PART I – SECTION C[Contract Number]
Statement of WorkDCE Modernization Kits

Airport Surveillance Radar – Model 9 (ASR-9) Data Communications Equipment (DCE) Modernization Kits Statement of Work

PART I – SECTION C[Contract Number]
Statement of WorkDCE Modernization Kits

Part I Section C: Statement of Work Contents

1Background1
2Scope1
3Period of Performance2
4Government-Furnished Material and Government-Furnished Information2
5Contractor Requirements2
5.1Program Management (CLIN 0001)2
5.2Local and Remote Kit First Article Units (CLIN 0002, CLIN 0003)3
5.2.1Acquisition of Parts for Local and Remote Kit First Article Units3
5.2.2Packaging and Labeling Instructions for Local and Remote Kits3
5.2.3Local and Remote Kit First Article Units3
5.3Production of Local and Remote Kits (CLIN 0004, CLIN 0005)4
5.3.1Acquisition of Parts for Local and Remote Kits4
5.3.2Local and Remote Kit Production Units4
5.4First Article Subrack Kits (CLIN 0006)4
5.4.1Acquisition of Parts for Subrack First Article Units4
5.4.2Subrack Assembly Kit Instructions and Quality Control Checklist4
5.4.3Packaging and Labeling Instructions for Subrack Kits4
5.4.4Subrack Kit First Article Units4
5.4.5First Article Inspection and Testing for Subrack Kits5
5.5Production of Subrack Kits (CLIN 0007)5
5.5.1Acquisition of Parts for Subrack Kits5
5.5.2Subrack Kit Production Units5
5.6First Article Local Wiring Kits and Remote Wiring Kits (CLIN 0008, CLIN 0009)5
5.6.1Acquisition of Cables and Connectors5
5.6.2Test Plan and Procedures for Wiring Kits5
5.6.3Wiring Kit First Article Units5
5.7Production of Local Wiring Kits and Remote Wiring Kits (CLIN 0010, CLIN 0011)6
5.7.1Acquisition of Cables and Connectors6
5.7.2Wiring Kit Production Units6
5.8Depot Spares Bulk Kit (CLIN 0012)6
5.8.1 Acquisition of Parts for Depot Spares Bulk Kit6
5.8.2 Packaging and Labeling Instructions for Depot Spares Bulk Kit6
5.8.3 Depot Spares Bulk Kit6
5.9Storage of Materials and Fabricated Components6
Airport Surveillance Radar – Model 9 (ASR-9)

Data Communications Equipment (DCE) Modernization Local and Remote Kits

Part I Section C: Statement of Work

C-ii Background The purpose of the ASR-9 is to enhance the safety of air travel through timely detection and reporting of aircraft position within 60 nautical miles of a radar location near an airport’s terminal approach and departure zones. Data from ASR-9 is provided to automation systems and used by air traffic controllers to provide positive indication of aircraft within terminal airspace (the airspace surrounding a major airport).

Each ASR-9 system has two distinct sites. The first, the local site, houses the radar equipment, including the antenna and transmitter. The second, the remote site, is located in the Terminal Radar Approach Control Facilities (TRACONs) and is used to distribute data to the end user. The ASR-9 system uses Racal-Milgo modems and an ANS 185 Switch to send surveillance, weather, and system control and monitoring data between the local radar site and the remote site. Failure of more than one modem will reduce radar performance, which could cause a full outage of primary radar, beacon, and weather data.

The modems and switch are obsolete and are anticipated to run out of stock within the next five years. The FAA is seeking a contractor to support a modernized replacement subsystem for the Racal-Milgo modems and ANS 185 Switch.

Scope The scope of this DCE Modernization effort consists of acquiring, assembling, and packing parts into the following kits:

a. Local Kit

b. Remote Kit

c. Subrack Kit

d. Local Wiring Kit

e. Remote Wiring Kit

f. Depot Spares Bulk Kit A “kit” is defined as an assembly consisting of multiple parts that, when grouped together, meet specific physical, functional and performance parameters. Each kit constitutes a portion of the overall DCE modernization configuration that will be installed at each ASR-9 site. The Local Kit and the Remote Kit consist of commercial-off-the-shelf (COTS), modified COTS, and custom parts. The Subrack Kit consists of COTS, modified COTS and custom parts that must be integrated into a Subrack. The Local Wiring Kit and Remote Wiring Kit consist of custom cables and connectors. The Depot Spares Bulk Kit consists of COTS, modified COTS and custom parts.

Specific tasks include:

a. Procuring parts

b. Receiving and storing Government-furnished material

c. Developing kitting instructions

d. Assembling kits

e. Packaging, labeling, and shipping kits to the FAA Logistics Center Period of Performance The period of performance is 24 months from the date of contract award.

