLIN 0005P Non-Fire Scrap Metal Removal
0005PAHauling Distance 0-30 miles20000TN
0005PBHauling Distance 30-60 miles8000TN
0005PCHauling Distance 60-120 miles2000TN
CLIN 0005Q Fire-Related Scrap Metal Removal
0005QAHauling Distance 0-30 miles0TN
0005QBHauling Distance 30-60 miles0TN
0005QCHauling Distance 60-120 miles0TN
CLIN 0005R Soil and Sediment Removal
0005RAHauling Distance 0-30 miles12000CY
0005RBHauling Distance 30-60 miles2500CY
0005RCHauling Distance 60-120 miles500CY
CLIN 0005S Non-Asbestos Containing Concrete Removal
0005SAUrban Sector Hauling Distance 0-15 miles0TN
0005SBUrban Sector Hauling Distance 16-30 miles0TN
0005SCUrban Sector Hauling Distance 31-60 miles0TN
0005SDNon Urban Sector Hauling Distance 0-15 miles0TN
0005SENon Urban Sector Hauling Distance 16-30 miles0TN
0005SFNon Urban Sector Hauling Distance 31-60 miles0TN
CLIN 0005T Asbestos Containing Concrete Removal
0005TAUrban Sector Hauling Distance 0-15 miles0TN
0005TBUrban Sector Hauling Distance 16-30 miles0TN
0005TCUrban Sector Hauling Distance 31-60 miles0TN
0005TDNon Urban Sector Hauling Distance 0-15 miles0TN
0005TENon Urban Sector Hauling Distance 16-30 miles0TN
0005TFNon Urban Sector Hauling Distance 31-60 miles0TN
CLIN 0005U Regulated Asbestos Containing Material (RACM)
0005UAUrban Sector Hauling Distance 0-15 miles0TN
0005UBUrban Sector Hauling Distance 16-30 miles0TN
0005UCUrban Sector Hauling Distance 31-60 miles0TN
0005UDNon Urban Sector Hauling Distance 0-15 miles0TN
0005UENon Urban Sector Hauling Distance 16-30 miles0TN
0005UFNon Urban Sector Hauling Distance 31-60 miles0TN
CLIN 0005V Titled Property Removal
0005VAUrban Sector Hauling Distance 0-15 miles4000EA
0005VBUrban Sector Hauling Distance 16-30 miles400EA
0005VCUrban Sector Hauling Distance 31-60 miles40EA
0005VDNon Urban Sector Hauling Distance 0-15 miles2100EA
0005VENon Urban Sector Hauling Distance 16-30 miles210EA
0005VFNon Urban Sector Hauling Distance 31-60 miles20EA
CLIN 0005W Special Waste Streams
0005WAUrban Sector Hauling Distance 0-15 milesTBNTBNTBNTBN
0005WBUrban Sector Hauling Distance 16-30 milesTBNTBNTBNTBN
0005WCUrban Sector Hauling Distance 31-60 milesTBNTBNTBNTBN
0005WDNon Urban Sector Hauling Distance 0-15 milesTBNTBNTBNTBN
0005WENon Urban Sector Hauling Distance 16-30 milesTBNTBNTBNTBN
0005WFNon Urban Sector Hauling Distance 31-60 milesTBNTBNTBNTBN
CLIN 0006 Debris Management
Sites
0006AATemporary Debris Staging & Reduction (TDSR) Site Establishment/RestrorationTBNEATBNTBN
0006ABInspection Tower10EA
0006ACHHM/BAM Receiving & Processing SiteTBNTBNTBNTBN
0006ADTitled Property Staging & Processing SiteTBNEATBNTBN
0006AETemporary Off-Loading Sites (TOLS)TBNEATBNTBN
Debris Reduction
0006BAVegetative Debris Reduction - Mechanical Grinding3,300,000CY
0006BBVegetative Debris Reduction - Air Curtain Incineration0CY
0006BCC&D Compaction800,000CY
CLIN 0007 Private Property Debris Removal
0007AARight-of-Entry Collection (up to 500 parcels)0EA
0007ABRight-of-Entry Collection (501-1000 parcels)0EA
0007ACRight-of-Entry Collection (over 1000 parcels)0EA
0007ADTemporary Sign Installation0EA
0007AEHazard Site Assessment0EA
0007AFHazard Site Assessment Report0EA
0007AGStructural Hazard Mitigation PlanTBNEA
0007AHParcel Clearance Report0EA
CLIN 0008 Regulatory Compliance
0008AAAsh CharacterizationTBNEATBNTBN
0008ABSoil Background Concentration SamplingTBNEATBNTBN
0008ACSoil and Ash TestingTBNEATBNTBN

MVD

IMPORTANT: Rates proposed by the offeror in the Schedule of Prices shall be binding across the entire region and not just in the scenario locality. Service Contract Act (SCA) Wage Rates apply. See https://sam.gov/wage-determinations for applicable Wage Determinations. Offerors should do their due diligence when determining the binding rate for each CLIN based on their understanding of the wage rates and other costs of performance across the region being proposed.

