A4 Iargo Springs Section B - MANDATORY.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
GAOA HMF Historic Iargo Springs Stair and Boardwalk Renovation
Solicitation number
12445524R0003
Issued by

About this file

This document contains a schedule of items and description for the GAOA HMF Historic Iargo Springs Stair and Boardwalk Renovation federal contract opportunity. The project consists of removing and replacing two vault toilet buildings, an information kiosk, an upper observation deck, select areas of a lower boardwalk, and construction of new elevated boardwalk loops and pathways at the Iargo Springs Interpretive Site in Iosco County, Michigan. The period of performance is through September 27, 2024, with all clearing and tree removal to be completed by March 29, 2024. The schedule of items lists the work elements and specifies lump sum, linear feet, square feet, and cubic yard pay units. It also includes an add alternative for additional boardwalk and observation deck construction.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

IARGO SPRINGS BOARDWALK and STAIR IMPOVEMENTS
IOSCO COUNTY, MICHIGAN

SECTION B - SCHEDULE OF ITEMS

Item No.Reference No.DescriptionPay UnitQuanUnit PriceTotal Price
0001BASE ITEMS
0001AA15101MobilizationLPSM1
0001AB15201Construction Survey and StakingLPSM1
0001AC15703-1000; 15716Soil Erosion & Sedimentation Control, including quantity items of soil stabilization, stabilized construction access, dust control, maintenance, removal, etc.LPSM1
0001AD15705-0100Silt FenceLPSM1
0001AE15705-2000Floating Turbidity CurtainLNFT300
0001AF20203Clearing and GrubbingLPSM1
0001AG20301Removal of existing Staircase, Boardwalk, disposal Method ALPSM1
0001AH20302Removal of Kiosk, disposal Method ALPSM1
0001AJ20303Removal of Existing Platform & Wooden Retaining Wall, disposal Method ALPSM1
0001AK20304Removal of Existing Deck Boards & Rail, disposal Method ALPSM1
0001AL20305Removal of Existing Vault Toilets, disposal Method ALPSM1
0001AM20701-0100; 30102-0300Earthen Causeway PathLPSM1
0001AN21202Site GradingLPSM1
0001AP30106-0100; 50101-24004" Thick Concrete PavementLPSM1
0001AQ55702Structural Timber and Lumber, Treated, Railing SystemLPSM1
0001AR55703-2000Structural Timber and Lumber, Treated, DeckingLPSM1
0001AS55706-2100Structural Timber and Lumber, Treated, StairwayLPSM1
0001AT55706-2200Structural Timber and Lumber, Treated, BoardwalkLPSM1
0001AU55706-2300Boardwalk MaintenanceSQFT1000
0001AV58201Helical Pile Equipment MobilizationLPSM1
0001AW58201-2000Helical Pile InstallationLNFT2,625
0001AX60101Concrete, Sign Post EmbedmentCUYD4
0001AY20413; 62404Topsoil, Stockpiling/Furnishing, Placing to 4" depthLPSM1
0001AZ62901Rolled Erosion Control Product, Type 2BLPSM1
0001BA64603-0300Fixture, BenchEACH11
0001BB64603-0700Fixture, Picnic TableEACH1
0001BC64603-1000Fixture, Vault ToiletEACH2
0001BD64603-1200Fixture, Wayside ExhibitEACH8
0001BE64620-0600Remove and Replace, Trash ReceptacleEACH1
0001TOTAL BASE BID
LPSM = Lump Sum; LNFT = Linear feet; SQFT = Square Feet; CUYD = Cubic Yard
ADD ALTERNATIVE #1 - INSTALL ADDITIONAL BOARDWALK AND OBSERVATION DECK
Item No.Reference No.DescriptionPay UnitQuantityUnit PriceTotal Price
0002OPTION ITEM
0002AA15705-2000Floating Turbidity CurtainLNFT180
0002AB55706-2200Structural Timber and Lumber, Treated, BoardwalkLPSM1
0002AC58201-2000Helical Pile InstallationLNFT570
0002TOTAL OPTION
LPSM = Lump Sum; LNFT = Linear feet
0001 and 0002 TOTAL BASE BID and OPTION
NOTES:
1. This schedule of items sheet includes all major work elements. Minor additional work may also be necessary to complete this project. It shall be the responsibility of the contractor to identify all work elements and bid the project accordingly. If any missing elements or deviations are discovered, please bring it to the attention of the contracting officer prior to submitting solicitation response. Bids will be considered all inclusive for the work described and no extra payment will be awarded unless substantial differing site conditions are discovered.
2. All work quantities included in this schedule of items are contract quantities, subject to subsection 109.02(b)
3. Alternate (Option bid items) will only be awarded based on available funds. Contractor shall provide pricing for all Option items.

File details come from the government source that posted it. Updated .