Government-Furnished Material and Government-Furnished Information The Contractor will receive from the Government the materials listed in Attachment J-1, DCE Hardware Parts - GFM no later than 30 calendar days after contract award. The Government will pay the cost of shipping Government-furnished material (GFM) from the Government to the Contractor facility. The Contractor must provide the Government with a shipping destination for receipt of GFM. The Contractor must conduct a physical examination of the GFM to determine if it is free from defects prior to assembly of the Local Kit, Remote Kit, Subrack Kit, and Depot Spares Bulk Kit.

The Contractor must return all unused GFM to the Government upon completion of performance. The Government will pay the cost of shipping unused GFM from the Contractor facility to the Government.

The Contractor should refer to Section J of the Screening Information Request (SIR) for the complete listing of Government Furnished Information.

The Government will provide COTS drawings and manufacturer datasheets upon request after contact award.

Contractor Requirements Program Management (CLIN 0001) The Contractor must perform the following tasks at the Contractor facility in managing the DCE Modernization Contract:

a. The Contractor must designate a Program Manager (PM) who is responsible and accountable for the total effort as described in this statement of work.

b. The Contractor must develop and maintain a Government-approved Project Schedule (CDRL 001) to track the tasks and activities required to complete all contract line items and contract data requirements.

c. The Contractor must use methods and metrics for assessing the on-time completion of project milestones and deliverables including: identification and procurement of long lead time material/parts; estimated schedule for start and completion for first article units; and estimated schedule for start and completion of production of Local Kits, Remote Kits, Subrack Kits, Local Wiring Kits, Remote Wiring Kits, Depot Spares Bulk Kit, GFM delivery and inspection.

d. The Contractor must identify and avoid or mitigate the impact of cost, technical, and schedule risks.

e. The Contractor must submit a Project Status Report (CDRL 002) to the Contracting Officer’s Representative (COR) each month that includes the following information: the status of parts procurements and receipt; the status of the contract deliverables; progress toward the completion of meeting project milestones and deliverables as noted above; and descriptions of risks to or issues that have affected the successful and timely achievement of milestones and of strategies to prevent or mitigate adverse impacts on performance.

Local and Remote Kit First Article Units (CLIN 0002, CLIN 0003) Acquisition of Parts for Local and Remote Kit First Article Units The Contractor must procure the first article quantities of COTS, modified COTS, and custom parts listed in Attachment J-2, DCE Hardware Parts - Local Parts. The Contractor must procure the first article quantities of COTS, modified COTS, and custom parts listed in Attachment J-3, DCE Hardware Parts -Remote Parts. The Contractor must use Attachment J-6, Custom Parts Documentation (zip file), to fabricate the custom parts. The Contractor must notify the Government when the custom parts are ready for inspection.

Packaging and Labeling Instructions for Local and Remote Kits The Contractor must develop Packaging and Labeling Instructions for Local and Remote Kits (CDRL 003) to group the parts listed in Attachment J-2, DCE Hardware Parts -Local Parts and Attachment J-3, DCE Hardware Parts -Remote Parts in accordance with the instructions provided in Section D of the SIR.

Local and Remote Kit First Article Units The Contractor must produce the first article quantities specified in Section F.2 of the SIR for the Local Kits and Remote Kits in accordance with the Government-approved Packaging and Labeling Instructions for Local and Remote Kits. The Contractor must notify the Government when the first article units are ready for inspection.

Production of Local and Remote Kits (CLIN 0004, CLIN 0005) Acquisition of Parts for Local and Remote Kits The Contractor must procure the production quantities of COTS, modified COTS, and custom parts listed in Attachment J-2, DCE Hardware Parts -Local Parts. The Contractor must procure the production quantities of COTS, modified COTS, and custom parts listed in Attachment J-3, DCE Hardware Parts -Remote Parts. The Contractor must use Attachment J-6, Custom Parts Documentation (zip file), to fabricate the custom parts. The Contractor must notify the Government when the custom parts are ready for inspection.

Local and Remote Kit Production Units The Contractor must produce the production quantities specified in Section F.2 of the SIR for the Local Kits and Remote Kits in accordance with the Government-approved Packaging and Labeling Instructions for Local and Remote Kits. The Contractor must notify the Government when the production units are ready for inspection.

First Article Subrack Kits (CLIN 0006) Acquisition of Parts for Subrack First Article Units The Contractor must procure the first article quantities of COTS, modified COTS, and custom parts listed in Attachment J-4, DCE Hardware Parts - Subrack. The Contract must use Attachment J-6, Custom Parts Documentation (zip file) and Attachment J-7, Subrack Assembly Instructions to fabricate the custom parts. The Contractor must notify the Government when the custom parts are ready for inspection.