Scenario:

The scenario location for the Mississippi Valley Division (MVD) Region includes the Mississippi Gulf Coast and inland counties extending north through Hattiesburg and Jackson. A strong late-season Category 3 Hurricane makes landfall near Biloxi–Gulfport, producing destructive winds, a storm surge exceeding 12 feet in low-lying coastal areas, and intense rainfall across the southern half of the state. Wind damage spreads inland along a trajectory from Pascagoula through Hattiesburg, Jackson, and into central Mississippi, with widespread tree fall, structural impacts, and localized flash flooding. Storm surge inundates residential neighborhoods, ports, commercial districts, and critical infrastructure along the Gulf Coast, while inland rainfall causes riverine flooding along the Pascagoula, Leaf, Pearl, and Strong Rivers, further expanding debris-generating impacts well beyond the immediate coastal counties.

Approximately 3 million cubic yards of vegetative debris and 1.5 million cubic yards of mixed construction and demolition debris are expected across the affected counties, along with large quantities of white goods. Coastal surge and wave action deposit debris along highways, rail corridors, and port facilities, while inland flooding and winds generate extensive roadside debris, destroy outbuildings, and damage manufactured housing units. Urban tree fall across Jackson, Hattiesburg, and surrounding municipalities contributes heavily to vegetative debris volumes. Waterborne debris accumulates in drainage channels, rivers, and culverts, producing blockages that complicate access and removal efforts. Significant waterway debris accumulation is present within the Ross R. Barnett Reservoir and its contributing waterways due to wind-driven debris and flooding. The reservoir and contains approximately 90,000 cubic yards of floating and submerged vegetative debris and 40,000 cubic yards of mixed structural and C&D-type debris, including dock sections, boathouse materials, and construction fragments transported from upstream neighborhoods.

Infrastructure disruption is significant, with prolonged outages of power, potable water, wastewater treatment, and communications in many impacted counties for 20–40 days. Key transportation routes, including interstate connectors and state highways, are obstructed by floodwaters, downed trees, and debris piles. Several coastal communities experience extended access limitations due to localized bridge damage, storm surge sediment deposition, and inundation of industrial port zones. Debris operations are further affected by saturated soils, sustained high temperatures, and limited housing availability for responding personnel in the immediate post-storm period.

The anticipated time for completion will be approximately two-hundred and ten (210) days for all debris removal, reduction, and disposal across the affected sectors. Contractors shall provide all management and field-level personnel necessary to successfully complete the mission within the period of performance. Commercial landfill disposal fees shall not be included in the prices below. Offerors shall provide their methods for locating, maintaining, operating, and coordinating the use of Temporary Debris Staging and Reduction (TDSR) and other staging and processing sites in accordance with their operational approach, environmental best practices, and regulatory requirements.

The scenario locality and information concerning a likely emergency event is provided for information purposes only. The quantities in each CLIN, which will be used for the purpose of determining the total evaluated price, are based on the Government’s assessment of the likely quantities required to respond to the most likely emergency event in this region.

The Government intends to multiply the estimated quantities in the Schedule of Prices by the rates proposed by each offeror for each CLIN for the base period and each option year. The Government will then apply the escalation rates and add all prices for each year, base and options, to arrive at the total evaluated price for each region.

Several regions have a Schedule of Prices that include CLINs with zero quantities. The Government has determined that the work called for in these CLINs is not likely to be needed to respond to the most likely emergency event in this region. To ensure that the total evaluated price for each region fairly reflects the price to respond to the most likely event in each region, the Government has included zero quantities for these CLINs.

To be considered for award, Offerors must propose unit prices for all CLINs, including those with zero quantities. The Government intends to evaluate the reasonableness of the offerors' proposed rates for each CLIN and the reasonableness of the offerors' total evaluated price prior to making contract awards in each region. Offerors are cautioned that unreasonably high price proposals may be rejected.

