Schedule_B _Pricing_Schedule_Revised.pdf
PDF 63 KB Posted
- Attached to
- Dockside repairs to the NOAA Vessel Rainier
- Solicitation number
- AB-133M-15-RB-0003
About this file
Attachment to Amendment 0002 Schedule B Price Schedule Revised 12/9/2014
View the file
Other files
Show 40 more
Latest 50 of 84 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION B, PRICE SCHEDULE Continued (Revised 12/9/2014)
Item No. Supplies/Services Quantity Unit Unit Price Amount
Bid schedule , work to be accomplished at NOAA facility in Newport OR
CLASS “A” BASIC ITEMS
The Contractor shall furnish all necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform dockside repairs required by the Statement of Work, and in accordance with the following schedule of prices.
In order to be considered responsive, each bidder shall bid on all items for the quantities outlined in the schedule.
0001 WORK ITEM 101
GENERAL REQUIREMENTS
JB
0002 WORK ITEM 103
INSTALL & TEST A-FRAME
SYSTEM
0003 WORK ITEM 104
UPGRADE MARINE
SANITATION SYSTEM
0004 WORK ITEM 105
REPLACE EXSTG DUPLEX
STRAINERS WITH SIMPLEX
STRAINERS
0005 WORK ITEM 106
AC SYSTEM UPGRADE IN
PLOT ANNEX & ET SPACES
0006 WORK ITEM 107
ME EXHAUST LAGGING
0007 WORK ITEM 108
SURVEY LAUNCH DAVIT
MAINTENANCE & HYD
MOD
0008 WORK ITEM 109
ANNUAL BOILER SVC &
BOILER CIRC PUMPS
REPLACE
0009 WORK ITEM 110
INSTALLED BASE
EVALUATION – SHIPS
AUTOMATION
0010 WORK ITEM 111
AFT CRANE MAINTENANCE
& MODS
0011 WORK ITEM 112
FIRE DOOR MODIFICATION
0012 WORK ITEM 113
NEW FLOORING
0013 WORK ITEM 114
STEERING SYSTEM
RENEWAL
AB-133M-15-RB-0003 Page - 2
0014 WORK ITEM 115
EGEN TO CERC ROOM
ELECTRICAL CONNECT
0015 WORK ITEM 116
RECONNECT GALLEY
VENTS THRU E-06-102 TO
WEATHER
0016 WORK ITEM 117
NEW DEEP SINK IN
SCULLERY
TOTAL ALL CLASS A
ITEMS (CLINS 0001 – 0016)
AB-133M-15-RB-0003 Page - 3
Work to be accomplished at NOAA facility in Newport, OR
CLASS "B" ITEMS, ADDITIONAL
ITEM REQUIREMENTS (AIR)
0017 WORK ITEM 201
Additional Work Requirements:
(See schedule note 1,2 and 3 below)
(I). 2,000 man hours multiplied by the regular hour labor rate of $________ per man hour equals the estimated additional work requirements labor cost for regular hours of $______________.
(II). 300 man hours multiplied by the overtime labor rate of $________ per man hour equals the estimated additional work requirements labor cost for overtime hours of
(III). 200 man hours multiplied by the premium (Sunday / Holiday) labor rate of $__________ per man hour equals the estimated additional work requirements labor cost for premium hours of
(I)+(II)+(III) = Total labor cost of
Material/Subcontractor markup rate of _______% multiplied by $200,000 = Markup cost of
Total Additional Work Requirement Cost Total labor cost + Markup cost + $200,000 =
LS
AB-133M-15-RB-0003 Page - 4
0018 WORK ITEM 202
ZINC CHROMATE
REMOVAL (BARE ZiCr) Price Per each 10 SF ordered.
10 SF
0019 WORK ITEM 203
ZINC CHROMATE
REMOVAL (OVERCOATED
ZiCr) Price Per each 10 SF ordered.
SF
TOTAL ALL ITEMS CLASS B
(CLINS 0017 – 0019)
Work to be accomplished at NOAA facility in Newport, OR
CLASS "C"OPTIONAL
ITEM
0020 WORK ITEM 301 TEMPORARY BERTHING
AND HOTEL
ACCOMODATIONS
TOTAL ALL ITEMS CLASS C
(CLINS 0020)
TOTAL ALL ITEMS CLASS A +
CLASS B + CLASS C (CLINS
0001 – 0020)
AB-133M-15-RB-0003 Page - 5