Subrack Assembly Kit Instructions and Quality Control Checklist The Contractor must develop a Subrack Assembly Quality Control Checklist (CDRL 004) based on Attachment J-7, Subrack Assembly Instructions.

Packaging and Labeling Instructions for Subrack Kits The Contractor must develop Packaging and Labeling Instructions for Subrack Kits (CDRL 005) in accordance with the instructions provided in Section D of the SIR and Attachment J-7, Subrack Assembly Instructions.

Subrack Kit First Article Units The Contractor must assemble the first article quantities specified in Section F.2 of the SIR for the Subrack Kits in accordance with Attachment J-7, Subrack Assembly Instructions. The Contractor must notify the Government when the Subrack Kits are ready for inspection. The Contractor may submit proposed changes to the Subrack Assembly Instructions, Attachment J-7, to the Government for consideration.

First Article Inspection and Testing for Subrack Kits The Quality Reliability Officer (QRO) will inspect the first article units of the Subrack Kits in accordance with the approved Subrack Assembly Quality Control Checklist, and Packaging and Labeling Instructions for Subrack Kits. Once the QRO has inspected the first article units, the Contractor must ship the first article units to the Government for functional testing. The Government will provide written notification to the Contractor if functional testing results in problem trouble reports (PTR). The Contractor must provide a Remedy Report (CDRL 006) to resolve the PTR.

Production of Subrack Kits (CLIN 0007) Acquisition of Parts for Subrack Kits The Contractor must procure the production quantities of COTS, modified COTS, and custom parts listed in Attachment J-4, DCE Hardware Parts - Subrack. The Contractor must use Attachment J-6, Custom Parts Documentation (zip file), and Attachment J-7, Subrack Assembly Instructions to fabricate the custom parts. The Contractor must notify the Government when the custom parts are ready for inspection.

Subrack Kit Production Units The Contractor must assemble the production quantities specified in Section F.2 of the SIR for the Subrack Kits in accordance with Attachment J-7, Subrack Assembly Instructions.

First Article Local Wiring Kits and Remote Wiring Kits (CLIN 0008, CLIN 0009) Acquisition of Cables and Connectors The Contractor must procure the quantities specified in Section F.2 of the SIR for the Local Wiring Kits and Remote Wiring Kits in accordance with Attachment J-8, Wiring Kit Manufacturing Specification.

Test Plan and Procedures for Wiring Kits The Contractor must develop a Test Plan and Procedures (CDRL 007) to ensure conformance with the requirements, quality, and packing in accordance with Attachment J-8, Wiring Kit Manufacturing Specification.

Wiring Kit First Article Units Upon Government approval of the Test Plan and Procedures, the Contractor must produce the first article quantities specified in Section F.2 of the SIR for the Local Wiring Kits and Remote Wiring Kits in accordance with Attachment J-8, Wiring Kit Manufacturing Specification and approved Test Plan and Procedures. The Contractor must notify the Government when the wiring kits are ready for inspection.

Production of Local Wiring Kits and Remote Wiring Kits (CLIN 0010, CLIN 0011) Acquisition of Cables and Connectors The Contractor must procure the production quantities specified in Section F.2 of the SIR for the Local Wiring Kits and Remote Wiring Kits in accordance with Attachment J-8, Wiring Kit Manufacturing Specification.

Wiring Kit Production Units The Contractor must produce the production quantities specified in Section F.2 of the SIR for the Local Wiring Kits and Remote Wiring Kits in accordance with Attachment J-8, Local Wiring Kit Manufacturing Specification and approved Test Plan and Procedures. The Contractor must notify the Government when the wiring kits are ready for inspection.

Depot Spares Bulk Kit (CLIN 0012)

5.8.1 Acquisition of Parts for Depot Spares Bulk Kit

The Contractor must procure the quantities of COTS, modified COTS, and custom parts listed in Attachment J-5, DCE Hardware Parts - Depot Spares Bulk Kit. The Contractor must use Attachment J-6, Custom Parts Documentation, to fabricate the custom parts. The Contractor must notify the Government when the custom parts are ready for inspection.

5.8.2 Packaging and Labeling Instructions for Depot Spares Bulk Kit The Contractor must develop Packaging and Labeling Instructions for Depot Spares Bulk Kits (CDRL 008) to group the parts listed in Attachment J-5, DCE Hardware Parts - Depot Spares Bulk Kit in accordance with the instructions provided in Section D of the SIR.

5.8.3 Depot Spares Bulk Kit

The Contractor must produce one depot spares bulk kit in accordance with the Government-approved Packaging and Labeling Instructions for Depot Spares Bulk Kits. The Contractor must notify the Government when the spares kits are ready for inspection.

Storage of Materials and Fabricated Components The Contractor must store all materials and fabricated components in a temperature and humidity controlled environment.