SubCLIN #QUANTITYUNITUNIT PRICEEXTENDED AMOUNT
CLIN 0001 Planning and Pre-Execution
0001AAOperations Manager84Hour
0001ABOperations Planner84Hour
0001ACEnvironmental Compliance Manager84Hour
0001ADSafety & Health Manager84Hour
0001AEQC Manager84Hour
0001AFAerial Assessment CrewTBNCrew Day
CLIN 0002 Training and Preparedness
0002AAManagement Team Training and Exercise0EA
CLIN 0003 Mobilization, Demobilization, and Data Management
CLIN 0003A Mobilization/Demobilization
0003AAMobilization, Demobilization, PermitsTBNJobTBNTBN
CLIN 0003B Automated Debris Management System
0003BAValidate and Certify ADMS0EA
0003BBAutomated Debris Management Sys (ADMS) up to 1,000,000 CY1,000,000CY
0003BCAutomated Debris Management Sys (ADMS) over 1,000,000 CY9,300,000CY
0003BDAutomated Debris Management Sys (ADMS) up to 100,000 TN100,000TN
0003BEAutomated Debris Management Sys (ADMS) over 100,000 TN370,000TN
CLIN 0004 Specialized Crew Support
0004AADebris Separation Crew900Crew Day
0004ABEmergency Road Clearance Crew10Crew Day
0004ACEmergency Search and Rescue Support Crew0Crew Day
0004ADHousehold Hazardous Material (HHM) Separation Crew (Parcel)0Crew Day
0004AEHHM Removal & Hauling Crew630Crew Day
0004AFHazardous & Toxic Waste (HTW) Crew60Crew Day
0004AGRegulated Materials Abatement Crew0Crew Day
0004AHLeaners and Hangers Crew210Crew Day
0004AIWaterway Barge Operation Crew60Crew Day
0004AJShoreline Waterway Operation Crew40Crew Day
0004AKTribal/Cultural/Biological/Archaeological MonitorsTBNCrew DayTBNTBN
CLIN 0005 Debris Loading / Hauling
CLIN 0005A Vegetative Debris Removal from Parcels and Hauling to Debris Management or Final Disposal Sites
0005AAUrban Sector Hauling Distance 0-15 miles0CY
0005ABUrban Sector Hauling Distance 16-30 miles0CY
0005ACUrban Sector Hauling Distance 31-60 miles0CY
0005ADNon Urban Sector Hauling, Distance 0-15 miles0CY
0005AENon Urban Sector Hauling, Distance 16-30 miles0CY
0005AFNon Urban Sector Hauling, Distance 31-60 miles0CY
CLIN 0005B Vegetative Debris Removal from Public Roads, Streets and ROWs and Hauling to Debris Management or Final Disposal Sites
0005BAUrban Sector Hauling Distance 0-15 miles960,000CY
0005BBUrban Sector Hauling Distance 16-30 miles300,000CY
0005BCUrban Sector Hauling Distance 31-60 miles90,000CY
0005BDNon Urban Sector Hauling, Distance 0-15 miles1,320,000CY
0005BENon Urban Sector Hauling, Distance 16-30 miles240,000CY
0005BFNon Urban Sector Hauling, Distance 31-60 miles90,000CY
CLIN 0005C Stump Removal and Hauling to Debris Management Site
0005CA<24" Diameter measured at 24" above the ground5625EA
0005CB24-36" Diameter measured at 24" above the ground1500EA
0005CC36-48" Diameter measured at 24" above the ground3100EA
0005CDOver 48" Diameter measured at 24" above the ground75EA
CLIN 0005D Hazardous Tree Removal (HTR) from Parcels
0005DA12" or less diameter measured 4.5' feet above the ground0EA
0005DB13" to 24" diameter measured 4.5' feet above the ground0EA
0005DC25" to 36" diameter measured 4.5' feet above the ground0EA
0005DD37" to 48" diameter measured 4.5' above the ground0EA
0005DE49" and larger diameter measured 4.5 feet above the ground0EA
CLIN 0005E Hazardous Tree Removal (HTR) from Public Roads, Streets, and ROWs
0005EA12" or less diameter measured 4.5' feet above the ground6000EA
0005EB13" to 24" diameter measured 4.5' feet above the ground5250EA
0005EC25" to 36" diameter measured 4.5' feet above the ground2700EA
0005ED37" to 48" diameter measured 4.5' above the ground900EA
0005EE49" and larger diameter measured 4.5 feet above the ground150EA
CLIN 0005F Reduced Vegetative Debris (Mulch) Removal from TDSR
0005FAHauling Distance 0-30 miles550,000CY
0005FBHauling Distance 31-60 miles150,000CY
0005FCHauling Distance 61-120 miles80,000CY
CLIN 0005G Reduced Vegetative Debris (Incinerated) Removal from TDSR
0005GAFrom Urban Sector Site Hauling Distance 0-15 miles5,500CY
0005GBFrom Urban Sector Site Hauling Distance 16-30 miles1,700CY
0005GCFrom Urban Sector Site Hauling Distance 31-60 miles520CY
0005GDFrom Non Urban Sector Site Hauling Distance 0- 15 miles7,700CY
0005GEFrom Non Urban Sector Site Hauling Distance 16-30 miles1,400CY
0005GFFrom Non Urban Sector Site Hauling Distance 31-60 miles500CY
CLIN 0005H Construction & Demolition (C&D) Debris Removal from Public Roads, Streets and ROWs
0005HAUrban Sector Hauling Distance 0-15 miles480,000CY
0005HBUrban Sector Hauling Distance 16-30 miles150,000CY
0005HCUrban Sector Hauling Distance 31-60 miles45,000CY
0005HDNon Urban Sector Hauling Distance 0-15 miles660,000CY
0005HENon Urban Sector Hauling Distance 16-30 miles120,000CY
0005HFNon Urban Sector Hauling Distance 31-60 miles45,000CY
CLIN 0005J Construction & Demolition (C&D) Non-Fire Debris Removal from Private and/or Commercial Property
0005JAUrban Sector Hauling Distance 0-15 miles0TN
0005JBUrban Sector Hauling Distance 16-30 miles0TN
0005JCUrban Sector Hauling Distance 31-60 miles0TN
