Schedule_B _Pricing_Schedule_Revised.pdf

PDF 63 KB Posted

Attached to
Dockside repairs to the NOAA Vessel Rainier
Solicitation number
AB-133M-15-RB-0003
Issued by

About this file

Attachment to Amendment 0002 Schedule B Price Schedule Revised 12/9/2014

View the file

Other files

File Type Posted
Amendment_0002.pdf PDF
RA-S4805-1 Rev 7 Sht1 T310.pdf PDF
RA-S4805-1 Rev 7 Sht2 T312.pdf PDF
DRAWING FA-S220-25.pdf PDF
RA-S4805-1 Rev 7 Sht1 SW Cooling T308.pdf PDF
NOAA MOC-Pacific Pier Information_2012.pdf PDF
ITEM 103 - RA-574-002.pdf PDF
ITEM 114 - PARTS LIST STEERING MOTOR.pdf PDF
ITEM 114 - DRAWING 808618-D.pdf PDF
ITEM 114 - E-1776 RFU75-NC A-5537.dwg DWG drawing
ITEM 108 - VESTDAVIT_MAINTENANCE_INSPECTIONS_MANUAL.pdf PDF
ITEM 114 - DRAWING 808612-D SHT 1.pdf PDF
ITEM 103 - RA-556-003.pdf PDF
IEEE_45-2002.pdf PDF
RA-S0900-2-2 Rev B Gen Plans.pdf PDF
ITEM 114 - DRAWING FA-S0201-1 REV B.pdf PDF
RAINIER DOCKSIDE SOW REV 5 DEC 04 2014.pdf PDF
ITEM 114 - B-3514 - Steering System Piping Diagram E-1776-1.pdf PDF
ITEM 114 - A-5903 —
Reference g MOC-631-2D.pdf PDF
ITEM 114 - DRAWING 808619-D-B SHT 1.pdf PDF
NOAA Std Spec S0100.pdf PDF
ITEM 103 - RA-571-001.pdf PDF
ITEM 114 - E-1776 Mode and Station Selector A-5553.dwg DWG drawing
ITEM 114 - DRAWING FA-S2201-01.pdf PDF
ITEM 104 - 750-0006 Mariner Gen 2 Brochure.pdf PDF
ITEM 103 - RA-185-001.pdf PDF
ITEM 114 - E-1776 Stand Wiring Sheet 1 Front Panel B-5566-1.dwg DWG drawing
ITEM 103 - 22349 PRELIMINARY SYSTEM OVERVIEW.pdf PDF
ITEM 114 - PHOTO 3.JPG JPG image
ITEM 114 - E-1776 Starter A-5538.dwg DWG drawing
ITEM 114 - A-5035 Rev.03 RFU 75 OAD-Layout1.pdf PDF
ITEM 114 - DRAWING 808620-D SHT 1.pdf PDF
ITEM 114 - E-1776 Stand Wiring Sheet 3 AP B-5566-3.dwg DWG drawing
ITEM 114 - DRAWING FA-S220-25.pdf PDF
ITEM 114 - SPECIFICATION AUTONAV MODEL 2-R4.0-45-CB2.docx DOCX document
ITEM 114 - E-1776 Stand Wiring Sheet 2 SCU B-5566-2.dwg DWG drawing
ITEM 103 - Item 305 - A-Frame Install.pdf PDF
NOAA Std Spec S4800-2 Piping Systems.pdf PDF
ITEM 114 - E-1776 Cabling B-6534.dwg DWG drawing
ITEM 114 - A-8410-R00-Layout1.pdf PDF
ITEM 114 - PHOTO 1.JPG JPG image
ITEM 114 - DRAWING 806619-D SHT 1.pdf PDF
RA-583-001 SurveyBt DavitFdnsStructMods.pdf PDF
ITEM 114 - E-1776 System Selector A-5539.dwg DWG drawing
ITEM 114 - G1062735.pdf PDF
ITEM 114 - E-1776 Wiring Sheet 3 B-5567-3.dwg DWG drawing
ITEM 114 - DRAWING FA-S2200-02 REV 2.pdf PDF
ITEM 114 - DRAWING 808621-D-B SHT 1.pdf PDF
ITEM 114 - E-1776 WFU 5 Pots A-5553.dwg DWG drawing
Show 40 more

Latest 50 of 84 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION B, PRICE SCHEDULE Continued (Revised 12/9/2014)

Item No. Supplies/Services Quantity Unit Unit Price Amount

Bid schedule , work to be accomplished at NOAA facility in Newport OR

CLASS “A” BASIC ITEMS

The Contractor shall furnish all necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform dockside repairs required by the Statement of Work, and in accordance with the following schedule of prices.

