This document contains an amendment to a solicitation for the Historic Iargo Springs Stair and Boardwalk Renovation project. The amendment extends the solicitation response due date to February 22, 2024 at 2:00 PM Eastern time. It also incorporates questions and answers from potential offerors. The project involves removing and replacing vault toilets and an information kiosk, as well as removing and replacing an upper observation deck, stairway, and sections of boardwalk. It also includes constructing new elevated boardwalk loops. All clearing and tree removal must be completed by March 29, 2024. The period of performance is from March 1, 2024 through September 27, 2024. The solicitation is issued by the USDA Forest Service.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12445524R0003 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
540B
OSCODA MI 48750-1595
5761 N SKEEL
HURON SHORES RANGER STATION
USDA FOREST SERVICE
ATLANTA GA 30309-2449
STE 876S
1720 PEACHTREE ST NW
USDA-FS CSA EAST 13
01/12/20240001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
01/12/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This amendment extends the solicitation due date to 2/22/2024 no later than 1400 Eastern time (2 p.m.).
Questions and answers as of 2/8/2024 are incorporated and attached. No other terms and conditions have been changed.
Period of Performance: 03/01/2024 to 09/27/2024
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
DEBRA K. BRINN
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
P a g e | 2
12445524R0003 Historic Iargo Springs Stair and Boardwalk Renovation
Questions and Answers February 8, 2024
1. Question:
Would the US Forest Service accept FRP (Fiber Reinforced Polymer) as an alternative in the Iargo Springs design and supply?
Answer: No. The Forest Service wants the materials as specified in the contract documents.
2. Question:
Is there any planned access for the bottom portion of the work? What was the previous access that was used to build the existing stairs and boardwalk system, and if there are any access requirements for this current project.
Answer: The Contractor can decide the best access alternative for the construction. The Forest Service has no pre-determined plan. Access from the river is an option. We have found documentation that a tramway was used to move material down the slope during the original construction. It was comprised of two steel rails with a cable driven by an electric motor. It was located on the old slide that is between the two main springs.
3. Question:
There is wood cribbing on top of helical foundations that would then support the stair structure, there would be potential cost savings to go full steel in lieu of the wood frame.
Answer: The Forest Service wants the wood posts in the locations as shown on the plan. Otherwise, use the boardwalk pier details.
4. Question:
We also noticed that there is a lot of debris in the water where the proposed new section of the boardwalk goes. Would this have to be removed by the contractor or will it be removed prior to the start of the contract?
Answer: It is presumed that the debris observed during the site visit occurred naturally. It is the Contractor's responsibility to clear the site as required to perform the work.
5. Question:
There is a section of the boardwalk that was broken by a falling tree. Would that be fixed prior to our work or is that something that would be added?
Answer: The recent damage to the boardwalk caused by a fallen tree will be repaired by the Forest Service. The previously identified damaged section in the solicitation documents is the only portion included in the Contract.
6. Question:
Will this project be awarded quick enough to be able to get the clearing completed by March 29?
P a g e | 3
Answer: The Forest Service intends to award the project as soon as possible. However, that may not be before March 29. The restriction in the specifications is due to the fungus associated with Oak Wilt. No oak trees may be cut between April 1 and July 15. The Forest Service is willing to work with the Contractor on a case-by-case basis regarding other clearing needs. Due to the demolition required and the location of the trees needing to be cleared, the Forest Service feels there is minimal impact, if any, to the ability to perform the contract around the cutting restrictions.
7. Question:
The completion date is listed as September 27th, is that firm or is there some flexibility on the completion date?
Answer: There is some flexibility on the completion date.
8. Question:
I'm going through the soil borings and can't find where they were taken on the plans. Do you have a map showing where they took those?
Answer: Pending
PENDING:
The 19% moisture content can only be achieved on the 2x material, anything larger would cause it to split prematurely and be rejected. The treatment method involving Naphthenate and Light Oil is not done in the state of Michigan, MCA .23 would be what can be quoted. Please clarify the Nominal vs Rough Sawn on the items that indicate both.
The plan notes indicate HDG fasteners and hardware, however some of the details indicate Stainless Steel hardware. The deck screws also indicate two different sizes and two different coatings, S.S or Coated. Could you provide clarification on which one is required.