0005JDNon Urban Sector Hauling Distance 0-15 miles0TN
0005JENon Urban Sector Hauling Distance 16-30 miles0TN
0005JFNon Urban Sector Hauling Distance 31-60 miles0TN
CLIN 0005K Construction & Demolition (C&D) Fire Debris Removal from Private and/or Commercial Property
0005KAUrban Sector Hauling Distance 0-15 miles0TN
0005KBUrban Sector Hauling Distance 16-30 miles0TN
0005KCUrban Sector Hauling Distance 31-60 miles0TN
0005KDNon Urban Sector Hauling Distance 0-15 miles0TN
0005KENon Urban Sector Hauling Distance 16-30 miles0TN
0005KFNon Urban Sector Hauling Distance 31-60 miles0TN
CLIN 0005L Compacted C&D Removal from TDSR to Final Disposal Site
0005LAHauling Distance 0-15 miles300,000TN
0005LBHauling Distance 16-30 miles100,000TN
0005LCHauling Distance 31-60 miles50,000TN
CLIN 0005M White Goods Debris Removal (Freon Containing)
0005MAUrban Sector Hauling Distance 0-15 miles5040EA
0005MBUrban Sector Hauling Distance 16-30 miles540EA
0005MCUrban Sector Hauling Distance 31-60 miles27EA
0005MDNon Urban Sector Hauling Distance 0-15 miles1260EA
0005MENon Urban Sector Hauling Distance 16-30 miles180EA
0005MFNon Urban Sector Hauling Distance 31-60 miles90EA
CLIN 0005M White Goods Debris Removal (Non-Freon Containing)
0005NAUrban Sector Hauling Distance 0-15 miles8100EA
0005NBUrban Sector Hauling Distance 16-30 miles900EA
0005NCUrban Sector Hauling Distance 31-60 miles45EA
0005NDNon Urban Sector Hauling Distance 0-15 miles2700EA
0005NENon Urban Sector Hauling Distance 16-30 miles450EA
0005NFNon Urban Sector Hauling Distance 31-60 miles225EA
CLIN 0005P Non-Fire Scrap Metal Removal
0005PAHauling Distance 0-30 miles11000TN
0005PBHauling Distance 30-60 miles4500TN
0005PCHauling Distance 60-120 miles800TN
CLIN 0005Q Fire-Related Scrap Metal Removal
0005QAHauling Distance 0-30 miles0TN
0005QBHauling Distance 30-60 miles0TN
0005QCHauling Distance 60-120 miles0TN
CLIN 0005R Soil and Sediment Removal
0005RAHauling Distance 0-30 miles17500CY
0005RBHauling Distance 30-60 miles5000CY
0005RCHauling Distance 60-120 miles2500CY
CLIN 0005S Non-Asbestos Containing Concrete Removal
0005SAUrban Sector Hauling Distance 0-15 miles0TN
0005SBUrban Sector Hauling Distance 16-30 miles0TN
0005SCUrban Sector Hauling Distance 31-60 miles0TN
0005SDNon Urban Sector Hauling Distance 0-15 miles0TN
0005SENon Urban Sector Hauling Distance 16-30 miles0TN
0005SFNon Urban Sector Hauling Distance 31-60 miles0TN
CLIN 0005T Asbestos Containing Concrete Removal
0005TAUrban Sector Hauling Distance 0-15 miles0TN
0005TBUrban Sector Hauling Distance 16-30 miles0TN
0005TCUrban Sector Hauling Distance 31-60 miles0TN
0005TDNon Urban Sector Hauling Distance 0-15 miles0TN
0005TENon Urban Sector Hauling Distance 16-30 miles0TN
0005TFNon Urban Sector Hauling Distance 31-60 miles0TN
CLIN 0005U Regulated Asbestos Containing Material (RACM)
0005UAUrban Sector Hauling Distance 0-15 miles0TN
0005UBUrban Sector Hauling Distance 16-30 miles0TN
0005UCUrban Sector Hauling Distance 31-60 miles0TN
0005UDNon Urban Sector Hauling Distance 0-15 miles0TN
0005UENon Urban Sector Hauling Distance 16-30 miles0TN
0005UFNon Urban Sector Hauling Distance 31-60 miles0TN
CLIN 0005V Titled Property Removal
0005VAUrban Sector Hauling Distance 0-15 miles2000EA
0005VBUrban Sector Hauling Distance 16-30 miles200EA
0005VCUrban Sector Hauling Distance 31-60 miles20EA
0005VDNon Urban Sector Hauling Distance 0-15 miles3500EA
0005VENon Urban Sector Hauling Distance 16-30 miles350EA
0005VFNon Urban Sector Hauling Distance 31-60 miles35EA
CLIN 0005W Special Waste Streams
0005WAUrban Sector Hauling Distance 0-15 milesTBNTBNTBNTBN
0005WBUrban Sector Hauling Distance 16-30 milesTBNTBNTBNTBN
0005WCUrban Sector Hauling Distance 31-60 milesTBNTBNTBNTBN
0005WDNon Urban Sector Hauling Distance 0-15 milesTBNTBNTBNTBN
0005WENon Urban Sector Hauling Distance 16-30 milesTBNTBNTBNTBN
0005WFNon Urban Sector Hauling Distance 31-60 milesTBNTBNTBNTBN
CLIN 0006 Debris Management
Sites
0006AATemporary Debris Staging & Reduction (TDSR) Site Establishment/RestrorationTBNEATBNTBN
0006ABInspection Tower12EA
0006ACHHM/BAM Receiving & Processing SiteTBNTBNTBNTBN
0006ADTitled Property Staging & Processing SiteTBNEATBNTBN
0006AETemporary Off-Loading Sites (TOLS)TBNEATBNTBN
Debris Reduction
0006BAVegetative Debris Reduction - Mechanical Grinding3,200,000CY
0006BBVegetative Debris Reduction - Air Curtain Incineration350,000CY
0006BCC&D Compaction900,000CY
CLIN 0007 Private Property Debris Removal
0007AARight-of-Entry Collection (up to 500 parcels)0EA
0007ABRight-of-Entry Collection (501-1000 parcels)0EA
0007ACRight-of-Entry Collection (over 1000 parcels)0EA
0007ADTemporary Sign Installation0EA
0007AEHazard Site Assessment0EA
0007AFHazard Site Assessment Report0EA
0007AGStructural Hazard Mitigation PlanTBNEA
0007AHParcel Clearance Report0EA
CLIN 0008 Regulatory Compliance
0008AAAsh CharacterizationTBNEATBNTBN
0008ABSoil Background Concentration SamplingTBNEATBNTBN
0008ACSoil and Ash TestingTBNEATBNTBN