In order to be considered responsive, each bidder shall bid on all items for the quantities outlined in the schedule.

0001 WORK ITEM 101

GENERAL REQUIREMENTS

JB

0002 WORK ITEM 103

INSTALL & TEST A-FRAME

SYSTEM

0003 WORK ITEM 104

UPGRADE MARINE

SANITATION SYSTEM

0004 WORK ITEM 105

REPLACE EXSTG DUPLEX

STRAINERS WITH SIMPLEX

STRAINERS

0005 WORK ITEM 106

AC SYSTEM UPGRADE IN

PLOT ANNEX & ET SPACES

0006 WORK ITEM 107

ME EXHAUST LAGGING

0007 WORK ITEM 108

SURVEY LAUNCH DAVIT

MAINTENANCE & HYD

MOD

0008 WORK ITEM 109

ANNUAL BOILER SVC &

BOILER CIRC PUMPS

REPLACE

0009 WORK ITEM 110

INSTALLED BASE

EVALUATION – SHIPS

AUTOMATION

0010 WORK ITEM 111

AFT CRANE MAINTENANCE

& MODS

0011 WORK ITEM 112

FIRE DOOR MODIFICATION

0012 WORK ITEM 113

NEW FLOORING

0013 WORK ITEM 114

STEERING SYSTEM

RENEWAL

AB-133M-15-RB-0003 Page - 2

0014 WORK ITEM 115

EGEN TO CERC ROOM

ELECTRICAL CONNECT

0015 WORK ITEM 116

RECONNECT GALLEY

VENTS THRU E-06-102 TO

WEATHER

0016 WORK ITEM 117

NEW DEEP SINK IN

SCULLERY

TOTAL ALL CLASS A

ITEMS (CLINS 0001 – 0016)

AB-133M-15-RB-0003 Page - 3

Work to be accomplished at NOAA facility in Newport, OR

CLASS "B" ITEMS, ADDITIONAL

ITEM REQUIREMENTS (AIR)

0017 WORK ITEM 201

Additional Work Requirements:

(See schedule note 1,2 and 3 below)

(I). 2,000 man hours multiplied by the regular hour labor rate of $________ per man hour equals the estimated additional work requirements labor cost for regular hours of $______________.

(II). 300 man hours multiplied by the overtime labor rate of $________ per man hour equals the estimated additional work requirements labor cost for overtime hours of

(III). 200 man hours multiplied by the premium (Sunday / Holiday) labor rate of $__________ per man hour equals the estimated additional work requirements labor cost for premium hours of

(I)+(II)+(III) = Total labor cost of

Material/Subcontractor markup rate of _______% multiplied by $200,000 = Markup cost of

Total Additional Work Requirement Cost Total labor cost + Markup cost + $200,000 =

LS

AB-133M-15-RB-0003 Page - 4

0018 WORK ITEM 202

ZINC CHROMATE

REMOVAL (BARE ZiCr) Price Per each 10 SF ordered.

10 SF

0019 WORK ITEM 203

ZINC CHROMATE

REMOVAL (OVERCOATED

ZiCr) Price Per each 10 SF ordered.

SF

TOTAL ALL ITEMS CLASS B

(CLINS 0017 – 0019)

Work to be accomplished at NOAA facility in Newport, OR

CLASS "C"OPTIONAL

ITEM

0020 WORK ITEM 301 TEMPORARY BERTHING

AND HOTEL

ACCOMODATIONS

TOTAL ALL ITEMS CLASS C

(CLINS 0020)

TOTAL ALL ITEMS CLASS A +

CLASS B + CLASS C (CLINS

0001 – 0020)

AB-133M-15-RB-0003 Page - 5