NOAA Std Spec S0100.pdf

PDF 37 KB Posted

Attached to
Dockside repairs to the NOAA Vessel Rainier
Solicitation number
AB-133M-15-RB-0003
Issued by

About this file

Specifications

View the file

Other files

File Type Posted
Amendment_0002.pdf PDF
Schedule_B _Pricing_Schedule_Revised.pdf PDF
RA-S4805-1 Rev 7 Sht1 T310.pdf PDF
RA-S4805-1 Rev 7 Sht2 T312.pdf PDF
DRAWING FA-S220-25.pdf PDF
RA-S4805-1 Rev 7 Sht1 SW Cooling T308.pdf PDF
NOAA MOC-Pacific Pier Information_2012.pdf PDF
ITEM 103 - RA-574-002.pdf PDF
ITEM 114 - PARTS LIST STEERING MOTOR.pdf PDF
ITEM 114 - DRAWING 808618-D.pdf PDF
ITEM 114 - E-1776 RFU75-NC A-5537.dwg DWG drawing
ITEM 108 - VESTDAVIT_MAINTENANCE_INSPECTIONS_MANUAL.pdf PDF
ITEM 114 - DRAWING 808612-D SHT 1.pdf PDF
ITEM 103 - RA-556-003.pdf PDF
IEEE_45-2002.pdf PDF
RA-S0900-2-2 Rev B Gen Plans.pdf PDF
ITEM 114 - DRAWING FA-S0201-1 REV B.pdf PDF
RAINIER DOCKSIDE SOW REV 5 DEC 04 2014.pdf PDF
ITEM 114 - B-3514 - Steering System Piping Diagram E-1776-1.pdf PDF
ITEM 114 - A-5903 —
Reference g MOC-631-2D.pdf PDF
ITEM 114 - DRAWING 808619-D-B SHT 1.pdf PDF
ITEM 103 - RA-571-001.pdf PDF
ITEM 114 - E-1776 Mode and Station Selector A-5553.dwg DWG drawing
ITEM 114 - DRAWING FA-S2201-01.pdf PDF
ITEM 104 - 750-0006 Mariner Gen 2 Brochure.pdf PDF
ITEM 103 - RA-185-001.pdf PDF
ITEM 114 - E-1776 Stand Wiring Sheet 1 Front Panel B-5566-1.dwg DWG drawing
ITEM 103 - 22349 PRELIMINARY SYSTEM OVERVIEW.pdf PDF
ITEM 114 - PHOTO 3.JPG JPG image
ITEM 114 - E-1776 Starter A-5538.dwg DWG drawing
ITEM 114 - A-5035 Rev.03 RFU 75 OAD-Layout1.pdf PDF
ITEM 114 - DRAWING 808620-D SHT 1.pdf PDF
ITEM 114 - E-1776 Stand Wiring Sheet 3 AP B-5566-3.dwg DWG drawing
ITEM 114 - DRAWING FA-S220-25.pdf PDF
ITEM 114 - SPECIFICATION AUTONAV MODEL 2-R4.0-45-CB2.docx DOCX document
ITEM 114 - E-1776 Stand Wiring Sheet 2 SCU B-5566-2.dwg DWG drawing
ITEM 103 - Item 305 - A-Frame Install.pdf PDF
NOAA Std Spec S4800-2 Piping Systems.pdf PDF
ITEM 114 - E-1776 Cabling B-6534.dwg DWG drawing
ITEM 114 - A-8410-R00-Layout1.pdf PDF
ITEM 114 - PHOTO 1.JPG JPG image
ITEM 114 - DRAWING 806619-D SHT 1.pdf PDF
RA-583-001 SurveyBt DavitFdnsStructMods.pdf PDF
ITEM 114 - E-1776 System Selector A-5539.dwg DWG drawing
ITEM 114 - G1062735.pdf PDF
ITEM 114 - E-1776 Wiring Sheet 3 B-5567-3.dwg DWG drawing
ITEM 114 - DRAWING FA-S2200-02 REV 2.pdf PDF
ITEM 114 - DRAWING 808621-D-B SHT 1.pdf PDF
ITEM 114 - E-1776 WFU 5 Pots A-5553.dwg DWG drawing
Show 40 more

Latest 50 of 84 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revised August, 1994

NOAA Standard Specification - S0100

IMPLEMENTATION AND CONDUCT OF CHECK POINTS

1. CHECK POINT is a phrase inserted in a work item to establish a point in the sequence of accomplishment of work at which time the NOAA designated representative shall be notified to permit observation of a specific operation, test or inspection by the Government.

1.1 A contractor designated point of contact shall be present at operations, tests or inspections specified as CHECK

POINTs.

2. Notify the NOAA designated representative and the Ship's Repair Officer at least four hours, but not more than one working day, prior to commencing the specific requirements in the paragraph following a CHECK POINT. Notify the NOAA representative in writing at least 48 hours, but not more than 72 hours, for subcontractors whose plants are located outside a 50 mile radius from the NOAA representatives work sit. Document the date, time and identification of the NOAA representative notified.

2.1 When more than one unit, operation, test or inspection is involved, the CHECK POINT requirement applies to each.

2.2 When operations, tests or inspections follow a CHECK POINT are to be performed after normal day shift working hours, on a weekend, or a Federal holiday, the NOAA representative shall be notified at least four hours before the end of the last preceding normal day shift.

3. In the event the NOAA representative is not present at the scheduled CHECK POINT, the contractor is to proceed, provided the required advance notice has been furnished to the NOAA representative and the contractor has completed and documented his preceding tests and operations.

4. In the event that work cannot be completed to a CHECK POINT for any reason (such as late delivery of material or interfacing of related work items), and work progress would be delayed in waiting for total completion of work to the CHECK POINT, the NOAA representative, upon notification, may conduct a partial inspection of the work or item. Notify the NOAA representative when the incomplete work or item is completed and ready for the remainder of the operation, test or inspection.

Partial CHECK POINTs shall be documented as in Paragraph 2.

5. CHECK POINT requirements for operations, tests or inspections involving a subcontractor shall be invoked by the contractor's purchase order or otherwise described such that the requirements of Paragraph 2 are met.

Implementation and Conduct of Check Points S0100

5.1 A designated representative of the contractor shall witness or perform and sign for all tests and inspections within a 50 mile radius of the contractor's facility.

5.2 The contractor may delegate responsibility to subcontractors only for specific operations, tests or inspections performed at facilities located outside a 50 mile radius of the contractor's facility; however, CHECK POINT notification requirements shall not be delegated.

5.3 Submit one legible copy of the technical specification portion of those purchase orders which involve CHECK POINTs to the NOAA representative prior to the commencement of work by the subcontractor.

6. Submit a list, for NOAA reference, designating the contractor's authorized representatives who witness, perform, present and sign for CHECK POINTs, inspections and tests. The list shall indicate the type of tests, inspections or CHECK POINTs for which each representative is qualified.

7. Provide two legible copies of the check point inspection and/or test results. One copy shall be submitted to the NOAA representative and one to the Ship's Repair Officer within 24 hours of CHECK POINT completion. Reports shall identify the test / inspection conducted, acc/rej criteria and the contractor's authorized representative.

File details come from the government source that posted it. Updated .