LRD

IMPORTANT: Rates proposed by the offeror in the Schedule of Prices shall be binding across the entire region and not just in the scenario locality. Service Contract Act (SCA) Wage Rates apply. See https://sam.gov/wage-determinations for applicable Wage Determinations. Offerors should do their due diligence when determining the binding rate for each CLIN based on their understanding of the wage rates and other costs of performance across the region being proposed.

Scenario:

The scenario location for the Lakes and Rivers Division (LRD) Region includes multiple counties in western Kentucky and northwestern Tennessee. A late-spring severe weather outbreak produces a long-track EF-4 Tornado that touches down near Martin, TN, and tracks northeast for more than 70 miles, crossing the state line and causing catastrophic damage across Fulton, Hickman, Graves, Marshall, and McCracken Counties in Kentucky. The tornado maintains peak intensities through suburban and semi-urban areas west and south of Paducah, destroying residential neighborhoods, multi-family housing complexes, commercial corridors, industrial facilities, metal buildings, agricultural structures, and critical public facilities.

Approximately 2.2 million cubic yards of construction and demolition (C&D) debris and 900,000 cubic yards of vegetative debris are expected across the affected counties, along with significant quantities of white goods, titled property, vehicles, manufactured housing debris, utility-line debris, commercial equipment, and regulated materials. The tornado’s core damage path results in large volumes of structural debris from collapsed homes, damaged commercial and industrial buildings, destroyed warehouses, and impacted public facilities.

Infrastructure disruption is substantial, with localized outages or impairment of power, potable water, communications, and transportation access throughout affected communities for 10–25 days. The tornado destroys or heavily damages dozens of transmission poles, distribution lines, substations, and lift stations. Roadways are obstructed.

The anticipated time for completion will be approximately one-hundred and eighty (180) days for all debris removal, reduction, and disposal across the affected sectors. Contractors shall provide all management and field-level personnel necessary to successfully complete the mission within the period of performance. Commercial landfill disposal fees shall not be included in the prices below. Offerors shall provide their methods for locating, maintaining, operating, and coordinating the use of Temporary Debris Staging and Reduction (TDSR) and other staging and processing sites in accordance with their operational approach, environmental best practices, and regulatory requirements.

The scenario locality and information concerning a likely emergency event is provided for information purposes only. The quantities in each CLIN, which will be used for the purpose of determining the total evaluated price, are based on the Government’s assessment of the likely quantities required to respond to the most likely emergency event in this region.

The Government intends to multiply the estimated quantities in the Schedule of Prices by the rates proposed by each offeror for each CLIN for the base period and each option year. The Government will then apply the escalation rates and add all prices for each year, base and options, to arrive at the total evaluated price for each region.

Several regions have a Schedule of Prices that include CLINs with zero quantities. The Government has determined that the work called for in these CLINs is not likely to be needed to respond to the most likely emergency event in this region. To ensure that the total evaluated price for each region fairly reflects the price to respond to the most likely event in each region, the Government has included zero quantities for these CLINs.

To be considered for award, Offerors must propose unit prices for all CLINs, including those with zero quantities. The Government intends to evaluate the reasonableness of the offerors' proposed rates for each CLIN and the reasonableness of the offerors' total evaluated price prior to making contract awards in each region. Offerors are cautioned that unreasonably high price proposals may be rejected.

