This Quality Assurance Surveillance Plan (QASP) is for CAD Vectorization Services by the U.S. Army Corps of Engineers Hydroelectric Design Center (USACE-HDC). The document outlines quality assurance procedures for two primary performance objectives: 1) vectorizing government-provided resource material (2D drawings), and 2) incorporating scanned redlines into vectorized drawings. The performance standards are stringent, allowing only 1 deficiency per 10 drawings, with deficiencies not to exceed 5% of a drawing's substantive content. The performance threshold is set at 100%, with all deficiencies requiring contractor correction prior to payment. The Contracting Officer's Representative (COR) will identify and communicate any deficiencies to the contractor for immediate resolution.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan (QASP) For

CAD Vectorization Services

INTRODUCTION

This Quality Assurance Surveillance Plan (QASP) has been developed to evaluate contractor actions while implementing the associated Performance Work Summary (PWS), titled CAD Vectorization Services. This plan outlines the procedures and guidelines the Government, USACE – Hydroelectric Design Center (HDC), will use in ensuring the required performance standards or services levels are achieved by the contractor.

This QASP provides a systematic method to evaluate the services required of the contractor and provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the Government pays only for the level of services received.

The contractor, and not the Government, is responsible for management and quality control actions to meet the terms of the contract. The role of the Government is quality assurance to ensure contract standards are achieved.

PERFORMANCE REQUIRES SUMMARY

The Performance Requirements Summary (PRS) in the following table determines if the contractor meets the performance standards of the contract, as well as provides guidelines for how and when surveillance will be performed. It ensures timeliness, effectiveness, and that the contractor is delivering the results specified in the contract.

Government contract quality assurance will be performed at such times and/or places as may be necessary to determine the services conform to contract requirements. The intent is to ensure that the Government receives the services for which it contracted.

The Government will only pay for services received. The following table lists the criteria that will be used to evaluate the contractor’s performance.

Quality Assurance Surveillance Plan Performance Objective PWS

Paragraph Allowed Number of Deficiencies

Vectorize by drafting government provided resource material (3.1) (2D)

8.1

1 every 10 drawings, not to exceed 5% of substantive content of drawing.

Incorporate scanned redlines in government provided resource material (3.1) to a vectorized drawing (2D)

8.3 1 every 10 drawings, not to exceed 5% of substantive content of drawing.

STANDARD

The performance threshold is 100%. All deficiencies shall be corrected by the contractor prior to payment.

PROCEDURES

If COR discovers deficiencies and/or receives complaints, the COR will pass them on to the Contractor for correction.