SubCLIN #QUANTITYUNITUNIT PRICEEXTENDED AMOUNT
CLIN 0001 Planning and Pre-Execution
0001AAOperations Manager84Hour
0001ABOperations Planner84Hour
0001ACEnvironmental Compliance Manager84Hour
0001ADSafety & Health Manager84Hour
0001AEQC Manager84Hour
0001AFAerial Assessment CrewTBNCrew Day
CLIN 0002 Training and Preparedness
0002AAManagement Team Training and Exercise0EA
CLIN 0003 Mobilization, Demobilization, and Data Management
CLIN 0003A Mobilization/Demobilization
0003AAMobilization, Demobilization, PermitsTBNJobTBNTBN
CLIN 0003B Automated Debris Management System
0003BAValidate and Certify ADMS0EA
0003BBAutomated Debris Management Sys (ADMS) up to 1,000,000 CY1,000,000CY
0003BCAutomated Debris Management Sys (ADMS) over 1,000,000 CY5,700,000CY
0003BDAutomated Debris Management Sys (ADMS) up to 100,000 TN100,000TN
0003BEAutomated Debris Management Sys (ADMS) over 100,000 TN470,000TN
CLIN 0004 Specialized Crew Support
0004AADebris Separation Crew600Crew Day
0004ABEmergency Road Clearance Crew10Crew Day
0004ACEmergency Search and Rescue Support Crew0Crew Day
0004ADHousehold Hazardous Material (HHM) Separation Crew (Parcel)0Crew Day
0004AEHHM Removal & Hauling Crew450Crew Day
0004AFHazardous & Toxic Waste (HTW) Crew45Crew Day
0004AGRegulated Materials Abatement Crew0Crew Day
0004AHLeaners and Hangers Crew150Crew Day
0004AIWaterway Barge Operation Crew0Crew Day
0004AJShoreline Waterway Operation Crew0Crew Day
0004AKTribal/Cultural/Biological/Archaeological MonitorsTBNCrew DayTBNTBN
CLIN 0005 Debris Loading / Hauling
CLIN 0005A Vegetative Debris Removal from Parcels and Hauling to Debris Management or Final Disposal Sites
0005AAUrban Sector Hauling Distance 0-15 miles0CY
0005ABUrban Sector Hauling Distance 16-30 miles0CY
0005ACUrban Sector Hauling Distance 31-60 miles0CY
0005ADNon Urban Sector Hauling, Distance 0-15 miles0CY
0005AENon Urban Sector Hauling, Distance 16-30 miles0CY
0005AFNon Urban Sector Hauling, Distance 31-60 miles0CY
CLIN 0005B Vegetative Debris Removal from Public Roads, Streets and ROWs and Hauling to Debris Management or Final Disposal Sites
0005BAUrban Sector Hauling Distance 0-15 miles108,000CY
0005BBUrban Sector Hauling Distance 16-30 miles54,000CY
0005BCUrban Sector Hauling Distance 31-60 miles18,000CY
0005BDNon Urban Sector Hauling, Distance 0-15 miles450,000CY
0005BENon Urban Sector Hauling, Distance 16-30 miles180,000CY
0005BFNon Urban Sector Hauling, Distance 31-60 miles90,000CY
CLIN 0005C Stump Removal and Hauling to Debris Management Site
0005CA<24" Diameter measured at 24" above the ground1700EA
0005CB24-36" Diameter measured at 24" above the ground450EA
0005CC36-48" Diameter measured at 24" above the ground90EA
0005CDOver 48" Diameter measured at 24" above the ground20EA
CLIN 0005D Hazardous Tree Removal (HTR) from Parcels
0005DA12" or less diameter measured 4.5' feet above the ground0EA
0005DB13" to 24" diameter measured 4.5' feet above the ground0EA
0005DC25" to 36" diameter measured 4.5' feet above the ground0EA
0005DD37" to 48" diameter measured 4.5' above the ground0EA
0005DE49" and larger diameter measured 4.5 feet above the ground0EA
CLIN 0005E Hazardous Tree Removal (HTR) from Public Roads, Streets, and ROWs
0005EA12" or less diameter measured 4.5' feet above the ground1800EA
0005EB13" to 24" diameter measured 4.5' feet above the ground1575EA
0005EC25" to 36" diameter measured 4.5' feet above the ground810EA
0005ED37" to 48" diameter measured 4.5' above the ground270EA
0005EE49" and larger diameter measured 4.5 feet above the ground45EA
CLIN 0005F Reduced Vegetative Debris (Mulch) Removal from TDSR
0005FAHauling Distance 0-30 miles165,000CY
0005FBHauling Distance 31-60 miles46,000CY
0005FCHauling Distance 61-120 miles25,000CY
CLIN 0005G Reduced Vegetative Debris (Incinerated) Removal from TDSR
0005GAFrom Urban Sector Site Hauling Distance 0-15 miles1,650CY
0005GBFrom Urban Sector Site Hauling Distance 16-30 miles500CY
0005GCFrom Urban Sector Site Hauling Distance 31-60 miles150CY
0005GDFrom Non Urban Sector Site Hauling Distance 0- 15 miles2,300CY
0005GEFrom Non Urban Sector Site Hauling Distance 16-30 miles410CY
0005GFFrom Non Urban Sector Site Hauling Distance 31-60 miles150CY
CLIN 0005H Construction & Demolition (C&D) Debris Removal from Public Roads, Streets and ROWs
0005HAUrban Sector Hauling Distance 0-15 miles264,000CY
0005HBUrban Sector Hauling Distance 16-30 miles132,000CY
0005HCUrban Sector Hauling Distance 31-60 miles44,000CY
0005HDNon Urban Sector Hauling Distance 0-15 miles1,100,000CY
0005HENon Urban Sector Hauling Distance 16-30 miles440,000CY
0005HFNon Urban Sector Hauling Distance 31-60 miles220,000CY
CLIN 0005J Construction & Demolition (C&D) Non-Fire Debris Removal from Private and/or Commercial Property
0005JAUrban Sector Hauling Distance 0-15 miles0TN
0005JBUrban Sector Hauling Distance 16-30 miles0TN
0005JCUrban Sector Hauling Distance 31-60 miles0TN
0005JDNon Urban Sector Hauling Distance 0-15 miles0TN
0005JENon Urban Sector Hauling Distance 16-30 miles0TN
0005JFNon Urban Sector Hauling Distance 31-60 miles0TN
CLIN 0005K Construction & Demolition (C&D) Fire Debris Removal from Private and/or Commercial Property
0005KAUrban Sector Hauling Distance 0-15 miles0TN
0005KBUrban Sector Hauling Distance 16-30 miles0TN
0005KCUrban Sector Hauling Distance 31-60 miles0TN
0005KDNon Urban Sector Hauling Distance 0-15 miles0TN
0005KENon Urban Sector Hauling Distance 16-30 miles0TN
0005KFNon Urban Sector Hauling Distance 31-60 miles0TN
CLIN 0005L Compacted C&D Removal from TDSR to Final Disposal Site
0005LAHauling Distance 0-15 miles400,000TN
0005LBHauling Distance 16-30 miles100,000TN
0005LCHauling Distance 31-60 miles50,000TN
CLIN 0005M White Goods Debris Removal (Freon Containing)
0005MAUrban Sector Hauling Distance 0-15 miles1,200EA
0005MBUrban Sector Hauling Distance 16-30 miles600EA
0005MCUrban Sector Hauling Distance 31-60 miles200EA
0005MDNon Urban Sector Hauling Distance 0-15 miles5,000EA
0005MENon Urban Sector Hauling Distance 16-30 miles2,000EA
0005MFNon Urban Sector Hauling Distance 31-60 miles1,000EA
CLIN 0005M White Goods Debris Removal (Non-Freon Containing)
0005NAUrban Sector Hauling Distance 0-15 miles1,800EA
0005NBUrban Sector Hauling Distance 16-30 miles900EA
0005NCUrban Sector Hauling Distance 31-60 miles300EA
0005NDNon Urban Sector Hauling Distance 0-15 miles7,500EA
0005NENon Urban Sector Hauling Distance 16-30 miles3,000EA
0005NFNon Urban Sector Hauling Distance 31-60 miles1,500EA
CLIN 0005P Non-Fire Scrap Metal Removal
0005PAHauling Distance 0-30 miles15000TN
0005PBHauling Distance 30-60 miles4000TN
0005PCHauling Distance 60-120 miles1500TN
CLIN 0005Q Fire-Related Scrap Metal Removal
0005QAHauling Distance 0-30 miles0TN
0005QBHauling Distance 30-60 miles0TN
0005QCHauling Distance 60-120 miles0TN
CLIN 0005R Soil and Sediment Removal
0005RAHauling Distance 0-30 miles0CY
0005RBHauling Distance 30-60 miles0CY
0005RCHauling Distance 60-120 miles0CY
CLIN 0005S Non-Asbestos Containing Concrete Removal
0005SAUrban Sector Hauling Distance 0-15 miles0TN
0005SBUrban Sector Hauling Distance 16-30 miles0TN
0005SCUrban Sector Hauling Distance 31-60 miles0TN
0005SDNon Urban Sector Hauling Distance 0-15 miles0TN
0005SENon Urban Sector Hauling Distance 16-30 miles0TN
0005SFNon Urban Sector Hauling Distance 31-60 miles0TN
CLIN 0005T Asbestos Containing Concrete Removal
0005TAUrban Sector Hauling Distance 0-15 miles0TN
0005TBUrban Sector Hauling Distance 16-30 miles0TN
0005TCUrban Sector Hauling Distance 31-60 miles0TN
0005TDNon Urban Sector Hauling Distance 0-15 miles0TN
0005TENon Urban Sector Hauling Distance 16-30 miles0TN
0005TFNon Urban Sector Hauling Distance 31-60 miles0TN
CLIN 0005U Regulated Asbestos Containing Material (RACM)
0005UAUrban Sector Hauling Distance 0-15 miles0TN
0005UBUrban Sector Hauling Distance 16-30 miles0TN
0005UCUrban Sector Hauling Distance 31-60 miles0TN
0005UDNon Urban Sector Hauling Distance 0-15 miles0TN
0005UENon Urban Sector Hauling Distance 16-30 miles0TN
0005UFNon Urban Sector Hauling Distance 31-60 miles0TN
CLIN 0005V Titled Property Removal
0005VAUrban Sector Hauling Distance 0-15 miles120EA
0005VBUrban Sector Hauling Distance 16-30 miles60EA
0005VCUrban Sector Hauling Distance 31-60 miles20EA
0005VDNon Urban Sector Hauling Distance 0-15 miles500EA
0005VENon Urban Sector Hauling Distance 16-30 miles200EA
0005VFNon Urban Sector Hauling Distance 31-60 miles100EA
CLIN 0005W Special Waste Streams
0005WAUrban Sector Hauling Distance 0-15 milesTBNTBNTBNTBN
0005WBUrban Sector Hauling Distance 16-30 milesTBNTBNTBNTBN
0005WCUrban Sector Hauling Distance 31-60 milesTBNTBNTBNTBN
0005WDNon Urban Sector Hauling Distance 0-15 milesTBNTBNTBNTBN
0005WENon Urban Sector Hauling Distance 16-30 milesTBNTBNTBNTBN
0005WFNon Urban Sector Hauling Distance 31-60 milesTBNTBNTBNTBN
CLIN 0006 Debris Management
Sites
0006AATemporary Debris Staging & Reduction (TDSR) Site Establishment/RestrorationTBNEATBNTBN
0006ABInspection Tower8EA
0006ACHHM/BAM Receiving & Processing SiteTBNTBNTBNTBN
0006ADTitled Property Staging & Processing SiteTBNEATBNTBN
0006AETemporary Off-Loading Sites (TOLS)TBNEATBNTBN
Debris Reduction
0006BAVegetative Debris Reduction - Mechanical Grinding930,000CY
0006BBVegetative Debris Reduction - Air Curtain Incineration100,000CY
0006BCC&D Compaction1,100,000CY
CLIN 0007 Private Property Debris Removal
0007AARight-of-Entry Collection (up to 500 parcels)0EA
0007ABRight-of-Entry Collection (501-1000 parcels)0EA
0007ACRight-of-Entry Collection (over 1000 parcels)0EA
0007ADTemporary Sign Installation0EA
0007AEHazard Site Assessment0EA
0007AFHazard Site Assessment Report0EA
0007AGStructural Hazard Mitigation PlanTBNEA
0007AHParcel Clearance Report0EA
CLIN 0008 Regulatory Compliance
0008AAAsh CharacterizationTBNEATBNTBN
0008ABSoil Background Concentration SamplingTBNEATBNTBN
0008ACSoil and Ash TestingTBNEATBNTBN

NAD

IMPORTANT: Rates proposed by the offeror in the Schedule of Prices shall be binding across the entire region and not just in the scenario locality. Service Contract Act (SCA) Wage Rates apply. See https://sam.gov/wage-determinations for applicable Wage Determinations. Offerors should do their due diligence when determining the binding rate for each CLIN based on their understanding of the wage rates and other costs of performance across the region being proposed.

Scenario:

The scenario location for the North Atlantic Division (NAD) Region includes the Hampton Roads metropolitan area of southeastern Virginia, with primary impacts across the cities of Norfolk, Virginia Beach, Chesapeake, Portsmouth, Suffolk, and Hampton. A large, slow-moving post-tropical cyclone tracks north along the Atlantic Coast before turning inland near Cape Henry. Although no longer a fully tropical system, the storm maintains a large wind field and an intense pressure gradient that drives significant coastal surge into the lower Chesapeake Bay and Elizabeth River. The system stalls for nearly 36 hours, producing 8–12 inches of rainfall, prolonged tidal flooding, and repeated rounds of moderate winds, peaking between 50–70 mph, across the Hampton Roads region. Storm surge overtops and inundates low-lying coastal and tidal areas, including segments of Norfolk’s Ghent, Larchmont/Edgewater, and Ocean View neighborhoods, as well as the Portsmouth waterfront, sections of Virginia Beach’s coastal corridor, and major transportation routes such as I-264, I-64, and multiple bridge–tunnel connectors. Riverine and tidal backflow causes flooding along the Elizabeth, Lafayette, and James Rivers. Residential neighborhoods, commercial districts, industrial facilities, and port-adjacent infrastructure experience significant debris-generating impacts

Approximately 2.4 million cubic yards of vegetative debris and 1.6 million cubic yards of mixed construction and demolition (C&D) debris are expected across the affected cities, along with substantial quantities of white goods, titled property, vehicles, marine debris, utility-line debris, and regulated materials. Prolonged inundation and repeated tidal cycles contribute to significant shoreline debris, including dock fragments, damaged marine structures, commercial and residential contents, and displaced small vessels.

Infrastructure disruption is severe, with widespread outages or impairment of power. Numerous primary and secondary roads are flooded, undermined, or blocked by debris, including washed-out segments of arterial routes and feeder roads supporting naval and port operations. Multiple neighborhoods are temporarily isolated by tidal flooding and debris blockages.

The anticipated time for completion will be approximately one-hundred and eighty (180) days for all debris removal, reduction, and disposal across the affected sectors. Contractors shall provide all management and field-level personnel necessary to successfully complete the mission within the period of performance. Commercial landfill disposal fees shall not be included in the prices below. Offerors shall provide their methods for locating, maintaining, operating, and coordinating the use of Temporary Debris Staging and Reduction (TDSR) and other staging and processing sites in accordance with their operational approach, environmental best practices, and regulatory requirements.

The scenario locality and information concerning a likely emergency event is provided for information purposes only.